Sky Gold & Diamonds Ltd: management guidance tracker
What management said it would deliver, when, where they said it — and what the reported numbers showed afterwards.
How to read this page — 30 seconds
- Latest guidance is what management said at its most recent results call, presentation or interview, next to what it had said before. Raised or Lowered tells you which way expectations moved.
- Other open guidance lists earlier promises that have not fallen due, soonest first, with the latest reported figure.
- Track record compares each promise that has fallen due with what the company actually delivered. That is the best guide to how much weight to give the new guidance.
Select any row for management's exact words, where they said it and how the target changed over time.
Latest guidance · 5 Nov 2026
From Concall transcript — Q2FY27 (5 Nov 2026). What management guided for most recently, against what it had said before.
PAT margin
Direct
Management said its earlier PAT margin guidance of 5% to 5.25% is in line and still on track.
Earlier
4.5–4.75%FY27 · 9 Aug 2026
Now5–5.25%FY27
Change
Raised
StatusOn track
So far: 5.31%
In management's words
“we have guided for a 5% to 5.25% of PAT margins, and we are in line to our historical guidance that we have provided to the streets.”
How it was checked
Year to date (Q1FY27–Q2FY27) net profit margin is 5.3% against the guided 5–5.25% for FY27.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 10 Feb 2025 — 3.5% for FY27
First stated
Concall transcript · On track (actual 5.31%)
- 10 Feb 2026 — ≥ 4.25% for FY27
Raised
Concall transcript · On track (actual 5.31%)
- 27 May 2026 — 4.5–4.75% for FY27
Raised
Concall presentation · On track (actual 5.31%)
- 9 Aug 2026 — 4.5–4.75% for FY27
Repeated
Investor presentation · On track (actual 5.31%)
- 5 Nov 2026 — 5–5.25% for FY27
Raised
Concall transcript · On track (actual 5.31%)
Revenue
Direct
Walked back
Management referred to an earlier target of INR18,000 crore revenue by FY2030, without restating whether it still holds.
Earlier
₹18,000 Cr – ₹19,000 Crby FY30 · 28 May 2026
Now₹18,000 Crby FY30
Change
Lowered
StatusPending
In management's words
“We had earlier guided for INR18,000 crores revenue by FY2030, INR945 crores of PAT, 20% to 25% of PAT converted into operating cash flow, and a net debt-free balance sheet by 2030.”
What it implies in numbers
Reaching ₹18,000 Cr by FY30 from ₹6,292 Cr (FY26) needs about 30.1% growth a year.
How it was checked
Due with FY30 results; nothing reported since the statement yet.
How this guidance changed
- 10 Feb 2026 — ₹18,000 Cr – ₹19,000 Cr for by 2030
First stated
Concall transcript · Pending (actual ₹8,084 Cr)
- 28 May 2026 — ₹18,000 Cr – ₹19,000 Cr for by FY30
Deadline brought forward
Concall transcript · Pending
- 5 Nov 2026 — ₹18,000 Cr for by FY30
Lowered
Concall transcript · Pending
PAT
Direct
Management referred to an earlier target of INR945 crore PAT by 2030, without restating whether it still holds.
Earlier
₹945 Crby 2030 · 28 May 2026
Now₹945 Crby 2030
Change
Repeated
StatusPending
In management's words
“We had earlier guided for INR18,000 crores revenue by FY2030, INR945 crores of PAT, 20% to 25% of PAT converted into operating cash flow, and a net debt-free balance sheet by 2030.”
What it implies in numbers
Reaching ₹945 Cr by Q3FY31 from ₹129 Cr (Q2FY27) needs about 59.8% growth a year.
How it was checked
Due with Q3FY31 results; nothing reported since the statement yet.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
- 10 Feb 2026 — ₹945 Cr for by 2030
First stated
Concall transcript · Pending (actual ₹406 Cr)
- 28 May 2026 — ₹945 Cr for by 2030
Repeated
Concall transcript · Pending (actual ₹406 Cr)
- 5 Nov 2026 — ₹945 Cr for by 2030
Repeated
Concall transcript · Pending
Operating cash flow as a share of PAT
Direct
Management referred to an earlier target of converting 20% to 25% of PAT into operating cash flow, without a stated time frame.
Earlier
20–25%Not specified · 28 May 2026
Now20–25%Not specified
Change
Repeated
StatusPending
In management's words
“20% to 25% of PAT converted into operating cash flow”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
- 28 May 2026 — 20–25% for Not specified
First stated
Concall transcript · Pending
- 5 Nov 2026 — 20–25% for Not specified
Repeated
Concall transcript · Pending
Net debt-free balance sheet
Indirect
Management referred to an earlier aim of a net debt-free balance sheet by 2030, without restating whether it still holds.
Earlier
First time stated
Nowmilestoneby 2030
Change
New
StatusPending
In management's words
“and a net debt-free balance sheet by 2030.”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Other open guidance · soonest due first
Earlier promises that have not fallen due yet, with the latest figure where one has been reported.
Tanishq onboarding
Hint
Management says Tanishq has verbally committed to onboard Sky Gold by Diwali.
Targetmilestone
DueQ3FY24
result by 14 Feb 2024
Said15 Aug 2023
Concall recording
StatusAwaiting data
In management's words
“They have verbally told us that we will on board you on till Diwali.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Verbal assurance only, not yet in writing
How this guidance changed
Stated once in the documents read so far.
B2C stores · B2C retail (South India)
Direct
Management plans about 8 to 9 B2C stores in South India within a year, not yet on paper.
Target8–9 stores
Dueby FY24
result by 30 May 2024
Said15 Aug 2023
Concall recording
StatusAwaiting data
In management's words
“Maybe 8 to 9 stores, but it is not on the paper.”
How it was checked
Store / outlet count is not in the stored financial tables.
Condition attached by management: Not yet formalised
Assumptions made in reading this
- horizon counted from FY23 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Gold metal loan share of debt
Direct
Walked back
Gold metal loans expected to be 50-60% of debt by the December quarter.
Target50–60%
DueQ3FY25
result by 14 Feb 2025
Said19 Nov 2024
Concall transcript
StatusAwaiting data
In management's words
“but I think we will be at 50%-60% of GML by December quarter and 80% by March quarter.”
How it was checked
Q3FY25 results were due by 2025-02-14 but are not in the stored data yet.
Condition attached by management: Subject to bank policies
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
Customer ordering app
Hint
Customer ordering app, currently on trial, expected to be fully live by the December quarter.
Targetmilestone
DueQ3FY25
result by 14 Feb 2025
Said19 Nov 2024
Concall transcript
StatusAwaiting data
In management's words
“I think by December quarter, it will be live totally.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
EBITDA margin (subsidiaries) · subsidiaries
Indirect
Subsidiary EBITDA margin expected to rise from 4.5% to 5.5% with new verticals and designs.
Target~5.5%
DueQ3FY25
result by 14 Feb 2025
Said19 Nov 2024
Concall transcript
StatusAwaiting data
In management's words
“we are also expecting them to take into quarter to 5.5% EBITDA”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: New verticals and designs, capital infusion
How this guidance changed
Stated once in the documents read so far.
Studded and 18 carat share · studded jewellery and 18 carat
Hint
Studded and 18 carat mix expected to increase further in the December quarter.
Targetto improve
DueQ3FY25
result by 14 Feb 2025
Said19 Nov 2024
Concall transcript
StatusAwaiting data
In management's words
“So, in this December quarter also you will see that our Studded and 18 Carat is increasing.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Gross margin
Direct
FY25 gross margin expected at about 6.5%, described as conservative.
Target≥ 6.5%
DueFY25
result by 30 May 2025
Said19 Nov 2024
Concall transcript
StatusAwaiting data
In management's words
“So, gross margin we are expecting to be 6.5% conservatively and EBITDA margin is 5% to 5.5%.”
How it was checked
Gross margin is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Q4 monthly volume
Hint
Management said Q4 volume is on track and much better than the December quarter, without giving a figure.
Targetto improve
DueQ4FY25
result by 30 May 2025
Said10 Feb 2025
Concall transcript
StatusAwaiting data
In management's words
“this quarter is much better than the December quarter.”
How it was checked
Volume is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Additional monthly volume from new clients · CaratLane and Aditya Birla
Direct
Monthly volume from CaratLane and Aditya Birla is expected to add about 100 kg from the April 2025 quarter.
Target100 kg per month
DueQ1FY26
result by 14 Aug 2025
Said10 Feb 2025
Concall transcript
StatusAwaiting data
In management's words
“So we are expecting to add from April quarter, 50 kg from both the companies.”
How it was checked
Volume is not in the stored financial tables.
Condition attached by management: Trial basis for Aditya Birla this quarter.
How this guidance changed
Stated once in the documents read so far.
Capex plan for new plant
Hint
Detailed capex amount and timing for the new plant to be announced after the June 2025 quarter; capex expected mostly from internal accruals.
Targetmilestone
DueQ1FY26
result by 14 Aug 2025
Said29 May 2025
Concall transcript
StatusAwaiting data
In management's words
“we will come up with all these details after June quarter and what will be our CAPEX plan and how we will be executing it.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Export order run rate (Malaysia advanced gold order) · exports
Direct
Export order run rate expected to reach 100 kg per month in the July 2025 quarter.
Target100 kg per month
DueQ2FY26
result by 14 Nov 2025
Said29 May 2025
Concall transcript
StatusAwaiting data
In management's words
“I think in one quarter we will be at 100 kg and 150 kg in July quarter, 100 kg run rate.”
How it was checked
Volume is not in the stored financial tables.
Condition attached by management: Depends on customer timelines and advance USD payments.
How this guidance changed
Stated once in the documents read so far.
Export order run rate · export
Direct
Management expects the outside export order to run at about 100 kg per month from next quarter.
Target~100 kg per month
DueQ2FY26
result by 14 Nov 2025
Said25 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“from next quarter, we'll be at the run rate of per month 100 kg.”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: Dubai office operational
How this guidance changed
Stated once in the documents read so far.
Receivable days
Direct
Management expects debtor days to fall to 25-26 in the coming quarter.
Target25–26 days
DueQ2FY26
result by 14 Nov 2025
Said25 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“And coming quarter also, it will come down to 25, 26 days.”
How it was checked
Q2FY26 results were due by 2025-11-14 but are not in the stored data yet.
How this guidance changed
Stated once in the documents read so far.
Lab-grown share of revenue · lab-grown diamonds
Indirect
Lab-grown diamonds are expected to reach about 5% of revenue within roughly 3-6 quarters.
Target~5%
Dueby Q3FY26
result by 14 Feb 2026
Said10 Feb 2025
Concall transcript
StatusAwaiting data
In management's words
“lab-grown will have a place of 5% in next 3, 4 quarters or 6 quarters.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- 'next quarter' counted from Q3FY25, the quarter being reported at the time
How this guidance changed
Stated once in the documents read so far.
Export order run rate (Malaysia advanced gold order) · exports
Direct
Export order run rate expected to reach 150 kg per month in the December 2025 quarter.
Target150 kg per month
DueQ3FY26
result by 14 Feb 2026
Said29 May 2025
Concall transcript
StatusAwaiting data
In management's words
“And again, December quarter we will be at 150 kg run rate and March quarter will be 200 kg.”
How it was checked
Volume is not in the stored financial tables.
Condition attached by management: Depends on customer timelines and advance USD payments.
How this guidance changed
Stated once in the documents read so far.
Export order run rate · export
Direct
Management expects the export order to reach a 200 kg per month run rate in Q3 FY26, while saying 125-150 kg is the conservative case.
Target~200 kg per month
DueQ3FY26
result by 14 Feb 2026
Said25 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“And third quarter, we are expecting 200 kg.”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: Customer order confirmation; management said conservatively 125-150 kg
How this guidance changed
Stated once in the documents read so far.
Volume run rate
Direct
Management says it is on track to reach a volume of 630 kg per month next quarter.
Target630 kg per month
DueQ3FY26
result by 14 Feb 2026
Said14 Nov 2025
Concall transcript · 2× since 25 Jul 2025
StatusAwaiting data
In management's words
“So, we are on track to reach 630 kg in next quarter.”
How it was checked
Volume is not in the stored financial tables.
Condition attached by management: Includes about 50 kg per month from Speed Bangle.
How this guidance changed
- 25 Jul 2025 — ~630 kg per month for Q3FY26
First stated
Concall transcript · Awaiting data
- 14 Nov 2025 — 630 kg per month for Q3FY26
Repeated
Concall transcript · Awaiting data
Speed Bangle volume · Speed Bangle (formerly Ganna N Gold)
Direct
Management expects Speed Bangle volume to rise to 50 kg per month next quarter.
Target50 kg per month
DueQ3FY26
result by 14 Feb 2026
Said14 Nov 2025
Concall transcript
StatusAwaiting data
In management's words
“next quarter it will be 50 kg per month”
How it was checked
Volume is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Export order run rate (Malaysia advanced gold order) · exports
Direct
Export order run rate expected to reach 200 kg per month in the March 2026 quarter.
Target200 kg per month
DueQ4FY26
result by 30 May 2026
Said29 May 2025
Concall transcript
StatusAwaiting data
In management's words
“And again, December quarter we will be at 150 kg run rate and March quarter will be 200 kg.”
How it was checked
Volume is not in the stored financial tables.
Condition attached by management: Depends on customer timelines and advance USD payments.
How this guidance changed
Stated once in the documents read so far.
Monthly volume · Ganna N Gold
Direct
Management expects Ganna N Gold to run at 60-70 kg per month this year on a job-work model.
Target60–70 kg per month
DueFY26
result by 30 May 2026
Said25 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“We are expecting this year, 60, 70 kg per month volume from this.”
How it was checked
Volume is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Job work percentage
Direct
Management is targeting job work at 7.5% of the business this year once Reliance and Aditya Birla orders begin.
Target7.5%
DueFY26
result by 30 May 2026
Said25 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“if the Reliance and Aditya Birla will be joined, we are targeting 7.5% this year.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Reliance and Aditya Birla orders start
How this guidance changed
Stated once in the documents read so far.
Footprint in large-format retail stores · large-format retail stores
Hint
Management has plans underway to expand its footprint through large-format retail stores, with no number or timeframe.
Targetto improve
DueFY26
result by 30 May 2026
Said1 Sep 2025
Annual report
StatusAwaiting data
In management's words
“With plans underway to expand our footprint in large-format retail stores,”
How it was checked
Store / outlet count is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Expansion into newer geographies and broader product categories
Hint
Management intends to expand into newer geographies and broaden product categories, with no numeric target.
Targetto improve
DueFY26
result by 30 May 2026
Said1 Sep 2025
Annual report
StatusAwaiting data
In management's words
“Looking ahead, our strategy is clear—expand into newer geographies, broaden our product categories, and deepen our relationships with existing customers while acquiring new ones.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Marketing and brand-building investment
Hint
Management intends to keep making substantial investments in marketing and brand-building with a global visibility focus, with no amount stated.
Targetto improve
DueFY26
result by 30 May 2026
Said1 Sep 2025
Annual report
StatusAwaiting data
In management's words
“Persist in substantial investments in marketing & brand-building endeavors, with a focus on global visibility.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Interest saving on borrowing cost
Direct
Walked back
Management expects to save 5.5% in interest on borrowings by shifting from CC limits to gold-metal loans.
Target−550 bps
DueFY26
result by 30 May 2026
Said14 Nov 2025
Concall transcript · 2× since 10 Feb 2025
StatusAwaiting data
In management's words
“So, we will save 5.5% of interest going ahead on the borrowing cost.”
What it implies in numbers
A change of 550 bps on 9.5% (FY25) implies interest cost of about 15.0% in FY26.
How it was checked
Interest cost as a ratio is not in the stored financial tables.
Condition attached by management: Depends on GML utilisation.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
- 10 Feb 2025 — −50 bps for FY26
First stated
Concall transcript · Awaiting data
- 14 Nov 2025 — −550 bps for FY26
Raised
Concall transcript · Awaiting data
Global accounting firm onboarding
Indirect
Following Q4 FY26 results, management plans to announce measures to strengthen financial reporting, including onboarding a larger global accounting firm.
Targetmilestone
DueQ4FY26
result by 30 May 2026
Said10 Feb 2026
Concall presentation
StatusAwaiting data
In management's words
“Following the Q4 FY26 results, we will announce strategic measures to further strengthen our financial reporting framework. As part of this, we plan to onboard one of the larger global accounting firms”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Global audit firm appointment
Indirect
A global audit firm will be appointed effective 1 April 2026, which is Q1 FY27.
Targetmilestone
Dueby Apr 2026
result by 14 Aug 2026
Said10 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“From 1st April, 2026, global audit firm will be put in place, kudos to Siddharth for leading this change.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Global audit firm appointment
Hint
Management plans to bring in a global audit firm from April 2026 for additional oversight.
Targetmilestone
Dueby Apr 2026
result by 14 Aug 2026
Said5 Sep 2026
Annual report
StatusAwaiting data
In management's words
“management has also indicated plans to bring in a global audit firm from April 2026 for additional oversight.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Land sale monetisation
Hint
Land sale expected by August end 2026, with cash encashment in August or September.
Targetmilestone
DueQ2FY27
result by 14 Nov 2026
Said28 May 2026
Concall transcript
StatusPending
In management's words
“We are expecting it by August end.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Appointment of 2-3 agencies for sale
How this guidance changed
Stated once in the documents read so far.
International run rate · international
Direct
International business expected to return to 12% of sales within one quarter, from current 7-8% run rate.
Target12%
Dueby Q2FY27
result by 14 Nov 2026
Said28 May 2026
Concall transcript
StatusPending
In management's words
“we are expecting in 1 quarter, it will be back to 12%.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Recovery of Dubai and UAE business
How this guidance changed
Stated once in the documents read so far.
PAT margin
Direct
PAT margin of about 4% expected in FY26, supported by savings from gold metal loans.
Target~4%
Dueby 2026
result by 14 Feb 2027
Said29 May 2025
Concall transcript
StatusPending
In management's words
“So again, yes, because of GML we will be saving 0.3-0.4 conservatively, so we can reach 4%. I think it's reachable in 2026.”
Condition attached by management: Depends on gold metal loan savings of 0.3-0.4 points.
Assumptions made in reading this
- '2026' read as calendar year 2026
How this guidance changed
Stated once in the documents read so far.
Export growth · exports
Hint
Management anticipates significant export growth over the next 12 to 16 months from the advanced gold order.
Targetto improve
DueQ1FY27–Q3FY27
result by 14 Feb 2027
Said29 May 2025
Concall transcript
StatusOn track
So far: exports 11% of sales in FY26 from 6% in FY25
In management's words
“We are optimistic about our success in the export market and anticipate significant growth over next 12 to 16 months.”
How it was checked
Export growth is shown in later periods, with exports doubling in Q2FY26 and rising to 11% of FY26 sales, but the deadline has not passed. (judged from later company statements)
Evidence (14 Nov 2025): “I am pleased to share that our exports have doubled this quarter, reaching around INR 150 crore” — Concall transcript — Q2FY26 (Nov 2025)
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
Condition attached by management: Scaling depends on customer timelines.
How this guidance changed
Stated once in the documents read so far.
PAT
Direct
Management expects FY26 PAT of INR200-210 crores.
Target₹200 Cr – ₹210 Cr
Dueby 2026
result by 14 Feb 2027
Said25 Jul 2025
Concall transcript
StatusPending
In management's words
“we'll be creating a INR200 crores - INR210 crores PAT, but we'll need INR350 crores.”
What it implies in numbers
Reaching ₹200 Cr by Q3FY27 from ₹44 Cr (Q1FY26) needs about 174.4% growth a year.
Assumptions made in reading this
- '2026' read as calendar year 2026
How this guidance changed
Stated once in the documents read so far.
Cash flow shortfall
Direct
Management expects a cash shortfall of about INR140 crores in FY26 against PAT of INR200-210 crores.
Target~₹140 Cr
Dueby 2026
result by 14 Feb 2027
Said25 Jul 2025
Concall transcript
StatusPending
In management's words
“So INR140 crores short will be there in 2026.”
Assumptions made in reading this
- '2026' read as calendar year 2026
How this guidance changed
Stated once in the documents read so far.
Gold metal loan (GML) utilisation
Direct
GML usage targeted at about INR350 crore within 3-4 quarters.
Target~₹350 Cr
DueQ2FY27–Q3FY27
result by 14 Feb 2027
Said10 Feb 2026
Concall transcript
StatusBehind
So far: GML outstanding nil at March 2026 end
In management's words
“we are targeting it to take in 3 to 4 quarters to INR350 crores, 80% of the limit.”
How it was checked
Target was about INR350 crore of GML usage by Q3FY27, but GML outstanding was nil at March 2026 end, with only a INR170 crore facility sanctioned. Deadline has not passed. (judged from later company statements)
Evidence (28 May 2026): “as of March end, our GML outstanding is nil, but we have INR170 crores of GML facility sanctioned with us.” — Concall transcript — Q4FY26 (Jun 2026)
Condition attached by management: Depends on banks providing SBLC limits and raw material availability.
Assumptions made in reading this
- 'next quarter' counted from Q3FY26, the quarter being reported at the time
How this guidance changed
Stated once in the documents read so far.
Blended revenue · subsidiaries
Direct
FY27 revenue of about INR6,300 crores blended, with about INR1,300 crores from subsidiaries and INR5,000 crores from the parent.
Target~₹1,300 Cr
DueFY27
result by 30 May 2027
Said19 Nov 2024
Concall transcript
StatusOn track
In management's words
“Yes. Already we have given a blended of INR3,300 crores this year and FY27 is INR6,300 crores. So, INR1,300 crores from subsidiaries and INR5,000 from the parent companies.”
What it implies in numbers
Reaching ₹1,300 Cr by FY27 from ₹1,745 Cr (FY24) needs about 9.3% decline a year.
How it was checked
Deadline is FY27 and not yet passed. Management now cites an FY27 guidance of INR8,100 crores, with a Q4 exit run rate of INR7,650 crores. No subsidiary-specific revenue figure is given. (judged from later company statements)
Evidence (28 May 2026): “our annualized Q4 exit run rate for revenue of INR7,650 crores is already close to our FY27 guidance of INR8,100 crores.” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (27 May 2026): “Since then, execution has exceeded expectations, and we have progressively upgraded our guidance.” — Concall presentation — Q4FY26 (Jun 2026)
How this guidance changed
Stated once in the documents read so far.
Revised target
Direct
Revenue target by FY27 was raised to INR7,200 crore from INR6,300 crore, based on existing clients.
Target₹7,200 Cr
Dueby FY27
result by 30 May 2027
Said10 Feb 2025
Concall transcript
StatusOn track
So far: ₹6,292 Cr (FY26)
In management's words
“So we have revised our target to INR7,200 crores by FY '27.”
What it implies in numbers
Reaching ₹7,200 Cr by FY27 from ₹1,745 Cr (FY24) needs about 60.4% growth a year.
How it was checked
FY26: ₹6,292 Cr against ₹7,200 Cr targeted by FY27 — ahead of the pace required. It now needs about 14.4% growth a year to get there.
Condition attached by management: Based on existing clients only; new clients such as CaratLane, Aditya Birla and P.N. Gadgil are excluded.
How this guidance changed
Stated once in the documents read so far — management described it as “raised” against earlier guidance.
Gross margin
Direct
Gross margin is expected to be about 7% in FY27.
Target7%
DueFY27
result by 30 May 2027
Said10 Feb 2025
Concall transcript
StatusOn track
So far: 9.6% gross margin in Q2 FY27
In management's words
“So gross margins, we are expecting to be at 7%, EBITDA at 5.5% and 3.5% PAT.”
How it was checked
Q2 FY27 gross margin of 9.6% and FY26 year-to-date of 8.45% are above the 7% guided for FY27, but full-year FY27 is not yet complete. (judged from later company statements)
Evidence (5 Nov 2026): “Gross margin expanded 133 basis points to 9.6% versus Q2 FY26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (28 May 2026): “our consolidated gross margin stands at 8.45%, up 245 basis points from 6% in FY24.” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
Stated once in the documents read so far.
Export share of revenue · exports
Direct
Exports are expected to rise to 13-15% of revenue by FY27 from about 8-9% now.
Target13–15%
Dueby FY27
result by 30 May 2027
Said10 Feb 2025
Concall transcript
StatusOn track
So far: 11% of sales in FY26
In management's words
“And this 8% to 9%, we are taking -- we are expecting to go to 13%, 14% or 15% by FY '27.”
How it was checked
Exports rose from 6% in FY25 to 11% in FY26, a trend consistent with the 13-15% target by FY27, though the target year is not yet complete. (judged from later company statements)
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
Stated once in the documents read so far.
Share of production from client-supplied bullion
Indirect
About 30-40% of production is expected to come from clients who supply their own bullion within two years.
Target30–40%
Dueby FY27
result by 30 May 2027
Said10 Feb 2025
Concall transcript
StatusPending
In management's words
“So in next 2 years, we are expecting 30% to 40% from this client.”
How it was checked
Production is not in the stored financial tables.
Condition attached by management: Depends on onboarding CaratLane, Aditya Birla, Reliance and Tanishq.
Assumptions made in reading this
- horizon counted from FY25 (statement made in its last quarter)
How this guidance changed
Stated once in the documents read so far.
Debtor days
Direct
Debtor days are expected to fall from about 25 days to around 15 days by FY27 as client-supplied bullion grows.
Target~15 days
Dueby FY27
result by 30 May 2027
Said10 Feb 2025
Concall transcript
StatusBehind
So far: 33 days (FY26)
In management's words
“we are expecting it to come to 15 to 10 days”
How it was checked
FY26: 33 days against 15 days targeted by FY27 — behind the pace required.
Condition attached by management: Depends on onboarding clients that supply their own bullion.
How this guidance changed
Stated once in the documents read so far.
Monthly production capacity
Direct
Management intends to build a facility taking monthly capacity to 4 tonnes after March 2027, subject to Board approval.
Target4 tonnes per month
Dueby FY27
result by 30 May 2027
Said10 Feb 2025
Concall transcript
StatusBehind
So far: capacity still about 1.2 tonnes per month
In management's words
“we will go up to 4 ton capacity. Now we are at 1 ton capacity.”
How it was checked
Capacity was still about 1,200 kg per month in FY26, with no evidence of the 4-tonne facility, which is due by March 2027 and subject to board approval. (judged from later company statements)
Evidence (5 Sep 2026): “with a current production capacity of approximately 1200 kg per month across the facility and its subsidiaries” — Annual report FY26
Evidence (14 Nov 2025): “1.2 tons per month, we have the capacity.” — Concall transcript — Q2FY26 (Nov 2025)
Condition attached by management: Subject to Board approval and client onboarding; company will inform the exchange.
How this guidance changed
Stated once in the documents read so far.
Advanced gold share of total revenue · advanced gold
Direct
Advanced gold expected to contribute 10% of total revenue by FY27.
Target10%
DueFY27
result by 30 May 2027
Said29 May 2025
Concall transcript
StatusOn track
So far: advance gold 16% of business in Q2FY27
In management's words
“We project this to contribute 10% of our total revenues by FY ’27”
How it was checked
Advanced gold reached 16% of business in Q2FY27, above the 10% target, though the metric is business rather than strictly revenue. (judged from later company statements)
Evidence (5 Nov 2026): “advance gold was 16% of our business in Q2 '27, ahead of our '27 target of 15%.” — Concall transcript — Q2FY27 (5 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Diamonds share of revenue · diamonds
Direct
Diamonds expected to rise from about 1% to 4% of revenue by FY27.
Target4%
DueFY27
result by 30 May 2027
Said29 May 2025
Concall transcript
StatusPending
In management's words
“we anticipate this increasing to 4% by FY ‘27.”
How it was checked
Revenue as a ratio is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Exports share of volume · exports
Direct
Exports, including Dubai and Malaysia, expected to be 20% of volume by FY27.
Target20%
DueFY27
result by 30 May 2027
Said29 May 2025
Concall transcript
StatusBehind
So far: exports 11% of sales in FY26
In management's words
“aiming for exports to represent. 20% of our volume by FY ’27.”
How it was checked
Exports reached 11% of FY26 sales, well short of the 20% volume target for FY27 with a deadline not yet passed. (judged from later company statements)
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
Stated once in the documents read so far.
Working days
Direct
Management expects working capital days to be 52 to 55 days in FY27 as advanced gold reduces the cycle.
Target52–55 days
DueFY27
result by 30 May 2027
Said25 Jul 2025
Concall transcript
StatusPending
In management's words
“on track for working days of 52 to 55 days in FY '27”
Condition attached by management: Advanced gold model rollout
How this guidance changed
Stated once in the documents read so far.
Operating cash flow
Indirect
Management expects the company to be cash-flow positive after March 2027.
Targetmilestone
Dueby FY27
result by 30 May 2027
Said25 Jul 2025
Concall transcript
StatusOn track
So far: Operating cash flow positive at INR136 crore in H1FY27; positive cash flow in Q1FY27
In management's words
“After March27, we'll be 100% cash flow positive.”
How it was checked
Operating cash flow turned positive in H1FY27 and Q1FY27, ahead of the after-March-2027 target, but the deadline has not yet passed. (judged from later company statements)
Evidence (5 Nov 2026): “we generated INR136 crores of operating cash flow in H1, against an outflow of INR101 crores in H1 last year.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (9 Aug 2026): “In Q1 FY27, the Company achieved positive cash flow” — Investor presentation — Q1FY27 (9 Aug 2026)
Condition attached by management: Advanced gold model and working capital release
How this guidance changed
Stated once in the documents read so far.
Capacity at the Navi Mumbai facility
Direct
Management plans to increase Navi Mumbai facility capacity to 4.5 tons per month, looking beyond FY26-27, from current capacity of 1,050 kg per month.
Target4.5 tons per month
DueFY27
result by 30 May 2027
Said1 Sep 2025
Annual report
StatusBehind
So far: Capacity about 1,200 kg per month
In management's words
“Looking ahead beyond FY 2026–27, our strategic focus will be on increasing capacity at the Navi Mumbai facility to 4.5 ton on per month basis.”
How it was checked
Capacity is about 1,200 kg per month, far short of the 4.5 ton target, and the expansion is described as usable only by 2028. (judged from later company statements)
Evidence (5 Sep 2026): “with a current production capacity of approximately 1200 kg per month across the facility and its subsidiaries” — Annual report FY26
Evidence (14 Nov 2025): “1.2 tons per month, we have the capacity.” — Concall transcript — Q2FY26 (Nov 2025)
Evidence (28 May 2026): “So, we have a 55% utilization. Till 2028 March, we don't have any problem of the capacity.” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
Stated once in the documents read so far.
Investments in IT, automation and ERP
Hint
Management plans to enhance IT and automation investment and implement an ERP system, with no amounts stated.
Targetto improve
DueFY27
result by 30 May 2027
Said1 Sep 2025
Annual report
StatusPending
In management's words
“We plan to enhance investments in IT and automation to support scalability, implement an ERP system to streamline operations, and strengthen our mid-management and regional sales teams to drive market penetration.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Average volume
Direct
Walked back
Average volume of about 750 kg expected in FY27.
Target~750 kg
DueFY27
result by 30 May 2027
Said10 Feb 2026
Concall transcript · 5× since 19 Nov 2024
StatusBehind
So far: around 650 kgs per month in Q4FY26
In management's words
“Approximately, we are expecting to be 750 kg average.”
How it was checked
Deadline FY27 not reached; the latest run rate of about 650 kg per month is below the 750 kg average target. (judged from later company statements)
Evidence (28 May 2026): “we have done around 650 kgs per month, and that is in line with our guidance that we have provided.” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (5 Sep 2026): “Advance gold contributed approximately 11-12% of volumes in FY26, up from 5.7% in FY25.” — Annual report FY26
Condition attached by management: Mix shift to 9kT, 14kT and 18kT; volume and revenue trade off against gold prices.
How this guidance changed
- 19 Nov 2024 — 750 kgs per month for FY27
First stated
Concall transcript · On track (actual 650 kgs per month in Q4FY26)
- 10 Feb 2025 — ≥ 1,050 kg for FY27
Raised
Concall transcript · Behind (actual around 650 kgs per month in Q4FY26)
- 25 Jul 2025 — 10% for FY27
Lowered
Concall transcript · On track (actual 16% of business in Q2 FY27)
- 14 Nov 2025 — 900 kg per month for FY27
Raised
Concall transcript · Behind (actual around 650 kgs per month in Q4FY26)
- 10 Feb 2026 — ~750 kg for FY27
Lowered
Concall transcript · Behind (actual around 650 kgs per month in Q4FY26)
Natural & lab-grown diamonds margins · Natural and lab-grown diamonds
Hint
Management expects its natural and lab-grown diamond business to improve, with better margins.
Targetto improve
DueFY27
result by 30 May 2027
Said10 Feb 2026
Concall presentation
StatusPending
In management's words
“we expect our new and nurturing business of natural & lab-grown diamonds to improve having better margins”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Promoter compensation
Indirect
Promoters to take zero salary from FY27 and draw compensation only through dividends.
Targetmilestone
DueFY27
result by 30 May 2027
Said10 Feb 2026
Concall transcript
StatusPending
In management's words
“As promoter, we have agreed for Zero salary compensation model from FY'27.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Recent guidance
Hint
Management expects to exceed its recent guidance, after raising it several times since the earlier INR 5,000 crore FY27 target.
Targetto improve
DueFY27
result by 30 May 2027
Said10 Feb 2026
Concall transcript
StatusPending
In management's words
“We would be exceeding even our recent guidance also.”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far — management described it as “raised” against earlier guidance.
Cash Flow Operations FY2027E
Direct
Operating cash flow for FY27 is estimated at Rs 180-225 crore, against a negative FY26 figure.
Target₹180 Cr – ₹225 Cr
DueFY27
result by 30 May 2027
Said27 May 2026
Concall presentation
StatusPending
In management's words
“FY2027E 180-225”
Condition attached by management: A separate chart on the same page labels a Mar-27E figure of 200-250 under the same heading; the labels conflict.
How this guidance changed
Stated once in the documents read so far.
Gross margin expansion
Direct
Gross margin expected to expand by 60 to 90 bps from better mix of advanced gold and studded jewellery.
Target+60–90 bps
DueFY27
result by 30 May 2027
Said28 May 2026
Concall transcript
StatusOn track
So far: Gross margin up 133 bps year-on-year to 9.6% in Q2 FY27
In management's words
“We expect our gross margin to expand by 60 to 90 basis points due to better mix of advanced gold and studded jewellery.”
How it was checked
Q2 FY27 gross margin rose 133 bps year-on-year, above the 60-90 bps FY27 target range; full-year FY27 has not yet closed. (judged from later company statements)
Evidence (5 Nov 2026): “Gross margin expanded 133 basis points to 9.6% versus Q2 FY26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (5 Nov 2026): “advance gold was 16% of our business in Q2 '27, ahead of our '27 target of 15%.” — Concall transcript — Q2FY27 (5 Nov 2026)
Condition attached by management: Better mix of advanced gold and studded jewellery
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Revenue projected
Direct
FY27 consolidated revenue is projected at about Rs 8,100 crore, revised upwards from the earlier Rs 5,000 crore target.
Target~₹8,100 Cr
DueFY27
result by 30 May 2027
Said9 Aug 2026
Investor presentation · 7× since 19 Nov 2024
StatusOn track
So far: ₹4,404 Cr (Q1FY27–Q2FY27)
In management's words
“FY27 Revenue projected at ~8,100 crore”
What it implies in numbers
Reaching ₹8,100 Cr by FY27 from ₹6,292 Cr (FY26) needs about 28.7% growth a year.
How it was checked
₹4,404 Cr booked in Q1FY27–Q2FY27 — 54% of the ₹8,100 Cr guided for FY27 with 50% of the period gone (simple pro-rata, ignores seasonality).
How this guidance changed
- 19 Nov 2024 — ~₹6,300 Cr for FY27
First stated
Concall transcript · On track (actual ₹4,404 Cr)
- 29 May 2025 — ₹7,600 Cr for FY27
Raised
Concall transcript · On track (actual ₹4,404 Cr)
- 25 Jul 2025 — ₹7,600 Cr for FY27
Repeated
Concall transcript · On track (actual ₹4,404 Cr)
- 14 Nov 2025 — ₹7,600 Cr for FY27
Repeated
Concall transcript · On track (actual ₹4,404 Cr)
- 10 Feb 2026 — ₹8,100 Cr for FY27
Raised
Concall transcript · On track (actual ₹4,404 Cr)
- 28 May 2026 — ₹8,100 Cr for FY27
Repeated
Concall transcript · On track (actual ₹4,404 Cr)
- 9 Aug 2026 — ~₹8,100 Cr for FY27
Repeated
Investor presentation · On track (actual ₹4,404 Cr)
EBITDA margin expected
Direct
FY27 EBITDA margin is expected to be in the range of about 7.0% to 7.5%, under a guidance block described as revised upwards.
Target7–7.5%
DueFY27
result by 30 May 2027
Said9 Aug 2026
Investor presentation · 3× since 10 Feb 2025
StatusOn track
So far: 7.88% (Q1FY27–Q2FY27)
In management's words
“EBITDA margin expected in the range of ~7.0-7.5%”
How it was checked
Year to date (Q1FY27–Q2FY27) ebitda / operating margin is 7.9% against the guided 7–7.5% for FY27.
How this guidance changed
- 10 Feb 2025 — 5.5% for FY27
First stated
Concall transcript · On track (actual 7.88%)
- 27 May 2026 — 7–7.5% for FY27
Raised
Concall presentation · On track (actual 7.88%)
- 9 Aug 2026 — 7–7.5% for FY27
Repeated
Investor presentation · On track (actual 7.88%)
PAT margin improvement Y-o-Y
Direct
Management guides for a 10-20 bps year-on-year improvement in PAT margin.
Target+10–20 bps
DueFY27
result by 30 May 2027
Said9 Aug 2026
Investor presentation · 3× since 10 Feb 2026
StatusPending
In management's words
“we guide for 10-20 bps improvement in PAT margins Y-o-Y as we continue investing in new geographies and high-growth categories”
What it implies in numbers
A change of 10–20 bps on 4.5% (FY26) implies net profit margin of about 4.6% to 4.7% in FY27.
Condition attached by management: Continued investment in new geographies and high-growth categories
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 10 Feb 2026 — +10–20 bps for FY27
First stated
Concall presentation · Pending
- 27 May 2026 — +10–20 bps for FY27
Repeated
Concall presentation · Pending
- 9 Aug 2026 — +10–20 bps for FY27
Repeated
Investor presentation · Pending
Promoter salaries
Hint
Promoters will not draw salaries from FY27 and will be paid only through dividends from operating cash flows.
Targetmilestone
DueFY27
result by 30 May 2027
Said9 Aug 2026
Investor presentation · 2× since 10 Feb 2026
StatusPending
In management's words
“promoters will not draw salaries from FY27, all promoter payouts will be solely through dividends generated from operating cash flows”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
- 10 Feb 2026 — milestone for FY27
First stated
Concall presentation · Pending
- 9 Aug 2026 — milestone for FY27
Repeated
Investor presentation · Pending
Net debt free status
Hint
Management expects to achieve a net-debt-free status through better operating cash flow and profitability, with no date given.
Targetto come down
DueFY27
result by 30 May 2027
Said9 Aug 2026
Investor presentation
StatusBehind
So far: Net debt INR531 Cr at September 2026
In management's words
“Net Debt free status to be achieved through improvement in OCF and profitability”
How it was checked
Net debt remained INR531 crore at September 2026, so net-debt-free status by FY27 looks unlikely; the FY27 deadline has not yet passed. (judged from later company statements)
Evidence (5 Nov 2026): “Net debt was INR531 crores at September end, and versus INR550 crores in March '26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (5 Nov 2026): “we generated INR136 crores of operating cash flow in H1, against an outflow of INR101 crores in H1 last year.” — Concall transcript — Q2FY27 (5 Nov 2026)
Condition attached by management: Improvement in OCF and profitability
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Higher gross margins from diamond-studded sales · natural and lab-grown diamond studded jewellery
Hint
Growth in diamond-studded jewellery sales is expected to strengthen the premium mix and support higher gross margins, with no date given.
Targetto improve
DueFY27
result by 30 May 2027
Said9 Aug 2026
Investor presentation
StatusOn track
So far: Gross margin 9.6% in Q2 FY27, up 133 bps year-on-year
In management's words
“Growth in natural and lab grown diamond studded jewellery sales will strengthen the premium product mix and support higher gross margins”
How it was checked
Gross margin expanded in Q2 FY27, consistent with the claim, but the evidence does not attribute this to diamond-studded sales. (judged from later company statements)
Evidence (5 Nov 2026): “Gross margin expanded 133 basis points to 9.6% versus Q2 FY26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Cash generation during the remainder of FY27
Hint
Management is committed to further enhancing cash generation during the remainder of FY27.
Targetto improve
DueFY27
result by 30 May 2027
Said9 Aug 2026
Investor presentation
StatusPending
In management's words
“committed on further enhancing cash generation during the remainder of FY27”
How it was checked
Production is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Cash flow from operations
Hint
Management is targeting positive operating cash flow after an FY26 outflow.
Targetto improve
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report · 4× since 29 May 2025
StatusPending
In management's words
“Cash Flow from Operations improved to negative `45 crore in FY26, from negative `272 crore in FY25 — targeting positive Cash Flow.”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 29 May 2025 — to improve for FY27
First stated
Concall transcript · Pending
- 14 Nov 2025 — to improve for FY27
Repeated
Concall transcript · Pending
- 28 May 2026 — to improve for FY27
Repeated
Concall transcript · Pending
- 5 Sep 2026 — to improve for FY27
Repeated
Annual report · Pending
Working capital cycle
Hint
Management aims to further improve the working capital cycle in FY27 and beyond, supported by ERP and receivables discipline.
Targetto come down
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report · 4× since 10 Feb 2026
StatusPending
In management's words
“As we look to FY27 and beyond, our target is to further improve our working capital cycle, supported by a modern ERP system and more disciplined receivables management.”
Condition attached by management: Supported by ERP system and receivables management
How this guidance changed
- 10 Feb 2026 — to come down for FY27
First stated
Concall presentation · Pending
- 27 May 2026 — to come down for FY27
Repeated
Concall presentation · Pending
- 9 Aug 2026 — to come down for FY27
Repeated
Investor presentation · Pending
- 5 Sep 2026 — to come down for FY27
Repeated
Annual report · Pending
Net debt
Indirect
Walked back
Management targets cutting net debt by more than half by next year.
Target≥ 50% growth
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report · 2× since 28 May 2026
StatusBehind
So far: INR531 crore net debt at September 2026, down from INR550 crore in March 2026
In management's words
“a target to cut net debt by more than half by next year”
How it was checked
The deadline has not passed. Net debt fell about INR19 crore (roughly 3.5%) since March 2026, far short of the more-than-half cut needed by FY27. (judged from later company statements)
Evidence (5 Nov 2026): “Net debt was INR531 crores at September end, and versus INR550 crores in March '26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Condition attached by management: Land monetisation proceeds directed toward debt reduction
How this guidance changed
- 28 May 2026 — ≥ 50% growth for FY27
Raised
Concall transcript · Behind (actual Net debt down about 3.5% (INR550 Cr to INR531 Cr) in H1 FY27)
- 5 Sep 2026 — ≥ 50% growth for FY27
Repeated
Annual report · Behind (actual INR531 crore net debt at September 2026, down from INR550 crore in March 2026)
Borrowing costs
Hint
The February 2026 credit rating upgrade is expected to support lower borrowing costs.
Targetto come down
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report · 2× since 28 May 2026
StatusPending
In management's words
“the February 2026 credit rating upgrade to IND A/Stable, which should support lower borrowing costs”
Condition attached by management: Depends on the February 2026 rating upgrade feeding through to lending terms.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 28 May 2026 — to come down for FY27
First stated
Concall transcript · Pending
- 5 Sep 2026 — to come down for FY27
Repeated
Annual report · Pending
Debt reduction from land sale proceeds
Hint
Management intends to sell previously owned land and use the proceeds for debt reduction.
Targetto come down
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report
StatusPending
In management's words
“the Company intends to generate cash from the sale of previously owned land assets, with proceeds directed toward debt reduction.”
Condition attached by management: Sale of previously owned land assets
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Diamond studded jewellery contribution · diamond studded jewellery
Hint
Management is targeting exponential growth in diamond-studded jewellery contribution.
Targetto improve
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report
StatusPending
In management's words
“Diamond studded jewellery contribution targeting exponential growth in this category.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Export contribution · export
Direct
Management targets export contribution of 15% or more in the near term.
Target≥ 15%
Dueby Q1FY28
result by 14 Aug 2027
Said5 Sep 2026
Annual report
StatusPending
In management's words
“Target: 15%+ export contribution in the near term, scaling toward 20% of volumes over the longer term.”
How it was checked
Exports is not in the stored financial tables.
Assumptions made in reading this
- 'near term' read as the next four quarters
How this guidance changed
Stated once in the documents read so far.
Production capacity target
Indirect
Walked back
Management first targeted monthly production of 1 ton by 2027.
Target≥ 1 tons per month
Dueby 2027
result by 14 Feb 2028
Said25 Jul 2025
Concall transcript
StatusPending
In management's words
“And we first targeted to achieve 1 ton per month by 2027.”
How it was checked
Production is not in the stored financial tables.
Assumptions made in reading this
- '2027' read as calendar year 2027
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
Receivable days
Direct
Walked back
Receivable days expected to return to 22 to 23 days within 4 to 6 quarters.
Target22–23 days
DueQ1FY28–Q3FY28
result by 14 Feb 2028
Said28 May 2026
Concall transcript · 2× since 29 May 2025
StatusPending
In management's words
“100%, we'll be back to that 22 - 23 days and it will take 4 to 6 quarters.”
How it was checked
Due with Q3FY28 results; nothing reported since the statement yet.
Condition attached by management: Shift to lesser-credit and advanced gold business
How this guidance changed
- 29 May 2025 — 20–22 days for Not specified
First stated
Concall transcript · Pending (actual 33 days)
- 28 May 2026 — 22–23 days for Q1FY28–Q3FY28
Raised
Concall transcript · Pending
Construction capex for new facility
Direct
Management expects INR 150 crore of construction capex for the new facility over three years.
Target₹150 Cr
Dueby FY28
result by 30 May 2028
Said14 Nov 2025
Concall transcript
StatusOn track
So far: ≈ ₹282 Cr (FY26)
In management's words
“So, we will need INR 150 crores for construction basis and INR 100 crores for furniture fixture and machinery which will be needed in 2028.”
What it implies in numbers
Reaching ₹150 Cr by FY28 from ₹82 Cr (FY25) needs about 22.3% growth a year.
How it was checked
FY26: ₹282 Cr against ₹150 Cr targeted by FY28 — ahead of the pace required. It now needs about 27.1% decline a year to get there.
Condition attached by management: Funded from internal accruals and extra PAT.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Entry into EU, UK and US markets · Europe and US
Indirect
Entry into Europe or US markets is tentatively targeted for May 2028 to 2029, after domestic opportunities are addressed.
Targetmilestone
Dueby May 2028
result by 14 Aug 2028
Said10 Feb 2026
Concall transcript
StatusPending
In management's words
“Maybe from May '28- '29 is what we should be targeting as of now.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Subject to product readiness and team preparation; domestic focus comes first.
How this guidance changed
Stated once in the documents read so far.
Manufacturing capacity
Direct
Capacity to be expanded 4x, from about 1 to 4 tons per month, with the new facility to open by 2028.
Target4x (quadruple)
Dueby 2028
result by 14 Feb 2029
Said29 May 2025
Concall transcript
StatusPending
In management's words
“we will come up with the plan of going for 4x by 2028 we will open this facility.”
What it implies in numbers
Quadrupling capacity from 1 (Q4FY25) means about 4 by Q3FY29 — roughly 44.7% growth a year.
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Detailed capex and funding plan to be given after the June 2025 quarter.
Assumptions made in reading this
- '2028' read as calendar year 2028
How this guidance changed
Stated once in the documents read so far.
Furniture, fixtures and machinery
Direct
Management expects INR 100 crore of furniture, fixture and machinery spend in 2028, funded by a term loan.
Target₹100 Cr
Dueby 2028
result by 14 Feb 2029
Said14 Nov 2025
Concall transcript
StatusPending
In management's words
“So, we will need INR 150 crores for construction basis and INR 100 crores for furniture fixture and machinery which will be needed in 2028.”
Condition attached by management: Funded via term loan in tranches.
Assumptions made in reading this
- '2028' read as calendar year 2028
How this guidance changed
Stated once in the documents read so far.
New facility opening
Indirect
Management plans to start construction in April 2026 and open the new facility by end-2028, when current 1.2 ton capacity is exhausted.
Targetmilestone
Dueby 2028
result by 14 Feb 2029
Said14 Nov 2025
Concall transcript
StatusPending
In management's words
“And in 2028, we are planning to open, end of the 2028, when our 1.2 ton of facility will be exhausted.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Subject to planning, quotations and a four to five month planning process.
Assumptions made in reading this
- '2028' read as calendar year 2028
How this guidance changed
Stated once in the documents read so far.
Gold processing capacity sufficiency
Hint
Current 1.2-ton capacity expected to be sufficient until March 2028, with asset-light options such as rental after that.
Targetmilestone
Dueby 2028
result by 14 Feb 2029
Said28 May 2026
Concall transcript
StatusOn track
So far: Current production capacity about 1,200 kg per month
In management's words
“Till 2028 March, we don't have any problem of the capacity.”
How it was checked
Annual report confirms about 1,200 kg per month capacity, and processing was around 650 kg per month in Q4 FY26; the March 2028 horizon has not passed. (judged from later company statements)
Evidence (5 Sep 2026): “with a current production capacity of approximately 1200 kg per month across the facility and its subsidiaries” — Annual report FY26
Evidence (28 May 2026): “we have done around 650 kgs per month, and that is in line with our guidance that we have provided.” — Concall transcript — Q4FY26 (Jun 2026)
Condition attached by management: Asset-light model; monetisation of current factory
Assumptions made in reading this
- '2028' read as calendar year 2028
How this guidance changed
Stated once in the documents read so far.
Acquisitions
Hint
Management says there is no need for any acquisition in the coming two to four years.
Targetmilestone
DueFY27–FY29
result by 30 May 2029
Said14 Nov 2025
Concall transcript
StatusBehind
So far: acquired 51% partnership interest in Shri Rishab Gold in December 2025
In management's words
“So, right now there is no need for any acquisition in the Company for coming forward 2, 3, 4 years.”
How it was checked
Guidance said no acquisition needed for 2-4 years, yet an acquisition of a 51% stake in Shri Rishab Gold completed within months. (judged from later company statements)
Evidence (10 Feb 2026): “acquired a 51% partnership interest, securing majority ownership and strategic control in Shri Rishab Gold” — Concall presentation — Q3FY26 (Feb 2026)
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Advanced gold share of total revenue · advanced gold
Direct
Advanced gold expected to reach 30% of total revenue by FY29-30.
Target30%
Dueby FY30
result by 30 May 2030
Said29 May 2025
Concall transcript
StatusOn track
So far: advance gold 16% of business in Q2FY27
In management's words
“growing to 30% by FY ’29-‘30”
How it was checked
Advanced gold share reached 16% in Q2FY27 and is ahead of the FY27 target, suggesting progress toward 30% by FY30. (judged from later company statements)
Evidence (5 Nov 2026): “advance gold was 16% of our business in Q2 '27, ahead of our '27 target of 15%.” — Concall transcript — Q2FY27 (5 Nov 2026)
Condition attached by management: Stated as a window (FY29-FY30); target_fy set to the end year.
How this guidance changed
Stated once in the documents read so far.
Share of India jewellery production
Indirect
Management aims for a 4-5% share of India's jewellery production in about five years, by 2031-32.
Target4–5%
Dueby FY30
result by 30 May 2030
Said25 Jul 2025
Concall transcript
StatusPending
In management's words
“We are aiming to be at 4%, 5% stake of India in coming 5 years or 2031, '32.”
How it was checked
Market share is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Promoter dilution
Hint
Management says there is no plan for promoter dilution or OFS for three to five years.
Targetmilestone
DueFY28–FY30
result by 30 May 2030
Said14 Nov 2025
Concall transcript
StatusPending
In management's words
“there is no plan for 3 to 5 years for any dilution from the OFS also”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
CFO/PAT
Direct
Management targets operating cash flow to PAT ratio of about 20% or more by FY30.
Target≥ 20%
DueFY30
result by 30 May 2030
Said10 Feb 2026
Concall presentation
StatusPending
In management's words
“CFO/PAT of ~20% +”
How this guidance changed
Stated once in the documents read so far.
Net debt-free position
Indirect
Company aims to become net debt-free by FY30.
Targetmilestone
Dueby FY30
result by 30 May 2030
Said10 Feb 2026
Concall transcript
StatusBehind
So far: net debt INR531 crore at September 2026, down from INR550 crore in March 2026
In management's words
“since we would like to be net debt free by FY'30.”
How it was checked
Deadline FY30 not reached; net debt remains INR531 crore, a small reduction, and the annual report's 'more than half' claim conflicts with the reported figures. (judged from later company statements)
Evidence (5 Nov 2026): “Net debt was INR531 crores at September end, and versus INR550 crores in March '26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (5 Sep 2026): “net debt reduced by more than half during the year” — Annual report FY26
Condition attached by management: Dependent on internal cash generation; growth capped at 30-35%.
How this guidance changed
Stated once in the documents read so far.
PAT margin
Direct
FY30 PAT margin is projected at about 5.25% or more.
Target≥ 5.25%
Dueby FY30
result by 30 May 2030
Said27 May 2026
Concall presentation · 2× since 10 Feb 2026
StatusPending
In management's words
“PAT margin projected to be ~5.25%+, aggregating to ₹ 945 crores”
How it was checked
Due with FY30 results; nothing reported since the statement yet.
How this guidance changed
- 10 Feb 2026 — ≥ 5.2% for by 2030
First stated
Concall transcript · Achieved (actual 5.22%)
- 27 May 2026 — ≥ 5.25% for by FY30
Deadline brought forward
Concall presentation · Pending
CFO/PAT
Direct
Operating cash flow to PAT ratio is targeted at about 20% or more by FY30.
Target≥ 20%
Dueby FY30
result by 30 May 2030
Said27 May 2026
Concall presentation
StatusPending
In management's words
“CFO/PAT of ~20% +”
How it was checked
Due with FY30 results; nothing reported since the statement yet.
How this guidance changed
Stated once in the documents read so far.
Exports mix · Exports
Hint
The export share of the revenue mix is expected to improve by FY30.
Targetto improve
DueFY30
result by 30 May 2030
Said27 May 2026
Concall presentation
StatusOn track
So far: Exports 11% of sales in FY26, up from 6% in FY25
In management's words
“Exports mix to improve”
How it was checked
Export share rose from 6% in FY25 to 11% in FY26, consistent with an improving mix; the FY30 deadline has not passed. (judged from later company statements)
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
Stated once in the documents read so far.
PAT margin
Direct
PAT margin target of 5.25% by FY2030, up 75 bps from current 4.5%.
Target5.25%
Dueby FY30
result by 30 May 2030
Said28 May 2026
Concall transcript · 2× since 29 May 2025
StatusPending
In management's words
“we have guided for a conservative 5.25% PAT margin by FY2030, which represents an expansion of 75 basis points from current levels.”
How it was checked
Due with FY30 results; nothing reported since the statement yet.
How this guidance changed
- 29 May 2025 — 4.5% for by FY27
First stated
Concall transcript · Achieved (actual 4.48%)
- 28 May 2026 — 5.25% for by FY30
Raised
Concall transcript · Pending
Net debt-free balance sheet
Indirect
Management aims for a net debt-free balance sheet by FY30, funded through internal cash generation.
Targetto come down
DueFY30
result by 30 May 2030
Said28 May 2026
Concall transcript
StatusOn track
So far: Net debt INR531 Cr at September 2026
In management's words
“Growth will be funded strictly through internal cash generation to achieve a net debt-free balance sheet by FY30.”
How it was checked
Net debt is still INR531 crore but has declined modestly and operating cash flow turned positive in H1 FY27; the FY30 deadline has not passed. (judged from later company statements)
Evidence (5 Nov 2026): “Net debt was INR531 crores at September end, and versus INR550 crores in March '26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (5 Nov 2026): “we generated INR136 crores of operating cash flow in H1, against an outflow of INR101 crores in H1 last year.” — Concall transcript — Q2FY27 (5 Nov 2026)
Condition attached by management: Growth funded only through internal cash generation
How this guidance changed
Stated once in the documents read so far — management described it as “lowered” against earlier guidance.
Advanced gold share of business
Indirect
FY30 sales projection assumes advanced gold business at about 30% of the mix.
Target30%
Dueby FY30
result by 30 May 2030
Said28 May 2026
Concall transcript
StatusOn track
So far: Advance gold 16% of business in Q2 FY27
In management's words
“the current projection that we are giving for FY30 of INR18,000 crores to INR19,000 crores considers 30% of advanced gold business.”
How it was checked
The FY30 projection assumes about 30% advanced gold mix; current share is 16%, rising, and the FY30 deadline has not passed. (judged from later company statements)
Evidence (5 Nov 2026): “advance gold was 16% of our business in Q2 '27, ahead of our '27 target of 15%.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (5 Sep 2026): “has helped reduce gold wastage in manufacturing from about 1.5% to about 0.5%” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Exports share of sales · exports
Indirect
Exports expected to reach close to 20% of overall sales, to be revisited as it nears that level.
Target~20%
Dueby FY30
result by 30 May 2030
Said28 May 2026
Concall transcript
StatusPending
In management's words
“the export should be close to 20% of the overall sales is what we are expecting.”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: To be relooked at when near 20%
How this guidance changed
Stated once in the documents read so far.
Revenue expected
Direct
FY30 revenue is expected to be about Rs 18,000-19,000 crore.
Target₹18,000 Cr – ₹19,000 Cr
DueFY30
result by 30 May 2030
Said9 Aug 2026
Investor presentation · 2× since 10 Feb 2026
StatusPending
In management's words
“Revenue expected to be ~₹18,000 -19,000 crore”
What it implies in numbers
Reaching ₹18,000 Cr by FY30 from ₹6,292 Cr (FY26) needs about 30.1% growth a year.
How this guidance changed
- 10 Feb 2026 — ₹18,000 Cr – ₹19,000 Cr for FY30
First stated
Concall presentation · Pending
- 9 Aug 2026 — ₹18,000 Cr – ₹19,000 Cr for FY30
Repeated
Investor presentation · Pending
PAT margin projected
Direct
FY30 PAT margin is projected at about 5.25% or higher.
Target≥ 5.25%
DueFY30
result by 30 May 2030
Said9 Aug 2026
Investor presentation · 2× since 10 Feb 2026
StatusPending
In management's words
“PAT margin projected to be ~5.25%+, aggregating to ₹ 945 crores”
How this guidance changed
- 10 Feb 2026 — ≥ 5.25% for FY30
First stated
Concall presentation · Pending
- 9 Aug 2026 — ≥ 5.25% for FY30
Repeated
Investor presentation · Pending
CFO/PAT
Direct
Walked back
FY30 operating cash flow to PAT ratio is targeted at about 20% or more.
Target≥ 20%
DueFY30
result by 30 May 2030
Said9 Aug 2026
Investor presentation · 2× since 10 Feb 2026
StatusPending
In management's words
“CFO/PAT of ~20% +”
How this guidance changed
- 10 Feb 2026 — ~₹945 Cr for FY30
First stated
Concall presentation · Pending
- 9 Aug 2026 — ≥ 20% for FY30
Lowered
Investor presentation · Pending
Advance gold share of volumes · advance gold
Direct
Advance gold is expected to contribute about 30% of volumes by FY30, from 11.5% in FY26.
Target~30%
DueFY30
result by 30 May 2030
Said9 Aug 2026
Investor presentation
StatusOn track
So far: Advance gold 16% of business in Q2 FY27
In management's words
“Advance gold expected to contribute ~30% of volumes by FY30, is 11.5% in FY26”
How it was checked
Advance gold share rose from 11.5% in FY26 to 16% in Q2 FY27 and 17% of volume in June 2026, toward the ~30% FY30 target; deadline not passed. (judged from later company statements)
Evidence (5 Nov 2026): “advance gold was 16% of our business in Q2 '27, ahead of our '27 target of 15%.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (9 Aug 2026): “Advance Gold Business Mix (%)*” — Investor presentation — Q1FY27 (9 Aug 2026)
How this guidance changed
Stated once in the documents read so far.
Advance gold share of total volumes · advance gold
Direct
Management targets advance gold at approximately 30% of total volumes by FY30.
Target~30%
Dueby FY30
result by 30 May 2030
Said5 Sep 2026
Annual report · 3× since 10 Feb 2026
StatusOn track
So far: Advance gold 16% of business in Q2 FY27
In management's words
“Target of approximately 30% of total volumes by FY30, reducing the Company’s dependence on gold-price-driven revenue movements.”
How it was checked
Advance gold reached 16% of business in Q2 FY27, rising toward the approximately 30% FY30 target; the deadline has not passed. (judged from later company statements)
Evidence (5 Nov 2026): “advance gold was 16% of our business in Q2 '27, ahead of our '27 target of 15%.” — Concall transcript — Q2FY27 (5 Nov 2026)
How this guidance changed
- 10 Feb 2026 — ~20% for by FY30
First stated
Concall presentation · On track (actual advance gold 17.0% of volume in June 2026, up from 11.5% in March 2026)
- 27 May 2026 — ~30% for by FY30
Raised
Concall presentation · On track (actual Advance gold 16% of business in Q2 FY27)
- 5 Sep 2026 — ~30% for by FY30
Repeated
Annual report · On track (actual Advance gold 16% of business in Q2 FY27)
Net debt-free
Indirect
The company has a stated roadmap to become net debt-free by FY2029-30.
Targetmilestone
Dueby FY30
result by 30 May 2030
Said5 Sep 2026
Annual report
StatusOn track
So far: Net debt INR531 Cr at September 2026
In management's words
“A stated roadmap to be net debt-free by FY2029-30”
How it was checked
Net debt has declined modestly to INR531 crore toward the stated roadmap to be net debt-free by FY2029-30; that deadline has not passed. (judged from later company statements)
Evidence (5 Nov 2026): “Net debt was INR531 crores at September end, and versus INR550 crores in March '26.” — Concall transcript — Q2FY27 (5 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
OCF to PAT
Direct
OCF to PAT of close to 20% targeted by 2030, rising sequentially from 2026.
Target~20%
Dueby 2030
result by 14 Feb 2031
Said10 Feb 2026
Concall transcript
StatusOn track
So far: ₹-45 Cr (FY26)
In management's words
“we are looking at revenue of INR18,000 crores to INR19,000 crores, PAT of 5.2% plus, OCF to PAT of close to 20% and achieving net debt-free position by 2030.”
How it was checked
FY26: ₹-45 Cr against ₹20 Cr targeted by FY31 — ahead of the pace required.
Condition attached by management: Sequential improvement between 2026 and 2030; Siddharth later said 2029 or 2030.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Working capital cycle
Direct
Management targets a working capital cycle of 50-55 days by 2030.
Target50–55 days
Dueby 2030
result by 14 Feb 2031
Said5 Sep 2026
Annual report
StatusPending
In management's words
“Target of 50-55 days working capital cycle by 2030.”
How it was checked
Due with FY31 results; nothing reported since the statement yet.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Vision of 4.5 ton
Indirect
Management's vision is to reach 4.5 ton of capacity in 2031-2032.
Target4.5 ton
Dueby FY31
result by 30 May 2031
Said14 Nov 2025
Concall transcript
StatusPending
In management's words
“to achieve 4.5 ton in 2031-2032.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Vision, not a firm plan.
How this guidance changed
Stated once in the documents read so far.
Export volumes share · export
Direct
Management targets export share of about 20% of total volumes over the longer term.
Target~20%
DueFY31–FY33
result by 30 May 2033
Said5 Sep 2026
Annual report
StatusPending
In management's words
“Export clients added during FY26 include DAMAS UAE and KANZ UAE, among others. Target: 15%+ export contribution in the near term, scaling toward 20% of volumes over the longer term.”
How it was checked
Exports is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Headcount
Direct
Headcount is expected to reach 800 by year end.
Target800 employees
DueNot specified
Said15 Aug 2023
Concall recording
StatusPending
In management's words
“by year end, it will be 800”
How it was checked
Headcount is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Subsidiary capacity utilisation · subsidiaries
Indirect
Subsidiary capacity utilisation to be ramped up towards 100%, with no timeframe given.
Target100%
DueNot specified
Said19 Nov 2024
Concall transcript
StatusPending
In management's words
“Yes 100%. That's why we have infused capital also in that.”
How it was checked
Capacity utilisation is not in the stored financial tables.
Condition attached by management: Capital infused and clients onboarded
How this guidance changed
Stated once in the documents read so far.
GML share of total debt
Indirect
Management wants GML to reach 70-80% of borrowings over time, with no date given.
Target70–80%
DueNot specified
Said10 Feb 2025
Concall transcript
StatusPending
So far: ₹869 Cr (FY26)
In management's words
“So we are -- we want to go up to 70% to 80% GML.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Helped by the upgrade to A- rating.
How this guidance changed
Stated once in the documents read so far.
Sanctioned working capital facilities
Indirect
Sanctioned working capital facilities are expected to be enhanced by about ₹150 crore.
Target~₹150 Cr
DueNot specified
Said15 Apr 2025
Credit-rating note (the rating agency's words)
StatusPending
In management's words
“expected enhancement in sanctioned working capital facilities by ~₹150 crore”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Inventory days
Direct
Inventory days targeted at 30-33 days, within an overall working capital cycle target of 50-55 days.
Target30–33 days
DueNot specified
Said29 May 2025
Concall transcript
StatusPending
So far: 50 days (FY26)
In management's words
“We aim for a working capital cycle of 50 to 55 days, achieving two inventory days of 30 to 33 days and receivables of 20 to 22 days.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Driven by the new ERP system.
How this guidance changed
Stated once in the documents read so far.
Turnover plan for 4x facility
Indirect
Turnover plan of Rs 27,000 crore linked to the 4x expansion, to be detailed after the June 2025 quarter.
Target₹27,000 Cr
DueNot specified
Said29 May 2025
Concall transcript
StatusPending
So far: ₹6,292 Cr (FY26)
In management's words
“So we have a plan of turnover of Rs. 27,000 crores.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Plan to be shared after the June 2025 quarter.
How this guidance changed
Stated once in the documents read so far.
Market share of organised jewellery market
Direct
Management aims for 7-9% of the roughly 600 tons Indian jewellery manufacturing market, with no date given.
Target7–9%
DueNot specified
Said29 May 2025
Concall transcript
StatusPending
In management's words
“So out of 600 tons we want to be somewhere about 7%-8%, 9% of the market share”
How it was checked
Market share is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
GML facility limit
Direct
Management expects the GML facility could rise from INR 170 crore to INR 350 crore with current bankers.
Target~₹350 Cr
DueNot specified
Said14 Nov 2025
Concall transcript
StatusPending
In management's words
“We expect that this INR 170 crore, considering the current set of bankers, can go up to INR 350 crores.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Requires change in banking terms, which takes time.
How this guidance changed
Stated once in the documents read so far.
Export share of sales · exports
Indirect
Exports to be about 15-20% of sales, with India around 80%; exports will not be pushed aggressively.
Target15–20%
DueNot specified
Said10 Feb 2026
Concall transcript · 3× since 19 Nov 2024
StatusPending
So far: 11% of sales in FY26
In management's words
“And 15%- 20%, we can export to other countries like UAE and Singapore and in the future, Europe or U.S.”
How it was checked
FY26 export share of 11% sits below the 15-20% range; no deadline was specified, so this is an open shortfall rather than a settled miss. (judged from later company statements)
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
- 19 Nov 2024 — 15–20% for Not specified
First stated
Concall transcript · Pending (actual exports rose to 11% of sales in FY26 from 6% in FY25)
- 14 Nov 2025 — 15–20% for by 2027
Repeated
Concall transcript · Behind (actual Exports 11% of sales in FY26, versus 15-20% target by March 2027)
- 10 Feb 2026 — 15–20% for Not specified
Repeated
Concall transcript · Pending (actual 11% of sales in FY26)
Net debt free status
Hint
Management aims to achieve net debt free status through better operating cash flow and profitability.
Targetmilestone
DueNot specified
Said10 Feb 2026
Concall presentation
StatusPending
So far: Net debt of INR531 crore at September 2026, down from INR550 crore in March 2026; not yet net debt free
In management's words
“Net Debt free status to be achieved through improvement in OCF and profitability”
How it was checked
Net debt is still positive at INR531 crore but has fallen, and operating cash flow turned positive in H1 FY27. E13's 'more than half' claim conflicts with E4's figures. (judged from later company statements)
Evidence (5 Nov 2026): “Net debt was INR531 crores at September end, and versus INR550 crores in March '26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (5 Sep 2026): “net debt reduced by more than half during the year” — Annual report FY26
Evidence (5 Nov 2026): “we generated INR136 crores of operating cash flow in H1, against an outflow of INR101 crores in H1 last year.” — Concall transcript — Q2FY27 (5 Nov 2026)
Condition attached by management: Improvement in OCF and profitability
How this guidance changed
Stated once in the documents read so far.
Interest cost
Indirect
Interest cost, close to 1.2% of sales, is expected to fall to virtually zero as debt is repaid.
Target~0%
DueNot specified
Said10 Feb 2026
Concall transcript
StatusPending
So far: ₹80 Cr (FY26)
In management's words
“interest cost currently at close to 1.2% of sales will reduce to virtually zero.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: As cash flow strengthens and debt is repaid.
How this guidance changed
Stated once in the documents read so far.
Equity dilution / fund raise
Hint
No equity dilution or fund raise is planned at this point; the business is to be funded from internal accruals.
Targetmilestone
DueNot specified
Said10 Feb 2026
Concall transcript
StatusPending
In management's words
“So we are all nicely funded, and we are guiding for cash flow. So we are not planning for any dilution at this point of time.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Export share of sales · exports
Direct
Export share expected to rise to about 13% from about 10% in the current quarter.
Target~13%
DueNot specified
Said10 Feb 2026
Concall transcript
StatusPending
So far: 11% of sales in FY26
In management's words
“and we are expecting to go to 13%.”
How it was checked
Exports reached 11% of FY26 sales, below the roughly 13% expected; no deadline was specified, so the outcome is not yet settled. (judged from later company statements)
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
Stated once in the documents read so far.
Distributor share of sales · distributor
Indirect
Distributors expected to reach 30-35% of mix, with corporate at 65-70%.
Target30–35%
DueNot specified
Said10 Feb 2026
Concall transcript
StatusPending
In management's words
“So you can see it will be distributors also will be at 30%- 35% range and corporate will be at 65%- 70% range.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Net debt free status
Indirect
The company expects to become net debt free through improvement in operating cash flow and profitability. No date is given.
Targetmilestone
DueNot specified
Said27 May 2026
Concall presentation
StatusPending
So far: Net debt of INR531 crore at September 2026, down from INR550 crore in March 2026; not yet net debt free
In management's words
“Net Debt free status to be achieved through improvement in OCF and profitability”
How it was checked
Net debt is still positive at INR531 crore but has fallen, and operating cash flow turned positive in H1 FY27. No date was given, and E13 conflicts with E4. (judged from later company statements)
Evidence (5 Nov 2026): “Net debt was INR531 crores at September end, and versus INR550 crores in March '26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (5 Sep 2026): “net debt reduced by more than half during the year” — Annual report FY26
Evidence (5 Nov 2026): “we generated INR136 crores of operating cash flow in H1, against an outflow of INR101 crores in H1 last year.” — Concall transcript — Q2FY27 (5 Nov 2026)
Condition attached by management: Improvement in OCF and profitability
How this guidance changed
Stated once in the documents read so far.
Revenue CAGR
Indirect
Management targets a sustainable revenue CAGR of 30% to 35%, capped deliberately to protect balance sheet.
Target30–35% a year (CAGR)
DueNot specified
Said28 May 2026
Concall transcript · 2× since 10 Feb 2026
StatusPending
In management's words
“We are targeting a sustainable revenue CAGR of 30% to 35%, projecting a PAT of INR945 crores by 2030.”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
- 10 Feb 2026 — 30–35% a year (CAGR) for by FY30
First stated
Concall transcript · On track (actual ₹6,292 Cr)
- 28 May 2026 — 30–35% a year (CAGR) for Not specified
Repeated
Concall transcript · Pending
Natural diamonds contribution · natural diamonds
Indirect
Management aims to double the natural diamond contribution, currently about 2%, in the coming years.
Target2x (double)
DueNot specified
Said9 Aug 2026
Investor presentation
StatusPending
In management's words
“with the objective to double this contribution in the coming years”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Planned expansion · UK, Malaysia and Singapore
Hint
The company plans to expand into the UK, Malaysia and Singapore.
Targetmilestone
DueNot specified
Said5 Sep 2026
Annual report
StatusPending
In management's words
“planned expansion into the UK, Malaysia and Singapore”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Planned integrated facilities
Hint
Planned integrated facilities are intended to make the company one of the largest vertically integrated B2B manufacturers.
Targetmilestone
DueNot specified
Said5 Sep 2026
Annual report
StatusPending
In management's words
“Planned integrated facilities aim to position the company among the largest vertically integrated B2B manufacturers.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Execution of projects efficiently and balance sheet discipline.
How this guidance changed
Stated once in the documents read so far.
Track record · promised vs delivered
Guidance whose deadline has passed, most recent first: how management performed after giving it.
Working capital cycle
Indirect
Long-term goal to reduce working capital below 50 days.
Promised≤ 50 daysfor FY30–FY32
Delivered34 daysFY26
ResultAchieved · early
Said29 May 2025Concall transcript
In management's words
“Our long-term goals include reducing working capital below 50 days”
How it was checked
Reached in FY26, before the FY32 deadline ahead of the stated window.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Long-term EBITDA margin
Indirect
Long-term EBITDA margin target of 5% to 5.5%.
Promised5–5.5%for FY29–FY31
Delivered5.55%FY25
ResultAchieved · beat · early
Said19 Nov 2024Concall transcript
In management's words
“while maintaining a long-term EBITDA margin of 5% to 5.5%.”
How it was checked
Reached in FY25, before the FY31 deadline ahead of the stated window.
Assumptions made in reading this
- horizon counted from FY24 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Cash flow positive
Indirect
Management expects the company to become cash flow positive by FY27.
Promisedmilestonefor by FY27
Deliveredpositive operating cash flow of INR136 crore in H1 FY27
ResultAchieved
Said10 Feb 2025Concall transcript
In management's words
“By FY '27, we'll be cash flow positive.”
How it was checked
The company reported positive cash flow in Q1 FY27 and INR136 crore operating cash flow in H1 FY27, so the FY27 positive cash flow target is already reached. (judged from later company statements)
Evidence (5 Nov 2026): “we generated INR136 crores of operating cash flow in H1, against an outflow of INR101 crores in H1 last year.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (9 Aug 2026): “In Q1 FY27, the Company achieved positive cash flow” — Investor presentation — Q1FY27 (9 Aug 2026)
Evidence (5 Nov 2026): “This is 58% of H1 PAT, well ahead of the 20% OCF to PAT conversion we guided earlier.” — Concall transcript — Q2FY27 (5 Nov 2026)
Condition attached by management: Depends on clients supplying their own bullion and on the planned new facility.
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Direct
Management conservatively expects EBITDA margin of 6.2-6.3% by FY27.
Promised6.2–6.3%for by FY27
Delivered6.93%FY26
ResultAchieved · beat · early
Said25 Jul 2025Concall transcript
In management's words
“But conservatively, we will be at 6.2%, 6.3% EBITDA and PAT level at 4.25% by FY '27, I'm telling.”
How it was checked
Reached in FY26, before the FY27 deadline.
How this guidance changed
- 29 May 2025 — 6.2–6.3% for by FY27
First stated
Concall transcript · Achieved (actual 6.93%)
- 25 Jul 2025 — 6.2–6.3% for by FY27
Repeated
Concall transcript · Achieved (actual 6.93%)
PAT margin
Direct
Management expects PAT margin to reach 4.25-4.5% by FY27 through GML savings and advanced gold gains.
Promised4.25–4.5%for by FY27
Delivered4.48%FY26
ResultAchieved · early
Said25 Jul 2025Concall transcript
In management's words
“by FY '27, we'll be reaching 4.25% or 4.5% PAT margin”
How it was checked
Reached in FY26, before the FY27 deadline.
Condition attached by management: Advanced gold growth and GML savings
How this guidance changed
Stated once in the documents read so far.
Advance gold business share · advance gold business
Direct
Management is targeting advance gold business at 10-12% of the business by 2027.
Promised10–12%for by FY27
DeliveredAdvance gold 16% of business in Q2FY27, ahead of 15% FY27 target
ResultAchieved
Said14 Nov 2025Concall transcript
In management's words
“we are targeting to be at 10% to 12% by '27 for advance gold business.”
How it was checked
Advance gold reached 16% of business in Q2FY27 and 17% of volume in June 2026, already above the 10-12% guided by FY27. (judged from later company statements)
Evidence (5 Nov 2026): “advance gold was 16% of our business in Q2 '27, ahead of our '27 target of 15%.” — Concall transcript — Q2FY27 (5 Nov 2026)
Evidence (9 Aug 2026): “Advance Gold Business Mix (%)*” — Investor presentation — Q1FY27 (9 Aug 2026)
Condition attached by management: Speed Bangle volumes and shifting working capital.
How this guidance changed
Stated once in the documents read so far.
Cash flow positive
Direct
Company expects to be cash flow positive in FY27.
Promisedmilestonefor FY27
Deliveredpositive cash flow achieved in Q1 FY27; H1 FY27 operating cash flow INR136 crore
ResultAchieved
Said10 Feb 2026Concall transcript
In management's words
“So the focus at this point of time is to be cash flow neutral by March '26 and further to be cash flow positive in the upcoming financial year.”
How it was checked
Deadline FY27 not reached, but positive cash flow was already achieved in Q1 FY27 and H1 operating cash flow was positive. (judged from later company statements)
Evidence (9 Aug 2026): “In Q1 FY27, the Company achieved positive cash flow” — Investor presentation — Q1FY27 (9 Aug 2026)
Evidence (5 Nov 2026): “we generated INR136 crores of operating cash flow in H1, against an outflow of INR101 crores in H1 last year.” — Concall transcript — Q2FY27 (5 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Advanced gold volume share
Direct
Walked back
Management expects advanced gold to be 7.5% of volume in FY26.
Promised7.5%for FY26
Delivered11.5% of volumes in FY26
ResultAchieved
Said25 Jul 2025Concall transcript
In management's words
“This year, we are expecting 7.5%. Next year, we are expecting 10%.”
How it was checked
Advanced gold rose to 11.5% of FY26 volumes, above the 7.5% guided; E9 reports 11-12%, consistent with exceeding the target. (judged from later company statements)
Evidence (28 May 2026): “increase in advanced gold business volumes to 11.5% for the year '26 versus 5.7% for the previous financial year.” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (5 Sep 2026): “Advance gold contributed approximately 11-12% of volumes in FY26, up from 5.7% in FY25.” — Annual report FY26
How this guidance changed
- 19 Nov 2024 — 550–600 kgs per month for FY26
First stated
Concall transcript · Achieved (actual around 650 kgs per month in Q4 FY26)
- 10 Feb 2025 — 650–700 kg for FY26
Raised
Concall transcript · Achieved (actual around 650 kgs per month in Q4 FY26)
- 29 May 2025 — 650–700 kg per month for FY26
Repeated
Concall transcript · Achieved (actual around 650 kgs per month at Q4FY26 exit)
- 25 Jul 2025 — 7.5% for FY26
Lowered
Concall transcript · Achieved (actual 11.5% of volumes in FY26)
Export share of sales · exports
Direct
Exports expected to reach 15% of sales next year (FY26).
Promised~15%for FY26
Delivered11% of sales in FY26
ResultMissed
Said19 Nov 2024Concall transcript
In management's words
“So, I think this year we will be at 12%-13% and next year we will be at 15%.”
How it was checked
Exports were 11% of sales in FY26, short of the roughly 15% guided for FY26. (judged from later company statements)
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
Stated once in the documents read so far.
PAT margin
Indirect
PAT margin target of 4% for FY26-FY27, described as long-term.
Promised~4%for by FY26
Delivered3.75%FY25
ResultAchieved · early
Said19 Nov 2024Concall transcript
In management's words
“But going forward for FY '26- '27, we will target 4%, 100% will go up to 4%.”
How it was checked
Reached in FY25, before the FY26 deadline.
Condition attached by management: Depends on GML mix, new verticals (studded, 18 carat, lab grown)
How this guidance changed
Stated once in the documents read so far.
Revenue projected
Direct
Walked back
Management projects FY26 consolidated revenue of about Rs 6,100 crore, revised upwards.
Promised~₹6,100 Crfor FY26
Delivered₹6,292 CrFY26
ResultAchieved
Said10 Feb 2026Concall presentation
In management's words
“FY26/ FY27 Revenue projected at ~₹6,100/ 8,100 crore”
What it implies in numbers
Reaching ₹6,100 Cr by FY26 from ₹3,548 Cr (FY25) needs about 71.9% growth a year.
How it was checked
FY26 actual ₹6,292 Cr — met the guided ~₹6,100 Cr (annual result).
How this guidance changed
- 10 Feb 2025 — ₹5,700 Cr for FY26
First stated
Concall transcript · Achieved (actual ₹6,292 Cr)
- 29 May 2025 — ₹5,400 Cr for FY26
Lowered
Concall transcript · Achieved (actual ₹6,292 Cr)
- 25 Jul 2025 — ₹5,400 Cr for FY26
Repeated
Concall transcript · Achieved (actual ₹6,292 Cr)
- 14 Nov 2025 — ₹5,400 Cr for FY26
Repeated
Concall transcript · Achieved (actual ₹6,292 Cr)
- 10 Feb 2026 — ~₹6,100 Cr for FY26
Raised
Concall presentation · Achieved (actual ₹6,292 Cr)
Gross debt
Direct
Gross debt is planned to rise to INR550-600 crore in FY26 to fund growth across segments.
Promised₹550 Cr – ₹600 Crfor FY26
Delivered₹869 CrFY26
ResultMissed
Said10 Feb 2025Concall transcript
In management's words
“this year is INR400 crores, so INR550 crores to INR600 crores.”
What it implies in numbers
Reaching ₹600 Cr by FY26 from ₹630 Cr (FY25) needs about 4.8% decline a year.
How it was checked
FY26 actual ₹869 Cr — short of the guided ₹550 Cr – ₹600 Cr (balance sheet).
Condition attached by management: Borrowing increases only as and when required; mostly through GML at lower interest.
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Direct
Management expects EBITDA margin of about 7.0-7.5% across FY26 and FY27.
Promised7–7.5%for FY26
Delivered6.93%FY26
ResultAchieved
Said10 Feb 2026Concall presentation
In management's words
“EBITDA margin expected in the range of ~7.0-7.5%”
How it was checked
FY26 actual 6.93% — met the guided 7–7.5% (annual result).
How this guidance changed
- 10 Feb 2025 — ~5.5% for FY26
First stated
Concall transcript · Achieved (actual 6.93%)
- 10 Feb 2026 — 7–7.5% for FY26
Raised
Concall presentation · Achieved (actual 6.93%)
PAT margin
Direct
Management guides PAT margin of 4.25% or more for FY26 and FY27.
Promised≥ 4.25%for FY26
Delivered4.48%FY26
ResultAchieved
Said10 Feb 2026Concall presentation
In management's words
“PAT margin guided at 4.25% +”
How it was checked
FY26 actual 4.48% — met the guided ≥ 4.25% (annual result).
How this guidance changed
- 10 Feb 2025 — 3.5–4% for FY26
First stated
Concall transcript · Achieved (actual 4.48%)
- 14 Nov 2025 — 4.25–4.3% for FY26
Raised
Concall transcript · Achieved (actual 4.48%)
- 10 Feb 2026 — ≥ 4.25% for FY26
Repeated
Concall presentation · Achieved (actual 4.48%)
Advanced gold share of volume · advanced gold
Direct
Advanced gold to be about 7.5% of volume in FY26, up from 5% last year.
Promised7.5%for FY26
Delivered11.5% of volumes in FY26
ResultAchieved
Said29 May 2025Concall transcript
In management's words
“So this year advanced gold business conservatively we will be at 7.5%.”
How it was checked
Advanced gold reached 11.5% of FY26 volumes, above the 7.5% target, and the annual report gives 11-12%. (judged from later company statements)
Evidence (28 May 2026): “increase in advanced gold business volumes to 11.5% for the year '26 versus 5.7% for the previous financial year.” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (5 Sep 2026): “Advance gold contributed approximately 11-12% of volumes in FY26, up from 5.7% in FY25.” — Annual report FY26
Condition attached by management: Stated as conservative.
How this guidance changed
Stated once in the documents read so far.
Gold metal loan share of inventory funding
Direct
Gold metal loans to fund 80-85% of inventory within three to four quarters.
Promised80–85%for by FY26
Deliveredabout 8% of business on GML in Q2FY26; GML outstanding nil at March 2026
ResultMissed
Said29 May 2025Concall transcript
In management's words
“we plan to go up to 80%-85% in three, four quarters from here.”
How it was checked
The GML programme was behind plan with only about 8% of business on GML, and outstanding was nil at March 2026, short of the 80-85% target by FY26. (judged from later company statements)
Evidence (14 Nov 2025): “The program is taking longer time than anticipated due to delays in documentation and supply constraints.” — Concall transcript — Q2FY26 (Nov 2025)
Evidence (28 May 2026): “as of March end, our GML outstanding is nil, but we have INR170 crores of GML facility sanctioned with us.” — Concall transcript — Q4FY26 (Jun 2026)
Condition attached by management: Bank cap of 90% noted; depends on lender availability.
How this guidance changed
Stated once in the documents read so far.
Exit rate
Direct
Management is on track for a Q4FY26 exit volume of 650 kg, as proposed by the analyst and accepted.
Promised650 kgfor Q4FY26
DeliveredAround 650 kgs per month in Q4FY26
ResultAchieved
Said10 Feb 2026Concall transcript
In management's words
“Yes, we already have done 630 kg this quarter, and we are on track on that.”
How it was checked
Q4FY26 processing was reported at around 650 kgs per month, which management described as in line with the guided exit rate. (judged from later company statements)
Evidence (28 May 2026): “we have done around 650 kgs per month, and that is in line with our guidance that we have provided.” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
- 25 Jul 2025 — ≥ 650 kg per month for Q4FY26
First stated
Concall transcript · Achieved (actual Around 650 kgs per month in Q4FY26)
- 10 Feb 2026 — 650 kg for Q4FY26
Repeated
Concall transcript · Achieved (actual Around 650 kgs per month in Q4FY26)
GML utilisation
Direct
Management expects to use INR 150-170 crore of gold-metal loan facilities by Q4FY26.
Promised₹150 Cr – ₹170 Crfor Q4FY26
DeliveredGML outstanding nil at March 2026 end
ResultMissed
Said14 Nov 2025Concall transcript
In management's words
“we expect to utilize INR 150 crores to INR 170 crores by Q4 of '26.”
How it was checked
Deadline passed; GML outstanding was nil at March 2026 against guided utilisation of INR 150-170 crore, though INR170 crore remained sanctioned. (judged from later company statements)
Evidence (28 May 2026): “as of March end, our GML outstanding is nil, but we have INR170 crores of GML facility sanctioned with us.” — Concall transcript — Q4FY26 (Jun 2026)
Condition attached by management: Depends on faster bank documentation and gold metal supply.
How this guidance changed
- 25 Jul 2025 — 70–75% for Q4FY26
First stated
Concall transcript · Missed (actual Gold metal loan outstanding nil at March 2026 end)
- 14 Nov 2025 — ₹150 Cr – ₹170 Cr for Q4FY26
Raised
Concall transcript · Missed (actual GML outstanding nil at March 2026 end)
Export share of revenue · export
Direct
Management is targeting exports at 17-20% of revenue in FY26.
Promised17–20%for FY26
DeliveredExports at 11% of sales in FY26
ResultMissed
Said25 Jul 2025Concall transcript
In management's words
“'26, we are targeting it to 17% to 20% or something.”
How it was checked
FY26 export target was 17-20% of revenue, but reported FY26 exports were 11% of sales, below the range. (judged from later company statements)
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (5 Sep 2026): “Sky Gold’s export business has grown from under 5% of revenue in FY22 to approximately 9% in Q3 FY26” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Quarterly revenue increase
Direct
Management expects revenue to rise by about INR150 crores each quarter to reach the FY26 target.
Promised~₹150 Crfor by FY26
Delivered₹6,292 CrFY26
ResultAchieved · beat
Said25 Jul 2025Concall transcript
In management's words
“So every quarter, we'll increase by INR150 crores or something every quarter.”
What it implies in numbers
Reaching ₹150 Cr by FY26 from ₹3,548 Cr (FY25) needs about 95.8% decline a year.
How it was checked
FY26 actual ₹6,292 Cr — ahead of the guided ~₹150 Cr (annual result).
How this guidance changed
Stated once in the documents read so far.
Borrowing costs
Hint
Management intends to lower borrowing costs by leveraging gold metal loans, with no quantified target.
Promisedto come downfor FY26
Deliveredup 77.8%FY26
ResultMissed
Said1 Sep 2025Annual report
In management's words
“On the financial front, we will continue to optimize capital structure by leveraging gold metal loans to improve profitability, enhance working capital efficiency, and reduce borrowing costs.”
How it was checked
Interest cost rose by 77.8% in FY26 from FY25 — against what management indicated (annual result).
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
PAT margin uplift from GML
Direct
Management says PAT margin can improve by about 20 bps once the full GML limit is availed.
Promised+~20 bpsfor FY26
Delivered73 bpsFY26
ResultAchieved · beat
Said14 Nov 2025Concall transcript
In management's words
“So, again, we can improve 20 basis point of PAT margins when we avail.”
What it implies in numbers
A change of 20 bps on 3.7% (FY25) implies net profit margin of about 3.9% in FY26.
How it was checked
FY26 actual 73 bps — ahead of the guided ~20 bps (annual result).
Condition attached by management: When the GML limit is fully utilised.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Cash-flow neutral / operating cash flows
Hint
Management expects near cash-flow neutrality by FY26 and positive operating cash flows from FY27, ahead of the earlier FY27-28 timeline.
Promisedmilestonefor FY26
DeliveredFY26 cash from operations of negative INR45 crore, described by management as near neutral and in line with guidance; H1 FY27 operating cash flow positive at IN
ResultAchieved
Said10 Feb 2026Concall presentation
In management's words
“while becoming near cash-flow neutral by FY26 and generating operating cash flows from FY27”
How it was checked
Management and the annual report describe FY26 operating cash flow of -45 crore, improved from -272 crore, as near neutral in line with guidance. H1 FY27 OCF is already positive. (judged from later company statements)
Evidence (28 May 2026): “Our cash from operations improved from negative INR272 crores to near neutral operating cash flows of INR45 crores negative, which is in line with our guidance.” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (5 Sep 2026): “Cash Flow from Operations improved to negative `45 crore in FY26, from negative `272 crore in FY25” — Annual report FY26
Evidence (5 Nov 2026): “we generated INR136 crores of operating cash flow in H1, against an outflow of INR101 crores in H1 last year.” — Concall transcript — Q2FY27 (5 Nov 2026)
How this guidance changed
Stated once in the documents read so far — management described it as “deadline brought forward” against earlier guidance.
Working capital days
Direct
Working capital days expected to fall below 60 by the end of FY26.
Promised≤ 60 daysfor by Q4FY26
Delivered34 daysQ4FY26
ResultAchieved
Said10 Feb 2026Concall transcript
In management's words
“Yes, we are expecting to be below 60 days overall.”
How it was checked
Q4FY26 actual 34 days — met the guided ≤ 60 days (reported ratio).
Condition attached by management: Driven by growth in advanced gold business.
How this guidance changed
Stated once in the documents read so far.
Cash flow neutral
Hint
Company aims to be cash flow neutral by March 2026.
Promisedmilestonefor by Mar 2026
DeliveredFY26 operating cash flow of INR -45 crore, described as near-neutral
ResultPartly achieved
Said10 Feb 2026Concall transcript
In management's words
“So the focus at this point of time is to be cash flow neutral by March '26 and further to be cash flow positive in the upcoming financial year.”
How it was checked
The March 2026 deadline has passed; FY26 operating cash flow was INR -45 crore, near neutral but not neutral. Later positive Q1 FY27 cash flow (E1) falls after the deadline. (judged from later company statements)
Evidence (28 May 2026): “Our cash from operations improved from negative INR272 crores to near neutral operating cash flows of INR45 crores negative, which is in line with our guidance.” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (5 Sep 2026): “Cash Flow from Operations improved to negative `45 crore in FY26, from negative `272 crore in FY25” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Overall working capital days
Direct
Walked back
Overall working capital days expected to stay below 60 going forward.
Promised≤ 60 daysfor Not specified
Delivered34 daysFY26
ResultAchieved
Said10 Feb 2026Concall transcript
In management's words
“We expect that the overall working capital days should be less than 60 days going forward.”
How it was checked
No deadline was given; reached in FY26.
Condition attached by management: Via better profitability and working capital days.
How this guidance changed
- 29 May 2025 — 50–55 days for Not specified
First stated
Concall transcript · Achieved (actual 34 days)
- 10 Feb 2026 — ≤ 60 days for Not specified
Raised
Concall transcript · Achieved (actual 34 days)
Exports as share of overall sales · exports
Direct
Management expects exports to be 10-12% of overall sales from Q3FY26 onwards.
Promised10–12%for Q3FY26
DeliveredExports approximately 9% of revenue in Q3FY26
ResultMissed
Said14 Nov 2025Concall transcript
In management's words
“export, you can expect 10% to 12% of the overall sales from next quarter onwards.”
How it was checked
Guidance was exports of 10-12% of sales from Q3FY26; reported Q3FY26 export share was about 9%, below the range. (judged from later company statements)
Evidence (5 Sep 2026): “Sky Gold’s export business has grown from under 5% of revenue in FY22 to approximately 9% in Q3 FY26” — Annual report FY26
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
How this guidance changed
Stated once in the documents read so far.
Gold metal loan interest rate
Direct
Gold metal loan rate expected at about 3.5-3.7% from the second quarter of FY26, with 3% possible later.
Promised3.5–3.7% growthfor Q2FY26
Deliveredoverall cost of about 4%
ResultMissed
Said29 May 2025Concall transcript
In management's words
“rates will be approximately 3.5% to 3.7% as per my assumption.”
What it implies in numbers
3.5–3.7% growth on 4.75 (Q2FY25) implies about 4.92 to 4.93 for Q2FY26.
How it was checked
Guidance was 3.5-3.7% from Q2FY26. In Q2, GML utilisation cost about 4% overall, above the guided range, and the programme was behind plan. (judged from later company statements)
Evidence (14 Nov 2025): “So, out of INR 170 crores, currently we are utilizing close to INR 40 crores, it comes at an overall cost of 4%.” — Concall transcript — Q2FY26 (Nov 2025)
Evidence (14 Nov 2025): “The program is taking longer time than anticipated due to delays in documentation and supply constraints.” — Concall transcript — Q2FY26 (Nov 2025)
Condition attached by management: Management's own assumption; rates may fall to 3% over a longer period.
How this guidance changed
Stated once in the documents read so far.
Gold metal loan share of inventory funding
Direct
Gold metal loans to fund about 20% of inventory in the first quarter of FY26.
Promised20%for Q2FY26
Deliveredabout 8% of business on GML in Q2FY26
ResultMissed
Said29 May 2025Concall transcript
In management's words
“So 1st Quarter we are targeting is 20%.”
How it was checked
Management said the GML programme was behind plan, with about 8% of business on GML in Q2 against a 20% target, and no GML outstanding at March 2026. (judged from later company statements)
Evidence (14 Nov 2025): “The program is taking longer time than anticipated due to delays in documentation and supply constraints.” — Concall transcript — Q2FY26 (Nov 2025)
Evidence (28 May 2026): “as of March end, our GML outstanding is nil, but we have INR170 crores of GML facility sanctioned with us.” — Concall transcript — Q4FY26 (Jun 2026)
Condition attached by management: Depends on bank availability and rates.
How this guidance changed
Stated once in the documents read so far.
Monthly production volume
Direct
Management expects monthly volume of about 580 kg in Q2 FY26.
Promised~580 kg per monthfor Q2FY26
Delivered544 kg per month in Q2FY26
ResultMissed
Said25 Jul 2025Concall transcript
In management's words
“Next quarter, we are approximately expecting 580-or-something.”
How it was checked
Guidance was about 580 kg per month for Q2FY26; reported Q2 volume was 544 kg per month, short of the target. (judged from later company statements)
Evidence (14 Nov 2025): “Volumes have been increased to 544 kgs per month for this quarter, registering a 20% growth versus Q1 FY'26.” — Concall transcript — Q2FY26 (Nov 2025)
How this guidance changed
Stated once in the documents read so far.
Revenue contribution · Ganna N Gold
Hint
Management expects Ganna N Gold to start contributing to revenue in Q2 FY26.
Promisedmilestonefor Q2FY26
DeliveredSpeed Bangle 41 kg per month sales in Q2
ResultAchieved
Said25 Jul 2025Concall transcript
In management's words
“Q2 only. August and September, it will be contributing, Q2 only.”
How it was checked
The Q2 FY26 statement reports Speed Bangle (formerly Ganna N Gold) sales of 41 kg per month, so revenue contribution began in Q2 as guided. (judged from later company statements)
Evidence (14 Nov 2025): “So, we got 41 kg sales in this quarter and next quarter it will be 50 kg per month.” — Concall transcript — Q2FY26 (Nov 2025)
Condition attached by management: Acquisition completion
How this guidance changed
Stated once in the documents read so far.
Dubai sales office opening · export
Hint
Management expects the Dubai sales office to open around 1 to 10 August 2025.
Promisedmilestonefor Q2FY26
DeliveredDubai office operating; first full quarter of operation reached (exact opening date not stated)
ResultAchieved
Said25 Jul 2025Concall transcript
In management's words
“approximately 1st August or 10 August, we'll open the office”
How it was checked
Annual report says export sales are routed through the Dubai office from its first full quarter of operation, indicating the office opened, though the exact date is not given. (judged from later company statements)
Evidence (5 Sep 2026): “Export sales is routed through the Dubai office ` 150 crore from first full quarter of operation” — Annual report FY26
Condition attached by management: Paperwork completion
How this guidance changed
Stated once in the documents read so far.
Ganna N Gold acquisition completion · Ganna N Gold
Hint
Management expects the Ganna N Gold acquisition to complete within about 7 to 10 days of the call.
Promisedmilestonefor Q2FY26
DeliveredShri Rishab Gold acquisition completed December 2025
ResultMissed
Said25 Jul 2025Concall transcript
In management's words
“That is in process and it will be completed in the last 7 to 10 days work is pending.”
How it was checked
Guidance expected completion within 7-10 days of the July 2025 call; the 51% stake was completed in December 2025, after the Q2FY26 deadline. (judged from later company statements)
Evidence (10 Feb 2026): “acquired a 51% partnership interest, securing majority ownership and strategic control in Shri Rishab Gold” — Concall presentation — Q3FY26 (Feb 2026)
Condition attached by management: Documentation pending
How this guidance changed
Stated once in the documents read so far.
Gold production capacity
Direct
Management says gold production capacity can reach 10 to 12 tonnes a year within one to two years, from about 3 tonnes now.
Promised10–12 tonnes per yearfor FY24–FY25
DeliveredAbout 1,000 kg per month installed capacity (about 12 tonnes a year) by April 2025, later 1,200 kg per month
ResultAchieved
Said15 Aug 2023Concall recording
In management's words
“we have the capacity of 10 to 12 ton to make here within one year, two years”
How it was checked
Installed capacity of about 1,000 kg per month, roughly 12 tonnes a year, falls within the 10-12 tonne guide, though the 2025 note is dated just after the deadline. (judged from later company statements)
Evidence (5 Sep 2026): “with a current production capacity of approximately 1200 kg per month across the facility and its subsidiaries” — Annual report FY26
Evidence (27 May 2026): “Manufacturing Capacity 14.4 tonne per year” — Concall presentation — Q4FY26 (Jun 2026)
Assumptions made in reading this
- horizon counted from FY23 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Revenue guidance
Direct
FY25 consolidated revenue guidance of INR3,300 crores, including INR2,700 crores from core operations and INR600 crores from subsidiaries.
Promised₹3,300 Crfor FY25
Delivered₹3,548 CrFY25
ResultAchieved · beat
Said19 Nov 2024Concall transcript
In management's words
“Our FY25 revenue guidance stands at INR3,300 crores which includes INR2,700 crores from our core operations and an additional INR600 crores from our subsidiaries which we acquired recently.”
What it implies in numbers
Reaching ₹3,300 Cr by FY25 from ₹1,745 Cr (FY24) needs about 89.1% growth a year.
How it was checked
FY25 actual ₹3,548 Cr — ahead of the guided ₹3,300 Cr (annual result).
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Direct
FY25 EBITDA margin expected in the range of 5% to 5.5%.
Promised5–5.5%for FY25
Delivered5.55%FY25
ResultAchieved · beat
Said19 Nov 2024Concall transcript
In management's words
“So, gross margin we are expecting to be 6.5% conservatively and EBITDA margin is 5% to 5.5%.”
How it was checked
FY25 actual 5.55% — ahead of the guided 5–5.5% (annual result).
How this guidance changed
Stated once in the documents read so far.
Export share of sales · exports
Direct
Exports expected to be 12-13% of sales in FY25.
Promised12–13%for FY25
Deliveredabout 6% of sales in FY25 (another source says about 8% of revenue)
ResultMissed
Said19 Nov 2024Concall transcript
In management's words
“So, I think this year we will be at 12%-13% and next year we will be at 15%.”
How it was checked
FY25 export share was about 6% of sales (or about 8% of revenue per another source), below the 12-13% guided for FY25. (judged from later company statements)
Evidence (28 May 2026): “increase in exports to 11% for the year versus 6% in the previous financial year” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (29 May 2025): “our export revenue tripling from approximately Rs. 100 crores in FY ‘24 to INR 300 crores in FY ‘25.” — Concall transcript — Q4FY25 (Jun 2025)
How this guidance changed
Stated once in the documents read so far.
Gold metal loan share of debt
Direct
Walked back
Gold metal loans expected to be about 80% of debt by the March quarter.
Promised~80%for Q4FY25
Delivered₹630 CrQ4FY25
ResultMissed
Said19 Nov 2024Concall transcript
In management's words
“but I think we will be at 50%-60% of GML by December quarter and 80% by March quarter.”
How it was checked
Q4FY25 actual ₹630 Cr — short of the guided ~80% (balance sheet).
Condition attached by management: Subject to bank policies
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
PAT margin
Direct
PAT margin targeted at 3.5% by reducing interest cost, with no timeframe given.
Promised~3.5%for FY25
Delivered3.75%FY25
ResultAchieved
Said19 Nov 2024Concall transcript
In management's words
“So, we are targeting to 3.5% by reducing our interest cost.”
How it was checked
FY25 actual 3.75% — met the guided ~3.5% (annual result).
Condition attached by management: Achieved by reducing interest cost through GML
Assumptions made in reading this
- no time frame was stated; checked on FY25, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Monthly production volume
Direct
Monthly volume expected to rise to 375-400 kgs per month by the end of FY25.
Promised375–400 kgs per monthfor FY25
Deliveredaveraged 447 kg per month in Q3 FY25
ResultAchieved
Said19 Nov 2024Concall transcript
In management's words
“we are having [inaudible] 375 kgs, 400 kgs per month till end of the year.”
How it was checked
Q3 FY25 monthly production averaged 447 kg, above the 375-400 kg per month expected by end of FY25. (judged from later company statements)
Evidence (10 Feb 2025): “our monthly production volume averaged 447 kg, up significantly from 270 kg per month last year” — Concall transcript — Q3FY25 (Feb 2025)
How this guidance changed
Stated once in the documents read so far.
Other income
Hint
Other income from sale of listed shares will stop once remaining shares (INR35 crores with SBI) are sold by December quarter.
Promisedto come downfor FY25
DeliveredunchangedFY25
ResultPartly achieved
Said19 Nov 2024Concall transcript
In management's words
“So, going forward these other income will be not there.”
How it was checked
Other income was unchanged in FY25 from FY25 — roughly in line with what management indicated (annual result).
Assumptions made in reading this
- no time frame was stated; checked on FY25, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Interest cost reduction
Direct
Interest cost expected to fall by about 0.5% of sales through higher gold metal loan usage, with no timeframe given.
Promised−~50 bpsfor FY25
DeliveredGML programme behind plan; only about 8% of business on GML in Q2FY26, with no evidence of a 0.5% of sales cost reduction
ResultMissed
Said19 Nov 2024Concall transcript
In management's words
“So, we are little bit late, but I think we will reduce the cost by 0.5%.”
How it was checked
Management itself said the GML conversion was behind, and later evidence shows slow usage and nil outstanding at March 2026, with no sign of the 0.5% reduction by FY25. (judged from later company statements)
Evidence (10 Feb 2025): “We were expecting by December, we are a little bit slower by one quarter” — Concall transcript — Q3FY25 (Feb 2025)
Evidence (14 Nov 2025): “The program is taking longer time than anticipated due to delays in documentation and supply constraints.” — Concall transcript — Q2FY26 (Nov 2025)
Evidence (28 May 2026): “as of March end, our GML outstanding is nil, but we have INR170 crores of GML facility sanctioned with us.” — Concall transcript — Q4FY26 (Jun 2026)
Condition attached by management: Gold metal loan ramp-up
Assumptions made in reading this
- no time frame was stated; checked on FY25, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Current borrowings
Direct
Borrowings are expected to be about INR380-400 crore at the end of FY25.
Promised₹380 Cr – ₹400 Crfor FY25
Delivered₹630 CrFY25
ResultMissed
Said10 Feb 2025Concall transcript
In management's words
“I think by the end of this year, we are at INR380-INR400 crores only.”
What it implies in numbers
Reaching ₹400 Cr by FY25 from ₹330 Cr (FY24) needs about 21.2% growth a year.
How it was checked
FY25 actual ₹630 Cr — short of the guided ₹380 Cr – ₹400 Cr (balance sheet).
How this guidance changed
Stated once in the documents read so far.
Gold metal loan (GML) share of loans
Direct
Walked back
Share of loans converted to GML was expected to reach 60-70% by March 2025.
Promised60–70%for by FY25
Deliveredabout 20-25% of loans on GML at Dec 2024 quarter; about 8% of business in Q2 FY26
ResultMissed
Said10 Feb 2025Concall transcript
In management's words
“So yes, we are expecting by March end 60%, 70%.”
How it was checked
GML conversion was about 20-25% in the December 2024 quarter and lagging, far below the 60-70% target by March 2025. (judged from later company statements)
Evidence (10 Feb 2025): “We were expecting by December, we are a little bit slower by one quarter” — Concall transcript — Q3FY25 (Feb 2025)
Evidence (14 Nov 2025): “The program is taking longer time than anticipated due to delays in documentation and supply constraints.” — Concall transcript — Q2FY26 (Nov 2025)
Evidence (28 May 2026): “as of March end, our GML outstanding is nil, but we have INR170 crores of GML facility sanctioned with us.” — Concall transcript — Q4FY26 (Jun 2026)
Condition attached by management: Depends on banks changing their models and approvals.
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
Gold metal loan (GML) share of loans
Direct
Share of loans converted to GML is now expected to reach 55-60% by the March 2025 quarter.
Promised55–60%for Q4FY25
Deliveredabout 20-25% at Dec 2024 quarter; about 8% of business in Q2 FY26
ResultMissed
Said10 Feb 2025Concall transcript
In management's words
“let's see, we will be at 55%, 60% by March quarter.”
How it was checked
GML conversion was about 20-25% in December 2024 and only about 8% in Q2 FY26, well short of the 55-60% expected by March 2025. (judged from later company statements)
Evidence (10 Feb 2025): “We were expecting by December, we are a little bit slower by one quarter” — Concall transcript — Q3FY25 (Feb 2025)
Evidence (14 Nov 2025): “The program is taking longer time than anticipated due to delays in documentation and supply constraints.” — Concall transcript — Q2FY26 (Nov 2025)
Evidence (28 May 2026): “as of March end, our GML outstanding is nil, but we have INR170 crores of GML facility sanctioned with us.” — Concall transcript — Q4FY26 (Jun 2026)
Condition attached by management: Depends on bank approvals; ICICI Bank and SBI processes ongoing.
How this guidance changed
Stated once in the documents read so far — management described it as “lowered” against earlier guidance.
FY25 revenue performance
Hint
Management said FY25 performance will be better than the INR3,300 crore target, without giving a number.
Promisedto improvefor FY25
Deliveredup 103.3%FY25
ResultAchieved
Said10 Feb 2025Concall transcript
In management's words
“So I think it will be better than that, but we'll not talk on the numbers, but this quarter is much better than that.”
How it was checked
Revenue rose by 103.3% in FY25 from FY24 — in line with what management indicated (annual result).
How this guidance changed
Stated once in the documents read so far.
Blended revenue
Direct
Blended revenue of about INR1,000 crores expected next quarter (Q3FY25), from parent INR700-750 crores and subsidiaries INR150-350 crores.
Promised~₹1,000 Crfor Q3FY25
Delivered₹998 CrQ3FY25
ResultAchieved
Said19 Nov 2024Concall transcript
In management's words
“So, we are expecting a totally blended INR1,000 crores revenue in the next quarter, from the parent company INR700-INR750 crores”
What it implies in numbers
Reaching ₹1,000 Cr by Q3FY25 from ₹769 Cr (Q2FY25) needs about 186.0% growth a year.
How it was checked
Q3FY25 actual ₹998 Cr — met the guided ~₹1,000 Cr (quarterly result).
Condition attached by management: Based on current run rate
How this guidance changed
Stated once in the documents read so far.
Gross margin
Indirect
Management aims for 7% to 8% gross margin through optimised product mix and exports, with no timeframe given.
Promised7–8%for Not specified
Delivered8.45% year-to-date consolidated gross margin in FY26
ResultAchieved
Said19 Nov 2024Concall transcript
In management's words
“We aim to achieve 7% to 8% gross margin through an optimized product mix and export,”
How it was checked
Reported gross margins of 8.27% to 8.45% in FY26 and 9.6% in Q2 FY27 are within or above the 7-8% aim, with no timeframe set. (judged from later company statements)
Evidence (28 May 2026): “our consolidated gross margin stands at 8.45%, up 245 basis points from 6% in FY24.” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (10 Feb 2026): “our consolidated gross margin stood at 8.27% versus 5.97% in FY '24, means an increase of 230 bps.” — Concall transcript — Q3FY26 (Feb 2026)
Evidence (5 Nov 2026): “Gross margin expanded 133 basis points to 9.6% versus Q2 FY26.” — Concall transcript — Q2FY27 (5 Nov 2026)
Condition attached by management: Through optimised product mix and export
How this guidance changed
Stated once in the documents read so far.
Headcount
Direct
Headcount is expected to reach 1,000 by August next year.
Promised1,000 employeesfor by Q2FY25
Deliveredabout 950 employees at Q3FY25
ResultMissed
Said15 Aug 2023Concall recording
In management's words
“and by August next year, it will be thousand”
How it was checked
Headcount was 800 in Nov 2024 and about 950 in Feb 2025, both short of the 1,000 target that was due by August 2024. (judged from later company statements)
Evidence (10 Feb 2025): “We are at 950 employees.” — Concall transcript — Q3FY25 (Feb 2025)
Evidence (19 Nov 2024): “So, together we are at 800 employees.” — Concall transcript — Q2FY25 (Nov 2024)
How this guidance changed
Stated once in the documents read so far.
Revenue in Q2 and Q3
Hint
Management expects Q2 and Q3 FY24 to be good on festive and wedding demand.
Promisedto improvefor FY24
Deliveredup 51.2%FY24
ResultAchieved
Said15 Aug 2023Concall recording
In management's words
“we are hoping Q2 and Q3 is very much expected to be good”
How it was checked
Revenue rose by 51.2% in FY24 from FY23 — in line with what management indicated (annual result).
How this guidance changed
Stated once in the documents read so far.
Debt
Hint
Management plans to keep increasing debt as and when required to fund inventory.
Promisedto improvefor FY24
Deliveredup 126.0%FY24
ResultAchieved
Said15 Aug 2023Concall recording
In management's words
“we are increasing the debt as and when required.”
How it was checked
Borrowings (gross debt) rose by 126.0% in FY24 from FY23 — in line with what management indicated (balance sheet).
Condition attached by management: As and when required
Assumptions made in reading this
- no time frame was stated; checked on FY24, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Margins
Hint
Management expects margins to improve as new machinery reduces gold-making costs.
Promisedto improvefor FY24
Deliveredup 1.3%FY24
ResultAchieved
Said15 Aug 2023Concall recording
In management's words
“in this setup our margins will improve because of the cost will be reduced”
How it was checked
EBITDA / operating margin rose by 1.3 pp in FY24 from FY23 — in line with what management indicated (annual result).
Condition attached by management: New machinery and cost reduction
Assumptions made in reading this
- no time frame was stated; checked on FY24, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Capacity utilisation
Hint
Management expects to utilise the new capacity within one year at most.
Promisedmilestonefor by FY24
Deliveredabout 55% utilised
ResultMissed
Said15 Aug 2023Concall recording
In management's words
“We are expecting to utilize this capacity in one year maximum.”
How it was checked
Utilisation of the new capacity was still about 55% in Q4FY26, and Q3FY25 output of 447 kg/month against roughly 1,000 kg installed shows capacity was not fully used within a year. (judged from later company statements)
Evidence (28 May 2026): “So, we have a 55% utilization. Till 2028 March, we don't have any problem of the capacity.” — Concall transcript — Q4FY26 (Jun 2026)
Evidence (10 Feb 2025): “our monthly production volume averaged 447 kg, up significantly from 270 kg per month last year” — Concall transcript — Q3FY25 (Feb 2025)
Evidence (15 Apr 2025): “with an installed capacity of upto 1,000 kg per month” — Credit-rating note — CARE Ratings (15 Apr 2025)
Assumptions made in reading this
- horizon counted from FY23 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Key points from each document
The main takeaways, newest document first.
Concall transcript — Q2FY27 (5 Nov 2026) · 5 Nov 2026
- Q2 FY27 consolidated revenue rose 61% year-on-year to INR2,391 crore, and H1 revenue rose 68% to INR4,403 crore.
- Operating cash flow turned positive at INR136 crore in H1 FY27 against an outflow in H1 FY26, and net debt fell to INR531 crore from INR550 crore in March 2026.
- Management says SEBI rules stop it giving forward guidance, so no new guidance is in the presentation and it will rely on its track record of past targets.
- Gross margin reached 9.6%, up 133 bps year-on-year, helped by a higher advance gold mix and more studded jewellery.
- Trade payables jumped to INR437 crore from INR92 crore, funding working capital, while inventory days rose to 39; management did not say whether this is sustainable.
- Management declined to disclose the purpose or use of proceeds of the recently announced fundraise, citing SEBI restrictions.
- Exports reached INR435 crore in Q2 FY27, against about INR35 crore for all of FY23, and are now about 18% of business.
- Reported Q2 PAT of INR129 crore includes a INR7.35 crore fraud-related exceptional charge at Star Mangalsutra; excluding it, operational PAT was INR135 crore.
- If no third-party buyer commits within 20 to 30 days, promoters will buy the land, which is part of the earlier land monetisation plan.
Annual report FY26 · 5 Sep 2026
- Management targets net debt reduction by more than half by next year, with land sale proceeds directed toward debt reduction, and a long-term ambition of net debt-free status by FY2030.
- Operating cash flow improved to negative Rs 45 crore in FY26 from negative Rs 272 crore, and management is targeting positive cash flow.
- Management reports FY26 revenue above its start-of-year guidance, PAT margin ahead of its promise, and EBITDA more than doubling.
- The company is shifting to a leased, asset-light model for new capacity and the advance gold model, aiming to reduce capex and gold price exposure.
- Exports are a key growth lever, with a target of 15%+ export contribution near term and about 20% of volumes longer term, and a 20% of total sales goal by FY2029-30.
- Working capital cycle fell to under 60 days in FY26 from 71 days, with a target of 50-55 days by 2030.
- Advance gold business rose to about 11-12% of volumes in FY26 from 5.7% in FY25, with a target of about 30% of volumes by FY30.
- Revenue from operations rose 77.42% to Rs 6,29,488.68 lakhs in FY2025-26 from Rs 3,54,801.96 lakhs a year earlier.
- Profit before tax rose 117.58% to Rs 37,906.42 lakhs in FY2025-26, well ahead of revenue growth.
- The company has a stated roadmap to become net debt-free by FY2029-30, supported by the February 2026 rating upgrade to IND A/Stable.
- Net debt was reduced by more than half during the year, and the debt-equity ratio fell from 0.78 to 0.58 times.
- Promoters will take zero fixed salary from FY27 and be compensated only through dividends paid from operating cash flows.
- Customer concentration is a stated risk, as the loss of one large retail partner could have a disproportionate effect on sales.
- Management expects demand for diamond-studded jewellery to grow exponentially, supported by the 24-carat diamond collection launch.
Investor presentation — Q1FY27 (9 Aug 2026) · 9 Aug 2026
- Management raised FY27 revenue guidance to about Rs 8,100 crore from the earlier Rs 5,000 crore target, after FY26 revenue reached Rs 6,295 crore.
- FY27 EBITDA margin is guided at about 7.0-7.5% and PAT margin at 4.5-4.75%, both raised, against FY26 actuals of 6.9% and 4.5%.
- FY30 targets are revenue of Rs 18,000-19,000 crore, PAT margin of about 5.25% or more (about Rs 945 crore PAT), and ROCE of 27% or more.
- Management targets cash-flow-driven deleveraging: FY27 operating cash flow of Rs 180-225 crore and a net-debt-free balance sheet, after FY26 operating cash flow was negative at Rs 45 crore.
- Advance gold, a client-supplied making-charge model, is expected to reach about 30% of volumes by FY30, up from 11.5% in FY26, supporting ROCE and working capital.
- Management guides for 10-20 bps year-on-year PAT margin improvement, while investing in new geographies and high-growth categories.
- Promoters will stop drawing salaries from FY27 and take compensation only as dividends from operating cash flow, a governance signal tied to cash generation.
- Management says FY27 margin gains depend on continued investment in new geographies and categories, and the FY30 targets rely on working capital improvement.
Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation · 2 Jul 2026
- The company states that no unpublished price sensitive information will be shared at the investor meeting.
- Management will hold one in-person investor meeting with investors on Thursday, 2nd July 2026.
- The document is a disclosure of meeting intimation only and contains no financial results, guidance or operating updates.
- The meeting schedule may change due to exigencies on the part of investors or the company.
- The company is filing this intimation under Regulation 30 of the SEBI LODR Regulations with BSE and NSE.
Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation · 15 Jun 2026
- The company states that no unpublished price sensitive information is proposed to be shared at the meeting.
- The company will host a group analyst meet and plant visit in person on Thursday, 18 June 2026.
- Management will interact with investors and analysts at the scheduled meeting.
- The meeting schedule may change due to exigencies on the part of investors or the company.
- The company was formerly known as Sky Gold Limited and is now named Sky Gold and Diamonds Limited.
Concall transcript — Q4FY26 (Jun 2026) · 28 May 2026
- Management targets a sustainable revenue CAGR of 30% to 35%, and says top-line expansion is intentionally capped to protect the balance sheet.
- Management is shifting toward a self-funded model with a target of net debt-free balance sheet by FY30, funded only by internal cash generation.
- Net debt is to be cut by over 50% in FY27 through land sale and operational improvement; land sale proceeds are expected around August–September 2026.
- PAT margin target is 5.25% by FY2030, up 75 bps from 4.5% in FY26, with gross margin and interest-cost savings cited as levers.
- FY27 revenue guidance was raised to INR8,100 crores from an original INR5,000 crores, which management says is 30% to 40% above initial estimates.
- Advanced gold model records only job-work fees as revenue, so revenue growth understates volume; management says it is PAT accretive despite a 70–125 bps lower gross margin.
- From FY27 promoters move to zero salary and dividend-only rewards, with dividends to be funded strictly from operating cash flows.
- Akash Talesara is proposed to be elevated to CEO, subject to Board approval, as management professionalises.
- Management sees no softening in B2B demand so far, but says it is too early to read June–July consumer behaviour after the duty increase.
- Gold price volatility is beyond management control, so volume guidance has been dropped while the FY30 PAT target is kept.
Concall presentation — Q4FY26 (Jun 2026) · 27 May 2026
- Management raised FY27 guidance to about Rs 8,100 crore revenue and a PAT margin of 4.5%-4.75%, up from earlier FY27 targets of about Rs 5,000 crore revenue and 3.5% PAT margin.
- Management targets FY30 revenue of about Rs 18,000-19,000 crore, with PAT margin of 5.25% or more and ROCE of 27% or more.
- FY26 EBITDA margin was 6.9% and PAT margin 4.5%; FY27 EBITDA margin is guided at 7.0%-7.5%.
- Management plans to monetise land and shift to asset-light leased capacity, with sale proceeds expected to cut net borrowings by about 20%.
- Operating cash flow was near neutral in FY26, and the company targets Rs 180-225 crore of operating cash flow in FY27 with a focus on cash generation.
- Advance gold, a making-charge model with no metal inventory, is expected to rise from 11.5% of volumes in FY26 to about 30% by FY30.
- Management guides for a 10-20 bps year-on-year PAT margin improvement, while investing in new geographies and categories.
- Promoters will forgo salaries from April 2026 and take payouts only as dividends from operating cash flow.
- Management's FY27 and FY30 targets depend on working capital and cash conversion; the document gives no detail on how the 'net debt positive' FY30 goal will be reached beyond working capital gains.
Concall presentation — Q3FY26 (Feb 2026) · 10 Feb 2026
- Management raised FY26 and FY27 revenue projections to about Rs 6,100 crore and Rs 8,100 crore, up from the earlier FY27 figure of about Rs 5,000 crore.
- Management expects EBITDA margin of about 7.0-7.5% and PAT margin of 4.25% or more for FY26/FY27, a step up from FY25's 5.5% EBITDA margin.
- FY30 targets are revenue of about Rs 18,000-19,000 crore and PAT margin of 5.25% or more, which management says aggregates to about Rs 945 crore of PAT.
- Management now expects the company to become near cash-flow neutral by FY26 and generate operating cash flow from FY27, earlier than the FY27-28 timeline it had guided.
- Advance gold, a client-supplied-metal model, is expected to rise to about 20% of volumes by FY30 from about 7% in FY26, which management says will lift ROCE.
- Operating cash flow was negative in FY25 because working capital absorbed heavily, so cash generation is a key execution risk.
- Management guides only 10-20 bps Y-o-Y PAT margin improvement because it is investing in new geographies and high-growth categories.
- Q3FY26 revenue from operations grew 77.1% year on year, and the company reported PAT of Rs 80.5 crore for the quarter.
- Promoters will stop drawing salaries from FY27 and take only dividends, and the company plans to hire a large global accounting firm after Q4 FY26 results.
Concall transcript — Q3FY26 (Feb 2026) · 10 Feb 2026
- Management guides for 30-35% revenue CAGR under its Sky Gold 3.0 plan, with growth deliberately capped to allow deleveraging by FY30.
- Vision 2030 targets revenue of INR18,000-19,000 crore, PAT margin of 5.2% plus and OCF to PAT near 20%, with net debt-free status by 2030.
- Management says the 2030 plan will be funded from internal accruals, with no dilution or fundraise planned at this point.
- FY27 guidance is INR8,100 crore revenue and about 750 kg average volume; PAT margin guidance of 4.25% plus is described as conservative against 9M FY26 at about 4.4%.
- Consolidated gross margin is 8.27% year to date, up about 230 bps from FY24, driven mainly by lower gold loss, advanced gold and higher-margin 18kT and studded products.
- A global audit firm will be appointed from 1 April 2026, and promoters will move to a zero-salary, dividend-only compensation model from FY27.
- Gold metal loan use is only INR80 crore against a INR150 crore limit, and management admits the ramp-up is slow; target is INR350 crore in 3-4 quarters.
- Management says the shift to 18kT and 9kT lighter jewellery is protecting demand, and that it is fully back-to-back hedged on gold price moves.
- Exports are expected to rise to about 13% of sales and distributors to 30-35% of mix; entry into Europe or US is targeted around May 2028-29, not before domestic opportunities are covered.
Concall transcript — Q2FY26 (Nov 2025) · 14 Nov 2025
- Management reiterated the INR 5,400 crore FY26 revenue target and said the company is on track, driven by new clients, operating efficiency and management capability.
- Management cited INR 7,600 crore as the FY27 revenue guidance alongside a 4.25% PAT margin, and said it would stick to the 7,600 crore number despite gold price assumptions.
- Gross margin rose on higher advance gold and studded diamond sales; management said PAT margin can be around 4.25-4.3%, with further gold-metal loan benefits still to come.
- Gold-metal loan (GML) rollout is slower than planned due to documentation and gold supply constraints; only about INR 40 crore of the INR 170 crore sanction was in use.
- Management expects cash flow from operations to turn positive after March 2027, after running short in FY27 and funding it with debt already raised.
- Exports doubled to about INR 150 crore in the quarter after a Dubai sales office opened; management targets exports at 10-12% of sales from Q3 and 15-20% by March 2027.
- Volumes rose to 544 kg per month in Q2, up about 20% quarter on quarter; management reiterated a 630 kg run rate next quarter and 900 kg by FY27.
- Company plans a new facility with construction from April 2026, about INR 150 crore for construction and INR 100 crore for fixtures and machinery, funded mainly from internal accruals.
- Revenue guidance is based on a conservative gold price of INR 90,000-95,000 per 10 grams, well below current prices, so management says revenue could rise if gold stays high.
- Management said there is no plan for further promoter dilution or OFS for three to five years and no acquisitions planned for two to four years, though it expects to raise its Rishab Gold stake to 100% later.
Annual report FY25 · 1 Sep 2025
- Revenue from operations rose 103.26% to Rs. 3,548.01 crore in FY25, driven by higher production volumes and demand in domestic and international markets.
- Revenue from operations nearly doubled to Rs 3,54,801.96 lakh in FY25 from Rs 1,74,548.42 lakh, a 103.27% rise year on year.
- Current borrowings rose to Rs 49,422.22 lakh from Rs 30,138.39 lakh, mainly working capital loans from banks, which increases financing risk.
- Management plans to raise Navi Mumbai capacity to 4.5 tons per month, beyond FY26-27, from about 1,050 kg per month today.
- Acquisitions of Sparkling Chains and Starmangalsutra add chains and mangalsutra segments, with management expecting portfolio, market presence and operational synergies.
- Operating profit margin rose to 6.16% in FY25 from 4.28%, and net profit margin rose to 3.74% from 2.32%.
- Profit before tax rose 169.69% to Rs 14,587.27 lakh, and total comprehensive income rose 240.81% to Rs 13,293.05 lakh.
- Net worth rose to Rs 68,379.71 lakh from Rs 24,411.71 lakh, and the debt-equity ratio fell to 0.92 times from 1.35 times.
- Revenue from operations rose sharply in FY25, with domestic jewellery sales of Rs 2,62,196.05 lakh against Rs 1,63,183.24 lakh a year earlier.
- Other income jumped to Rs 2,858.71 lakh, driven mainly by a Rs 1,585.56 lakh gain on sale of investments, so it is not recurring operating income.
- Standalone net profit rose to Rs 11,114.14 lakh from Rs 4,048.11 lakh, with basic EPS of Rs 7.98 against Rs 3.52.
- Current borrowings rose to Rs 58,845.58 lakhs at 31 March 2025 from Rs 30,138.39 lakhs, a sharp increase in short-term debt.
- Trade receivables increased to Rs 45,218.67 lakhs from Rs 10,214.95 lakhs, a significant rise in working capital tied up in debtors.
- Management intends to use gold metal loans to improve profitability, working capital efficiency and borrowing costs, without a quantified target.
Concall transcript — Q1FY26 (Jul 2025) · 25 Jul 2025
- Management targets group revenue of INR5,400 crores in FY26 and INR7,600 crores in FY27, which it calls midway between conservative and aggressive.
- Management expects PAT margin of 4.25-4.5% by FY27 and EBITDA margin of 6.2-6.3%, helped by gross margin gains from advanced gold and job work.
- Monthly volume is expected to rise from 456 kg in Q1 to about 580 kg in Q2, 630 kg in Q3 and a conservative 650 kg exit rate in Q4 FY26.
- Management expects FY26 PAT of INR200-210 crores against about INR350 crores of cash needs, leaving a roughly INR140 crore cash shortfall in FY26 before turning cash-flow positive after FY27.
- Gold metal loan limits of about INR190 crores were secured from three banks, with utilisation expected to reach 70-75% by the March 2026 quarter as high-cost working capital is replaced.
- A 200 kg per month outside export order is expected to ramp up, with about 100 kg per month from Q2 and 200 kg targeted in Q3 FY26 if the customer confirms.
- Advanced gold share of volume is targeted at 7.5% in FY26 and 10% in FY27, which management expects to lift gross margin and reduce working capital.
- Management expects operating cash flow to turn positive after FY27 and debtor days to fall to 25-26 in the next quarter, supporting working capital release.
- Ganna N Gold, a job-work bangle acquisition with approvals received, is expected to start contributing in Q2 at about 60-70 kg per month with no capex needed.
- Long-term aims include reaching about 1 ton per month of production by 2027 and 4-5% share of India's jewellery making by 2031-32, from about 1% today.
Documents read
- Concall transcript — Q2FY27 (5 Nov 2026) · Concall transcript · 5 Nov 2026 · 5 statements
- Annual report FY26 · Annual report · 5 Sep 2026 · 15 statements
- Investor presentation — Q1FY27 (9 Aug 2026) · Investor presentation · 9 Aug 2026 · 18 statements
- Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation · Exchange announcement · 2 Jul 2026
- Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation · Exchange announcement · 15 Jun 2026
- Concall transcript — Q4FY26 (Jun 2026) · Concall transcript · 28 May 2026 · 17 statements
- Concall presentation — Q4FY26 (Jun 2026) · Concall presentation · 27 May 2026 · 17 statements
- Concall presentation — Q3FY26 (Feb 2026) · Concall presentation · 10 Feb 2026 · 19 statements
- Concall transcript — Q3FY26 (Feb 2026) · Concall transcript · 10 Feb 2026 · 24 statements
- Concall transcript — Q2FY26 (Nov 2025) · Concall transcript · 14 Nov 2025 · 24 statements
- Annual report FY25 · Annual report · 1 Sep 2025 · 8 statements
- Concall transcript — Q1FY26 (Jul 2025) · Concall transcript · 25 Jul 2025 · 26 statements
- Concall transcript — Q4FY25 (Jun 2025) · Concall transcript · 29 May 2025 · 32 statements
- Credit-rating note — CARE Ratings (15 Apr 2025) · Credit-rating note (the rating agency's words) · 15 Apr 2025 · 2 statements
- Concall transcript — Q3FY25 (Feb 2025) · Concall transcript · 10 Feb 2025 · 25 statements
- Concall transcript — Q2FY25 (Nov 2024) · Concall transcript · 19 Nov 2024 · 24 statements
- Concall recording — Q1FY24 (Aug 2023) · Concall recording · 15 Aug 2023 · 13 statements
Guidance is extracted from company documents and interviews by an AI model and then checked against reported numbers by rule. It can contain errors or miss context, and the stored figures may differ from the basis management guided on. This page is information only and is not investment advice.