Syrma SGS Technology Ltd stock page

Syrma SGS Technology Ltd: management guidance tracker

What management said it would deliver, when, where they said it — and what the reported numbers showed afterwards.

18 documents read Covering 29 Jan 2025 to 6 Nov 2026 Last checked against results: 20 Nov 2026
Delivery score
64%
Moderate · 24 settled promises
Promises tracked
186
117 direct · 25 indirect · 44 hints
✓ Achieved
14
+ 6 partly
✗ Missed
4
Still open
162
20 on track · 5 behind
Walked back
10
target cut or date pushed
How to read this page — 30 seconds
  1. Latest guidance is what management said at its most recent results call, presentation or interview, next to what it had said before. Raised or Lowered tells you which way expectations moved.
  2. Other open guidance lists earlier promises that have not fallen due, soonest first, with the latest reported figure.
  3. Track record compares each promise that has fallen due with what the company actually delivered. That is the best guide to how much weight to give the new guidance.
Direct: an explicit number for a periodIndirect: a number that follows from what was said (“double in 5 years” → ~14.9% a year)Hint: a direction only
✓ Achieved◐ Partly achieved✗ Missed↗ On track↘ Behind⏳ Pending — not due, or not yet measurable

Select any row for management's exact words, where they said it and how the target changed over time.

Latest guidance · 6 Nov 2026

From Concall transcript — Q2FY27 (6 Nov 2026). What management guided for most recently, against what it had said before.

ARC system OEE improvement Direct
OEE expected to improve 6-10% across all plants once the ARC system is mature.
Earlier
First time stated
Now
+600–1,000 bps
FY27
Change New
StatusPending

In management's words

“I think once the system is mature, we expect that the OEE should increase by anything between 6% to 10% across all plants”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 22 · 6 Nov 2026

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Once the ARC system is mature across plants.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

EBITDA margin Direct Walked back
FY27 EBITDA margin expected to close at 10-10.5%, against 9.9% in H1 FY27.
Earlier
10.5–11%
FY27 · 4 Aug 2026
Now
10–10.5%
FY27
Change Lowered
StatusOn track
So far: 9.92%

In management's words

“I expect the year to close at 10% to 10.5%.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 5 · 6 Nov 2026

How it was checked

Year to date (Q1FY27–Q2FY27) ebitda / operating margin is 9.9% against the guided 10–10.5% for FY27.

How this guidance changed

  1. 30 Jan 2026 — ~10% for FY27 First stated
    Concall transcript · On track (actual 9.92%)
  2. 4 Aug 2026 — 10.5–11% for FY27 Raised
    Concall transcript · Behind (actual 9.92%)
  3. 6 Nov 2026 — 10–10.5% for FY27 Lowered
    Concall transcript · On track (actual 9.92%)
EBITDA margin at full capacity (excluding PLI) · PCB Direct
PCB steady-state EBITDA margin at full capacity expected at 15-18%, excluding PLI incentives.
Earlier
First time stated
Now
15–18%
FY27
Change New
StatusPending

In management's words

“the EBITDA margin at a full capacity ramp-up should be within the range of 15% to 18%.”
Bijay Agrawal, CFO · Concall transcript — Q2FY27 (6 Nov 2026), p. 15 · 6 Nov 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Excludes PLI; lower in initial year at around 40% utilisation.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Elcome revenue · Elcome Direct
Elcome revenue expected at INR300-350 crore in FY27, reiterated from earlier communication.
Earlier
First time stated
Now
₹300 Cr – ₹350 Cr
FY27
Change New
StatusPending

In management's words

“Elcome, we had previously communicated we expect this year somewhere between INR300 crores to INR350 crores kind of revenue.”
Bijay Agrawal, CFO · Concall transcript — Q2FY27 (6 Nov 2026), p. 18 · 6 Nov 2026

What it implies in numbers

Reaching ₹300 Cr by FY27 from ₹4,819 Cr (FY26) needs about 93.8% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Exports · Exports Direct
FY27 exports expected to cross INR1,700 crore, up from INR1,200 crore in FY26.
Earlier
₹1,500 Cr – ₹1,600 Cr
FY27 · 4 Aug 2026
Now
≥ ₹1,700 Cr
FY27
Change Raised
StatusPending

In management's words

“We expect this year that exports should cross the INR1,700 crores mark.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 4 · 6 Nov 2026

How it was checked

Exports is not in the stored financial tables.

How this guidance changed

  1. 18 May 2026 — ≥ ₹1,500 Cr for FY27 First stated
    Concall transcript · On track (actual H1 FY27 export revenue of INR901 crore, about 60% of the INR1,500 crore guidance)
  2. 4 Aug 2026 — ₹1,500 Cr – ₹1,600 Cr for FY27 Raised
    Concall transcript · On track (actual export revenue of INR901 crore in H1 FY27, against the INR1,500-1,600 crore full-year range)
  3. 6 Nov 2026 — ≥ ₹1,700 Cr for FY27 Raised
    Concall transcript · Pending
Minority profit Direct
Minority profit for FY27 expected at INR30-45 crore, mainly from Elcome and SJML.
Earlier
First time stated
Now
₹30 Cr – ₹45 Cr
FY27
Change New
StatusOn track
So far: ₹230 Cr

In management's words

“And full year basis, this can be around -- in the range of INR30 crores to INR45 crores.”
Bijay Agrawal, CFO · Concall transcript — Q2FY27 (6 Nov 2026), p. 19 · 6 Nov 2026

How it was checked

₹230 Cr booked in Q1FY27–Q2FY27 — 767% of the ₹30 Cr guided for FY27 with 50% of the period gone (simple pro-rata, ignores seasonality).

How this guidance changed

Stated once in the documents read so far.

ODM revenue · ODM Direct
FY27 ODM revenue expected to cross INR1,000-1,100 crore, up from INR825 crore in FY26.
Earlier
First time stated
Now
₹1,000 Cr – ₹1,100 Cr
FY27
Change New
StatusPending

In management's words

“So in all probability and certainty, we'll be crossing the INR1,000 crores to INR1,100 crores mark in the ODM revenue.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 5 · 6 Nov 2026

What it implies in numbers

Reaching ₹1,000 Cr by FY27 from ₹4,819 Cr (FY26) needs about 79.2% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

PCB project capex (remaining FY27) · PCB Direct
PCB project capex of INR400-450 crore expected to be incurred by end FY27.
Earlier
~₹400 Cr
FY27 · 4 Aug 2026
Now
₹400 Cr – ₹450 Cr
FY27
Change Raised
StatusPending

In management's words

“So by the end of this year, we will be incurring about INR400 crores to INR450 crores kind of a capex.”
Bijay Agrawal, CFO · Concall transcript — Q2FY27 (6 Nov 2026), p. 15 · 6 Nov 2026

What it implies in numbers

Reaching ₹400 Cr by FY27 from ₹404 Cr (FY26) needs about 1.0% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

  1. 30 Jan 2026 — ₹300 Cr – ₹350 Cr for FY27 First stated
    Concall transcript · Pending
  2. 18 May 2026 — ~₹250 Cr for FY27 Lowered
    Concall transcript · Pending
  3. 4 Aug 2026 — ~₹400 Cr for FY27 Raised
    Concall transcript · On track (actual More than Rs 200 crore already spent, with another Rs 200 crore expected in the balance of FY27)
  4. 6 Nov 2026 — ₹400 Cr – ₹450 Cr for FY27 Raised
    Concall transcript · Pending
Revenue Direct
FY27 revenue expected to be around INR7,000 crore, touching or crossing that level.
Earlier
Management called this raised; the earlier figure was on a different basis or is not in the documents read
Now
~₹7,000 Cr
FY27
Change Raised
StatusOn track
So far: ₹3,579 Cr

In management's words

“which would translate into around INR7,000 crores of revenue.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 4 · 6 Nov 2026

What it implies in numbers

Reaching ₹7,000 Cr by FY27 from ₹4,819 Cr (FY26) needs about 45.3% growth a year.

How it was checked

₹3,579 Cr booked in Q1FY27–Q2FY27 — 51% of the ₹7,000 Cr guided for FY27 with 50% of the period gone (simple pro-rata, ignores seasonality).

Condition attached by management: Dependent on supply chain constraints.

How this guidance changed

Stated once in the documents read so far — management described it as “raised” against earlier guidance.

Revenue growth Direct
FY27 revenue growth guided at 40-45% on an annualised basis, revised up from 35-45%, conditional on supply chain conditions.
Earlier
≥ 35% growth
FY27 · 4 Aug 2026
Now
40–45% growth
FY27
Change Raised
StatusOn track
So far: 71.24% growth

In management's words

“we would be able to deliver 40% to 45% growth this year on an annualized basis, which would translate into around INR7,000 crores of revenue.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 4 · 6 Nov 2026

What it implies in numbers

40–45% growth on ₹4,819 Cr (FY26) implies about ₹6,747 Cr to ₹6,988 Cr for FY27.

How it was checked

Year to date (Q1FY27–Q2FY27) growth is 71.2% against the guided 40–45% for FY27.

Condition attached by management: Dependent on supply chain constraints easing; management said the number depends on supply chain.

How this guidance changed

  1. 30 Jan 2026 — ~30% growth for FY27 First stated
    Concall transcript · On track (actual 71.24% growth)
  2. 18 May 2026 — 30–35% growth for FY27 Raised
    Concall transcript · On track (actual 71.24% growth)
  3. 4 Aug 2026 — ≥ 35% growth for FY27 Raised
    Concall transcript · On track (actual 71.24% growth)
  4. 6 Nov 2026 — 40–45% growth for FY27 Raised
    Concall transcript · On track (actual 71.24% growth)
Syrma Johari (SJML) revenue · Syrma Johari MedTech Direct
SJML targeted at around INR300 crore full-year revenue in FY27, against INR210-220 crore last year.
Earlier
First time stated
Now
~₹300 Cr
FY27
Change New
StatusPending

In management's words

“Full year basis, again, we should be targeting somewhere around INR300 crores as against INR220 crores, INR210 crores of last year.”
Bijay Agrawal, CFO · Concall transcript — Q2FY27 (6 Nov 2026), p. 18 · 6 Nov 2026

What it implies in numbers

Reaching ₹300 Cr by FY27 from ₹4,819 Cr (FY26) needs about 93.8% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Syrma Johari revenue growth · Syrma Johari MedTech Direct
Syrma Johari expected to grow 45-50% in FY27.
Earlier
First time stated
Now
45–50% growth
FY27
Change New
StatusPending

In management's words

“We expect a 45% to 50% growth in Syrma Johari this year.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 18 · 6 Nov 2026

What it implies in numbers

45–50% growth on ₹4,819 Cr (FY26) implies about ₹6,988 Cr to ₹7,228 Cr for FY27.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

PCB project commercial production start · PCB Direct
PCB facility expected to start commercial production by April 2027.
Earlier
First time stated
Now
milestone
by Apr 2027
Change New
StatusPending

In management's words

“We continue to target a commercial production start of this facility by April '27.”
Bijay Agrawal, CFO · Concall transcript — Q2FY27 (6 Nov 2026), p. 7 · 6 Nov 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

EBITDA margin Direct
FY28 EBITDA margin expected at 10.5-11%, possibly slightly above 11%, as margin-accretive projects start.
Earlier
First time stated
Now
10.5–11%
FY28
Change New
StatusPending

In management's words

“I expect that we should be anything between 10.5% to 11% or maybe marginally better than 11%.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 5 · 6 Nov 2026

Condition attached by management: Depends on margin-accretive projects coming on stream and supply chain easing.

How this guidance changed

Stated once in the documents read so far.

Elemaster JV revenue · Elemaster JV Direct
Elemaster JV expected to deliver INR150-200 crore of revenue in FY28 once approvals are in place.
Earlier
First time stated
Now
₹150 Cr – ₹200 Cr
FY28
Change New
StatusPending

In management's words

“we expect it to deliver anything between INR150 crores to INR200 crores of revenue.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 18 · 6 Nov 2026

What it implies in numbers

Reaching ₹150 Cr by FY28 from ₹4,819 Cr (FY26) needs about 82.4% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Requires regulatory approvals and certifications (ISO, IRIS, RDSO) to be completed in FY27.

How this guidance changed

Stated once in the documents read so far.

Exports · Exports Direct
FY28 exports expected to be around INR2,000 crore if FY27 exports exceed INR1,700 crore.
Earlier
First time stated
Now
~₹2,000 Cr
FY28
Change New
StatusPending

In management's words

“next year, it should give us a INR2,000 crores in exports.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 4 · 6 Nov 2026

How it was checked

Exports is not in the stored financial tables.

Condition attached by management: Conditional on achieving the INR1,700 crore FY27 export target.

How this guidance changed

Stated once in the documents read so far.

Greenfield cum brownfield capex excluding PCB Direct
Capex excluding PCB estimated at INR100-150 crore per year for the next two years.
Earlier
First time stated
Now
₹100 Cr – ₹150 Cr
by FY28
Change New
StatusPending

In management's words

“Apart from PCB, the normal greenfield cum brownfield capex is what we estimate somewhere around INR100 crores to INR150 crores per year for next 2 years.”
Bijay Agrawal, CFO · Concall transcript — Q2FY27 (6 Nov 2026), p. 16 · 6 Nov 2026

What it implies in numbers

Reaching ₹100 Cr by FY28 from ₹404 Cr (FY26) needs about 50.2% decline a year.

How it was checked

Due with FY28 results; nothing reported since the statement yet.

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Kaga JV revenue · Kaga JV Direct
Kaga JV expected to contribute INR100-150 crore of revenue next year, with little revenue this year.
Earlier
First time stated
Now
₹100 Cr – ₹150 Cr
FY28
Change New
StatusPending

In management's words

“INR100 crores to INR150 crores of revenue coming in from the Kaga joint venture”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 23 · 6 Nov 2026

What it implies in numbers

Reaching ₹100 Cr by FY28 from ₹4,819 Cr (FY26) needs about 85.6% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Requires IATF 16949 approval after 2-3 months of production.

How this guidance changed

Stated once in the documents read so far.

PCB project total investment · PCB Direct
Total PCB project investment expected at INR800-900 crore, to be completed by March 2028.
Earlier
First time stated
Now
₹800 Cr – ₹900 Cr
by Mar 2028
Change New
StatusPending

In management's words

“So the total investment towards the project could be INR800 crores to INR900 crores.”
Bijay Agrawal, CFO · Concall transcript — Q2FY27 (6 Nov 2026), p. 15 · 6 Nov 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

PCB revenue · PCB Direct
PCB revenue expected at around INR250-300 crore in FY28 from about six to seven months of commercial production.
Earlier
First time stated
Now
₹250 Cr – ₹300 Cr
FY28
Change New
StatusPending

In management's words

“INR250 crores or INR300 crores.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 15 · 6 Nov 2026

What it implies in numbers

Reaching ₹250 Cr by FY28 from ₹4,819 Cr (FY26) needs about 77.2% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Commercial production for about 6-7 months in FY28.

How this guidance changed

Stated once in the documents read so far.

Revenue Direct
Management expects revenue to cross $1 billion in FY28.
Earlier
First time stated
Now
≥ $1 bn
FY28
Change New
StatusPending

In management's words

“we should be able to cross the $1 billion revenue mark in revenues.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 4 · 6 Nov 2026

What it implies in numbers

Reaching ₹1,000 Cr by FY28 from ₹4,819 Cr (FY26) needs about 54.4% decline a year.

How it was checked

Guided in US dollars while stored numbers are in rupees.

Condition attached by management: Depends on supply chain easing and fiscal discipline.

How this guidance changed

Stated once in the documents read so far.

Net working capital days Direct Walked back
Management expects annualised net working capital of about 60-65 days and does not see it below 60 days in the next six months.
Earlier
~60 days
by FY25 · 29 Jan 2025
Now
60–65 days
Not specified
Change Raised
StatusPending

In management's words

“it could be anything between 60 to 65 days.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 13 · 6 Nov 2026

How it was checked

No timeline was given; tracked against each new result.

Condition attached by management: Depends on supply chain strategic inventory.

How this guidance changed

  1. 29 Jan 2025 — ~60 days for by FY25 First stated
    Concall transcript · Achieved (actual 37 days)
  2. 6 Nov 2026 — 60–65 days for Not specified Raised
    Concall transcript · Pending
PCB revenue · PCB Indirect
PCB revenue expected at INR700-800 crore in FY29 on about INR800 crore of investment.
Earlier
First time stated
Now
₹700 Cr – ₹800 Cr
FY29
Change New
StatusPending

In management's words

“if we invest about INR800 crores of investment, we should expect about INR700 crores to INR800 crores in '28-'29 from this revenue.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 15 · 6 Nov 2026

What it implies in numbers

Reaching ₹700 Cr by FY29 from ₹4,819 Cr (FY26) needs about 47.4% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Revenue growth over the next 3-5 years Indirect
Management expects 30-35% revenue growth annually for the next 3-5 years, on a larger base.
Earlier
30–35% growth
FY29–FY31 · 4 Aug 2026
Now
30–35% growth
FY29–FY31
Change Repeated
StatusPending

In management's words

“we are very confident that we would be able to: a, grow at 30%, 35% for the next 3 to 5 years on a larger base, lower export base.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 5 · 6 Nov 2026

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

  1. 18 May 2026 — 30–35% growth for FY28–FY31 First stated
    Concall transcript · Pending
  2. 4 Aug 2026 — 30–35% growth for FY29–FY31 Repeated
    Concall transcript · Pending
  3. 6 Nov 2026 — 30–35% growth for FY29–FY31 Repeated
    Concall transcript · Pending
Camera module production start · Camera modules Hint
Camera module production for automotive expected to start around end of FY27.
Earlier
First time stated
Now
milestone
by FY27
Change New
StatusPending

In management's words

“we expect that by around end of this fiscal, we should be in a position to start production in that.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 11 · 6 Nov 2026

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Subject to facility construction and customer interest.

How this guidance changed

Stated once in the documents read so far.

Credible partner for ISM project Hint
Management hopes to have something concrete on the ISM scheme with a credible partner in the next six months.
Earlier
First time stated
Now
milestone
by FY27
Change New
StatusPending

In management's words

“hopefully, we should have something concrete in the next 6 months.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 11 · 6 Nov 2026

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Only if a credible partner is found.

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Industrial segment H2 growth · Industrial Hint
Industrial segment expected to grow faster in H2 FY27 than in H1.
Earlier
First time stated
Now
to improve
H2FY27
Change New
StatusPending

In management's words

“apart from automotive segment, we expect this segment should grow faster in the second half of this year.”
Bijay Agrawal, CFO · Concall transcript — Q2FY27 (6 Nov 2026), p. 6 · 6 Nov 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Overhead structure Hint
Management expects overhead costs to fall further with technology adoption.
Earlier
First time stated
Now
to come down
FY27
Change New
StatusPending

In management's words

“My overhead structure has come down, and I expect it to further come down with adoption of technology”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 24 · 6 Nov 2026

How it was checked

Other is not in the stored financial tables.

Condition attached by management: With adoption of technology.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Supply chain constraints Hint
Management expects supply chain constraints to persist for 5-6 months and ease around April-June 2027.
Earlier
First time stated
Now
to come down
FY27
Change New
StatusPending

In management's words

“the supply chain constraints will remain for the next 5 to 6 months and are expected to ease out only in April to June of '27.”
J.S. Gujral, Managing Director · Concall transcript — Q2FY27 (6 Nov 2026), p. 5 · 6 Nov 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Other open guidance · soonest due first

Earlier promises that have not fallen due yet, with the latest figure where one has been reported.

EBITDA in absolute numbers Direct
Management is on track for FY25 operating EBITDA of about 305-310 crore.
Target
₹305 Cr – ₹310 Cr
Due
FY25
result by 30 May 2025
Said
29 Jan 2025
Concall transcript
StatusAwaiting data

In management's words

“we are on track to achieve the guided EBITDA in percentage and absolute numbers, what we had said, of 305, 310, something of that rate for the current year.”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 4 · 29 Jan 2025

What it implies in numbers

Reaching ₹305 Cr by FY25 from ₹203 Cr (FY24) needs about 50.2% growth a year.

How it was checked

Guided on an adjusted basis, which the stored numbers do not carry.

How this guidance changed

Stated once in the documents read so far.

PLI benefit Direct
Management estimates FY25 PLI benefit at about 15-17 crore, net basis.
Target
₹15 Cr – ₹17 Cr
Due
FY25
result by 30 May 2025
Said
29 Jan 2025
Concall transcript
StatusAwaiting data

In management's words

“On the PLI, for the current year, we are estimating it should be around Rs. 15-17 crore.”
Bijay Agrawal, CFO · Concall transcript — Q3FY25 (Feb 2025), p. 17 · 29 Jan 2025

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Railways revenue · railways Direct
Management guided about 70 crore of railway revenue in FY25 and says it is on track.
Target
~₹70 Cr
Due
FY25
result by 30 May 2025
Said
29 Jan 2025
Concall transcript
StatusAwaiting data

In management's words

“we will be doing about 70 crores of revenue from the railways, and we are on track to achieve that revenue this year.”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 19 · 29 Jan 2025

What it implies in numbers

Reaching ₹70 Cr by FY25 from ₹3,154 Cr (FY24) needs about 97.8% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Weighted average asset turn Direct
Management expects asset turn to be around 6x in the current year.
Target
~6x
Due
FY25
result by 30 May 2025
Said
29 Jan 2025
Concall transcript
StatusAwaiting data

In management's words

“we are hoping we should be around somewhere around 6x of asset turn, and that is where we are staying this year.”
Bijay Agrawal, CFO · Concall transcript — Q3FY25 (Feb 2025), p. 14 · 29 Jan 2025

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Scale increase and Pune ramp-up

How this guidance changed

Stated once in the documents read so far.

MedTech business rebound · MedTech Hint Walked back
Management expects MedTech to bounce back in Q1 FY26.
Target
milestone
Due
Q1FY26
result by 14 Aug 2025
Said
29 Jan 2025
Concall transcript
StatusAwaiting data

In management's words

“we are very confident that in Q1 of next year, it will bounce back to whatever we had envisaged”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 4 · 29 Jan 2025

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.

EBITDA margins Hint
Management expects EBITDA margins to rise in FY26 alongside 30-35% growth.
Target
to improve
Due
FY26
result by 30 May 2026
Said
29 Jan 2025
Concall transcript
StatusAwaiting data

In management's words

“next year, we expect a growth of about 30%, 35%, with corresponding increase in the EBITDA margins.”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 4 · 29 Jan 2025

How it was checked

Guided on an adjusted basis, which the stored numbers do not carry.

Condition attached by management: Operational leverage kicks in with growth

How this guidance changed

Stated once in the documents read so far.

Railways revenue · railways Direct
Management targets railway revenue of 100 crore or more in FY26.
Target
≥ ₹100 Cr
Due
FY26
result by 30 May 2026
Said
29 Jan 2025
Concall transcript
StatusAwaiting data

In management's words

“anything between 100 or 100 plus crores in railways in FY '26 is what we are targeting.”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 19 · 29 Jan 2025

What it implies in numbers

Reaching ₹100 Cr by FY26 from ₹3,787 Cr (FY25) needs about 97.4% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Depends on RDSO product approvals

How this guidance changed

Stated once in the documents read so far.

MedTech revenue · MedTech Direct
Management says MedTech revenue in FY26 could be closer to 150-200 crore, though it is early.
Target
₹150 Cr – ₹200 Cr
Due
FY26
result by 30 May 2026
Said
29 Jan 2025
Concall transcript
StatusAwaiting data

In management's words

“we should be closer to maybe 160, 150, 170 or 200”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 15 · 29 Jan 2025

What it implies in numbers

Reaching ₹150 Cr by FY26 from ₹3,154 Cr (FY24) needs about 78.2% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Depends on product development pipeline and designing stage

How this guidance changed

Stated once in the documents read so far.

Industrial growth 30%-plus · Industrial Direct
Industrial segment targeted to grow about 30% or more in FY26.
Target
≥ 30% growth
Due
FY26
result by 30 May 2026
Said
14 May 2025
Concall transcript
StatusAwaiting data

In management's words

“30%-plus in the Industrial segment.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY25 (May 2025), p. 13 · 14 May 2025

What it implies in numbers

30% growth on ₹3,787 Cr (FY25) implies about ₹4,923 Cr for FY26.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

PLI incentive income Direct
PLI incentive income for FY26 expected at INR15-18 crore, about half of FY25's INR35 crore.
Target
₹15 Cr – ₹18 Cr
Due
FY26
result by 30 May 2026
Said
14 May 2025
Concall transcript
StatusAwaiting data

In management's words

“this income can be somewhere ranging between INR15 crores to INR18 crores for the next year also.”
Bijay Agrawal, CFO · Concall transcript — Q4FY25 (May 2025), p. 15 · 14 May 2025

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Depends on consumer and telecom consumer business volume next year.

How this guidance changed

Stated once in the documents read so far.

Europe demand back to 2024 levels · Europe Hint
Management expects European demand to recover to 2024 levels by end of calendar 2025.
Target
milestone
Due
by FY26
result by 30 May 2026
Said
14 May 2025
Concall transcript
StatusAwaiting data

In management's words

“we would see it back to what we were there in '24.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY25 (May 2025), p. 12 · 14 May 2025

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Based on slow rebound in order inflows; tariff uncertainty could change the outcome.

How this guidance changed

Stated once in the documents read so far.

Full-year CAPEX in the EMS business · EMS Direct
EMS business full-year FY26 capex is guided at below about Rs 100 crore.
Target
≤ ₹100 Cr
Due
FY26
result by 30 May 2026
Said
24 Jul 2025
Concall transcript
StatusAwaiting data

In management's words

“In the EMS, yes, the guidance remains same. Full-year CAPEX should be less than Rs. 100 odd crores for this year.”
Bijay Agrawal, CFO · Concall transcript — Q1FY26 (Jul 2025), p. 12 · 24 Jul 2025

What it implies in numbers

Reaching ₹100 Cr by FY26 from ₹193 Cr (FY25) needs about 48.2% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

EBITDA margin of PCB business · PCB Direct
PCB business is expected to earn EBITDA margin of 15-18% once the process is stabilised.
Target
15–18%
Due
FY26
result by 30 May 2026
Said
24 Jul 2025
Concall transcript
StatusAwaiting data

In management's words

“EBITDA margin 15%-18% once the whole process is stabilized”
J.S. Gujral, Managing Director · Concall transcript — Q1FY26 (Jul 2025), p. 8 · 24 Jul 2025

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Once process is stabilised and higher-layer PCBs are made.

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Laptop production ramp-up · IT Hint
Production ramp-up of localised laptop manufacturing is expected in FY26.
Target
milestone
Due
FY26
result by 30 May 2026
Said
3 Sep 2025
Annual report
StatusAwaiting data

In management's words

“The production ramp-up is expected in FY26, which will support the brand’s market access”
Annual report FY25, p. 31 · 3 Sep 2025

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

MedTech segment rebound · Healthcare and MedTech Hint
MedTech business expected to see a strong rebound in the coming years.
Target
to improve
Due
FY26
result by 30 May 2026
Said
3 Sep 2025
Annual report
StatusAwaiting data

In management's words

“These initiatives are expected to enable a strong rebound in this segment in the coming years”
Annual report FY25, p. 48 · 3 Sep 2025

How it was checked

Other is not in the stored financial tables.

Condition attached by management: recalibrated MedTech strategy and new Pune design centre

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

ESG training monitoring system Hint
Company plans to introduce a monitoring system for ESG training coverage in FY26.
Target
milestone
Due
FY26
result by 30 May 2026
Said
3 Sep 2025
Annual report
StatusAwaiting data

In management's words

“a monitoring system is planned for FY26.”
Annual report FY25, p. 112 · 3 Sep 2025

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Exports Direct
Export revenue guided at about INR1,000 crore for FY26; management says it is on track.
Target
~₹1,000 Cr
Due
FY26
result by 30 May 2026
Said
11 Nov 2025
Concall transcript · 2× since 3 Sep 2025
StatusAwaiting data

In management's words

“we have guided about INR1,000 crores of exports in the current year. We are on track to achieve that.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 10 · 11 Nov 2025

How it was checked

Exports is not in the stored financial tables.

How this guidance changed

  1. 3 Sep 2025 — ≥ ₹1,000 Cr for FY26 First stated
    Annual report · Achieved (actual Export revenue up 41% year on year in FY26 from an FY25 base of INR860 crore, implying above INR1,000 crore.)
  2. 11 Nov 2025 — ~₹1,000 Cr for FY26 Repeated
    Concall transcript · Awaiting data
Smart metering business revenue · smart metering Direct
Smart metering revenue targeted at near INR300 crore or more for FY26, with a new large customer adding in H2.
Target
≥ ₹300 Cr
Due
FY26
result by 30 May 2026
Said
11 Nov 2025
Concall transcript
StatusAwaiting data

In management's words

“we are targeting near about INR300 crores plus from the smart metering business.”
Bijay Agrawal, CFO · Concall transcript — Q2FY26 (Nov 2025), p. 12 · 11 Nov 2025

What it implies in numbers

Reaching ₹300 Cr by FY26 from ₹3,787 Cr (FY25) needs about 92.1% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

PLI income Direct
PLI income for FY26 expected in the range of INR20 to 25 crore on a net basis, spread evenly over four quarters.
Target
₹20 Cr – ₹25 Cr
Due
FY26
result by 30 May 2026
Said
11 Nov 2025
Concall transcript
StatusAwaiting data

In management's words

“For the financial year, generally, we have already guided it should be in the range of around INR20 crores to INR25 crores on net basis.”
Bijay Agrawal, CFO · Concall transcript — Q2FY26 (Nov 2025), p. 11 · 11 Nov 2025

How it was checked

Other is not in the stored financial tables.

Condition attached by management: management said it should be by and large evenly spread over the 4 quarters, not guaranteed as secular

How this guidance changed

Stated once in the documents read so far.

Consumer basket share of total sales · consumer Direct
Consumer share of total sales is expected to be about 32% for FY26.
Target
~32%
Due
FY26
result by 30 May 2026
Said
30 Jan 2026
Concall transcript · 3× since 14 May 2025
StatusAwaiting data

In management's words

“And even if I say for the whole year, it is at about 32% of the total sale.”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 8 · 30 Jan 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

  1. 14 May 2025 — ~30% for FY26 First stated
    Concall transcript · Awaiting data
  2. 24 Jul 2025 — ≤ 30% for FY26 Repeated
    Concall transcript · Awaiting data
  3. 30 Jan 2026 — ~32% for FY26 Raised
    Concall transcript · Awaiting data
Elcome revenue · Elcome Direct
Elcome is expected to deliver INR280-300 crore of revenue in FY26 as an entity.
Target
₹280 Cr – ₹300 Cr
Due
FY26
result by 30 May 2026
Said
30 Jan 2026
Concall transcript
StatusAwaiting data

In management's words

“Elcome should be delivering anything between INR280 crores to INR300 crores of revenue.”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 12 · 30 Jan 2026

What it implies in numbers

Reaching ₹280 Cr by FY26 from ₹3,787 Cr (FY25) needs about 92.6% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Elcome shown as entity; not fully consolidated

How this guidance changed

Stated once in the documents read so far.

Elcome revenue in Q4 · Elcome Direct
Management expects Elcome revenue of INR100-120 crore in Q4 FY26.
Target
₹100 Cr – ₹120 Cr
Due
Q4FY26
result by 30 May 2026
Said
30 Jan 2026
Concall transcript
StatusAwaiting data

In management's words

“And also, Elcome related, we are expecting INR100 crores to INR120 crores of revenue in the quarter 4.”
Bijay Agrawal, Chief Financial Officer · Concall transcript — Q3FY26 (Feb 2026), p. 9 · 30 Jan 2026

What it implies in numbers

Reaching ₹100 Cr by Q4FY26 from ₹1,264 Cr (Q3FY26) needs about 100.0% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Revenue from Elemaster JV · Elemaster JV Direct
Management does not expect any revenue from the Elemaster JV in Q4 FY26.
Target
≤ ₹0 Cr
Due
Q4FY26
result by 30 May 2026
Said
30 Jan 2026
Concall transcript
StatusAwaiting data

In management's words

“we are not expecting any revenue from Elemaster JV in the fourth quarter.”
Bijay Agrawal, Chief Financial Officer · Concall transcript — Q3FY26 (Feb 2026), p. 9 · 30 Jan 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Networking capital days reduction Direct
Net working capital days expected to fall by another 5 to 7 days over the next 2 to 3 quarters.
Target
5–7 days
Due
Q4FY26–Q1FY27
result by 14 Aug 2026
Said
11 Nov 2025
Concall transcript
StatusAwaiting data
So far: 68 days (Q4FY26)

In management's words

“we are confident of bringing down by another 5 to 7 days in next 2 to 3 quarters.”
Bijay Agrawal, CFO · Concall transcript — Q2FY26 (Nov 2025), p. 5 · 11 Nov 2025

How it was checked

Q1FY27 results were due by 2026-08-14 but are not in the stored data yet.

Assumptions made in reading this

  • 'next quarter' counted from Q2FY26, the quarter being reported at the time

How this guidance changed

Stated once in the documents read so far.

Net working capital days Direct Walked back
Management aims to cut net working capital days by 3-5 days over the next 2-3 quarters.
Target
3–5 days
Due
Q1FY27–Q2FY27
result by 14 Nov 2026
Said
30 Jan 2026
Concall transcript
StatusBehind
So far: 68 days (Q4FY26)

In management's words

“We again continue to focus on reduction of net working capital days by another maybe 3 to 5 days over the next 2 to 3 quarters.”
Bijay Agrawal, Chief Financial Officer · Concall transcript — Q3FY26 (Feb 2026), p. 6 · 30 Jan 2026

How it was checked

Q4FY26: 68 days against 5 days targeted by Q2FY27 — behind the pace required.

Assumptions made in reading this

  • 'next quarter' counted from Q3FY26, the quarter being reported at the time

How this guidance changed

Stated once in the documents read so far — management described it as “raised” against earlier guidance.

First SMT line operational · Elemaster JV (Bengaluru) Hint
The first SMT line at the Elemaster JV facility in Bengaluru is expected to be operational in Q2 FY2027.
Target
milestone
Due
Q2FY27
result by 14 Nov 2026
Said
7 Jun 2026
Investor presentation
StatusPending

In management's words

“Q2 FY2027 First SMT line operational”

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Green energy sourcing Direct
Implementation of the agreement to source 7.5 million units of green energy is expected from August 2026.
Target
milestone
Due
by Aug 2026
result by 14 Nov 2026
Said
7 Jun 2026
Investor presentation
StatusPending

In management's words

“Agreement signed to source 7.5 million units of green energy, with implementation expected from August 2026.”

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

GHG reduction target timing (SBTi-aligned near-term targets) Hint
Company intends to set near-term SBTi-aligned GHG targets by July 2026.
Target
milestone
Due
by Jul 2026
result by 14 Nov 2026
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“The Company aims to reduce GHG emissions intensity by 25% by FY30 and set near-term SBTi-aligned targets by July 2026.”
Annual report FY26, p. 72 · 3 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far — management described it as “repeated” against earlier guidance.

Green energy sourcing Direct
From August 2026 the company will source 7.5 million units of green energy each year.
Target
7,500,000 million units of green energy per year
Due
by Aug 2026
result by 14 Nov 2026
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“From August 2026, we will source 7.5 million units of green energy each year”
Sandeep Tandon, Executive Chairman · Annual report FY26, p. 16 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Civil works completion for the bare-board PCB facility · Bare-board PCB (Naidupeta, Andhra Pradesh) Hint
Civil works for the Naidupeta PCB facility are targeted for completion in the second quarter of FY27.
Target
milestone
Due
Q2FY27
result by 14 Nov 2026
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“with civil works targeted for completion in the second quarter and trial production between December 2026 and early 2027”
Annual report FY26, p. 43 · 3 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

PCB phase one capex · PCB Direct
Phase one of the PCB project is expected to cost INR360-400 crore, completed around December 2026 or in FY27.
Target
₹360 Cr – ₹400 Cr
Due
by Dec 2026
result by 14 Feb 2027
Said
30 Jan 2026
Concall transcript
StatusOn track
So far: More than INR200 crore already spent, with another INR200 crore expected in the balance of FY27

In management's words

“So, in the first phase, which would be completed by December '26 or '26, '27, we should be spending approximately INR360 crores to INR400 crores”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 11 · 30 Jan 2026

How it was checked

Spend of over INR200 crore plus another INR200 crore expected points to roughly the INR360-400 crore range. Completion by December 2026 is not yet confirmed. (judged from later company statements)

Evidence (6 Nov 2026): “We have already spent more than INR200 crores for the project and expecting to spend another INR200 crores in the balance of the year.” — Concall transcript — Q2FY27 (6 Nov 2026)

How this guidance changed

Stated once in the documents read so far.

Trial production at the bare-board PCB facility · Bare-board PCB (Naidupeta, Andhra Pradesh) Hint
Trial production at the Naidupeta PCB facility is targeted between December 2026 and early 2027.
Target
milestone
Due
by Dec 2026
result by 14 Feb 2027
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“with civil works targeted for completion in the second quarter and trial production between December 2026 and early 2027”
Annual report FY26, p. 43 · 3 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Targeted ROCE Direct
Management targets ROCE of 20%, reached gradually over the next two years.
Target
~20%
Due
by FY27
result by 30 May 2027
Said
29 Jan 2025
Concall transcript
StatusOn track
So far: 17% (FY26)

In management's words

“gradually it should then move towards our targeted ROCE of 20% over the next two years.”
Satendra Singh, CEO · Concall transcript — Q3FY25 (Feb 2025), p. 13 · 29 Jan 2025

How it was checked

FY26: 17% against 20% targeted by FY27 — ahead of the pace required.

Assumptions made in reading this

  • horizon counted from FY25 (statement made in its last quarter)

How this guidance changed

Stated once in the documents read so far.

Initial PCB capacity capex · PCB Direct
Initial PCB capacity of about a third of total, $30-35 million, expected to be spent over the next 12-18 months.
Target
$30 mn – $35 mn
Due
Q2FY27–Q4FY27
result by 30 May 2027
Said
24 Jul 2025
Concall transcript
StatusOn track
So far: more than INR200 crore spent on PCB project, with another INR200 crore expected in balance of FY27

In management's words

“I personally believe that in the next 12 to 18 months, when we start the plant with a certain capacity, initial capacity, should be about a third of the total, which should be about $30 million to $35 million.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY26 (Jul 2025), p. 18 · 24 Jul 2025

How it was checked

PCB spending is progressing with more expected in FY27, but the evidence does not isolate the initial $30-35 million capacity spend. (judged from later company statements)

Evidence (6 Nov 2026): “We have already spent more than INR200 crores for the project and expecting to spend another INR200 crores in the balance of the year.” — Concall transcript — Q2FY27 (6 Nov 2026)

How this guidance changed

Stated once in the documents read so far.

Commercial production of PCB plant · PCB Hint
Commercial production of the PCB plant is expected around Q4 FY27 or Q1 FY28.
Target
milestone
Due
Q4FY27
result by 30 May 2027
Said
24 Jul 2025
Concall transcript
StatusPending

In management's words

“The commercial production we expect it should start sometime towards Q4 of FY '27 or first quarter of FY '28.”
Bijay Agrawal, CFO · Concall transcript — Q1FY26 (Jul 2025), p. 9 · 24 Jul 2025

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Depends on PLI and state approvals.

How this guidance changed

Stated once in the documents read so far.

EMS capex excluding PCB, FY26-27 outlook · EMS Indirect
Excluding the PCB project, annual capex is expected at about Rs 80-100 crore over FY26-27.
Target
₹80 Cr – ₹100 Cr
Due
by FY27
result by 30 May 2027
Said
24 Jul 2025
Concall transcript
StatusPending

In management's words

“So, excluding this PCB, it should be around Rs. 80 crores to Rs. 100 crores.”
Bijay Agrawal, CFO · Concall transcript — Q1FY26 (Jul 2025), p. 18 · 24 Jul 2025

What it implies in numbers

Reaching ₹80 Cr by FY27 from ₹193 Cr (FY25) needs about 35.6% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Excludes PCB project capex.

How this guidance changed

Stated once in the documents read so far.

PCB trial production start · PCB Direct
PCB project trial production targeted around December 2026, which is Q4 FY27, with no change to the deadline.
Target
milestone
Due
by Q4FY27
result by 30 May 2027
Said
11 Nov 2025
Concall transcript
StatusOn track
So far: over INR200 crore spent on PCB project so far, with another INR200 crore expected in balance of FY27

In management's words

“we are confident that we would be able to stick to the deadline of starting trial production somewhere around December '26 or fourth quarter of '26-'27.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 7 · 11 Nov 2025

How it was checked

Spending is ongoing toward the project, but the evidence does not confirm trial production has started. The Q4FY27 deadline has not passed. (judged from later company statements)

Evidence (6 Nov 2026): “We have already spent more than INR200 crores for the project and expecting to spend another INR200 crores in the balance of the year.” — Concall transcript — Q2FY27 (6 Nov 2026)

Condition attached by management: government land registration and approvals

How this guidance changed

Stated once in the documents read so far.

Phase 2 PCB capex start (CCL and HDI) · PCB Hint
Phase 2 PCB capex, covering CCL and HDI, expected to start towards the end of FY27.
Target
milestone
Due
FY27
result by 30 May 2027
Said
11 Nov 2025
Concall transcript
StatusPending

In management's words

“that Phase 2 would start somewhere towards end of '27, which will be the CCL part, followed by the HDI part.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 16 · 11 Nov 2025

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: purely dependent upon demand

How this guidance changed

Stated once in the documents read so far.

Defence revenues kick-in · defence Hint
Defence revenues expected to start contributing in FY27.
Target
milestone
Due
FY27
result by 30 May 2027
Said
11 Nov 2025
Concall transcript
StatusPending

In management's words

“The defense and the PCB, the defense revenues will kick in, in '27-'28 -- '26-'27, sorry.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 10 · 11 Nov 2025

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

EBITDA margin next year Hint
Management expects next year to show an incremental jump in revenues and EBITDA margins.
Target
to improve
Due
FY27
result by 30 May 2027
Said
11 Nov 2025
Concall transcript
StatusPending

In management's words

“And next year would see an incremental jump in revenues and EBITDA margins.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 4 · 11 Nov 2025

How this guidance changed

Stated once in the documents read so far.

State capital incentive receipt · PCB Direct
State capital incentives for PCB spend up to March 2027 expected to be received in FY28.
Target
milestone
Due
by Mar 2027
result by 30 May 2027
Said
11 Nov 2025
Concall transcript
StatusPending

In management's words

“So I believe that the state capital incentives should come back to us in the financial year '27-'28 for the amount spent between now and March '27.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 16 · 11 Nov 2025

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: state capital incentive of 50% of amount spent

How this guidance changed

Stated once in the documents read so far.

Elcome revenue growth · Elcome Direct
Elcome is expected to grow 10-15% in FY27.
Target
10–15% growth
Due
FY27
result by 30 May 2027
Said
30 Jan 2026
Concall transcript
StatusPending

In management's words

“Next year, I think if we are doing about INR280 crores to INR300 crores this year in Elcome, next year, we should be taking it anything between a 10% to 15% growth rate”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 12 · 30 Jan 2026

What it implies in numbers

10–15% growth on ₹4,819 Cr (FY26) implies about ₹5,301 Cr to ₹5,542 Cr for FY27.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Margin profile · Elcome Direct
Management expects Elcome margins of above 20% to be sustained in coming years.
Target
≥ 20%
Due
FY27
result by 30 May 2027
Said
30 Jan 2026
Concall transcript
StatusPending

In management's words

“And the margins are upwards of 20%, 24%, 25%, which we believe we will be able to sustain in the coming years also.”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 12 · 30 Jan 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Absolute increase in EBITDA Indirect
Management says it will deliver a 30% absolute increase in EBITDA in FY27.
Target
≥ 30% growth
Due
FY27
result by 30 May 2027
Said
18 May 2026
Concall transcript · 2× since 30 Jan 2026
StatusOn track
So far: 75.74% growth (Q1FY27–Q2FY27)

In management's words

“But the more critical thing which we have guided is that we'll deliver a 30% absolute increase in EBITDA.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY26 (18 May 2026), p. 9 · 18 May 2026

What it implies in numbers

30% growth on ₹546 Cr (FY26) implies about ₹71 Cr for FY27.

How it was checked

Year to date (Q1FY27–Q2FY27) growth is 75.7% against the guided ≥ 30% for FY27.

How this guidance changed

  1. 30 Jan 2026 — ~30% growth for FY27 First stated
    Concall transcript · On track (actual 75.74% growth)
  2. 18 May 2026 — ≥ 30% growth for FY27 Repeated
    Concall transcript · On track (actual 75.74% growth)
Total EBITDA Direct
Management is targeting total EBITDA of INR700 crore in FY27.
Target
₹700 Cr
Due
FY27
result by 30 May 2027
Said
18 May 2026
Concall transcript · 2× since 30 Jan 2026
StatusOn track
So far: ₹355 Cr (Q1FY27–Q2FY27)

In management's words

“targeting INR700 crores of total EBITDA for the next year, FY '27.”
Bijay Agrawal, CFO · Concall transcript — Q4FY26 (18 May 2026), p. 6 · 18 May 2026

What it implies in numbers

Reaching ₹700 Cr by FY27 from ₹546 Cr (FY26) needs about 28.2% growth a year.

How it was checked

₹355 Cr booked in Q1FY27–Q2FY27 — 51% of the ₹700 Cr guided for FY27 with 50% of the period gone (simple pro-rata, ignores seasonality).

How this guidance changed

  1. 30 Jan 2026 — ~₹650 Cr for FY27 First stated
    Concall transcript · On track (actual ₹355 Cr)
  2. 18 May 2026 — ₹700 Cr for FY27 Raised
    Concall transcript · On track (actual ₹355 Cr)
Operating EBITDA margin Direct
FY27 operating EBITDA margin is guided at 10.5-11%, conservatively below FY26's roughly 12%.
Target
10.5–11%
Due
FY27
result by 30 May 2027
Said
18 May 2026
Concall transcript
StatusBehind
So far: Q1 FY27 operating EBITDA of Rs 162 crore on about Rs 1,604 crore revenue, roughly 10.1% margin

In management's words

“next year, we are guiding 10.5% to 11%, keeping this turmoil into account.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY26 (18 May 2026), p. 9 · 18 May 2026

How it was checked

Q1 FY27 operating EBITDA of Rs 162 crore on about Rs 1,604 crore revenue implies a margin near 10.1%, below the 10.5-11% guidance. This is one quarter and the full-year outcome is not yet known. (judged from later company statements)

Evidence (4 Aug 2026): “Our operating EBITDA increased by 69% year-on-year to Rs. 162 crores” — Concall transcript — Q1FY27 (4 Aug 2026)

Evidence (29 Jul 2026): “Total Revenue Rs 16,037 million ▲ 67.1% YoY” — Press release — Q1FY27

Condition attached by management: Keeping the current raw material and geopolitical turmoil into account; may be revised upward if the situation stabilises.

How this guidance changed

Stated once in the documents read so far — management described it as “raised” against earlier guidance.

MedTech business revenue · health care (MedTech) Direct
MedTech (health care) revenue is expected to cross INR500 crore in FY27.
Target
≥ ₹500 Cr
Due
FY27
result by 30 May 2027
Said
18 May 2026
Concall transcript
StatusPending

In management's words

“next year, my MedTech business should cross the INR500 crores mark.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY26 (18 May 2026), p. 10 · 18 May 2026

What it implies in numbers

Reaching ₹500 Cr by FY27 from ₹4,819 Cr (FY26) needs about 89.6% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

EBITDA, operating cash flow and revenue growth Hint
Management is confident of exceeding or sustaining FY26 performance on EBITDA, operating cash flow and revenue growth.
Target
to hold or improve
Due
FY27
result by 30 May 2027
Said
18 May 2026
Concall transcript
StatusPending

In management's words

“we are very confident that on the 3 critical parameters which we measure ourselves against, primarily the EBITDA, operating cash flow and the revenue growth, on all these 3, we would be able to exceed the performance of this year or sustain the performance of this year.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY26 (18 May 2026), p. 4 · 18 May 2026

How this guidance changed

Stated once in the documents read so far.

Second-half revenue versus first half Hint
Management expects H2 FY27 revenue and profit to be stronger than H1, based on history and the current run-rate.
Target
to improve
Due
H2FY27
result by 30 May 2027
Said
18 May 2026
Concall transcript
StatusPending

In management's words

“historically, the second half is much better than the first half, we are very confident of delivering the figures”
J.S. Gujral, Managing Director · Concall transcript — Q4FY26 (18 May 2026), p. 11 · 18 May 2026

How this guidance changed

Stated once in the documents read so far.

ODM revenue growth · ODM Indirect
ODM revenue is expected to grow about 30%, adding roughly INR250 crore in FY27.
Target
~30% growth
Due
FY27
result by 30 May 2027
Said
18 May 2026
Concall transcript
StatusOn track
So far: H1 FY27 ODM revenue of INR591 crore, up 117% year-on-year, against a roughly INR1,070 crore FY27 target

In management's words

“A 30% growth on INR825 crores is we have to grow the ODM business by another INR250 crores next year in '26-'27.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY26 (18 May 2026), p. 13 · 18 May 2026

What it implies in numbers

30% growth on ₹4,819 Cr (FY26) implies about ₹6,265 Cr for FY27.

How it was checked

H1 FY27 ODM revenue of INR591 crore is about 55% of the roughly INR1,070 crore needed for 30% growth on INR825 crore. The FY27 deadline has not passed. (judged from later company statements)

Evidence (6 Nov 2026): “Our ODM revenue for the quarter is INR322 crores and for H1 it is INR591 crores registering a year-on-year growth of 117% for H1.” — Concall transcript — Q2FY27 (6 Nov 2026)

Evidence (3 Aug 2026): “ODM revenue rose 80% to H825 crore” — Annual report FY26

Condition attached by management: Endeavour to sustain ODM share at around 17% of revenue.

How this guidance changed

Stated once in the documents read so far.

Consumer revenue growth · consumer Indirect
Consumer revenue is cautiously expected to grow 8-10% in FY27, to about INR1,600 crore.
Target
8–10% growth
Due
FY27
result by 30 May 2027
Said
18 May 2026
Concall transcript
StatusPending

In management's words

“This year it's about INR1,452 crores and 8%, 10% growth, it should be about INR1,600 crores”
J.S. Gujral, Managing Director · Concall transcript — Q4FY26 (18 May 2026), p. 10 · 18 May 2026

What it implies in numbers

8–10% growth on ₹4,819 Cr (FY26) implies about ₹5,205 Cr to ₹5,301 Cr for FY27.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

IT and railways growth · IT and railways Direct
IT and railways is expected to keep growing at 30-40% a year over the coming years, after the current very high growth fades.
Target
30–40% growth
Due
FY27
result by 30 May 2027
Said
18 May 2026
Concall transcript
StatusPending

In management's words

“but it will continue to deliver healthy 30%, 40% growth rates over the coming years.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY26 (18 May 2026), p. 9 · 18 May 2026

What it implies in numbers

30–40% growth on ₹4,819 Cr (FY26) implies about ₹6,265 Cr to ₹6,747 Cr for FY27.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

2nd SMT line · Elemaster JV (Bengaluru) Direct
A second SMT line at the Elemaster JV facility is planned for FY27.
Target
milestone
Due
FY27
result by 30 May 2027
Said
7 Jun 2026
Investor presentation
StatusPending

In management's words

“2nd line in FY'27”

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Product bouquet for defence · Defence and maritime (Elcome) Hint
Management intends to significantly increase the range of defence electronics offerings at Elcome.
Target
to improve
Due
FY27
result by 30 May 2027
Said
7 Jun 2026
Investor presentation
StatusPending

In management's words

“we intend to increase the bouquet of offerings significantly”
J.S. Gujral, MD · Investor presentation — Q4FY26 (7 Jun 2026), p. 18 · 7 Jun 2026

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Acquire & consolidate defense platforms · Defence and maritime Hint
A future plan is to acquire and consolidate defence platforms.
Target
to improve
Due
FY27
result by 30 May 2027
Said
7 Jun 2026
Investor presentation
StatusPending

In management's words

“Acquire & consolidate defense platforms”

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

FY27 aspirations on growth Hint
Management remains firmly committed to its FY27 aspirations on growth, without giving a numeric target.
Target
to improve
Due
FY27
result by 30 May 2027
Said
29 Jul 2026
Press release
StatusPending

In management's words

“We remain firmly committed to our FY27 aspirations on growth.”
Jasbir Singh Gujral, Managing Director · Press release — Q1FY27, p. 2 · 29 Jul 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Exports ... will keep expanding their share Hint
Exports will keep expanding their share of revenue.
Target
to improve
Due
FY27
result by 30 May 2027
Said
3 Aug 2026
Annual report · 2× since 7 Jun 2026
StatusOn track
So far: H1FY27 exports about 25% of revenue (INR901 cr of INR3,603 cr), up from roughly 24% a year earlier; ODM about 16% of H1 revenue, up from roughly 13%

In management's words

“Exports and higher-margin ODM will keep expanding their share”
Jasbir Singh Gujral, Managing Director · Annual report FY26, p. 17 · 3 Aug 2026

How it was checked

Both exports and ODM grew faster than total revenue in H1FY27 year-on-year, so their revenue shares rose. The FY27 deadline has not yet passed. (judged from later company statements)

Evidence (6 Nov 2026): “our export revenue increased by 91% year-on-year to approximately INR514 crores for the quarter and INR901 crores for H1 registering a growth of 80% year-on-year for H1.” — Concall transcript — Q2FY27 (6 Nov 2026)

Evidence (6 Nov 2026): “Our ODM revenue for the quarter is INR322 crores and for H1 it is INR591 crores registering a year-on-year growth of 117% for H1.” — Concall transcript — Q2FY27 (6 Nov 2026)

Evidence (6 Nov 2026): “Our consolidated total revenue for H1 '27 is INR3,603 crores representing a growth of 71% year-on-year.” — Concall transcript — Q2FY27 (6 Nov 2026)

Condition attached by management: Allowing for a volatile global input-cost environment

How this guidance changed

  1. 7 Jun 2026 — to improve for FY27 First stated
    Investor presentation · On track (actual exports grew about 61% in Q1 FY27 and 80% in H1 FY27)
  2. 3 Aug 2026 — to improve for FY27 Repeated
    Annual report · On track (actual H1FY27 exports about 25% of revenue (INR901 cr of INR3,603 cr), up from roughly 24% a year earlier; ODM about 16% of H1 revenue, up from roughly 13%)
Captive solar power supply to Chennai plants · Chennai plants 1, 2 and 3 Hint
Supply of captive solar power to Chennai plants is expected to start in the next financial year.
Target
milestone
Due
FY27
result by 30 May 2027
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“the supply of captive solar power is expected to commence from the next financial year, further increasing the share of renewable energy in the Company's energy mix.”
Annual report FY26, p. 54 · 3 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Steady expansion of EBITDA Hint
Management expects steady expansion of EBITDA in FY27.
Target
to improve
Due
FY27
result by 30 May 2027
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“We hold ourselves to three cornerstones: consistent top-line growth, steady expansion of EBITDA, and positive cash generation and enter the year confident of delivering on each.”
Sandeep Tandon, Executive Chairman · Annual report FY26, p. 16 · 3 Aug 2026

How this guidance changed

Stated once in the documents read so far.

Higher-margin ODM share · ODM Hint
Higher-margin ODM work will keep expanding its share of revenue.
Target
to improve
Due
FY27
result by 30 May 2027
Said
3 Aug 2026
Annual report
StatusOn track
So far: ODM about 16% of H1FY27 revenue (INR591 cr of INR3,603 cr), up 117% YoY, from roughly 13% a year earlier

In management's words

“Exports and higher-margin ODM will keep expanding their share”
Jasbir Singh Gujral, Managing Director · Annual report FY26, p. 17 · 3 Aug 2026

How it was checked

ODM revenue grew 117% against 71% total growth, so its share of revenue rose. The FY27 deadline has not yet passed. (judged from later company statements)

Evidence (6 Nov 2026): “Our ODM revenue for the quarter is INR322 crores and for H1 it is INR591 crores registering a year-on-year growth of 117% for H1.” — Concall transcript — Q2FY27 (6 Nov 2026)

Evidence (6 Nov 2026): “Our consolidated total revenue for H1 '27 is INR3,603 crores representing a growth of 71% year-on-year.” — Concall transcript — Q2FY27 (6 Nov 2026)

Condition attached by management: Allowing for a volatile global input-cost environment

How this guidance changed

Stated once in the documents read so far.

Full-year contributions from Naval and Maritime Electronics and the Elemaster platform · Naval and Maritime Electronics; Elemaster JV Hint
The Naval and Maritime Electronics vertical and the Elemaster platform will begin full-year contributions in FY27.
Target
milestone
Due
FY27
result by 30 May 2027
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“our Naval and Maritime Electronics vertical and the Elemaster platform will begin full-year contributions”
Jasbir Singh Gujral, Managing Director · Annual report FY26, p. 17 · 3 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Allowing for a volatile global input-cost environment

How this guidance changed

Stated once in the documents read so far.

PCB project moves from construction to commissioning · Bare-board PCB Hint
The PCB project is expected to move from construction to commissioning in the coming year.
Target
milestone
Due
FY27
result by 30 May 2027
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“our PCB project will move from construction to commissioning”
Jasbir Singh Gujral, Managing Director · Annual report FY26, p. 17 · 3 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Allowing for a volatile global input-cost environment

How this guidance changed

Stated once in the documents read so far.

Profitability baseline reset from the PCB project · Bare-board PCB Hint
The PCB project has the potential, over time, to reset the company's profitability baseline.
Target
to improve
Due
FY27
result by 30 May 2027
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“with the potential, over time, to reset the profitability baseline of your Company”
Jasbir Singh Gujral, Managing Director · Annual report FY26, p. 17 · 3 Aug 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

EcoVadis rating Hint
Management is working towards an EcoVadis Platinum rating from its current Gold rating.
Target
to improve
Due
FY27
result by 30 May 2027
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“with Platinum the level we now work towards”
Sandeep Tandon, Executive Chairman · Annual report FY26, p. 16 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Revenue and EBITDA versus guidance Hint
Management expects FY27 revenue and EBITDA to exceed the prior guidance, based on Q1 performance.
Target
to improve
Due
FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript · 2× since 11 Nov 2025
StatusPending

In management's words

“So, that is the statement we made. We should exceed that guidance based on the 1st Quarter performance.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY27 (4 Aug 2026), p. 12 · 4 Aug 2026

Condition attached by management: Supply chain constraints not worsening

How this guidance changed

  1. 11 Nov 2025 — to improve for FY27 First stated
    Concall transcript · Pending
  2. 4 Aug 2026 — to improve for FY27 Repeated
    Concall transcript · Pending
Export growth for the current year · exports Direct
Management expects FY27 export growth of around 30% to 40%.
Target
30–40% growth
Due
FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript · 3× since 30 Jan 2026
StatusOn track
So far: exports up 80% year-on-year in H1 FY27, above the 30-40% expectation

In management's words

“So, I expect that this year, we should grow our export by around 30% to 40%.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY27 (4 Aug 2026), p. 17 · 4 Aug 2026

What it implies in numbers

30–40% growth on 1,200 (FY26) implies about 1,560 to 1,680 for FY27.

How it was checked

Deadline FY27 not passed. H1 export growth of 80% already exceeds the 30-40% expectation, though full-year outcome is not settled. (judged from later company statements)

Evidence (6 Nov 2026): “our export revenue increased by 91% year-on-year to approximately INR514 crores for the quarter and INR901 crores for H1 registering a growth of 80% year-on-year for H1.” — Concall transcript — Q2FY27 (6 Nov 2026)

Condition attached by management: Geopolitical situation settling

How this guidance changed

  1. 30 Jan 2026 — 25–30% growth for FY27 First stated
    Concall transcript · On track (actual Export revenue up 80% year-on-year in H1 FY27, ahead of the 25-30% FY27 growth target)
  2. 18 May 2026 — 25–30% growth for FY27 Repeated
    Concall transcript · On track (actual exports up 80% year-on-year in H1 FY27, above the 25-30% target range)
  3. 4 Aug 2026 — 30–40% growth for FY27 Raised
    Concall transcript · On track (actual exports up 80% year-on-year in H1 FY27, above the 30-40% expectation)
Capex excluding PCB for the full year Direct
Management expects FY27 capex excluding the PCB project of Rs 100 crore to Rs 150 crore.
Target
₹100 Cr – ₹150 Cr
Due
FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript · 2× since 18 May 2026
StatusPending

In management's words

“So, ex of PCB, CAPEX is what we are seeing around Rs. 100 crore to Rs. 150 crore for the full year”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 15 · 4 Aug 2026

What it implies in numbers

Reaching ₹100 Cr by FY27 from ₹404 Cr (FY26) needs about 75.2% decline a year.

Condition attached by management: Excludes PCB project

How this guidance changed

  1. 18 May 2026 — ₹100 Cr – ₹150 Cr for FY27 First stated
    Concall transcript · Pending
  2. 4 Aug 2026 — ₹100 Cr – ₹150 Cr for FY27 Repeated
    Concall transcript · Pending
Consumer business share of total revenue · consumer Direct
Management expects consumer business to be around 30% of total revenue on an annualised basis, with quarterly variation.
Target
~30%
Due
FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“But on an annualized basis, we still think that our consumer business would be around 30% of the total revenue.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY27 (4 Aug 2026), p. 10 · 4 Aug 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Quarterly aberrations expected

How this guidance changed

Stated once in the documents read so far.

PCB project power-on of equipment · PCB Indirect
Management expects to power on PCB phase-one equipment in January to March 2027, followed by sample production.
Target
milestone
Due
Q4FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“we are on schedule to power on the equipments in the quarter of January, March, and take out samples and then the process of approval from the client starts.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY27 (4 Aug 2026), p. 5 · 4 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Equipment delivery from October onwards

How this guidance changed

Stated once in the documents read so far.

MedTech subsidiary business growth · MedTech Direct
Management expects the MedTech subsidiary to grow almost 50% this year from a base of about Rs 210 crore.
Target
~50% growth
Due
FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“And this year we are expecting the business should be growing almost 50% because the base is lower here.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 12 · 4 Aug 2026

What it implies in numbers

50% growth on 210 (FY26) implies about 315 for FY27.

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Healthcare (incl. MedTech) share of total business · healthcare Direct
Management has guided healthcare including MedTech at about 7% to 8% of total business for FY27.
Target
7–8%
Due
FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“And that is how we have been guiding that there should be approximately 7%-8% of our total overall business for this year.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 12 · 4 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Inventory held as strategic asset Hint
Management will keep elevated inventory as a strategic asset for the next quarter or two, not as working capital to be cut.
Target
to hold or improve
Due
FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“We have also taken a cautious call that we will not treat inventory as a working capital, at least for the next quarter or two.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY27 (4 Aug 2026), p. 5 · 4 Aug 2026

Condition attached by management: Until supply chain normalises

How this guidance changed

Stated once in the documents read so far.

Defense portfolio growth rate · defense Direct
Management is very confident the defense portfolio will keep growing at around 30% to 35%.
Target
30–35% growth
Due
FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“We are very confident that going forward, this sector, defense portfolio, would continue to give 30%, 35%, growth rate.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY27 (4 Aug 2026), p. 25 · 4 Aug 2026

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

EBITDA margin for PCB at full ramp-up excluding PLI · PCB Direct
Management expects PCB EBITDA margin of 15% to 18% at full ramp-up, excluding PLI incentives.
Target
15–18%
Due
FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“Normally, with the full, complete ramp up volume, one can expect ex of any PLI incentive, the EBITDA is in the range of 15% to 18%.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 11 · 4 Aug 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Full ramp-up volume; excludes PLI incentive

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

EBITDA margin for PCB in first year · PCB Indirect
Management expects PCB EBITDA margin around 10% or lower in the first year due to low initial utilisation.
Target
≤ 10%
Due
by FY27
result by 30 May 2027
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“But initially, when the capacity utilizations are lower, EBITDAs can also be lower, around 10% or maybe less than 10% also.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 11 · 4 Aug 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Low capacity utilisation in year one

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

ODM sales as share of sales (short term) · ODM Direct
Management sets a short-term target of 17% to 19% for ODM as a share of sales.
Target
17–19%
Due
by Q1FY28
result by 14 Aug 2027
Said
4 Aug 2026
Concall transcript
StatusBehind
So far: ODM about 16% of H1 FY27 revenue, below the 17-19% short-term target

In management's words

“Short term, 17% to 18% to 19% will be the target.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY27 (4 Aug 2026), p. 18 · 4 Aug 2026

How it was checked

Deadline Q1FY28 not passed, but ODM share in H1 FY27 is about 16%, below the 17-19% target range for that deadline. (judged from later company statements)

Evidence (6 Nov 2026): “Our ODM revenue for the quarter is INR322 crores and for H1 it is INR591 crores registering a year-on-year growth of 117% for H1.” — Concall transcript — Q2FY27 (6 Nov 2026)

Evidence (6 Nov 2026): “Our consolidated total revenue for H1 '27 is INR3,603 crores representing a growth of 71% year-on-year.” — Concall transcript — Q2FY27 (6 Nov 2026)

Assumptions made in reading this

  • 'near term' read as the next four quarters

How this guidance changed

Stated once in the documents read so far.

PCB project commercial production · PCB Hint
Management expects the PCB project to begin at least commercial production by April 2027.
Target
milestone
Due
by 2027
result by 14 Feb 2028
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“We expect this PCB project to start at least commercial production by April of 2027.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 7 · 4 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

Assumptions made in reading this

  • '2027' read as calendar year 2027

How this guidance changed

Stated once in the documents read so far.

R&D investment Hint
Company will aggressively invest in R&D over the next three years.
Target
to improve
Due
FY28
result by 30 May 2028
Said
3 Sep 2025
Annual report
StatusPending

In management's words

“Over the next three years, we will aggressively invest in research and development, diversify our product offerings, and strengthen partnerships with customers and suppliers.”
Sandeep Tandon, Executive Chairman · Annual report FY25, p. 15 · 3 Sep 2025

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • horizon counted from FY25 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Capex for PCB over FY26 to FY28 · PCB Direct
Combined PCB capex across FY26 to FY28 expected at INR700 to 800 crore, loaded toward FY27.
Target
₹700 Cr – ₹800 Cr
Due
by FY28
result by 30 May 2028
Said
11 Nov 2025
Concall transcript
StatusOn track
So far: More than INR200 crore already spent, with another INR200 crore expected in the balance of FY27

In management's words

“what we are anticipating between FY '26, '27, '28 together is what we would be spending around INR700 crores to INR800 crores together.”
Bijay Agrawal, CFO · Concall transcript — Q2FY26 (Nov 2025), p. 13 · 11 Nov 2025

What it implies in numbers

Reaching ₹700 Cr by FY28 from ₹193 Cr (FY25) needs about 53.6% growth a year.

How it was checked

Roughly INR400 crore is spent or expected by FY27-end against the INR700-800 crore FY26-FY28 total, with the FY28 deadline still open. (judged from later company statements)

Evidence (6 Nov 2026): “We have already spent more than INR200 crores for the project and expecting to spend another INR200 crores in the balance of the year.” — Concall transcript — Q2FY27 (6 Nov 2026)

Evidence (30 Jul 2026): “Proceeds have been utilized towards capital expenditure as per the details mentioned in the Prospectus” — Use-of-proceeds report — Q1FY27

How this guidance changed

Stated once in the documents read so far.

Defence business revenue · defence (Elcome) Indirect
Elcome defence business expected to grow from about INR200 crore to INR300-350 crore in the next two to three years.
Target
₹300 Cr – ₹350 Cr
Due
FY27–FY28
result by 30 May 2028
Said
11 Nov 2025
Concall transcript
StatusPending

In management's words

“we are confident that we would be able to grow this business from the current level of about INR200 crores to maybe INR300 crores, INR350 crores in the years to come.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 9 · 11 Nov 2025

What it implies in numbers

Reaching ₹300 Cr by FY28 from ₹3,787 Cr (FY25) needs about 57.1% decline a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: defence is lumpy and loaded toward H2

Assumptions made in reading this

  • horizon counted from FY25 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

PCB revenues kick-in · PCB Hint
PCB revenues expected to start in FY28.
Target
milestone
Due
FY28
result by 30 May 2028
Said
11 Nov 2025
Concall transcript
StatusPending

In management's words

“The PCB revenues would kick in in '27-'28.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 10 · 11 Nov 2025

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

CCL, HDI and flex PCB capex · CCL, HDI and flex PCB Direct
Capex of about INR800 crore for CCL, HDI and flex PCB projects may be executed between FY28 and FY30.
Target
~₹800 Cr
Due
by FY28
result by 30 May 2028
Said
18 May 2026
Concall transcript
StatusPending

In management's words

“So both put together, we will be spending another INR800 crores for those projects. But that project capex may get executed somewhere between FY '28 to FY '30.”
Bijay Agrawal, CFO · Concall transcript — Q4FY26 (18 May 2026), p. 12 · 18 May 2026

What it implies in numbers

Reaching ₹800 Cr by FY28 from ₹404 Cr (FY26) needs about 40.7% growth a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Following ECMS approval.

Assumptions made in reading this

  • timeline wording 'between FY '28 to FY '30' parsed as FY28–FY30; using the extracted FY28

How this guidance changed

Stated once in the documents read so far.

FY28 growth with PCB Direct
FY28 growth is expected to be above 30-35%, helped by the PCB vertical starting up.
Target
≥ 30% growth
Due
FY28
result by 30 May 2028
Said
18 May 2026
Concall transcript
StatusPending

In management's words

“'27-'28, logically, the growth should be superior to 30%, 35% because of the addition of the PCB vertical.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY26 (18 May 2026), p. 15 · 18 May 2026

Condition attached by management: PCB vertical kicks in during FY27-FY28.

How this guidance changed

Stated once in the documents read so far.

Life Cycle Assessments / Product Carbon Footprint for key products Hint
Company is targeting Life Cycle Assessments and Product Carbon Footprint studies for key products by FY28.
Target
milestone
Due
by FY28
result by 30 May 2028
Said
3 Aug 2026
Annual report · 2× since 3 Sep 2025
StatusPending

In management's words

“The Company is targeting to conducting Life Cycle Assessments (LCAs)/Product Carbon Footprint (PCF) for key products by FY28 and aims to reduce packaging material usage by 5% by FY30 through reuse and recycling.”
Annual report FY26, p. 72 · 3 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

  1. 3 Sep 2025 — milestone for by FY28 First stated
    Annual report · Pending
  2. 3 Aug 2026 — milestone for by FY28 Repeated
    Annual report · Pending
Planned capital expenditure · PCB plant (first phase) Direct
First-phase PCB plant capex planned at $91 million over the next three to four years.
Target
$91 mn
Due
FY28–FY29
result by 30 May 2029
Said
3 Sep 2025
Annual report
StatusOn track
So far: More than INR200 crore already spent on the PCB project, with another INR200 crore expected in the balance of FY27.

In management's words

“The first phase of this project involves a planned capital expenditure of $91 million over the next three to four years.”
Sandeep Tandon, Executive Chairman · Annual report FY25, p. 15 · 3 Sep 2025

What it implies in numbers

Reaching ₹91 Cr by FY29 from ₹193 Cr (FY25) needs about 17.1% decline a year.

How it was checked

Same first-phase PCB spend as the earlier item: spending is underway and the FY28–FY29 deadline has not passed. The $91 million total cannot be verified from the evidence. (judged from later company statements)

Evidence (6 Nov 2026): “We have already spent more than INR200 crores for the project and expecting to spend another INR200 crores in the balance of the year.” — Concall transcript — Q2FY27 (6 Nov 2026)

Assumptions made in reading this

  • horizon counted from FY25 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

PCB multilayer project capex · PCB Indirect
The PCB multilayer project is planned at about INR800 crore of capex across two phases, with phase two spanning to mid-FY29.
Target
~₹800 Cr
Due
by FY29
result by 30 May 2029
Said
18 May 2026
Concall transcript · 2× since 24 Jul 2025
StatusOn track
So far: more than INR200 crore spent, with another INR200 crore expected in balance of FY27 (about INR400 crore of INR800 crore)

In management's words

“we said that we are planning to spend approximately $90 million, which is INR800 crores of capex over the year for this multilayer line kind of a PCB setup.”
Bijay Agrawal, CFO · Concall transcript — Q4FY26 (18 May 2026), p. 8 · 18 May 2026

What it implies in numbers

Reaching ₹800 Cr by FY29 from ₹404 Cr (FY26) needs about 25.6% growth a year.

How it was checked

Deadline FY29 not passed. Spending of about INR400 crore against the INR800 crore plan is progressing, though completion is not yet shown. (judged from later company statements)

Evidence (6 Nov 2026): “We have already spent more than INR200 crores for the project and expecting to spend another INR200 crores in the balance of the year.” — Concall transcript — Q2FY27 (6 Nov 2026)

How this guidance changed

  1. 24 Jul 2025 — $91 mn for FY28–FY29 First stated
    Concall transcript · On track (actual More than INR200 crore already spent on the PCB project, with another INR200 crore expected in the balance of FY27.)
  2. 18 May 2026 — ~₹800 Cr for by FY29 Raised
    Concall transcript · On track (actual more than INR200 crore spent, with another INR200 crore expected in balance of FY27 (about INR400 crore of INR800 crore))
Revenue potential of framework agreement Indirect
The first multi-year framework agreement has revenue potential of roughly USD 250 million over two to three years.
Target
~$250 mn
Due
FY28–FY29
result by 30 May 2029
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“a revenue potential of roughly USD 250 million over two to three years”
Jasbir Singh Gujral, Managing Director · Annual report FY26, p. 17 · 3 Aug 2026

What it implies in numbers

Reaching ₹250 Cr by FY29 from ₹4,819 Cr (FY26) needs about 62.7% decline a year.

How it was checked

Guided in US dollars while stored numbers are in rupees.

Condition attached by management: Revenue potential, not a committed order

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Renewable share of energy consumption Direct
Target to raise renewable share of energy consumption to 50% by FY30.
Target
50%
Due
by FY30
result by 30 May 2030
Said
3 Sep 2025
Annual report
StatusBehind
So far: 9.5% renewable share of energy consumption in FY26

In management's words

“Increase energy consumption from renewable sources to 50% in Near term by FY30”
Annual report FY25, p. 36 · 3 Sep 2025

How it was checked

Renewables were 9.5% of energy consumption in FY26, far below the 50% target for FY30 with the deadline not yet reached. (judged from later company statements)

Evidence (3 Aug 2026): “renewable sources met 9.5% of our energy consumption” — Annual report FY26

How this guidance changed

Stated once in the documents read so far.

GHG emissions intensity (Scope 1 + 2) Direct
Target to reduce Scope 1 and 2 GHG emissions intensity by 25% by FY30.
Target
−2,500 bps
Due
FY30
result by 30 May 2030
Said
3 Sep 2025
Annual report
StatusPending

In management's words

“Reduce GHG emissions intensity (Scope 1 + 2) by 25% in Near term by FY30”
Annual report FY25, p. 36 · 3 Sep 2025

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Water use intensity Direct
Company's additional goal is to lower water use intensity by 10% by FY30.
Target
10%
Due
by FY30
result by 30 May 2030
Said
3 Sep 2025
Annual report
StatusPending

In management's words

“Additional goals include increasing renewable energy share to 50%, reducing Scope 3 intensity by 10%, lowering water use intensity by 10% by FY30, and reducing waste generation intensity by 0.5% by FY30.”
Annual report FY25, p. 112 · 3 Sep 2025

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Women employment ratio Direct
Target to maintain women's share of workforce above 50% by FY30.
Target
≥ 50%
Due
by FY30
result by 30 May 2030
Said
3 Sep 2025
Annual report
StatusBehind
So far: women were 48% of the workforce in FY26

In management's words

“Maintain diversity ratio (women employment) of > 50% by FY30”
Annual report FY25, p. 36 · 3 Sep 2025

How it was checked

Women were 48% of the workforce in FY26, below the above-50% target for FY30, which has not yet arrived. (judged from later company statements)

Evidence (3 Aug 2026): “The Company remains committed to gender diversity, with women representing 48% of the workforce in FY 26.” — Annual report FY26

How this guidance changed

Stated once in the documents read so far.

PCB project total capex · PCB Direct
Management plans to spend about INR1,500 crore on the PCB project by FY30.
Target
~₹1,500 Cr
Due
by FY30
result by 30 May 2030
Said
30 Jan 2026
Concall transcript
StatusPending

In management's words

“Overall, the INR1,500 crores, we want to -- we are planning to spend that by FY '30.”
Bijay Agrawal, Chief Financial Officer · Concall transcript — Q3FY26 (Feb 2026), p. 11 · 30 Jan 2026

What it implies in numbers

Reaching ₹1,500 Cr by FY30 from ₹193 Cr (FY25) needs about 50.7% growth a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Covers CCL, HDI and Flex lines that still await government approvals

How this guidance changed

Stated once in the documents read so far.

GHG emissions intensity Direct
Company aims to reduce GHG emissions intensity by 25% by FY30.
Target
~25%
Due
by FY30
result by 30 May 2030
Said
3 Aug 2026
Annual report · 2× since 3 Sep 2025
StatusPending

In management's words

“The Company aims to reduce GHG emissions intensity by 25% by FY30 and set near-term SBTi-aligned targets by July 2026.”
Annual report FY26, p. 72 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

  1. 3 Sep 2025 — 25% for by FY30 First stated
    Annual report · Pending
  2. 3 Aug 2026 — ~25% for by FY30 Repeated
    Annual report · Pending
Packaging material usage Direct
Company aims to reduce packaging material usage by 5% by FY30 through reuse and recycling.
Target
5%
Due
by FY30
result by 30 May 2030
Said
3 Aug 2026
Annual report · 2× since 3 Sep 2025
StatusPending

In management's words

“The Company is targeting to conducting Life Cycle Assessments (LCAs)/Product Carbon Footprint (PCF) for key products by FY28 and aims to reduce packaging material usage by 5% by FY30 through reuse and recycling.”
Annual report FY26, p. 72 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

  1. 3 Sep 2025 — 5% for by FY30 First stated
    Annual report · Pending
  2. 3 Aug 2026 — 5% for by FY30 Repeated
    Annual report · Pending
Waste generation intensity Direct
Company aims to reduce waste generation intensity by 0.5% by FY30.
Target
0.5%
Due
by FY30
result by 30 May 2030
Said
3 Aug 2026
Annual report · 2× since 3 Sep 2025
StatusPending

In management's words

“Additional goals include increasing renewable energy share to 50%, reducing Scope 3 emissions intensity by 10%, lowering water use intensity by 10%, and reducing waste generation intensity by 0.5% by FY30.”
Annual report FY26, p. 72 · 3 Aug 2026

How it was checked

Production is not in the stored financial tables.

How this guidance changed

  1. 3 Sep 2025 — 0.5% for by FY30 First stated
    Annual report · Pending
  2. 3 Aug 2026 — 0.5% for by FY30 Repeated
    Annual report · Pending
Renewable energy share Direct
Company aims to increase renewable energy share to 50% by FY30.
Target
50%
Due
by FY30
result by 30 May 2030
Said
3 Aug 2026
Annual report · 2× since 3 Sep 2025
StatusPending

In management's words

“Additional goals include increasing renewable energy share to 50%, reducing Scope 3 emissions intensity by 10%, lowering water use intensity by 10%, and reducing waste generation intensity by 0.5% by FY30.”
Annual report FY26, p. 72 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

  1. 3 Sep 2025 — 50% for by FY30 First stated
    Annual report · Behind (actual 9.5% renewable share of energy consumption in FY26)
  2. 3 Aug 2026 — 50% for by FY30 Repeated
    Annual report · Pending
Greenhouse gas emissions intensity Direct
The company commits to reduce greenhouse gas emissions intensity by 25% by FY30.
Target
25% growth
Due
FY30
result by 30 May 2030
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“reduce greenhouse gas emissions intensity by 25% by FY30”
Sandeep Tandon, Executive Chairman · Annual report FY26, p. 16 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Water use intensity Direct
Company aims to lower water use intensity by 10% by FY30.
Target
10%
Due
by FY30
result by 30 May 2030
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“Additional goals include increasing renewable energy share to 50%, reducing Scope 3 emissions intensity by 10%, lowering water use intensity by 10%, and reducing waste generation intensity by 0.5% by FY30.”
Annual report FY26, p. 72 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Total Phased Capex · PCB (Naidupeta JV) Direct
Total phased capex of about ₹1,600 crore for the PCB project is to be spent over the next 3-5 years.
Target
~₹1,600 Cr
Due
FY29–FY31
result by 30 May 2031
Said
7 Jun 2026
Investor presentation
StatusPending

In management's words

“~₹1,600 Cr* Total Phased Capex *To Be Spent over the next 3-5 Years”

What it implies in numbers

Reaching ₹1,600 Cr by FY31 from ₹404 Cr (FY26) needs about 31.7% growth a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Total phased capex · Bare-board PCB (Naidupeta, Andhra Pradesh) Direct
Total phased capex for the Naidupeta PCB project is around ₹1,600 crore, deployed over three to five years.
Target
~₹1,600 Cr
Due
FY29–FY31
result by 30 May 2031
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“Total phased capex runs to around H1,600 crores, deployed over the next three to five years.”
Annual report FY26, p. 7 · 3 Aug 2026

What it implies in numbers

Reaching ₹1,600 Cr by FY31 from ₹404 Cr (FY26) needs about 31.7% growth a year.

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: The project draws substantial central and state policy support, covering close to half of the total phased investment.

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Kaga JV business opportunity · Kaga JV Indirect
Management sees Kaga JV business of about Rs 300 crore to Rs 500 crore over three to five years.
Target
₹300 Cr – ₹500 Cr
Due
FY29–FY31
result by 30 May 2031
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“So, we are just starting setting up this JV right now. So, in this current year, this may not be much, but over the three, four, five years, we can see somewhere around Rs. 300 crore to Rs. 500 crore kind of a business on long-term basis.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 14 · 4 Aug 2026

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Operational efficiencies Hint
Management expects operational efficiencies to keep improving over the medium term as volumes scale and programs mature.
Target
to improve
Due
FY29–FY31
result by 30 May 2031
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“We remain confident that as volume grows and continues to scale, and newer programs mature, our overall operational efficiencies will continue to improve overall over the medium term.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 6 · 4 Aug 2026

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)
  • 'medium term' read as 3 to 5 years

How this guidance changed

Stated once in the documents read so far.

Consumer business share of revenue · consumer Direct
Management aims to bring high-volume consumer business below 35% of revenue over the long term.
Target
≤ 35%
Due
FY30–FY32
result by 30 May 2032
Said
29 Jan 2025
Concall transcript
StatusPending

In management's words

“The endeavor of the management on a long-term basis is to bring down the high volume consumer business, which is inherently low margin, to below 35% mix.”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 11 · 29 Jan 2025

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Growth in other segments needed

Assumptions made in reading this

  • horizon counted from FY25 (statement made in its last quarter)
  • 'long term' read as 5 to 7 years

How this guidance changed

Stated once in the documents read so far.

Export contribution to revenue Indirect Walked back
Long-term target is to raise export contribution to over 25% of revenue.
Target
≥ 25%
Due
FY30–FY32
result by 30 May 2032
Said
3 Sep 2025
Annual report · 2× since 29 Jan 2025
StatusOn track
So far: Export revenue was 25% of operating revenue in FY26 and 24% in Q1 FY27.

In management's words

“the Company has set a long-term target to increase export contributions to over 25%, with an aspirational goal of reaching 30% of overall revenue.”
Annual report FY25, p. 47 · 3 Sep 2025

How it was checked

Export share is about 24–25%, close to the long-term target of over 25%. The FY30–FY32 deadline has not passed. (judged from later company statements)

Evidence (7 Jun 2026): “25% of Operating Revenue” — Investor presentation — Q4FY26 (7 Jun 2026)

Evidence (29 Jul 2026): “Export Revenue 24 % of Operating Revenue ▲ 67% YoY” — Press release — Q1FY27

Evidence (4 Aug 2026): “Overall export number for the quarter is around Rs. 387 crores.” — Concall transcript — Q1FY27 (4 Aug 2026)

Assumptions made in reading this

  • horizon counted from FY25 (last completed year at the statement date)
  • 'long term' read as 5 to 7 years

How this guidance changed

  1. 29 Jan 2025 — 25–30% for FY30–FY32 First stated
    Concall transcript · Achieved (actual Exports 25% of FY26 operating revenue)
  2. 3 Sep 2025 — ≥ 25% for FY30–FY32 Lowered
    Annual report · On track (actual Export revenue was 25% of operating revenue in FY26 and 24% in Q1 FY27.)
ODM share of revenue · ODM Direct
Long-term target is for ODM business to reach 25% of revenues, from 12% currently.
Target
≥ 25%
Due
FY30–FY32
result by 30 May 2032
Said
3 Sep 2025
Annual report · 2× since 14 May 2025
StatusOn track
So far: ODM revenue was 17% of revenue in FY26, up from 12%; H1 FY27 ODM revenue of INR591 crore grew 117%.

In management's words

“Our Original Design Manufacturing (ODM) business currently contributes 12% of revenues, with a long-term target to reach 25%.”
Jasbir Singh Gujral, Managing Director · Annual report FY25, p. 17 · 3 Sep 2025

How it was checked

ODM share rose from 12% to 17% and H1 FY27 growth is strong. The FY30–FY32 target of 25% has not yet been tested. (judged from later company statements)

Evidence (3 Aug 2026): “ODM revenue rose 80% to H825 crore” — Annual report FY26

Evidence (6 Nov 2026): “Our ODM revenue for the quarter is INR322 crores and for H1 it is INR591 crores registering a year-on-year growth of 117% for H1.” — Concall transcript — Q2FY27 (6 Nov 2026)

Assumptions made in reading this

  • horizon counted from FY25 (last completed year at the statement date)
  • 'long term' read as 5 to 7 years

How this guidance changed

  1. 14 May 2025 — ~25% for FY30–FY32 First stated
    Concall transcript · Behind (actual ODM 17% of FY26 revenue, up from 12%)
  2. 3 Sep 2025 — ≥ 25% for FY30–FY32 Repeated
    Annual report · On track (actual ODM revenue was 17% of revenue in FY26, up from 12%; H1 FY27 ODM revenue of INR591 crore grew 117%.)
ODM share of sales (long-term target) · ODM Indirect
Management's long-term target is to raise ODM to about a quarter of sales, a multi-year effort.
Target
~25%
Due
FY31–FY33
result by 30 May 2033
Said
4 Aug 2026
Concall transcript
StatusOn track
So far: ODM about 16% of H1FY27 revenue, up from roughly 13% a year earlier

In management's words

“The long-term target is to take it up to a quarter.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY27 (4 Aug 2026), p. 18 · 4 Aug 2026

How it was checked

ODM share is about 16%, rising toward the long-term quarter-of-sales target. The FY31-FY33 horizon has not passed. (judged from later company statements)

Evidence (6 Nov 2026): “Our ODM revenue for the quarter is INR322 crores and for H1 it is INR591 crores registering a year-on-year growth of 117% for H1.” — Concall transcript — Q2FY27 (6 Nov 2026)

Evidence (6 Nov 2026): “Our consolidated total revenue for H1 '27 is INR3,603 crores representing a growth of 71% year-on-year.” — Concall transcript — Q2FY27 (6 Nov 2026)

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)
  • 'long term' read as 5 to 7 years

How this guidance changed

Stated once in the documents read so far.

Revenue achievable on current gross block Indirect
Management says the current gross block can support 6,000-6,500 crore of revenue with marginal balancing additions.
Target
₹6,000 Cr – ₹6,500 Cr
Due
Not specified
Said
29 Jan 2025
Concall transcript
StatusPending

In management's words

“we should be able to achieve 6,500 crores of, 6,000-6,500 crores of revenue with this gross block with marginal addition for balancing equipment”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 14 · 29 Jan 2025

How it was checked

Capacity is not in the stored financial tables.

Condition attached by management: Depends on product mix with about 35-37% consumer; marginal balancing equipment

How this guidance changed

Stated once in the documents read so far.

Consumer segment in totality · Consumer Indirect
Consumer segment in totality expected to be between 25% and 30% of revenue in FY26 and FY27.
Target
25–30%
Due
Not specified
Said
14 May 2025
Concall transcript
StatusPending

In management's words

“consumer segment in totality would be anything between 25% and 30%.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY25 (May 2025), p. 18 · 14 May 2025

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Remaining high-volume, low-margin Consumer business to be brought down; own-design products to fill the gap.

How this guidance changed

Stated once in the documents read so far.

Net working capital investment days for PCB business · PCB Direct
PCB business is expected to need 60-75 days of net working capital initially.
Target
60–75 days
Due
Not specified
Said
24 Jul 2025
Concall transcript
StatusPending

In management's words

“we expect initially the investment could be in the range of 60 to 75 days of net working capital investment for this business.”
Bijay Agrawal, CFO · Concall transcript — Q1FY26 (Jul 2025), p. 11 · 24 Jul 2025

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

ROCE of the PCB plant at maturity · PCB Indirect
Management expects the PCB plant to earn ROCE of around 20% once mature.
Target
~20%
Due
Not specified
Said
24 Jul 2025
Concall transcript
StatusPending

In management's words

“once the plant is matured, we should be able to earn a 20%, 18%, 20%, 20% EBITDA margin, and the ROCE of about the same percentage around 20%.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY26 (Jul 2025), p. 8 · 24 Jul 2025

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Once the plant is matured.

How this guidance changed

Stated once in the documents read so far.

Asset turns of PCB plant · PCB Indirect
Asset turns for the PCB plant are expected between 1.2x and 2x depending on product.
Target
1.2–2x
Due
Not specified
Said
24 Jul 2025
Concall transcript
StatusPending

In management's words

“Asset turns, we expect it should vary somewhere between 1.2x to 2x.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY26 (Jul 2025), p. 9 · 24 Jul 2025

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Depends on product mix.

How this guidance changed

Stated once in the documents read so far.

Export contribution to revenue (aspirational) Indirect
Aspirational goal is for exports to reach 30% of overall revenue.
Target
30%
Due
Not specified
Said
3 Sep 2025
Annual report
StatusPending

In management's words

“the Company has set a long-term target to increase export contributions to over 25%, with an aspirational goal of reaching 30% of overall revenue.”
Annual report FY25, p. 47 · 3 Sep 2025

How it was checked

Exports is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Consumer segment share of revenues · Consumer Indirect
Consumer segment expected to continue contributing around 30% of revenues.
Target
~30%
Due
Not specified
Said
3 Sep 2025
Annual report
StatusPending

In management's words

“the consumer segment will continue to play an important role in our portfolio, contributing a healthy balance of around 30% of revenues”
Sandeep Tandon, Executive Chairman · Annual report FY25, p. 15 · 3 Sep 2025

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Female share of workforce Direct
Company remains committed to gender diversity, aiming for over 50% female representation in its workforce.
Target
≥ 50%
Due
Not specified
Said
3 Sep 2025
Annual report
StatusPending
So far: 48%

In management's words

“Syrma SGS remains committed to gender diversity, aiming for over 50% female”
Annual report FY25, p. 112 · 3 Sep 2025

How it was checked

Women were 48% of the workforce in FY26, below the aspirational over-50% level, with no deadline yet passed. (judged from later company statements)

Evidence (3 Aug 2026): “The Company remains committed to gender diversity, with women representing 48% of the workforce in FY 26.” — Annual report FY26

How this guidance changed

Stated once in the documents read so far.

PCB capacity · PCB Direct
PCB project planned with total capacity of about 2.5 million square meters, with a CCL plant in phase two.
Target
2,500,000 million square meters
Due
Not specified
Said
11 Nov 2025
Concall transcript · 3× since 24 Jul 2025
StatusPending

In management's words

“when I'm putting up a 2.5 million square meter capacity for the PCBs.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 16 · 11 Nov 2025

How it was checked

Capacity is not in the stored financial tables.

How this guidance changed

  1. 24 Jul 2025 — 1,500,000–2,000,000 million square meters per annum for Not specified First stated
    Concall transcript · Pending
  2. 3 Sep 2025 — 1,500,000–2,000,000 million square meters per annum for Not specified Repeated
    Annual report · Pending
  3. 11 Nov 2025 — 2,500,000 million square meters for Not specified Raised
    Concall transcript · Pending
Central incentive as % of revenue · PCB Direct Walked back
Central PCB incentive expected to average about 5% to 6% of revenue, ranging between 4% and 10% by tier.
Target
5–6%
Due
Not specified
Said
11 Nov 2025
Concall transcript · 2× since 24 Jul 2025
StatusPending

In management's words

“Yes, between 4% to 10% depending upon different layers. But yes, average would be somewhere around 5% to 6% what we are expecting.”
Bijay Agrawal, CFO · Concall transcript — Q2FY26 (Nov 2025), p. 17 · 11 Nov 2025

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: central PLI incentive; 4% to 10% by tier

How this guidance changed

  1. 24 Jul 2025 — 5–7% for Not specified First stated
    Concall transcript · Pending
  2. 11 Nov 2025 — 5–6% for Not specified Lowered
    Concall transcript · Pending
Gross material margin Indirect
Gross material margin expected to hover around 24% and move within a 23% to 26% range as consumer business normalises.
Target
23–26%
Due
Not specified
Said
11 Nov 2025
Concall transcript
StatusPending

In management's words

“So the consumer business having normalized, I think it will be around 23% to 25%, 24% to 25%, 26%. That would be the range of the gross material margin.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 15 · 11 Nov 2025

How it was checked

Gross margin is not in the stored financial tables.

Condition attached by management: when healthcare and exports pick up

How this guidance changed

Stated once in the documents read so far.

Government subsidy on PCB capex · PCB Direct
Management expects a 50% Andhra Pradesh government subsidy on PCB capex spent up to March 2027, received in FY27-28.
Target
~50%
Due
Not specified
Said
30 Jan 2026
Concall transcript · 2× since 24 Jul 2025
StatusPending

In management's words

“would be making us eligible for a 50% subsidy from the government of Andhra Pradesh.”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 17 · 30 Jan 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Spend must be incurred up to March 2027

How this guidance changed

  1. 24 Jul 2025 — 35–60% for Not specified First stated
    Concall transcript · Pending
  2. 30 Jan 2026 — ~50% for Not specified Raised
    Concall transcript · Pending
Organic capex Direct
Normal organic capex is expected to be INR80-100 crore on a year-on-year basis.
Target
₹80 Cr – ₹100 Cr
Due
Not specified
Said
30 Jan 2026
Concall transcript
StatusPending
So far: ₹404 Cr (FY26)

In management's words

“normal organic-related capex requirement would be INR80 crores to INR100 crores on a year-on-year basis.”
Bijay Agrawal, Chief Financial Officer · Concall transcript — Q3FY26 (Feb 2026), p. 14 · 30 Jan 2026

How it was checked

No timeline was given; tracked against each new result.

How this guidance changed

Stated once in the documents read so far.

Multilayer PCB capex · PCB (Naidupeta JV) Direct
Capex for the multilayer PCB part of the project is expected to be about ₹800-900 crore.
Target
₹800 Cr – ₹900 Cr
Due
Not specified
Said
7 Jun 2026
Investor presentation
StatusPending

In management's words

“~₹800-900- Cr For Multilayer PCB”

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Ownership stake in JVCo · Joint venture company (JVCo) Direct
The company will invest for an aggregate ownership stake of up to 60% in the joint venture company to be incorporated with Kaga.
Target
≤ 60%
Due
Not specified
Said
22 Jun 2026
Exchange announcement
StatusPending

In management's words

“the Company shall invest for an aggregate ownership stake of upto 60% in the Joint Venture Company”
Bhabagrahi Pradhan, Company Secretary · Announcement under Regulation 30 (LODR)-Joint Venture, p. 1 · 22 Jun 2026

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Subject to customary conditions precedent and closing conditions as set out in the Agreement

How this guidance changed

Stated once in the documents read so far.

Equity shares subscribed in JVCo by the Company · Joint venture company (JVCo) Direct
The company will subscribe equity shares in the joint venture company for an aggregate amount of approximately INR 15 crore.
Target
~₹15 Cr
Due
Not specified
Said
22 Jun 2026
Exchange announcement
StatusPending

In management's words

“by the Company for an aggregate amount of approx. INR 15 Cr”
Bhabagrahi Pradhan, Company Secretary · Announcement under Regulation 30 (LODR)-Joint Venture, p. 3 · 22 Jun 2026

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Subject to customary conditions precedent and closing conditions as set out in the Agreement

How this guidance changed

Stated once in the documents read so far.

Remaining 40% stake in Elcome · Naval and Maritime Electronics Hint
The remaining 40% of Elcome is to be acquired under a definitive agreement.
Target
milestone
Due
Not specified
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“Remaining 40%: to be acquired under a definitive agreement”
Annual report FY26, p. 6 · 3 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Extend framework contract model across largest partners Hint
Management intends to extend the multi-year framework contract model across its largest partners.
Target
milestone
Due
Not specified
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“we intend to extend the model across our largest partners”
Jasbir Singh Gujral, Managing Director · Annual report FY26, p. 17 · 3 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Women share of workforce Direct
Company targets to maintain a diverse and inclusive workforce with more than 50% women employment.
Target
≥ 50%
Due
Not specified
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“target to maintain a diverse and inclusive workforce with >50% women employment”
Annual report FY26, p. 72 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Employees receiving ESG-related training Direct
Company aims to ensure 80% of employees receive regular ESG-related training.
Target
≥ 80%
Due
Not specified
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“The Company aims to maintain a workforce diversity ratio of over 50% women and ensure that 80% of employees receive regular ESG-related training.”
Annual report FY26, p. 72 · 3 Aug 2026

How it was checked

Headcount is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Solar power sourcing commitment Direct
Company is committed to sourcing 75 lakh units of solar power annually.
Target
₹0.75 Cr
Due
Not specified
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“with a commitment to source 75 lakh units of solar power annually.”
Annual report FY26, p. 73 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Renewable energy share Direct
The company's sustainability commitments include a 50% renewable energy share, with no year stated.
Target
50%
Due
Not specified
Said
3 Aug 2026
Annual report
StatusPending

In management's words

“a 50% renewable energy share”
Annual report FY26, p. 10 · 3 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Debt share of PCB phase-one funding · PCB Direct
Management plans to fund 50% to 60% of phase-one PCB spend with debt, with the rest from accruals and government incentives.
Target
50–60%
Due
Not specified
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“And again, a 50% - 60% debt is what we will be taking for this thing.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 10 · 4 Aug 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Government CAPEX incentive of 50% available

How this guidance changed

Stated once in the documents read so far.

PCB phase 2 and phase 3 start · PCB Indirect
Management expects PCB phase two and three to begin around end-2027 or early 2028.
Target
milestone
Due
Not specified
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“And the second phase and the third phase of the project will only start towards the end of '27, early '28.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY27 (4 Aug 2026), p. 10 · 4 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

PCB asset turn · PCB Indirect
Management expects PCB asset turn of around 1.5x once utilisation reaches 80% plus, on a gross basis before subsidies.
Target
~1.5x
Due
Not specified
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“Normally, asset turn varies around 1.5x. But initially, in the very first year, as you are checking, the capacity utilization can be lower around 40% to 50%.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 11 · 4 Aug 2026

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Gross basis, before subsidies; utilisation 80% plus

How this guidance changed

Stated once in the documents read so far.

Revenue from new customer additions at full ramp-up Indirect
Management says the 18 new customers could add Rs 1,000 crore plus revenue on a full ramp-up basis, with volumes starting next year.
Target
≥ ₹1,000 Cr
Due
Not specified
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“But this new customer additions may have a potential to give me additionally Rs. 1,000 crore plus kind of a revenue on a full ramp-up basis.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 17 · 4 Aug 2026

How it was checked

Customers / subscribers is not in the stored financial tables.

Condition attached by management: Full ramp-up, which may take several years

How this guidance changed

Stated once in the documents read so far.

Kaga JV initial investment · Kaga JV Direct
Initial investment into the Kaga JV is expected to be about Rs 24-25 crore, shared by both partners.
Target
₹24 Cr – ₹25 Cr
Due
Not specified
Said
4 Aug 2026
Concall transcript
StatusPending

In management's words

“Initial investment into the JV would be approximately Rs. 24-25 crores by both the partners together.”
Bijay Agrawal, CFO · Concall transcript — Q1FY27 (4 Aug 2026), p. 7 · 4 Aug 2026

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Syrma holds 60% of the JV

How this guidance changed

Stated once in the documents read so far.

Track record · promised vs delivered

Guidance whose deadline has passed, most recent first: how management performed after giving it.

Green energy sourcing Direct
Commitment to source 50 lakh units of green energy from April 2026.
Promised
₹0.5 Cr
for by Apr 2026
Delivered
1.3 million units of green electricity (13 lakh units) in FY26
ResultMissed
Said
3 Sep 2025
Annual report

In management's words

“supported by our commitment to source 50 lakh units of green energy from April 2026.”
Sandeep Tandon, Executive Chairman · Annual report FY25, p. 15 · 3 Sep 2025

How it was checked

Target was 50 lakh units from April 2026; the annual report shows only 1.3 million units (13 lakh) of green electricity in FY26, well short. (judged from later company statements)

Evidence (3 Aug 2026): “renewable sources met 9.5% of our energy consumption” — Annual report FY26

Condition attached by management: MoU signed

How this guidance changed

Stated once in the documents read so far.

Networking capital days Direct Walked back
Net working capital days to come down below 65 by year-end FY26 from 73 days in September 2025.
Promised
≤ 65 days
for by FY26
Delivered
68 days
FY26
ResultPartly achieved
Said
11 Nov 2025
Concall transcript

In management's words

“We again continue to make efforts to bring it down to below 65 days and we are confident of bringing down by another 5 to 7 days in next 2 to 3 quarters.”
Bijay Agrawal, CFO · Concall transcript — Q2FY26 (Nov 2025), p. 5 · 11 Nov 2025

How it was checked

FY26 actual 68 days — narrowly short of the guided ≤ 65 days (reported ratio).

How this guidance changed

  1. 29 Jan 2025 — ≤ 60 days for Not specified First stated
    Concall transcript · Achieved (actual 37 days)
  2. 24 Jul 2025 — ≤ 65 days for by Q1FY27 Raised
    Concall transcript · Awaiting data (actual 68 days)
  3. 11 Nov 2025 — ≤ 65 days for by FY26 Deadline brought forward
    Concall transcript · Partly achieved (actual 68 days)
Growth Direct Walked back
Management reiterates around 30% revenue growth for FY26.
Promised
~30% growth
for FY26
Delivered
27.25% growth
FY26
ResultAchieved
Said
30 Jan 2026
Concall transcript

In management's words

“See, we had guided last year also. And this year also, we are saying that we'll be growing at around 30%.”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 15 · 30 Jan 2026

What it implies in numbers

30% growth on ₹3,787 Cr (FY25) implies about ₹4,923 Cr for FY26.

How it was checked

FY26 actual 27.25% — met the guided ~30% (annual result).

How this guidance changed

  1. 29 Jan 2025 — 30–35% growth for FY26 First stated
    Concall transcript · Partly achieved (actual 27.25% growth)
  2. 14 May 2025 — 30–35% growth for FY26 Repeated
    Concall transcript · Partly achieved (actual 27.25% growth)
  3. 24 Jul 2025 — 30–35% growth for FY26 Repeated
    Concall transcript · Partly achieved (actual 27.25% growth)
  4. 3 Sep 2025 — 30–35% growth for FY26 Repeated
    Annual report · Partly achieved (actual 27.25% growth)
  5. 11 Nov 2025 — ~30% growth for FY26 Lowered
    Concall transcript · Achieved (actual 27.25% growth)
  6. 30 Jan 2026 — ~30% growth for FY26 Repeated
    Concall transcript · Achieved (actual 27.25% growth)
Capex Direct
Capex for the balance of FY26 expected at INR60 to 100 crore, including PCB investments.
Promised
₹60 Cr – ₹100 Cr
for FY26
Delivered
≈ ₹404 Cr
FY26
ResultMissed
Said
11 Nov 2025
Concall transcript

In management's words

“we expect to invest around INR60 crores to INR100 crores, including my investments towards the PCB business also in the balance of the year.”
Bijay Agrawal, CFO · Concall transcript — Q2FY26 (Nov 2025), p. 6 · 11 Nov 2025

What it implies in numbers

Reaching ₹60 Cr by FY26 from ₹193 Cr (FY25) needs about 68.9% decline a year.

How it was checked

FY26 actual ₹404 Cr (estimate) — short of the guided ₹60 Cr – ₹100 Cr (change in fixed assets and CWIP plus depreciation).

How this guidance changed

  1. 29 Jan 2025 — ₹100 Cr – ₹150 Cr for FY26 First stated
    Concall transcript · Missed (actual ≈ ₹404 Cr)
  2. 11 Nov 2025 — ₹60 Cr – ₹100 Cr for FY26 Lowered
    Concall transcript · Missed (actual ≈ ₹404 Cr)
Operating EBITDA margin (excluding other income) Direct
Management now expects FY26 operating EBITDA margin of 8.5-9%, up from earlier guidance of about 8%.
Promised
8.5–9%
for FY26
Delivered
H1FY26 operating EBITDA margin of 10.1%
ResultAchieved
Said
24 Jul 2025
Concall transcript

In management's words

“we would be able to deliver an EBITDA margin of 8.5% to 9% this year. What we had guided earlier was approximately 8%.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY26 (Jul 2025), p. 14 · 24 Jul 2025

How it was checked

H1FY26 margin of 10.1% exceeded the 8.5-9% guidance. Full-year FY26 margin is not separately reported. (judged from later company statements)

Evidence (11 Nov 2025): “seeing the performance for the first half year, which is now 10%, we are very confident that we'll be able to exceed the guidance” — Concall transcript — Q2FY26 (Nov 2025)

Condition attached by management: Based on Q1 performance, order book and execution schedules. Includes FX gains or losses.

How this guidance changed

  1. 29 Jan 2025 — ~8% for FY26 First stated
    Concall transcript · Awaiting data
  2. 24 Jul 2025 — 8.5–9% for FY26 Raised
    Concall transcript · Achieved (actual H1FY26 operating EBITDA margin of 10.1%)
Revenue Direct Walked back
Management expects FY26 revenue of INR4,850 to INR5,000 crore.
Promised
₹4,850 Cr – ₹5,000 Cr
for FY26
Delivered
₹4,819 Cr
FY26
ResultPartly achieved
Said
30 Jan 2026
Concall transcript

In management's words

“we should be able to grow this figure by about INR1,600 crores plus such that we should be sitting at anything between INR4,850 crores, INR4,900 crores to INR5,000 crores.”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 9 · 30 Jan 2026

What it implies in numbers

Reaching ₹4,850 Cr by FY26 from ₹3,787 Cr (FY25) needs about 28.1% growth a year.

How it was checked

FY26 actual ₹4,819 Cr — narrowly short of the guided ₹4,850 Cr – ₹5,000 Cr (annual result).

How this guidance changed

  1. 29 Jan 2025 — ~₹6,000 Cr for FY26 First stated
    Concall transcript · Missed (actual ₹4,819 Cr)
  2. 24 Jul 2025 — ₹4,800 Cr – ₹5,000 Cr for FY26 Lowered
    Concall transcript · Achieved (actual ₹4,819 Cr)
  3. 30 Jan 2026 — ₹4,850 Cr – ₹5,000 Cr for FY26 Range narrowed
    Concall transcript · Partly achieved (actual ₹4,819 Cr)
EBITDA margin Direct
Management expects EBITDA margin of approximately 8% in FY26.
Promised
~8%
for FY26
Delivered
11.33%
FY26
ResultAchieved · beat
Said
3 Sep 2025
Annual report

In management's words

“We anticipate revenue growth of 30-35% in FY26, while maintaining an EBITDA margin of approximately 8%.”
Jasbir Singh Gujral, Managing Director · Annual report FY25, p. 17 · 3 Sep 2025

How it was checked

FY26 actual 11.33% — ahead of the guided ~8% (annual result).

How this guidance changed

  1. 14 May 2025 — ~8% for FY26 Raised
    Concall transcript · Achieved (actual 11.33%)
  2. 3 Sep 2025 — ~8% for FY26 Repeated
    Annual report · Achieved (actual 11.33%)
Exports · exports Direct Walked back
Management expects FY26 exports of about INR1,100 crore.
Promised
~₹100 Cr
for FY26
Delivered
Exports were 25% of operating revenue in FY26; the absolute INR figure is not stated
ResultAchieved
Said
30 Jan 2026
Concall transcript

In management's words

“So, if we are targeting, we are doing about INR1,100 crores this year.”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 14 · 30 Jan 2026

How it was checked

Exports were 25% of FY26 revenue. ODM revenue of INR825 crore at 17% of revenue implies total revenue near INR4,850 crore, so exports would be about INR1,200 crore, above the INR1,100 crore target. (judged from later company statements)

Evidence (7 Jun 2026): “25% of Operating Revenue” — Investor presentation — Q4FY26 (7 Jun 2026)

Evidence (11 May 2026): “25% of Operating Revenue” — Concall presentation — Q4FY26 (May 2026)

Evidence (3 Aug 2026): “ODM revenue rose 80% to H825 crore” — Annual report FY26

Evidence (3 Aug 2026): “We also set out to lift exports to 25% of revenue, a milestone we reached this year.” — Annual report FY26

How this guidance changed

  1. 14 May 2025 — ≥ ₹1,000 Cr for FY26 Deadline pushed out
    Concall transcript · Achieved (actual Implied FY26 exports of about INR1,213 crore (INR860 crore in FY25 grown 41%))
  2. 24 Jul 2025 — ≥ ₹1,000 Cr for FY26 Repeated
    Concall transcript · Achieved (actual Export revenue up 41% year on year in FY26 from an FY25 base of INR860 crore, implying above INR1,000 crore.)
  3. 30 Jan 2026 — ~₹100 Cr for FY26 Lowered
    Concall transcript · Achieved (actual Exports were 25% of operating revenue in FY26; the absolute INR figure is not stated)
Net working capital days for the full year Direct
Management expects full-year FY26 working capital days to be around 60, below the 65-day target.
Promised
~60 days
for FY26
Delivered
68 days
FY26
ResultPartly achieved
Said
24 Jul 2025
Concall transcript

In management's words

“So, on an overall basis, I think we should be nearer to what we have guided, which is 60 days.”
J.S. Gujral, Managing Director · Concall transcript — Q1FY26 (Jul 2025), p. 18 · 24 Jul 2025

How it was checked

FY26 actual 68 days — narrowly short of the guided ~60 days (reported ratio).

Condition attached by management: Depends on order execution and inventory build for new customers.

How this guidance changed

  1. 14 May 2025 — ≤ 65 days for FY26 First stated
    Concall transcript · Partly achieved (actual 68 days)
  2. 24 Jul 2025 — ~60 days for FY26 Lowered
    Concall transcript · Partly achieved (actual 68 days)
Growth of about 20%, 22% · Exports Direct
Export growth of about 20-22% expected in FY26.
Promised
20–22% growth
for FY26
Delivered
Export revenue grew 41% in FY26
ResultAchieved
Said
14 May 2025
Concall transcript

In management's words

“So despite that, we are expecting a growth of about 20%, 22%.”
J.S. Gujral, Managing Director · Concall transcript — Q4FY25 (May 2025), p. 11 · 14 May 2025

How it was checked

FY26 export growth of 41% exceeded the 20-22% expected. (judged from later company statements)

Evidence (7 Jun 2026): “25% of Operating Revenue” — Investor presentation — Q4FY26 (7 Jun 2026)

Evidence (11 May 2026): “25% of Operating Revenue” — Concall presentation — Q4FY26 (May 2026)

Condition attached by management: Subject to tariff clarity and customer orders.

How this guidance changed

Stated once in the documents read so far.

Depreciation not expected to rise much Hint
Depreciation not expected to increase much going forward as capex has been capitalised.
Promised
to hold or improve
for FY26
Delivered
up 12.0%
FY26
ResultMissed
Said
14 May 2025
Concall transcript

In management's words

“So we don't foresee much of increase in the depreciation going forward, barring standard depreciation”
Bijay Agrawal, CFO · Concall transcript — Q4FY25 (May 2025), p. 15 · 14 May 2025

How it was checked

Depreciation rose by 12.0% in FY26 from FY25 — against what management indicated (annual result).

Condition attached by management: Barring standard depreciation.

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Capex varies from INR300 crores to almost INR1,000 crores Direct
Potential capex for component manufacturing under the government scheme could range from INR300 crore to almost INR1,000 crore.
Promised
₹300 Cr – ₹1,000 Cr
for by FY26
Delivered
≈ ₹404 Cr
FY26
ResultAchieved
Said
14 May 2025
Concall transcript

In management's words

“Broadly, we can see the capex varies from maybe a INR300 crores, INR400 crores to almost INR1,000 crores also here.”
Bijay Agrawal, CFO · Concall transcript — Q4FY25 (May 2025), p. 10 · 14 May 2025

What it implies in numbers

Reaching ₹300 Cr by FY26 from ₹193 Cr (FY25) needs about 55.4% growth a year.

How it was checked

FY26 actual ₹404 Cr (estimate) — met the guided ₹300 Cr – ₹1,000 Cr (change in fixed assets and CWIP plus depreciation).

Condition attached by management: Depends on component chosen and capacity; contingent on participating in the component scheme (no proposal approved by board yet).

How this guidance changed

Stated once in the documents read so far.

Elcome and Navicom consolidation · Elcome and Navicom Indirect
Elcome and Navicom expected to be consolidated into Syrma's financials in Q4 FY26.
Promised
milestone
for Q4FY26
Delivered
—
ResultAchieved
Said
11 Nov 2025
Concall transcript

In management's words

“we expect this to be consolidated in our overall financials in Q4. That's what we are targeting.”
Bijay Agrawal, CFO · Concall transcript — Q2FY26 (Nov 2025), p. 6 · 11 Nov 2025

How it was checked

Elcome was consolidated from 31 December 2025, within the Q4 FY26 target window, though no evidence covers Navicom. (judged from later company statements)

Evidence (29 Jan 2026): “Syrma SGS consummated the acquisition of 60% stake on Dec 17th,2025 for ₹2,350 Million.” — Concall presentation — Q3FY26 (Feb 2026)

How this guidance changed

Stated once in the documents read so far.

Growth rate excluding defence and PCB Hint
Excluding defence and PCB, management expects superior growth in the coming years than achieved in FY26 so far.
Promised
to improve
for FY26
Delivered
up 27.3%
FY26
ResultAchieved
Said
11 Nov 2025
Concall transcript

In management's words

“if I were to only talk of excluding the defense and the PCB venture, we still believe that we are in a position to deliver superior growth in the coming years than what we have achieved this year thus far.”
J. S. Gujral, Managing Director · Concall transcript — Q2FY26 (Nov 2025), p. 10 · 11 Nov 2025

How it was checked

Revenue rose by 27.3% in FY26 from FY25 — in line with what management indicated (annual result).

Condition attached by management: excludes defence and PCB

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Positive cash flow Direct
Management is confident of achieving positive cash flow of around 25% to 30% for full-year FY26, as previously targeted.
Promised
25–30%
for FY26
Delivered
₹290 Cr
FY26
ResultAchieved · beat
Said
11 Nov 2025
Concall transcript

In management's words

“we are confident of achieving a positive cash flow of around 25% to 30% for the full year as targeted and communicated previously.”
Bijay Agrawal, CFO · Concall transcript — Q2FY26 (Nov 2025), p. 6 · 11 Nov 2025

How it was checked

FY26 actual ₹290 Cr — ahead of the guided 25–30% (cash flow statement).

Condition attached by management: metric basis not defined by management

How this guidance changed

Stated once in the documents read so far.

EBITDA Direct
Management is confident of FY26 EBITDA of INR500 crore or more.
Promised
≥ ₹500 Cr
for FY26
Delivered
₹546 Cr
FY26
ResultAchieved
Said
30 Jan 2026
Concall transcript

In management's words

“And now we are confident that we should be able to deliver INR500 crores plus of EBITDA, up from INR324 crores of last year, which would translate into a 55%, 57% growth”
J.S. Gujral, Managing Director · Concall transcript — Q3FY26 (Feb 2026), p. 4 · 30 Jan 2026

What it implies in numbers

Reaching ₹500 Cr by FY26 from ₹323 Cr (FY25) needs about 54.8% growth a year.

How it was checked

FY26 actual ₹546 Cr — met the guided ≥ ₹500 Cr (annual result).

How this guidance changed

Stated once in the documents read so far — management described it as “raised” against earlier guidance.

Tax rate for Q4 Direct
Effective tax rate for Q4 FY26 is expected at about 23-24%.
Promised
23–24%
for Q4FY26
Delivered
21%
Q4FY26
ResultPartly achieved
Said
30 Jan 2026
Concall transcript

In management's words

“Tax rate for the fourth quarter would be somewhere around 23% -- 23%, 24%.”
Bijay Agrawal, Chief Financial Officer · Concall transcript — Q3FY26 (Feb 2026), p. 17 · 30 Jan 2026

How it was checked

Q4FY26 actual 21% — narrowly short of the guided 23–24% (reported).

How this guidance changed

Stated once in the documents read so far.

Operating EBITDA margin Hint
Management says any movement in operating EBITDA margin in coming quarters will be only north of 7%.
Promised
to improve
for by Q3FY26
Delivered
H1FY26 operating EBITDA margin of 10.1%
ResultAchieved
Said
29 Jan 2025
Concall transcript

In management's words

“if any movement, it will be only north of 7% in the coming quarters”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 4 · 29 Jan 2025

How it was checked

Margins stayed above 7% through H1FY26 at 10.1%. Q3 figures are not separately reported, so the check covers only part of the period. (judged from later company statements)

Evidence (11 Nov 2025): “seeing the performance for the first half year, which is now 10%, we are very confident that we'll be able to exceed the guidance” — Concall transcript — Q2FY26 (Nov 2025)

Assumptions made in reading this

  • 'near term' read as the next four quarters

How this guidance changed

Stated once in the documents read so far.

Exports as share of operating revenue · Exports Direct
Management has guided that exports should be about 24-27% of revenue.
Promised
24–27%
for Not specified
Delivered
Export revenue was 25% of operating revenue in FY26; Q1 FY27 was 24%.
ResultAchieved
Said
24 Jul 2025
Concall transcript

In management's words

“we have guided we should be doing about 24% to 27% of exports.”
Bijay Agrawal, CFO · Concall transcript — Q1FY26 (Jul 2025), p. 10 · 24 Jul 2025

How it was checked

FY26 exports reached 25% of operating revenue, within the guided 24–27% range, and management says the 25% milestone was reached. (judged from later company statements)

Evidence (7 Jun 2026): “25% of Operating Revenue” — Investor presentation — Q4FY26 (7 Jun 2026)

Evidence (11 May 2026): “25% of Operating Revenue” — Concall presentation — Q4FY26 (May 2026)

Evidence (3 Aug 2026): “We also set out to lift exports to 25% of revenue, a milestone we reached this year.” — Annual report FY26

How this guidance changed

Stated once in the documents read so far.

Operating EBITDA margin Direct
Management holds guidance of a minimum 7% operating EBITDA margin for FY25.
Promised
≥ 7%
for FY25
Delivered
8.6% FY25 EBITDA margin
ResultAchieved
Said
29 Jan 2025
Concall transcript

In management's words

“we are confident that we would continue to grow at the industry plus average with the margin which we have guided that is a min EBITDA margin of 7%. We hold that guidance for this year”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 4 · 29 Jan 2025

How it was checked

FY25 EBITDA margin of 8.6% exceeded the 7% minimum, and management said the communicated target was achieved. (judged from later company statements)

Evidence (14 May 2025): “As we close the year, we find that we have achieved the target set and communicated to everyone.” — Concall transcript — Q4FY25 (May 2025)

Evidence (3 Sep 2025): “By prioritising Industrial, Automotive and Healthcare segments, we have improved our EBITDA margin from 6.9% in FY24 to 8.6% in FY25” — Annual report FY25

How this guidance changed

Stated once in the documents read so far.

Capex Direct
Management expects FY25 capex of about 200-245 crore.
Promised
₹200 Cr – ₹245 Cr
for FY25
Delivered
≈ ₹193 Cr
FY25
ResultPartly achieved
Said
29 Jan 2025
Concall transcript

In management's words

“So, current year it will be around 200 to 245 crore”
Bijay Agrawal, CFO · Concall transcript — Q3FY25 (Feb 2025), p. 21 · 29 Jan 2025

What it implies in numbers

Reaching ₹200 Cr by FY25 from ₹586 Cr (FY24) needs about 65.9% decline a year.

How it was checked

FY25 actual ₹193 Cr (estimate) — narrowly short of the guided ₹200 Cr – ₹245 Cr (change in fixed assets and CWIP plus depreciation).

How this guidance changed

Stated once in the documents read so far.

Consumer business share of revenue · consumer Direct
Management had targeted consumer business at about 40% of FY25 revenue.
Promised
~40%
for FY25
Delivered
35-36% of overall revenue
ResultAchieved
Said
29 Jan 2025
Concall transcript

In management's words

“we have targeted about 40% of our revenue coming in from consumer business.”
J. S. Gujral, Managing Director · Concall transcript — Q3FY25 (Feb 2025), p. 8 · 29 Jan 2025

How it was checked

Consumer share was 35-36% in FY25, below the about-40% target, and management said the mix-reduction target was met. (judged from later company statements)

Evidence (14 May 2025): “We have brought out the Consumer business to 35%, 36% of overall revenues.” — Concall transcript — Q4FY25 (May 2025)

How this guidance changed

Stated once in the documents read so far.

ROCE Direct
Management expects FY25 ROCE to close at about 14.5-15%.
Promised
14.5–15%
for FY25
Delivered
12%
FY25
ResultMissed
Said
29 Jan 2025
Concall transcript

In management's words

“we should be closing around 14.5% to 15% of ROCE”
Satendra Singh, CEO · Concall transcript — Q3FY25 (Feb 2025), p. 13 · 29 Jan 2025

How it was checked

FY25 actual 12% — short of the guided 14.5–15% (reported ratio).

How this guidance changed

Stated once in the documents read so far.

Tax rate for the current year Direct
Management expects the FY25 effective tax rate to be about 23-25%.
Promised
23–25%
for FY25
Delivered
22%
FY25
ResultPartly achieved
Said
29 Jan 2025
Concall transcript

In management's words

“This is approximately 23 to 25% there.”
Bijay Agrawal, CFO · Concall transcript — Q3FY25 (Feb 2025), p. 20 · 29 Jan 2025

How it was checked

FY25 actual 22% — narrowly short of the guided 23–25% (reported).

How this guidance changed

Stated once in the documents read so far.

Key points from each document

The main takeaways, newest document first.

Concall transcript — Q2FY27 (6 Nov 2026) · 6 Nov 2026
  • Management raised FY27 revenue growth guidance to 40-45%, which it says implies about INR7,000 crore of revenue, with growth to be delivered while maintaining fiscal discipline.
  • Management said it is confident of crossing $1 billion of revenue in FY28, while also saying the 40-45% FY27 guidance depends on supply chain easing.
  • Management said supply chain constraints are expected to persist for 5-6 months and ease only in April to June 2027, and that the guidance is kept conservative because of this.
  • Management guided FY27 EBITDA margin to 10-10.5% and FY28 to 10.5-11%, with PCB and other margin-accretive projects expected to lift margins from FY28-29.
  • The PCB project, with total investment of INR800-900 crore, is targeted to start commercial production by April 2027. Management expects INR700-800 crore of revenue from it in FY29 on the INR800 crore investment.
  • Exports are guided to cross INR1,700 crore in FY27 and about INR2,000 crore in FY28, with new customer onboarding cited as the driver.
  • Open order book stood at INR7,420 crore at September 2026, with about INR1,200 crore of it extending beyond 12 months, which management attributes to longer customer commitments during supply constraints.
  • Operating cash flow turned positive in Q2 at INR120 crore, about 30% of EBITDA, after a negative Q1, and working capital days fell to 63 from 71.
  • Management said that guidance is set conservatively, citing supply chain constraints, the US midterm elections and Middle East developments as uncertainties, and it now expects the consumer segment to taper in H2.
Concall transcript — Q1FY27 (4 Aug 2026) · 4 Aug 2026
  • Q1 FY27 consolidated revenue rose 67% year-on-year to Rs 1,604 crore, with PAT up 112%. Management says there were no one-time revenue bookings.
  • Management reiterated FY27 revenue growth guidance of 35% plus and said it expects to exceed that guidance based on Q1 performance.
  • Operating EBITDA margin was 10.1% in Q1 because of higher consumer mix. Management maintained FY27 margin guidance of 10.5% to 11%.
  • Net working capital days rose from 63 to 71 on higher inventory held as a strategic asset. Short-term borrowings rose about Rs 340 crore, though the company still reports net cash of Rs 122 crore.
  • Supply chain constraints from the West Asia situation, specialty chemicals and component lead times are a key industry concern. Management set up a war room to protect customer deliveries.
  • Exports grew about 61% in Q1 and management expects FY27 exports of Rs 1,500 to 1,600 crore, up from about Rs 1,200 crore in FY26.
  • The PCB project is on track. Management expects commercial production by April 2027, with phase-one debt funding of 50% to 60% and a 50% government capex incentive.
  • Order book stood at about Rs 6,770 crore at June end, with about Rs 5,400 crore expected to execute within 12 months. Management reported 18 new client onboardings in the quarter.
  • ODM revenue was Rs 270 crore in Q1, up about 115% year-on-year but down sequentially from Rs 345 crore. Management targets ODM at 17% to 19% short term and about 25% long term.
  • Management expects consumer business to hold around 30% of annual revenue, with quarterly swings. Industrial revenue moderated sequentially because of maritime seasonality and slower smart metering.
Annual report FY26 · 3 Aug 2026
  • The Naidupeta bare-board PCB project, around ₹1,600 crore phased over three to five years, is the largest strategic bet, with trial production targeted for December 2026 to early 2027.
  • Consolidated total revenue rose 27% to ₹4,857 crore in FY26, with EBITDA up 56% and profit after tax up 87% year on year.
  • Operating EBITDA margin expanded 270 basis points to 11.3%, helped by a richer vertical mix, growing exports and a larger ODM book.
  • Entry into naval and maritime electronics via a 60% Elcome stake and a rail and industrial JV with Elemaster adds higher-barrier verticals in a single year.
  • Gross borrowings fell from ₹611 crore to ₹353 crore, net debt of ₹264 crore turned into net cash of ₹467 crore, and the long-term rating was upgraded to AA.
  • The first multi-year, multi-product framework agreement carries revenue potential of about USD 250 million over two to three years, and management plans to extend the model.
  • The company raised Rs 10,000 million through a QIP in FY26 and reports that all proceeds were utilised as per the placement document.
  • Debt-equity fell to 0.08 times from 0.34 times, mainly because borrowings were repaid from QIP proceeds and equity grew.
  • Revenue from operations rose to Rs 43,671.54 million in FY26 from Rs 36,157.51 million, and profit for the year rose to Rs 2,933.69 million from Rs 1,686.59 million.
  • Imported raw materials are in shortage or costlier, which the company says is reducing margins; it is negotiating price increases with customers.
  • Auditors flagged impairment assessment of investments, loans and receivables from subsidiaries as a key audit matter, since subsidiary net worth is below carrying value.
  • The company raised INR 10,000 million through a QIP in FY26 at a premium of INR 689 per share, and reports that all proceeds have been used as per the placement document.
  • Consolidated revenue from operations rose to INR 48,190.59 million in FY26 from INR 37,866.91 million in FY25.
  • Net debt fell sharply to INR 549.60 million at 31 March 2026 from INR 3,169.90 million a year earlier, and the net debt to equity ratio dropped to 0.02 times.
Use-of-proceeds report — Q1FY27 · 30 Jul 2026
  • The final monitoring agency report says the entire Rs 7,257.22 million net IPO proceeds are fully utilised, with nothing left unutilised, so the IPO monitoring is closing.
  • The monitoring agency reports no deviation from the objects of the issue, and no revision to the original cost of any object.
  • The Rs 4,030 million capital expenditure object is fully utilised, and the agency says the spend follows the details in the prospectus.
  • The Rs 1,315.80 million working capital object is fully used for labour charges, and general corporate purposes are capped below 25% of gross fresh-issue proceeds.
  • No delay in implementing any object is reported, because the entire proceeds have been fully utilised.
  • The statutory auditor certificate is dated July 28, 2026, and the board approved the general corporate purposes utilisation on July 29, 2026.
  • The report restates the 2022 offer-document plans for SMT lines and a R&D facility as historical objects of the IPO. It sets no new forward targets.
Press release — Q1FY27 · 29 Jul 2026
  • Consolidated revenue rose 67.1% year-on-year to Rs 16,037 million in Q1FY27, with EBITDA up 72.0% and PAT up 111.8%.
  • Growth was led by Automotive, Consumer and the export business, as customer programmes onboarded through FY26 begin to scale.
  • Management said it remains firmly committed to its FY27 growth aspirations, without giving a numeric target.
  • A strategic joint venture with KAGA Electronics Co., Ltd. aims to strengthen electronics manufacturing in India and support Japanese OEM customers.
  • Consolidated EBITDA margin was 11.0% in Q1FY27, up 31 bps year-on-year but down from 12.6% in Q4FY26.
  • Export revenue was 24% of operating revenue in Q1FY27, up 67% year-on-year.
  • Management plans to scale MedTech and Maritime electronics and progress its PCB project as part of building the next phase of growth.
  • Jaidit Singh Brar was appointed Chief Executive Officer effective June 26, 2026, bringing over 25 years of leadership experience.
  • India Ratings upgraded the long-term credit rating to IND AA/Stable from IND AA-/Stable and affirmed the short-term rating at IND A1+.
Board Meeting Outcome for Outcome Of Board Meeting Held On July 29, 2026, Under Regulation 30 And 33 Read With Part A Of Schedule Ill Of The SEBI (Listing Oblig · 29 Jul 2026
  • Standalone revenue from operations for the quarter ended June 2026 was Rs 14,428.21 million, against Rs 9,080.56 million restated for the June 2025 quarter.
  • Consolidated revenue from operations for the quarter ended June 2026 was Rs 15,886.18 million, against Rs 9,439.80 million a year earlier.
  • The Board approved raising up to Rs 1,000 crore through a QIP or other permissible mode, with details to be disclosed when decided by the Board or its committee.
  • The company signed an agreement with Kaga Electronics India for a new electronics manufacturing services company, in which Syrma would hold up to 60% and Kaga up to 40%, subject to conditions precedent.
  • Standalone profit after tax for the quarter was Rs 940.61 million, up from Rs 808.88 million in the preceding quarter ended March 2026.
  • The Board recommended a final dividend of 15% (Rs 1.5 per share of Rs 10) for FY2025-26, subject to shareholder approval at the AGM.
  • The Board approved re-appointment of Sandeep Tandon as Executive Chairman for five years from October 1, 2026, subject to shareholder approval.
  • The entire net IPO proceeds of Rs 7,257.22 million have been utilised as per the prospectus objects, leaving no unutilised amount as of June 30, 2026.
  • The Board approved the appointment of Umesh Sagta & Associates as Cost Auditors for FY2026-27, subject to shareholder confirmation of remuneration.
Investor presentation — Q1FY27 · 29 Jul 2026
  • Profitability expanded sharply year on year, with PBT up 110% and PAT up 112%, although EBITDA margin declined quarter on quarter.
  • Revenue from operations rose 66.7% year on year to Rs 15,886 million in Q1FY27, up 8.4% quarter on quarter.
  • EBITDA margin of 11.0% was up only 0.3 points year on year but fell 1.6 points from the 12.6% in Q4FY26.
  • Export revenue grew 67% year on year and made up 24% of operating revenue in Q1FY27.
  • The company reported net cash of Rs 1,224 million at 30 June 2026, with net debt to LTM EBITDA at -0.2, versus net cash in the prior quarter.
  • Total debt rose to Rs 6,860 million from Rs 3,531 million, mainly because working capital loans increased to Rs 6,193 million.
  • Net working capital days rose to 71 from 63 as management built strategic inventory against supply chain risk and early ramp-up of new customers.
  • ROCE improved to 17.3% from 13.5% a year earlier, and ROCE adjusted for goodwill was 20.1%.
Announcement under Regulation 30 (LODR)-Joint Venture · 22 Jun 2026
  • Syrma SGS has signed an agreement with Kaga Electronics India to set up a joint venture EMS facility in India focused on Japanese clients.
  • The company will hold up to 60% of the joint venture company, with Kaga Electronics holding up to 40%, subject to conditions precedent and closing conditions.
  • Syrma's equity subscription in the JV is approximately INR 15 crore, while Kaga's is INR 10 crore.
  • The JV is not yet incorporated and the transaction remains subject to customary conditions precedent and closing conditions.
  • The JV board will have four directors, two nominated by Syrma and two by Kaga, giving Syrma equal board representation.
  • The transaction is not with a promoter or group company and is not a related party transaction conducted at arm's length.
Investor presentation — Q4FY26 (7 Jun 2026) · 7 Jun 2026
  • Syrma plans about ₹1,600 crore of phased capex for its Naidupeta PCB platform over the next 3-5 years, with ECMS incentives expected to reimburse about half.
  • FY26 revenue rose 27% to ₹48,569 Mn and EBITDA rose 56% to ₹5,823 Mn, with EBITDA margin expanding to 12.0%.
  • Net debt turned into net cash of ₹4,672 Mn at March 2026, against net debt of ₹2,639 Mn a year earlier.
  • The ₹235 crore acquisition of a 60% stake in Elcome gives Syrma entry into maritime and defence electronics, which management sees as a high-margin, high-barrier segment.
  • The PCB project depends on ECMS incentives and on delivering a plant ready for commercial operations by around March 2027, which carries execution risk.
  • Capex and investments rose to ₹7,420 Mn in FY26 from ₹1,052 Mn in FY25, funded by ₹6,385 Mn of net borrowing and equity inflows.
  • Q4 FY26 EBITDA margin of 12.6% fell from 13.3% in Q3, and gross margin fell from 27.4% to 25.9%.
  • IT and Railways revenue grew 74% in FY26 to ₹4,336 Mn, the fastest-growing industry segment, while Consumer grew only 8%.
  • The Elemaster JV in Bengaluru expects its first SMT line to be operational in Q2 FY2027, with a second line in FY27.
  • Working capital days improved to 63 in FY26 from 69 in FY25, and OCF to EBITDA held at about 53%.
Concall transcript — Q4FY26 (18 May 2026) · 18 May 2026
  • Management guides about 30-35% blended revenue growth for FY27, supported by order book, new customers and the exports run-rate.
  • FY27 operating EBITDA margin guided at 10.5-11%, below the roughly 12% delivered in FY26, which management attributes to caution on raw materials and geopolitics.
  • A large PCB capex programme of about INR800 crore is planned, with about INR250 crore in FY27 and the rest spread to mid-FY29, partly funded by debt and a 25% JV partner.
  • Metal price rises and logistics disruption are being passed through to customers only with a lag, so margin pressure may persist until supply chains normalise.
  • Management expects the PCB project to be funded without a cash shortfall, relying on a 50-60% government subsidy, internal accruals and borrowings.
  • Export growth is targeted at about 25-30% and exports of about INR1,500 crore for FY27, supported by 32 new customers onboarded in FY26.
  • The Ksolare acquisition with Premier Energies was dropped; management now plans a greenfield renewable-energy inverter entry, with details expected within a quarter.
  • Net debt of INR264 crore turned into net cash of INR467 crore by March 2026, with debt cut from INR611 crore to INR353 crore and debt-to-equity at 0.1x.
  • Management expects rising competition from larger EMS players and says it will compete on cost structure and export relationships.
  • Order book stood at about INR6,600 crore after INR1,470 crore of Q4 deliveries, but its growth slowed to about 3% between December and March.
  • Management says it will prioritise working capital and will forgo top-line growth rather than let the cycle lengthen, with a further reduction from 63 days targeted.
Concall presentation — Q4FY26 (May 2026) · 11 May 2026
  • FY26 revenue from operations rose 27.2% to Rs 48,191 million, and profit grew faster than revenue as margins expanded.
  • FY26 EBITDA margin was 12.0% against 9.7% a year earlier, with gross margin up about 3 points.
  • Q4FY26 PAT rose 67% year on year to Rs 1,192 million, with revenue up 57% on operating revenue.
  • Capex and investments rose sharply to Rs 7,420 million in FY26 from Rs 1,052 million, a major step-up in investing outflow.
  • Total debt fell to Rs 3,531 million and the company reports net cash of Rs 4,672 million at March 2026, compared with net debt a year earlier.
  • Q4FY26 EBITDA margin of 12.6% was below Q3FY26's 13.3%, and the ex-other-income EBITDA margin also eased sequentially.
  • IT and Railways revenue grew 74% in FY26 and Auto grew 39%, while Consumer grew only 8% and its share of revenue fell to 30%.
  • Debt to equity fell to 0.1 from 0.3, while ROCE improved to 16.9% from 12.4%.
  • Net working capital days improved to 63 from 69, but operating cash flow conversion was slightly lower at 53.2% of EBITDA.
  • Export revenue was 25% of operating revenue in FY26.
Concall transcript — Q3FY26 (Feb 2026) · 30 Jan 2026
  • Management now expects FY26 EBITDA of INR500 crore plus, up from the earlier INR400 crore guidance, after INR370 crore in the first nine months.
  • Management expects 30% growth in both revenue and EBITDA in FY27, with a blended EBITDA margin of about 10%.
  • Management guides FY26 revenue of INR4,850 to INR5,000 crore, which needs a sharp sequential step-up in Q4.
  • Q3 margin expansion was driven by higher export, ODM, industrial and healthcare mix, with gross margin of 27.4% and EBITDA margin of 12.6%.
  • Management plans about INR1,500 crore of PCB and related capex by FY30, with phase one of INR360-400 crore and an expected 50% Andhra Pradesh subsidy.
  • Smart meter growth is being held back by management's choice to avoid customers that tie up working capital, with FY27 growth guided at 20-30%.
  • Management says US tariff uncertainty has weighed on the sector for months and hopes it resolves this quarter; it sees the India-EU FTA as a longer-term positive for exports.
  • Net working capital is about 76 days (68 days excluding Elcome), with a further 5-6 day reduction targeted over the next 2-3 quarters.
  • Elcome acquisition is closed; it is guided to add INR280-300 crore revenue in FY26 and grow 10-15% in FY27, with margins above 20%.
  • Order book visibility stood at about INR6,400 crore at December end, with auto about 31% and consumer about 25%.

Documents read

← Back to the Syrma SGS Technology Ltd stock page All companies tracked

Guidance is extracted from company documents and interviews by an AI model and then checked against reported numbers by rule. It can contain errors or miss context, and the stored figures may differ from the basis management guided on. This page is information only and is not investment advice.

𝕏