Sambhv Steel Tubes Ltd: management guidance tracker
What management said it would deliver, when, where they said it — and what the reported numbers showed afterwards.
How to read this page — 30 seconds
- Latest guidance is what management said at its most recent results call, presentation or interview, next to what it had said before. Raised or Lowered tells you which way expectations moved.
- Other open guidance lists earlier promises that have not fallen due, soonest first, with the latest reported figure.
- Track record compares each promise that has fallen due with what the company actually delivered. That is the best guide to how much weight to give the new guidance.
Select any row for management's exact words, where they said it and how the target changed over time.
Latest guidance · 27 Oct 2026 – 5 Nov 2026
From Concall transcript — Q2FY27 (3 Nov 2026), Investor presentation — Q2FY27 (29 Oct 2026), Credit-rating note — CARE Ratings (5 Nov 2026), Credit-rating note — CRISIL (27 Oct 2026). What management guided for most recently, against what it had said before.
Basic product approval · SS seamless
Direct
Management expects basic approval for its product to come in the next 3-6 months, enabling supply to OEM supply chains.
Earlier
First time stated
NowmilestoneFY27–FY27
Change
New
StatusPending
In management's words
“And the basic approval will come to me in the next 3-6 months.”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Cost savings from captive syngas, oxygen, nitrogen and acid regeneration plants vs external procurement
Direct
Captive syngas, oxygen, nitrogen and acid regeneration plants are expected to deliver about 40-50% cost savings versus external procurement, adding to future margins.
Earlier
First time stated
Now40–50%FY27
Change
New
StatusPending
In management's words
“Having Captive Syngas, Oxygen, Nitrogen,& Acid Regeneration plants will lead to ~40–50% cost savings compared to external procurement; resulting into future margin accretion”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
EBITDA margin from captive power
Direct
Captive power meeting over 90% of electricity needs could add about 1-1.5% incremental EBITDA margin.
Earlier
First time stated
Now+100–150 bpsFY27
Change
New
StatusPending
In management's words
“then there is an incremental EBITDA that we can target for around 1.5%.”
What it implies in numbers
A change of 100–150 bps on 11.4% (FY26) implies ebitda / operating margin of about 12.4% to 12.9% in FY27.
Condition attached by management: Captive power covering 90% or more of electricity requirement
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
EBITDA margin per ton (full year FY27)
Direct
FY27 EBITDA per ton bracket revised upward to INR8,000-8,500, described as optimistically achievable.
Earlier
~12%FY27 · 8 Aug 2026
Now₹8,000 – ₹8,500FY27
Change
Raised
StatusPending
In management's words
“around 8,000 to 8,500 is the bracket that we would like to give for full year of FY27”
Condition attached by management: Current scenario
How this guidance changed
- 8 Aug 2026 — ~12% for FY27
First stated
Concall transcript · On track (actual 12.5%)
- 3 Nov 2026 — ₹8,000 – ₹8,500 for FY27
Raised
Concall transcript · Pending
Kesda captive power plant Phase I · Kesda
Direct
The 25 MW Kesda captive power plant (Phase I) is to be commissioned by Q4FY27.
Earlier
First time stated
NowmilestoneQ4FY27
Change
New
StatusOn track
In management's words
“Kesda (Phase I): 25 MW to be commissioned by Q4FY27”
How it was checked
Management said on 3 Nov 2026 that Kesda expansion is on track for on-time commissioning; the Q4FY27 deadline has not passed and no commissioning is confirmed. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Kuthrel solar power plant Phase I · Kuthrel
Direct
The 4 MW Kuthrel solar power plant (Phase I) is to be commissioned by Q4FY27.
Earlier
First time stated
NowmilestoneQ4FY27
Change
New
StatusPending
In management's words
“Kuthrel (Phase I): 4 MW solar power plant to be commissioned by Q4FY27”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Phase I stainless-steel coil capacity · Kesda
Direct
Phase I adds 0.36 MMTPA of stainless-steel coil capacity, targeted for commissioning by Q4FY27.
Earlier
First time stated
NowmilestoneQ4FY27
Change
New
StatusOn track
In management's words
“adding 0.36 MMTPA capacity of Stainless-Steel Coils in Phase I, targeted for commissioning by Q4FY27”
How it was checked
E1 says the Kesda expansion is on track for on-time commissioning, but the 0.36 MMTPA stainless coil Phase I is not named and the Q4FY27 deadline has not passed. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Value-added product sales volume
Direct
FY27 value-added product sales aspired at 4.10-4.25 lakh ton, including over 2.4 lakh ton MS pipes.
Earlier
First time stated
Now410,000–425,000 tonFY27
Change
New
StatusOn track
So far: about 214,782 ton of value-added sales in H1FY27 (Q1 101,191 MT plus Q2 113,591 MT)
In management's words
“we aspire to achieve around 4,10,000 ton to 4,25,000 ton of total value-added product sales”
How it was checked
The FY27 deadline is open. H1 value-added sales of about 214,782 MT run near half of the 410,000–425,000 ton range, so the target is plausible but not yet reached. (judged from later company statements)
Evidence (5 Nov 2026): “value-added product sales volumes increasing to 113,591 MT in Q2FY27 from 101,191 MT in Q1FY27” — Credit-rating note — CARE Ratings (5 Nov 2026)
Evidence (5 Nov 2026): “Sales volume increased to ~230,433 MT, supported by ramp-up of value-added products and better capacity utilisation.” — Credit-rating note — CARE Ratings (5 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
30 MW power plant at Sarora (INR150 crore)
Direct
30 MW captive power plant at Sarora costing INR150 crore to be live by September 2027, saving INR60-70 crore minimum.
Earlier
First time stated
Nowmilestoneby Sep 2027
Change
New
StatusPending
In management's words
“So that capex of 30 megawatt power plant of INR150 crores will be live by September 2027, which will help me cost saving of INR60 crores to INR70 crores at minimum.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Brownfield structural pipes & tubes capacity (DFT route) · Sarora
Direct
Sarora brownfield DFT-route expansion adds 0.15 MMTPA of structural pipes and tubes capacity, targeted for commissioning by Q2FY28.
Earlier
First time stated
NowmilestoneQ2FY28
Change
New
StatusOn track
In management's words
“adding 0.15 MMTPA capacity of Structural Pipes & Tubes through DFT route, targeted for commissioning by Q2FY28”
How it was checked
E1 says the Sarora expansion is on track for on-time commissioning, which may cover the DFT line, but the Q2FY28 deadline has not passed and no commissioning is reported. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Integrated pipe manufacturing capacity (DFT route) addition · MS pipes
Direct
Pipe capacity to rise from 3.5 lakh ton to 5 lakh ton, with the addition live by September 2027.
Earlier
First time stated
Now₹0.01 Crby Sep 2027
Change
New
StatusPending
In management's words
“where our capacity of pipe manufacturing will be going from 3.5 lakh ton to 5 lakh ton. So we are adding 1.5 lakh ton of integrated pipe manufacturing facility. So that will be live by September 2027.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Sarora Unit III captive power plant Phase I · Sarora Unit III
Direct
The 30 MW Sarora Unit III captive power plant (Phase I) is to be commissioned by Q2FY28.
Earlier
First time stated
NowmilestoneQ2FY28
Change
New
StatusOn track
In management's words
“Sarora Unit III (Phase I): 30 MW to be commissioned by Q2FY28”
How it was checked
E1 says the Sarora expansion is on track for on-time commissioning, which may include the 30 MW Unit III plant; the Q2FY28 deadline has not passed. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
EBITDA FY28
Direct
Walked back
FY28 EBITDA upward of INR550 crore on about 5.5 lakh tons volume.
Earlier
≥ ₹8,000FY28 · 8 Aug 2026
Now≥ ₹550 CrFY28
Change
Lowered
StatusPending
In management's words
“So approximately 5.5 lakh tons is what we are aspiring to achieve in FY28, where my EBITDA will be upward of around INR550 crores.”
What it implies in numbers
Reaching ₹550 Cr by FY28 from ₹276 Cr (FY26) needs about 41.2% growth a year.
Condition attached by management: Including Kesda plant; speaker's FY27/FY28 wording is inconsistent
How this guidance changed
- 8 Aug 2026 — ≥ ₹8,000 for FY28
First stated
Concall transcript · Pending
- 3 Nov 2026 — ≥ ₹550 Cr for FY28
Lowered
Concall transcript · Pending
EBITDA FY28 at full Kesda utilisation
Direct
Once Kesda is fully utilised, volume of about 7 lakh ton and EBITDA upward of INR750 crore expected in FY28.
Earlier
First time stated
Now≥ ₹750 CrFY28
Change
New
StatusPending
In management's words
“once my Kesda unit fully gets utilized, so my volume will be approximately upward of around 7 lakh ton, and EBITDA level, we are looking upward of around INR750 crores.”
How it was checked
Capacity utilisation is not in the stored financial tables.
Condition attached by management: Once Kesda unit is fully utilised
How this guidance changed
Stated once in the documents read so far.
Incremental FY28 sales from current capex cycle
Direct
Walked back
Additional sales of about INR2,300-2,400 crore in FY28 from stainless steel (about INR2,000 crore) and DFT MS pipes (about INR300 crore).
Earlier
~₹4,500 CrFY28 · 10 Nov 2025
Now₹2,300 Cr – ₹2,400 CrFY28
Change
Lowered
StatusPending
In management's words
“approximately INR2,300 crores to INR2,400 crores of sales additionally from this existing capex cycle that is going on, which will be done in FY28.”
What it implies in numbers
Reaching ₹2,300 Cr by FY28 from ₹2,413 Cr (FY26) needs about 2.4% decline a year.
Condition attached by management: Stainless steel at 1-1.2 lakh ton; 50,000 ton MS DFT mill
How this guidance changed
- 10 Nov 2025 — ~₹4,500 Cr for FY28
First stated
Concall transcript · Pending
- 3 Nov 2026 — ₹2,300 Cr – ₹2,400 Cr for FY28
Lowered
Concall transcript · Pending
Normal EBITDA · SS seamless
Direct
Management aspires to a normal EBITDA margin of 15% for the seamless project, about two years after start, with the first year lower.
Earlier
First time stated
Now15%by FY28
Change
New
StatusPending
In management's words
“on a normal basis 15% is what I think is a normal EBITDA that I am aspiring.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Learning phase in first year; higher margin possible if achieved
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Phase I seamless pipe capacity
Direct
Phase I of the seamless pipe project adds an initial 14,400 MTPA, targeted for commissioning by Q4FY28.
Earlier
First time stated
NowmilestoneQ4FY28
Change
New
StatusPending
In management's words
“adding initial 14,400 MTPA capacity in Phase I, targeted for commissioning by Q4FY28”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Solar capacity, first phase
Direct
The first phase of the Kuthrel solar project, 3.2 MW, is proposed for FY2028.
Earlier
First time stated
Now3.2 MWFY28
Change
New
StatusPending
In management's words
“The project is proposed to be implemented in two phases, comprising 3.2 MW in FY2028 and 4.8 MW in FY2029.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Project at planning stage; debt tie-up not finalised.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Working capital requirement for seamless expansion · SS seamless
Direct
Working capital required for the seamless expansion in FY28 is expected to be INR150-200 crores at maximum.
Earlier
First time stated
Now₹150 Cr – ₹200 CrFY28
Change
New
StatusPending
In management's words
“In FY28, it will be in the range of INR150 crores to INR200 crores at max.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Solar capacity, second phase
Direct
The second phase of the Kuthrel solar project, 4.8 MW, is proposed for FY2029.
Earlier
First time stated
Now4.8 MWFY29
Change
New
StatusPending
In management's words
“The project is proposed to be implemented in two phases, comprising 3.2 MW in FY2028 and 4.8 MW in FY2029.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Project at planning stage; debt tie-up not finalised.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Stainless steel capacity utilisation after Kesda ramp-up · stainless steel
Direct
Kesda stainless capacity expected at 30-35% utilisation in the first year and 60-65% by FY29.
Earlier
First time stated
Now30–35%FY29
Change
New
StatusPending
In management's words
“in the first year, I feel, with the ramp-up, we will have around 30% to 35% of capacity utilization, and by FY29, it will be around 60%-65%.”
How it was checked
Capacity utilisation is not in the stored financial tables.
Condition attached by management: Assumes Kesda commissioning by March 2027
How this guidance changed
Stated once in the documents read so far.
Working capital requirement for seamless expansion · SS seamless
Direct
At a production level of 3,000-4,000 tons in FY29, working capital needed is expected to be INR50-60 crores at maximum.
Earlier
First time stated
Now₹50 Cr – ₹60 CrFY29
Change
New
StatusPending
In management's words
“In FY29, for a production of let's say 3,000 ton to 4,000 ton, we think INR50 crores to INR60 crores is at max we require in terms of working capital.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Production of 3,000-4,000 tons
How this guidance changed
Stated once in the documents read so far.
Production per annum · SS seamless
Direct
Management targets seamless pipe production of 9,000-10,000 tons per annum in FY30.
Earlier
First time stated
Now9,000–10,000 tons per annumFY30
Change
New
StatusPending
In management's words
“INR80 crores-INR90 crores is my working capital Utilization of 9,000-10,000 tons per annum in FY30.”
How it was checked
Production is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Seamless capacity utilisation · seamless pipes
Direct
Seamless capacity utilisation expected at about 30% in FY29 and 60-65% in FY30.
Earlier
First time stated
Now60–65%FY30
Change
New
StatusPending
In management's words
“I will be having our first year of operation in FY29, which I believe approximately 30% capacity utilization at best we can achieve, and then 60%-65% of capacity utilization that we can target for FY30.”
How it was checked
Capacity utilisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Seamless pipe production · seamless pipes
Direct
Seamless plant expected to produce at least 10,000 tons by FY30 with INR150 crore investment.
Earlier
First time stated
Now≥ 10,000 tonFY30
Change
New
StatusPending
In management's words
“with INR150 crores, we feel we will be at least getting 10,000 ton production by FY30 at max.”
How it was checked
Production is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Seamless pipe revenue · seamless pipes
Direct
Seamless plant at 10,000 tons with average realisation of INR400 per ton is expected to generate about INR400 crore revenue by FY30.
Earlier
First time stated
Now~₹400 CrFY30
Change
New
StatusPending
In management's words
“we think we will be somewhere generating around INR400 crores of revenue”
What it implies in numbers
Reaching ₹400 Cr by FY30 from ₹2,413 Cr (FY26) needs about 36.2% decline a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Average realisation of INR400 per ton
How this guidance changed
Stated once in the documents read so far.
Working capital requirement for seamless expansion · SS seamless
Direct
Maximum working capital required for the seamless expansion by FY30 is estimated at INR80-90 crores.
Earlier
First time stated
Now₹80 Cr – ₹90 CrFY30
Change
New
StatusPending
In management's words
“INR80 crores-INR90 crores is the maximum working capital that we require.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Captive power share of energy need
Direct
Meet 90% of energy needs through captive power by 2030.
Earlier
First time stated
Now≥ 90%by 2030
Change
New
StatusPending
In management's words
“We aim to scale our finished product capacity from 0.6 million ton to over 2 million ton, while we aim to meet our 90% energy need through captive power by 2030.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Finished product capacity
Direct
Scale finished product capacity from 0.6 million ton to over 2 million ton as part of Vision 2030.
Earlier
~2,000,000 million tons of finished steelby 2030 · 11 May 2026
Now≥ 2,000,000 million tonby 2030
Change
Repeated
StatusPending
In management's words
“We aim to scale our finished product capacity from 0.6 million ton to over 2 million ton, while we aim to meet our 90% energy need through captive power by 2030.”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
- 11 May 2026 — ~2,000,000 million tons of finished steel for by 2030
First stated
Concall transcript · Pending
- 3 Nov 2026 — ≥ 2,000,000 million ton for by 2030
Repeated
Concall transcript · Pending
Finished product capacity addition · Kesda
Direct
The Kesda greenfield project is proposed to add 1.2 MMTPA of finished product capacity in phases by 2030.
Earlier
First time stated
Now1.2 MMTPAby 2030
Change
New
StatusPending
In management's words
“propose to add 1.2 MMTPA finished product capacity in phased manner by 2030”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Stainless-steel seamless pipes & tubes capacity addition
Direct
Walked back
Management proposes adding 0.05 MMTPA of fully backward-integrated stainless-steel seamless pipe capacity in phases by 2030.
Earlier
2.03 MMTPAby 2030 · 18 Aug 2026
Now0.05 MMTPAby 2030
Change
Lowered
StatusPending
In management's words
“propose to add 0.05 MMTPA fully backward integrated production capacity of Stainless-Steel Seamless Pipes & Tubes in phased manner by 2030”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
- 10 May 2026 — 2.03 MMTPA for FY30–FY31
First stated
Concall presentation · On track
- 18 Aug 2026 — 2.03 MMTPA for by 2030
Deadline brought forward
Annual report · Pending
- 29 Oct 2026 — 0.05 MMTPA for by 2030
Lowered
Investor presentation · Pending
Subsidiary capex to FY31 · subsidiary
Direct
Rough estimate of about INR400 crore capex to FY31 under the subsidiary, funded 50% internal accruals and 50% debt or equity.
Earlier
First time stated
Now~₹400 CrFY31
Change
New
StatusPending
In management's words
“FY31, I would say, it will be around in the range of INR400 crores”
What it implies in numbers
Reaching ₹400 Cr by FY31 from ₹136 Cr (FY26) needs about 24.1% growth a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Rough estimate; 50% internal accruals and 50% debt or equity
How this guidance changed
Stated once in the documents read so far.
Capex · SS seamless
Direct
Management is spending INR150 crores of capex on the seamless pipe expansion.
Earlier
First time stated
Now₹150 CrNot specified
Change
New
StatusPending
In management's words
“I am doing a capex of INR150 crores.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Estimated CAPEX for DFT brownfield expansion · Sarora
Direct
Estimated capex for the DFT-route brownfield expansion of structural pipes is INR 500 million.
Earlier
First time stated
Now₹50 CrNot specified
Change
New
StatusPending
In management's words
“adding 1,50,000 MTPA capacity with an estimated CAPEX of INR 500 Million, targeted for commissioning by Q2FY28”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Estimated CAPEX for Phase I stainless-steel coils · Kesda
Direct
Estimated capex for Phase I stainless-steel coil capacity is INR 8,100 million.
Earlier
First time stated
Now₹810 CrNot specified
Change
New
StatusPending
In management's words
“Phase-I includes 0.36 MMTPA Stainless-steel Coils production capacity with estimated CAPEX of INR 8,100 Million”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Investment in stainless-steel seamless pipes plant · stainless-steel seamless pipes
Direct
Investment of INR148 crore in stainless-steel seamless pipes and tubes with 14,400 tpa production capacity.
Earlier
First time stated
Now₹148 CrNot specified
Change
New
StatusPending
In management's words
“We are now entering high-growth, high-margin business of stainless-steel seamless pipes and tubes with investment of INR148 crores, with production capacity of 14,400-ton per annum.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Phase 2 and Phase 3 capex
Direct
Phase 2 and Phase 3 capex, including power, estimated at INR1,500-2,000 crore; not yet Board approved.
Earlier
₹200 CrNot specified · 18 Aug 2026
Now₹1,500 Cr – ₹2,000 CrNot specified
Change
Raised
StatusPending
In management's words
“approximately we believe it will be in the range of INR1,500 crores to INR2,000 crores for both the phases, including all the power.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Not yet approved by the Board; to be clarified after Kesda goes live in March 2027
How this guidance changed
- 10 Nov 2025 — ~₹935 Cr for Not specified
First stated
Concall transcript · Pending (actual ₹136 Cr)
- 2 Feb 2026 — ₹930 Cr – ₹940 Cr for Not specified
Range widened
Concall transcript · Pending (actual ₹136 Cr)
- 18 Aug 2026 — ₹200 Cr for Not specified
Lowered
Annual report · Pending
- 3 Nov 2026 — ₹1,500 Cr – ₹2,000 Cr for Not specified
Raised
Concall transcript · Pending
ROCE · SS seamless
Direct
Management aspires to ROCE of more than 24-25% on the seamless expansion.
Earlier
First time stated
Now≥ 24%Not specified
Change
New
StatusPending
In management's words
“More than 24%, 25%.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Combined working capital and capex of INR240-250 crores; utilisation of 50-70%
How this guidance changed
Stated once in the documents read so far.
Commencement of commercial operations at Kesda facility · stainless steel
Indirect
The Kesda greenfield facility is expected to commence commercial operations from Q3FY28.
Earlier
First time stated
NowmilestoneQ3FY28
Change
New
StatusPending
In management's words
“is expected to commence commercial operations from Q3FY28.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Subject to timely implementation without major cost overruns.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Commencement of projects
Indirect
The capex projects are likely to commence from Q3 FY28.
Earlier
First time stated
NowmilestoneQ3FY28
Change
New
StatusPending
In management's words
“projects likely to commence from the third quarter of fiscal 2028 and having reached completion of ~30% till date”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- reported by CRISIL in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Warrant issue
Indirect
A ₹100 crore warrant issue is planned, with ₹25 crore infused in the current fiscal year and the rest by FY28.
Earlier
First time stated
Now₹100 Crby FY28
Change
New
StatusPending
In management's words
“warrant issue of ₹100 crore (₹25 crore already infused in current FY and rest would be infused by FY28)”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Capex programme under Vision 2030 roadmap
Indirect
The company is undertaking a capex programme of over ₹1,150 crore under its Vision 2030 roadmap.
Earlier
First time stated
Now≥ ₹1,150 Crby 2030
Change
New
StatusPending
In management's words
“SSTL is undertaking a major capex programme of over ₹1,150 crore under its Vision 2030 roadmap to enhance scale, diversify its product portfolio and improve operational integration.”
How it was checked
Due with FY31 results; nothing reported since the statement yet.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
EBITDA-level margin accretion from cost initiatives
Indirect
EBITDA-level margin accretion of 2.5-3% targeted by 2030 from captive power and cost initiatives.
Earlier
First time stated
Now+250–300 bpsby 2030
Change
New
StatusPending
In management's words
“approximately 2.5% to 3% of margin, EBITDA-level margin accretion that we are targeting by 2030.”
What it implies in numbers
A change of 250–300 bps on 12.1% (Q2FY27) implies ebitda / operating margin of about 14.6% to 15.1% in Q3FY31.
Condition attached by management: Includes captive power and other cost optimisation initiatives
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Fresh term debt
Indirect
The company will raise fresh term debt of about Rs 815 crore to fund its ongoing greenfield and brownfield capex over the medium term.
Earlier
First time stated
Now~₹815 CrFY29–FY31
Change
New
StatusPending
In management's words
“the company will be raising fresh term debt of ~Rs 815 crore to fund its ongoing greenfield and brownfield capex projects over the medium term”
What it implies in numbers
Reaching ₹815 Cr by FY31 from ₹373 Cr (FY26) needs about 16.9% growth a year.
How it was checked
Due with FY31 results; nothing reported since the statement yet.
Assumptions made in reading this
- reported by CRISIL in its rating note, not stated by management directly
- horizon counted from FY26 (last completed year at the statement date)
- 'medium term' read as 3 to 5 years
How this guidance changed
Stated once in the documents read so far.
Integrated seamless pipe capacity · Seamless pipes
Indirect
Seamless pipe capacity is to rise from 14,400 TPA in Phase I to 50,000 TPA fully integrated within the next five years.
Earlier
First time stated
Now50,000 TPAby FY31
Change
New
StatusPending
In management's words
“14,400 TPA (Phase I: Piercing & Pilgering) → 50,000 TPA Fully Integrated in next 5 years”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
8 MW captive solar power plant at Kuthrel
Indirect
The company plans an 8 MW captive solar plant at Kuthrel at an estimated project cost of ₹25 crore.
Earlier
First time stated
Now~₹25 CrNot specified
Change
New
StatusPending
In management's words
“the company is also planning to set up an 8 MW captive behind-the-meter solar power plant at its Kuthrel manufacturing facility at an estimated project cost of ₹25 crore.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Debt tie-up not yet finalised; project at planning stage.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Brownfield expansion at Sarora facility · ERW pipes
Indirect
The company is undertaking a ₹200 crore brownfield expansion at its Sarora facility.
Earlier
First time stated
Now₹200 CrNot specified
Change
New
StatusPending
In management's words
“SSTL is also undertaking a ₹200 crore brownfield expansion at its existing Sarora facility”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Capex · ERW pipes
Indirect
The company is undertaking about Rs 200 crore of capex to increase its ERW pipe capacity.
Earlier
First time stated
Now~₹200 CrNot specified
Change
New
StatusPending
In management's words
“SSTL is undertaking capex of ~Rs 200 crore to increase the electric resistance welded pipes capacity by 1.5 lakh TPA and captive power plant capacity by 30 MW.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- reported by CRISIL in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Captive power plant capacity increase · captive power plant
Indirect
The company plans to increase captive power plant capacity by 30 MW alongside its brownfield capex.
Earlier
First time stated
Now30 MWNot specified
Change
New
StatusPending
In management's words
“SSTL is undertaking capex of ~Rs 200 crore to increase the electric resistance welded pipes capacity by 1.5 lakh TPA and captive power plant capacity by 30 MW.”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- reported by CRISIL in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
EBITDA · SS seamless
Indirect
Management expects EBITDA of INR60-70 crores from the seamless project at 50-70% utilisation.
Earlier
First time stated
Now₹60 Cr – ₹70 CrNot specified
Change
New
StatusPending
In management's words
“I am thinking of a EBITDA of INR60 crores-INR70 crores. It will come to me easily.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Maximum utilization of 50%-70%
How this guidance changed
Stated once in the documents read so far.
EBITDA from seamless capacity · seamless pipes
Indirect
Seamless capacity expected to generate EBITDA of INR60-70 crore by the second year of full operation.
Earlier
First time stated
Now₹60 Cr – ₹70 CrNot specified
Change
New
StatusPending
In management's words
“we are having EBITDA margin in terms of this capacity, we will be around INR60 crores to INR70 crores, which we will be feeling is a comfortable number by second year of full operation.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Second year of full operation
How this guidance changed
Stated once in the documents read so far.
ERW pipe capacity after Sarora expansion · ERW pipes
Indirect
The Sarora expansion, including a 1.5 lakh TPA DFT-based ERW pipe mill, will increase ERW pipe capacity to 5.0 lakh TPA.
Earlier
First time stated
Now₹0.05 CrNot specified
Change
New
StatusPending
In management's words
“involving the addition of a 1.5 lakh TPA Direct Forming Technology (DFT)-based ERW pipe mill and a 30 MW captive power plant, which will increase ERW pipe capacity to 5.0 lakh TPA.”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
ERW pipe capacity increase · ERW pipes
Indirect
The company plans to increase ERW pipe capacity by 1.5 lakh TPA through brownfield capex.
Earlier
First time stated
Now₹0.01 CrNot specified
Change
New
StatusPending
In management's words
“SSTL is undertaking capex of ~Rs 200 crore to increase the electric resistance welded pipes capacity by 1.5 lakh TPA and captive power plant capacity by 30 MW.”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- reported by CRISIL in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Estimated cost of Kesda stainless-steel facility and captive power plant · stainless steel
Indirect
The Kesda greenfield stainless-steel facility and 25 MW captive power plant have an estimated cost of ₹957 crore.
Earlier
First time stated
Now~₹957 CrNot specified
Change
New
StatusPending
In management's words
“The company is setting up a 3.6 lakh TPA greenfield stainless-steel manufacturing facility at Kesda, Chhattisgarh, and a 25 MW captive power plant, at an estimated cost of ₹957 crore.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Greenfield stainless-steel manufacturing facility at Kesda · stainless steel
Indirect
The company is setting up a 3.6 lakh TPA greenfield stainless-steel facility at Kesda.
Earlier
First time stated
Now₹0.04 CrNot specified
Change
New
StatusPending
In management's words
“The company is setting up a 3.6 lakh TPA greenfield stainless-steel manufacturing facility at Kesda, Chhattisgarh”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Net debt to operating EBITDA
Indirect
Net debt to operating EBITDA expected to rise to about 1.4-1.5x during the capex cycle, from 1.04x in H1.
Earlier
Management called this lowered; the earlier figure was on a different basis or is not in the documents read
Now1.4–1.5xNot specified
Change
Lowered
StatusPending
In management's words
“this will increase a little bit to approximately somewhere in the range of 1.4x to 1.5x on a net debt basis to operating EBITDA level.”
How it was checked
Net debt to EBITDA is not in the stored financial tables.
Condition attached by management: Kesda unit going live during capex cycle
How this guidance changed
Stated once in the documents read so far — management described it as “lowered” against earlier guidance.
Stainless steel capacity · stainless steel
Indirect
After completion of the greenfield project, stainless steel capacity will rise from 1.16 lakh TPA to about 4.8 lakh TPA.
Earlier
First time stated
Now~₹0.05 CrNot specified
Change
New
StatusPending
In management's words
“Post completion, the company's stainless steel capacity will increase from 1.16 lakh TPA to ~4.8 lakh TPA and timely offtake of the same”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: completion of the greenfield stainless steel project
Assumptions made in reading this
- reported by CRISIL in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Term debt for Kesda project · stainless steel
Indirect
The Kesda project is to be funded partly through ₹675 crore of term debt, with the rest from promoter or internal contribution.
Earlier
First time stated
Now₹675 CrNot specified
Change
New
StatusPending
In management's words
“The project is being funded through a mix of ₹675 crore term debt and promoter/internal contribution”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Total captive power capacity on completion
Indirect
Total captive power capacity is expected to rise to about 80 MW on completion of the planned expansions.
Earlier
First time stated
Now~80 MWNot specified
Change
New
StatusPending
In management's words
“On completion, the company's total captive power capacity is expected to increase to ~80 MW, supporting greater energy security and cost competitiveness.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: On completion of the planned expansions.
Assumptions made in reading this
- reported by CARE Ratings in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Q3 volume and capacity utilisation
Hint
No further room for higher capacity utilisation in Q3; volume expected to be restricted to the Q1 level.
Earlier
First time stated
Nowto hold or improveQ3FY27
Change
New
StatusPending
In management's words
“So there is no further scope of for higher capacity utilization in Q3.”
How it was checked
Volume is not in the stored financial tables.
Condition attached by management: Destocking by distributors in Q2
How this guidance changed
Stated once in the documents read so far.
International expansion of footprint · International
Hint
Management is planning to expand its international footprint through stainless steel seamless pipes, with no timeline given.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“Planning to expand international footprint by leveraging our expertise and through stainless steel seamless pipe product”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Kesda stainless steel integrated facility (360,000 ton) commissioning · stainless steel
Hint
The 360,000 ton stainless steel integrated facility at Kesda will be live by March 2027.
Earlier
First time stated
Nowmilestoneby Mar 2027
Change
New
StatusPending
In management's words
“so it will be live by March 2027.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Net debt to EBITDA ratio held for full year
Hint
Management would like the H1 net debt to EBITDA ratio of about 1.04x to hold for a full year by end of Q4 FY27.
Earlier
First time stated
Nowto hold or improveQ4FY27
Change
New
StatusPending
In management's words
“we would like to have this ratio intact for a full year by, let's say, end of Q4 FY27.”
How it was checked
Net debt to EBITDA is not in the stored financial tables.
Condition attached by management: Superseded by expectation of 1.4-1.5x during capex cycle
How this guidance changed
Stated once in the documents read so far.
Net realisation
Hint
Net realisation for the full year expected to stay in a similar range to current Q3 prices.
Earlier
First time stated
Nowto hold or improveFY27
Change
New
StatusPending
In management's words
“for the entire year, if you see, I think, the net realization will be in the similar range only.”
How it was checked
ARPU / realisation is not in the stored financial tables.
Condition attached by management: Coil prices remain elevated
How this guidance changed
Stated once in the documents read so far.
Q1 and Q2 performance continuing
Hint
Management says the Q1 and Q2 FY27 performance can continue in Q3 and Q4, subject to the geopolitical situation.
Earlier
First time stated
Nowto hold or improveH2FY27
Change
New
StatusPending
In management's words
“If this situation remains geopolitical, then yes, sir, it can continue subject to geopolitical situation, sir.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Subject to geopolitical situation remaining as it is
How this guidance changed
Stated once in the documents read so far.
Stainless steel EBITDA per ton · stainless steel
Hint
Stainless steel EBITDA of INR12,000-13,000 per ton expected to remain sustainable in Q3 and Q4 FY27 despite imports.
Earlier
First time stated
Nowto hold or improveFY27
Change
New
StatusPending
In management's words
“So I think in Q3 and Q4 also it is quite sustainable.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Import pressure and QCO relaxation continue
How this guidance changed
Stated once in the documents read so far.
Seamless pipe manufacturing plant commissioning · seamless pipes
Hint
The seamless pipe manufacturing plant will be live by March 2028.
Earlier
First time stated
Nowmilestoneby Mar 2028
Change
New
StatusPending
In management's words
“And then we have recently announced seamless pipe manufacturing capability, our manufacturing plant, which will be live by March 2028.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Other open guidance · soonest due first
Earlier promises that have not fallen due yet, with the latest figure where one has been reported.
Q2 FY26 sales volume
Hint
Management aims for Q2 FY26 volume to be flattish versus Q1, despite monsoon seasonality.
Targetto hold or improve
DueQ2FY26
result by 14 Nov 2025
Said25 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“we as a management trying to achieve the flattish number or maybe we will be achieving the Q1 number”
How it was checked
Volume is not in the stored financial tables.
Condition attached by management: Monsoon seasonality impact
How this guidance changed
Stated once in the documents read so far.
Galvanizing capacity utilisation · galvanized products
Direct
Galvanizing utilisation, currently around 85%, is targeted to reach 95% by the next earnings call.
Target≥ 95%
DueQ3FY26
result by 14 Feb 2026
Said10 Nov 2025
Concall transcript
StatusAwaiting data
In management's words
“So, our target is that when we sit with you in the next quarter, we will be at 95%.”
How it was checked
Capacity utilisation is not in the stored financial tables.
Assumptions made in reading this
- 'next quarter' counted from Q2FY26, the quarter being reported at the time
How this guidance changed
Stated once in the documents read so far.
Total capacity at year-end
Indirect
Total capacity is expected to reach 5,86,000 tons by year-end FY26, up from 5,10,000 tons.
Target586,000 tons
DueQ4FY26
result by 30 May 2026
Said25 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“So in this year-end, our total capacity will be 5,86,000 tons.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
ERW pipe sales volume FY26 · ERW pipes
Direct
Management guides ERW pipe sales volume of around 2,20,000-2,30,000 tons for FY26.
Target220,000–230,000 tons
DueFY26
result by 30 May 2026
Said25 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“around let's say 2,20,000, 2,30,000 tons of ERW pipe.”
How it was checked
Volume is not in the stored financial tables.
Condition attached by management: Not a precise number
How this guidance changed
Stated once in the documents read so far.
Galvanized pipe and coil sales volume FY26 · galvanized pipes and coils
Direct
Management guides galvanized pipe and coil sales volume of around 50,000-55,000 tons for FY26.
Target50,000–55,000 tons
DueFY26
result by 30 May 2026
Said25 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“Let's say around 50,000 to 55,000 tons of galvanized pipe and coil”
How it was checked
Volume is not in the stored financial tables.
Condition attached by management: Not a precise number
How this guidance changed
Stated once in the documents read so far.
Operating conditions improvement
Hint
Management expects the Q1FY26 rebound in operating conditions to sustain.
Targetto hold or improve
DueFY26
result by 30 May 2026
Said3 Sep 2025
Annual report
StatusAwaiting data
In management's words
“and we expect this improvement to sustain”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Return to shareholders versus alternative asset classes
Hint
Management expects to generate returns for shareholders superior to alternative asset classes across the foreseeable future.
Targetto improve
DueFY26
result by 30 May 2026
Said3 Sep 2025
Annual report
StatusAwaiting data
In management's words
“Across the foreseeable future, we expect to generate a return superior to what our risk partners (shareholders) would be able to generate if they invested in alternative asset classes.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Stainless steel CR capacity · stainless steel CR
Direct
Stainless steel CR capacity is to be doubled from 58,000 to 1,16,000 tpa, to be implemented by end-March 2026.
Target116,000 tons per annum
Dueby FY26
result by 30 May 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“we are doing from 58,000 ton to 1,16,000 ton in stainless steel. We will implement this till the end of March.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
300 series share of stainless mix · stainless steel
Direct
Management aims for a 50-50 mix of 300 and 200 series stainless steel in Q4 FY26, from about 30-70 currently.
Target50%
DueQ4FY26
result by 30 May 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“if you see for the stainless steel 300 and 200 series it is mostly 30-70 currently, but we try to achieve 50-50 mix in Q4.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Volume (blended)
Direct
Management expects Q4 FY26 blended volume of approximately 1 to 1.5 lakh tons.
Target₹0.01 Cr
DueQ4FY26
result by 30 May 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“Volume, it may be approximately 1 lakh. Blended. 1.5 lakh or 1 lakh in between.”
How it was checked
Volume is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Average sales realisation (stainless) · stainless steel
Direct
Stainless steel average realisation is expected to rise to about INR1.4-1.5 lakh per ton in Q4 if the 300-series mix reaches 50%.
Target₹140,000 – ₹150,000
DueQ4FY26
result by 30 May 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“So, as Mr. Bikash said, we are trying to reach 304 and 316. So if we take it from 30% to 50%, then our realization will increase from 1,40,000 lakh to 1,50,000 per ton.”
How it was checked
ARPU / realisation is not in the stored financial tables.
Condition attached by management: Depends on 300-series mix rising to 50%.
How this guidance changed
Stated once in the documents read so far.
Utilisation timeline for IPO proceeds under GCP
Direct
Walked back
The deadline for utilising IPO proceeds under the General Corporate Purposes head was extended to September 30, 2026, after the original March 2026 date was missed.
Targetmilestone
Dueby Sep 2026
result by 14 Nov 2026
Said5 Aug 2026
Use-of-proceeds report
StatusPending
In management's words
“Subsequently, the timeline for utilization of the IPO proceeds under GCP was extended to September 30, 2026, in accordance with the Board resolution dated April 23, 2026.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
MS pipe net realisation per ton (Q2 FY27) · MS pipe and tube
Direct
Q2 FY27 net realisation for MS pipe and tube is expected at about INR58,000 per ton.
Target~₹58,000
DueQ2FY27
result by 14 Nov 2026
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“realization which we envisage currently for Q2 FY27 is INR58,000 approximately for MS pipe”
How it was checked
ARPU / realisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
GP pipe net realisation per ton (Q2 FY27) · GP pipe
Direct
Q2 FY27 net realisation for GP pipe is expected at INR72,000-73,000 per ton.
Target₹72,000 – ₹73,000
DueQ2FY27
result by 14 Nov 2026
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“INR72,000 to INR73,000 for GP pipe”
How it was checked
ARPU / realisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
SS 200 series net realisation per ton (Q2 FY27) · stainless steel SS 200
Direct
Q2 FY27 net realisation for SS 200 series is expected at about INR1,30,000 per ton.
Target~₹130,000
DueQ2FY27
result by 14 Nov 2026
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“INR1,30,000 per ton for SS 200 series and around INR2,00,000 per ton for SS 300 series.”
How it was checked
ARPU / realisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
SS 300 series net realisation per ton (Q2 FY27) · stainless steel SS 300
Direct
Q2 FY27 net realisation for SS 300 series is expected at around INR2,00,000 per ton.
Target~₹200,000
DueQ2FY27
result by 14 Nov 2026
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“around INR2,00,000 per ton for SS 300 series.”
How it was checked
ARPU / realisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Operating EBITDA (enterprise level)
Direct
Management is confident of operating EBITDA of at least INR260 crore at enterprise level for FY26.
Target≥ ₹260 Cr
Dueby 2026
result by 14 Feb 2027
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“And overall, if I talk about 2026, then we are confident that we will be achieving upward of INR260 crores of operating EBITDA On an enterprise level.”
What it implies in numbers
Reaching ₹260 Cr by Q3FY27 from ₹51 Cr (Q3FY26) needs about 409.8% growth a year.
Assumptions made in reading this
- '2026' read as calendar year 2026
How this guidance changed
Stated once in the documents read so far.
Phase 1 commissioning (Kesda greenfield)
Hint
Phase 1 of the Kesda greenfield project is expected to be commissioned at the end of FY27.
Targetmilestone
Dueby FY27
result by 30 May 2027
Said25 Jul 2025
Concall transcript
StatusPending
In management's words
“with Phase 1 is expected to be commissioned end of financial year 2027”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Phase 1 ERW pipes and tubes capacity · ERW pipes and tubes
Direct
Phase 1 of unit three is planned to add 1,80,000 tons of fully integrated pipes and tubes capacity.
Target180,000 tons
Dueby FY27
result by 30 May 2027
Said25 Jul 2025
Concall transcript
StatusOn track
In management's words
“End product in first phase will be 1,80,000 of pipes and tubes fully integrated backward and forward.”
How it was checked
Management says Kesda and Sarora expansions are on track for on-time commissioning; the FY27 deadline has not passed and no phase 1 ERW figure is yet reported. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Evidence (18 Aug 2026): “Sambhv is developing two additional captive power plants” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Phase 1 stainless steel capacity · stainless steel
Direct
Phase 1 of unit three is planned to add 1,80,000 tons of stainless steel production capacity.
Target180,000 tons
Dueby FY27
result by 30 May 2027
Said25 Jul 2025
Concall transcript
StatusOn track
In management's words
“And 1,80,000 ton of stainless steel production capacity fully backward integrated and forward integrated.”
How it was checked
Management says Kesda and Sarora expansions are on track for on-time commissioning; the FY27 deadline has not passed and no phase 1 stainless figure is yet reported. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Evidence (18 Aug 2026): “Sambhv is developing two additional captive power plants” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Kesda Phase I commissioning · Kesda greenfield project
Direct
Phase I of the Kesda project is scheduled for commissioning by the end of FY 2026-27.
Targetmilestone
Dueby FY27
result by 30 May 2027
Said3 Sep 2025
Annual report
StatusPending
In management's words
“Phase I scheduled for commissioning by end of FY 2026-27”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Phase 1 commissioning (five-year expansion)
Direct
Phase 1 of the capacity expansion is likely to be commissioned in the last quarter of FY 2026-27.
Targetmilestone
DueQ4FY27
result by 30 May 2027
Said3 Sep 2025
Annual report
StatusOn track
In management's words
“Phase 1 of which is likely to be commissioned in the last quarter of FY 2026-27”
How it was checked
Management says the Kesda and Sarora expansions are on track for on-time commissioning; the Q4FY27 deadline has not passed. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Condition attached by management: likely
How this guidance changed
Stated once in the documents read so far.
Gross block
Indirect
The expansion is expected to more than double gross block when completed in late FY27.
Target≥ 2x (double)
Dueby FY27
result by 30 May 2027
Said3 Sep 2025
Annual report
StatusBehind
So far: ₹732 Cr (FY26)
In management's words
“this expansion is likely to more than double the Company's gross block in one stroke when completed in late FY 2026-27”
What it implies in numbers
Doubling fixed assets from ₹750 Cr (FY25) means about ₹1,500 Cr by FY27 — roughly 41.4% growth a year.
How it was checked
FY26: ₹732 Cr against ₹1,500 Cr targeted by FY27 — behind the pace required. It now needs about 104.9% growth a year to get there.
Condition attached by management: likely
How this guidance changed
Stated once in the documents read so far.
Phase I commissioning of Kesda greenfield plant · Kesda greenfield plant (Phase I)
Hint
Phase I of the Kesda greenfield facility is expected to be commissioned in FY27.
Targetmilestone
DueFY27
result by 30 May 2027
Said31 Jan 2026
Concall presentation
StatusPending
In management's words
“Phase I is expected to be commissioned in FY27.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Distributor network expansion · Kerala, Tamil Nadu, Andhra Pradesh, Goa, Maharashtra
Hint
Management plans to increase distributors in new states and UTs, including Kerala, Tamil Nadu, Andhra Pradesh, Goa and Maharashtra.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Jan 2026
Concall presentation
StatusOn track
So far: 47 distributors across 15 states and 1 UT
In management's words
“plan to increase distributors in states/UT’s such as Kerala, Tamil Nadu, Andhra Pradesh, Goa, Maharashtra etc.”
How it was checked
The FY27 deadline has not passed. The distributor network has expanded to 47 across 15 states and 1 UT, but evidence does not confirm the named states specifically. (judged from later company statements)
Evidence (18 Aug 2026): “Expanded network to 47 distributors and 1,000+ dealers across 15 States and 1 Union Territory” — Annual report FY26
Evidence (10 May 2026): “Received product approval from leading government organizations including Powergrid Corporation Ltd, Hindustan Shipyard Ltd, NPCC, Maharashtra Jeevan Pradhikaran” — Concall presentation — Q4FY26 (May 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
International footprint expansion
Hint
The company is planning to expand its international footprint by leveraging its ERW pipes and tubes expertise.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Jan 2026
Concall presentation
StatusPending
In management's words
“Also planning to expand international footprint by leveraging our expertise in ERW pipes and tubes (GI and GP)”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Total stainless steel annual capacity · stainless steel
Direct
Total stainless steel annual capacity is expected to be about 4,70,000 tons by FY27.
Target~470,000 tons per annum
DueFY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript · 2× since 10 Nov 2025
StatusOn track
In management's words
“It will be approximately 4,70,000 tons of annual capacity.”
How it was checked
Management says Kesda and Sarora are on track, but no evidence shows total stainless capacity near 470,000 tons. The FY27 deadline has not passed. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Evidence (18 Aug 2026): “It undertook a brownfield capacity expansion from 58,000 MTPA to 116,000 MTPA for stainless steel.” — Annual report FY26
How this guidance changed
- 10 Nov 2025 — 178,000 tons per annum CRAP coil for FY27
First stated
Concall transcript · Pending
- 2 Feb 2026 — ~470,000 tons per annum for FY27
Raised
Concall transcript · On track
Stage 1 capex balance
Direct
About INR700 crore of Stage 1 capex is to be spent over the next 12 months, after INR250 crore already incurred by December.
Target~₹700 Cr
Dueby FY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusPending
So far: ≈ ₹136 Cr (FY26)
In management's words
“So, the balance is approximately INR700 crores capex to be done in the next 12 months.”
What it implies in numbers
Reaching ₹700 Cr by FY27 from ₹136 Cr (FY26) needs about 414.7% growth a year.
How it was checked
FY26: ₹136 Cr against ₹700 Cr targeted by FY27.
Assumptions made in reading this
- horizon counted from FY26 (statement made in its last quarter)
How this guidance changed
Stated once in the documents read so far.
Stainless steel greenfield capacity (phase 1) · stainless steel greenfield (Kesda)
Direct
The Kesda greenfield stainless steel capacity is expected to be commissioned by Q4 2027.
Targetmilestone
DueQ4FY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusOn track
In management's words
“we are expecting that capacity to be commissioned? by Q4 2027.”
How it was checked
Management says Kesda expansion is on track for on-time commissioning, though only about 30% of projects are complete. The Q4FY27 deadline has not passed. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Evidence (27 Oct 2026): “having reached completion of ~30% till date” — Credit-rating note — CRISIL (27 Oct 2026)
Evidence (27 Oct 2026): “The group has incurred a large greenfield capex of Rs 935 crore to set up a 3.6 lakh TPA integrated SS manufacturing unit at Kesda, Chhattisgarh” — Credit-rating note — CRISIL (27 Oct 2026)
Condition attached by management: Quarter as worded; fiscal versus calendar basis not stated.
How this guidance changed
Stated once in the documents read so far.
Phase-I stainless-steel coils capacity · Stainless-steel coils (Kesda & Kuthrel Unit-II)
Direct
Phase-I of the Kesda and Kuthrel Unit-II greenfield expansion, including 0.36 MMTPA of stainless-steel coils, to be commissioned by Q4FY27.
Targetmilestone
DueQ4FY27
result by 30 May 2027
Said10 May 2026
Concall presentation
StatusOn track
In management's words
“Phase-I includes 0.36 MMTPA Stainless-Steel Coils and to be commissioned by Q4FY27”
How it was checked
Management says Kesda and Sarora expansions are on track for on-time commissioning. The Q4FY27 deadline has not passed. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Evidence (18 Aug 2026): “Sambhv is developing two additional captive power plants” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Estimated CAPEX · Phase-I stainless-steel coils (Kesda & Kuthrel Unit-II greenfield)
Direct
Estimated capex for Phase-I stainless-steel coils capacity is INR 8,100 million.
Target~₹810 Cr
Dueby Q4FY27
result by 30 May 2027
Said10 May 2026
Concall presentation
StatusBehind
So far: Rs 935 crore of greenfield capex incurred for the 3.6 lakh TPA Kesda unit, above the INR 810 crore estimate
In management's words
“Phase-I includes 0.36 MMTPA Stainless-Steel Coils production capacity with estimated CAPEX of INR 8,100 Million, targeted for commissioning by Q4FY27”
What it implies in numbers
Reaching ₹810 Cr by Q4FY27 from ₹136 Cr (Q4FY26) needs about 495.6% growth a year.
How it was checked
E18 reports Rs 935 crore spent on the 3.6 lakh TPA Kesda unit, which is the same Phase-I scope estimated at INR 810 crore. Spend already exceeds the estimate before the Q4FY27 deadline. (judged from later company statements)
Evidence (27 Oct 2026): “having reached completion of ~30% till date” — Credit-rating note — CRISIL (27 Oct 2026)
Evidence (27 Oct 2026): “The group has incurred a large greenfield capex of Rs 935 crore to set up a 3.6 lakh TPA integrated SS manufacturing unit at Kesda, Chhattisgarh” — Credit-rating note — CRISIL (27 Oct 2026)
How this guidance changed
Stated once in the documents read so far.
Commissioning of 25 MW power plant at Kesda · 25 MW power plant at Kesda (Phase-I)
Hint
The 25 MW round-the-clock power plant at Kesda in Phase-I is targeted for commissioning by Q4FY27.
Targetmilestone
DueQ4FY27
result by 30 May 2027
Said10 May 2026
Concall presentation
StatusPending
In management's words
“Setting up round-the-clock 25 MW Power Plant at Kesda in Phase-I to enhance cost efficiency with estimated CAPEX of INR 1,250 Million, targeted for commissioning by Q4FY27”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Estimated CAPEX · 25 MW power plant at Kesda
Direct
Estimated capex for the 25 MW Kesda power plant is INR 1,250 million.
Target~₹125 Cr
Dueby Q4FY27
result by 30 May 2027
Said10 May 2026
Concall presentation
StatusPending
In management's words
“Setting up round-the-clock 25 MW Power Plant at Kesda in Phase-I to enhance cost efficiency with estimated CAPEX of INR 1,250 Million”
What it implies in numbers
Reaching ₹125 Cr by Q4FY27 from ₹136 Cr (Q4FY26) needs about 8.1% decline a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Cost efficiency (zinc usage in GP coils and pipes) · GP coils & GP pipes
Hint
New technology for GP coils and pipes will use much less zinc, further improving cost efficiency.
Targetto improve
DueFY27
result by 30 May 2027
Said10 May 2026
Concall presentation
StatusPending
In management's words
“For GP Coils & Pipes, company adopted advanced technology which will use significantly less quantity of zinc thereby further improving cost efficiency”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Distributor network expansion · Kerala, Tamil Nadu, Andhra Pradesh, Goa, Maharashtra etc
Hint
Plan to increase the number of distributors in new states and UTs such as Kerala, Tamil Nadu, Andhra Pradesh, Goa and Maharashtra.
Targetto improve
DueFY27
result by 30 May 2027
Said10 May 2026
Concall presentation
StatusPending
In management's words
“Accordingly, plan to increase distributors in states/UT’s such as Kerala, Tamil Nadu, Andhra Pradesh, Goa, Maharashtra etc”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
International footprint expansion · International
Hint
Company plans to expand its international footprint using its ERW pipes and tubes expertise.
Targetto improve
DueFY27
result by 30 May 2027
Said10 May 2026
Concall presentation
StatusPending
In management's words
“Also planning to expand international footprint by leveraging our expertise in ERW pipes and tubes (GI and GP)”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Kesda phase 1 stainless steel capacity commissioning · stainless steel
Hint
Phase 1 of the Kesda greenfield project (3,60,000 tpa stainless steel) remains on track for commissioning in Q4FY27.
Targetmilestone
DueQ4FY27
result by 30 May 2027
Said11 May 2026
Concall transcript · 2× since 10 Nov 2025
StatusOn track
In management's words
“remain on track for commissioning in quarter four, financial year 2027.”
How it was checked
Management says the Kesda expansions are on track for on-time commissioning; the Q4FY27 deadline has not passed and no commissioning is yet reported. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
How this guidance changed
- 10 Nov 2025 — milestone for Q4FY27
First stated
Concall transcript · On track
- 11 May 2026 — milestone for Q4FY27
Repeated
Concall transcript · On track
ERW and tubes capacity expansion through DFT · ERW pipes and tubes
Hint
The 1,50,000 tpa DFT-based ERW expansion (INR50 crore capex) is expected to come online by Q4FY27.
Targetmilestone
DueQ4FY27
result by 30 May 2027
Said11 May 2026
Concall transcript
StatusPending
In management's words
“By Q4 FY '27 ma'am.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Kesda plant capex (INR930 crore)
Direct
Most of the INR930 crore Kesda plant capex will be deployed in FY27.
Target₹930 Cr
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript · 2× since 25 Jul 2025
StatusPending
In management's words
“currently for the Kesda plant, which is currently the INR930 crores, so most of the money will be deployed in this year itself.”
What it implies in numbers
Reaching ₹930 Cr by FY27 from ₹136 Cr (FY26) needs about 583.8% growth a year.
How this guidance changed
- 25 Jul 2025 — 60–65% for FY27
First stated
Concall transcript · Pending
- 8 Aug 2026 — ₹930 Cr for FY27
Raised
Concall transcript · Pending
EBITDA per ton (FY27)
Direct
Weighted average EBITDA per ton for FY27 is expected in the range of INR7,500 to INR8,500.
Target₹7,500 – ₹8,500
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript · 2× since 11 May 2026
StatusBehind
So far: ₹196 Cr (Q1FY27–Q2FY27)
In management's words
“In terms of overall weighted average EBITDA, I would say it will be in the range of 7,500 to 8,500 for entire year.”
What it implies in numbers
Reaching ₹7,500 Cr by FY27 from ₹276 Cr (FY26) needs about 2617.4% growth a year.
How it was checked
₹196 Cr booked in Q1FY27–Q2FY27 — 3% of the ₹7,500 Cr guided for FY27 with 50% of the period gone (simple pro-rata, ignores seasonality).
Condition attached by management: Monsoon softness and stainless steel price softness are acknowledged; management calls the guidance conservative.
How this guidance changed
- 11 May 2026 — ₹7,000 – ₹8,000 for FY27
First stated
Concall transcript · Behind (actual ₹196 Cr)
- 8 Aug 2026 — ₹7,500 – ₹8,500 for FY27
Raised
Concall transcript · Behind (actual ₹196 Cr)
Revenue growth over 2026 base
Direct
FY27 revenue is expected to grow 10% to 15% over the 2026 base.
Target10–15% growth
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript
StatusOn track
So far: 37.66% growth (Q1FY27–Q2FY27)
In management's words
“with again the revenue growth of 10% to 15% over the base of 2026 and EBITDA growth of again 10% to 15% over 2026 number.”
How it was checked
Year to date (Q1FY27–Q2FY27) growth is 37.7% against the guided 10–15% for FY27.
How this guidance changed
Stated once in the documents read so far.
EBITDA growth over 2026 number
Direct
FY27 operating EBITDA is expected to grow 10% to 15% over the INR270 crore base reported for 2026.
Target10–15% growth
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript
StatusOn track
So far: 47.37% growth (Q1FY27–Q2FY27)
In management's words
“over the base of let's say INR270 crores operating EBITDA that we have reported in 2026. We wanted to give a guidance of 10% to 15% incremental over there for this particular financial year 2027.”
What it implies in numbers
10–15% growth on ₹270 Cr (FY27) implies about ₹297 Cr to ₹31 Cr for FY27.
How it was checked
Year to date (Q1FY27–Q2FY27) growth is 47.4% against the guided 10–15% for FY27.
Condition attached by management: Management describes this as conservative after an analyst expected over 30%.
How this guidance changed
Stated once in the documents read so far.
Sales volume growth over 2026 base
Direct
FY27 volume is expected to rise 10% to 15% over the 2026 base.
Target10–15% growth
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript
StatusOn track
In management's words
“if I answer this financial year volume guidance, it will be 10% to 15% over and above what we have given in 2026.”
How it was checked
H1FY27 volume of about 230,433 MT annualises above the 10-15% growth range over the FY26 base of 396,731 MT, but the year has not ended. (judged from later company statements)
Evidence (5 Nov 2026): “Sales volume increased to ~230,433 MT, supported by ramp-up of value-added products and better capacity utilisation.” — Credit-rating note — CARE Ratings (5 Nov 2026)
Evidence (18 Aug 2026): “MT, record sales volume (as compared to 290,581 in FY 2024-25)” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
PAT guidance (FY27)
Direct
FY27 PAT margin is guided at around 6%, with a 1% standard deviation.
Target~6%
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript
StatusOn track
So far: 7.53% (Q1FY27–Q2FY27)
In management's words
“In terms of PAT, we want to give a guidance of 6% with a standard deviation of 1%.”
How it was checked
Year to date (Q1FY27–Q2FY27) net profit margin is 7.5% against the guided ~6% for FY27.
How this guidance changed
Stated once in the documents read so far.
MS pipes and tubes sales volume (FY27) · MS pipes and tubes
Direct
FY27 sales volume for MS pipes and tubes is expected at 230,000-240,000 tons.
Target230,000–240,000 tons
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“2,30,000 tons to 2,40,000 tons for MS pipes and tubes segment”
How it was checked
Volume is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
GP pipe and coil sales volume (FY27) · GP pipe and coil
Direct
FY27 sales volume for GP pipe and coil is expected at around 90,000 tons.
Target~90,000 tons
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“around 90,000 tons for GP pipe and coil together”
How it was checked
Volume is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Stainless steel CR coil sales volume (FY27) · stainless steel CR coil
Direct
FY27 sales volume for stainless steel CR coil is expected at around 60,000 tons.
Target~60,000 tons
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“let's say around 60,000 tons for stainless steel SS stainless steel CR coil.”
How it was checked
Volume is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton, stainless steel (FY27) · stainless steel
Direct
Stainless steel EBITDA per ton for FY27 is guided at around INR15,000-16,000.
Target₹15,000 – ₹16,000
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“we given guidance of around INR15,000 to INR16,000 per ton for this financial, which we will continue to.”
What it implies in numbers
Reaching ₹15,000 Cr by FY27 from ₹276 Cr (FY26) needs about 5334.8% growth a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Management later says stainless steel margin will be softer due to QCO relaxation and import competition.
How this guidance changed
Stated once in the documents read so far.
MS pipe price change (FY27) · MS pipe
Direct
MS pipe prices are expected to fall a further 3-5% before stabilising this fiscal year.
Target3–5% growth
DueFY27
result by 30 May 2027
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“let's say, another 3% to 5% downward for this financial year we are looking at where the price will stabilize.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
ERW capacity after DFT-based Pipe Mill expansion · ERW pipes
Direct
The DFT-based pipe mill expansion is to increase ERW capacity to 500,000 MTPA in FY27.
Target500,000 MTPA
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusOn track
In management's words
“Complete the DFT-based Pipe Mill expansion, increasing ERW capacity to 500,000 MTPA.”
How it was checked
ERW capacity was 350,000 MTPA at March 2026 (E14), and management says expansions are on track for on-time commissioning (E2), with the FY27 deadline not yet passed. (judged from later company statements)
Evidence (5 Nov 2026): “350,000 MTPA for ERW pipes and tubes” — Credit-rating note — CARE Ratings (5 Nov 2026)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Premium steel grades Thermos Steel N and SN
Hint
Management plans to launch premium steel grades, including Thermos Steel N and SN, in FY27.
Targetmilestone
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Diversify the product portfolio: Launch premium steel grades, including Thermos Steel N and SN grades.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Captive power project at Kesda
Direct
Management plans to progress the 25 MW captive power project at Kesda in FY27.
Targetmilestone
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusOn track
In management's words
“Strengthen energy security: Progress the 25 MW captive power project at Kesda.”
How it was checked
E1 says the Kesda expansion is on track, which may cover the 25 MW Kesda captive project, but E1 does not name that project specifically. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Distribution network expansion in southern and northern markets · Southern and northern markets
Hint
Management plans to expand its distribution network across key southern and northern markets in FY27.
Targetto improve
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Deepen market presence: Expand the distribution network across key southern and northern markets.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Annual tree plantation target
Direct
Annual tree plantation target of at least 1,000 for FY 2026-27.
Target≥ 1,000 trees
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Annual tree plantation target, FY 2026-27”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Safety standards for new facilities
Hint
All new facilities under implementation will be made to meet established safety standards before and during commissioning.
Targetmilestone
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“During FY 2026-27, the Company will focus on ensuring that all new facilities under implementation meet its established safety standards before and during commissioning.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Blended margins
Hint
Vision 2030 includes enhancing overall blended margins through a higher value-added mix.
Targetto improve
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Enhance overall blended margins”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Operational productivity and capacity expansion outcomes
Hint
As new projects are commissioned, management expects productivity and manufacturing scale to improve.
Targetto improve
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“As new projects are commissioned, Sambhv expects to improve productivity, expand manufacturing scale, strengthen energy self-sufficiency and increase the contribution of specialised value-added steel products.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: As new projects are commissioned
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Energy self-sufficiency
Hint
Management intends to increase energy self-sufficiency going forward.
Targetto improve
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Going forward, Sambhv will focus on increasing energy self-sufficiency, improving resource circularity”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Pre-payment and/or scheduled repayment of borrowings
Hint
IPO fresh-issue proceeds are being used to pre-pay or repay certain outstanding borrowings, with no amount or timeline stated.
Targetto come down
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“The proceeds from the fresh issue are being utilised towards pre-payment and/or scheduled repayment of certain outstanding borrowings of the Company”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Sustained profitable growth
Hint
Management says the company is positioned to accelerate profitable growth in its next phase.
Targetto improve
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusOn track
In management's words
“the Company is positioned to accelerate profitable growth while strengthening its position as a leading value-added steel products provider.”
How it was checked
Management says the plan presented in Q1 is on track as of the call date with no delay (E17), though the profitable growth claim is qualitative and FY27 has not ended. (judged from later company statements)
Evidence (3 Nov 2026): “To this point of time, as on date, yes, we are in on track, sir. There is no delay that I need to emphasize on.” — Concall transcript — Q2FY27 (3 Nov 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Targeted growth in GP pipes · GP pipes
Hint
Company is targeting growth in GP pipes with higher corrosion resistance for coastal regions, with no number or timeline stated.
Targetto improve
DueFY27
result by 30 May 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Targeted growth in GP pipes with higher corrosion resistance requirements for coastal regions.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Commissioning of Kesda & Kuthrel Unit II and 25 MW captive power plant · Stainless steel complex
Hint
Commissioning Kesda & Kuthrel Unit II, the associated 25 MW captive power plant and other brownfield projects is an immediate priority.
Targetmilestone
Dueby Q1FY28
result by 14 Aug 2027
Said18 Aug 2026
Annual report
StatusPending
In management's words
“The Company’s immediate priorities include commissioning the Kesda & Kuthrel Unit II under the stainless steel complex, the associated 25 MW captive power plant and other ongoing brownfield expansion projects.”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- 'near term' read as the next four quarters
How this guidance changed
Stated once in the documents read so far.
Revenue share from stainless steel division · stainless steel
Direct
Stainless steel is expected to contribute 60-65% of company revenue in FY28, with GP and ERW pipes at 35-40%.
Target60–65%
DueFY28
result by 30 May 2028
Said10 Nov 2025
Concall transcript
StatusPending
In management's words
“Approximately 60% to 65% will be from the stainless steel division.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: After the Kesda capacity goes live.
How this guidance changed
Stated once in the documents read so far.
Margin
Direct
Management expects FY28 margin of 10-13% depending on market conditions; the metric is not explicitly named as EBITDA.
Target10–13%
DueFY28
result by 30 May 2028
Said10 Nov 2025
Concall transcript
StatusPending
In management's words
“And the margin will be in the range of 10%-13% depending on the market condition.”
Condition attached by management: Depends on market condition; tied to additional capex.
How this guidance changed
Stated once in the documents read so far.
Additional capex
Direct
Management expects another Rs 300-400 crore of additional capex by FY28, dependent on execution of current projects.
Target₹300 Cr – ₹400 Cr
Dueby FY28
result by 30 May 2028
Said11 May 2026
Concall transcript
StatusPending
In management's words
“by FY28, we will have another INR300 crores to INR400 crores of additional capex that we may announce”
What it implies in numbers
Reaching ₹300 Cr by FY28 from ₹136 Cr (FY26) needs about 48.5% growth a year.
How it was checked
Due with FY28 results; nothing reported since the statement yet.
Condition attached by management: Depends on execution and timeline of announced capex
How this guidance changed
Stated once in the documents read so far.
Power plant capex (DFT pipe mill and power plant)
Direct
INR100 crore of the power plant and DFT mill project is expected to be spent in FY28.
Target₹100 Cr
DueFY28
result by 30 May 2028
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“that will have INR100 crores expenditure this year and INR100 crores expenditure next financial year.”
What it implies in numbers
Reaching ₹100 Cr by FY28 from ₹136 Cr (FY26) needs about 14.3% decline a year.
How this guidance changed
Stated once in the documents read so far.
Working capital requirement for Kesda (FY28)
Direct
About INR200 crore of additional working capital is expected to be needed in FY28 for the Kesda plant ramp-up.
Target~₹200 Cr
DueFY28
result by 30 May 2028
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“For that, we may require around INR200 crores of working capital,”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Linked to FY28 average capacity utilisation of around 35%.
How this guidance changed
Stated once in the documents read so far.
Market share target · stainless steel and pipes and tubes
Indirect
Management's longer-term target is to raise market share to up to 10% in stainless steel and pipes and tubes.
Target≤ 10%
DueFY27–FY29
result by 30 May 2029
Said25 Jul 2025
Concall transcript
StatusPending
In management's words
“And going forward, our target is to do it up to 10%. So gradually, you will find us here in a few years.”
How it was checked
Market share is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
- 'few years' read as 2 to 4 years
How this guidance changed
Stated once in the documents read so far.
Working capital requirement for Kesda (FY29)
Direct
About INR300 crore of working capital is expected to be required in FY29 as Kesda utilisation rises.
Target~₹300 Cr
DueFY29
result by 30 May 2029
Said8 Aug 2026
Concall transcript
StatusPending
In management's words
“when it will be fully utilized up to 60%, 65% in FY29, we will require around INR300 crores of working capital”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Linked to FY29 utilisation of 60-65%.
How this guidance changed
Stated once in the documents read so far.
Revenues
Direct
Management expects its platforms to generate around 25% revenue CAGR over the next five years.
Target~25% a year (CAGR)
Dueby FY30
result by 30 May 2030
Said3 Sep 2025
Annual report
StatusOn track
So far: ₹2,413 Cr (FY26)
In management's words
“The complement of the various platforms we have created will empower the Company to generate around 25% CAGR in revenues across the next five years, more than three times the projected growth of the national economy”
What it implies in numbers
25% a year on ₹1,511 Cr (FY25) compounds to about ₹4,611 Cr by FY30.
How it was checked
FY26: ₹2,413 Cr against ₹4,611 Cr targeted by FY30 — ahead of the pace required. It now needs about 17.6% growth a year to get there.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Aggregate manufacturing capacity of end products
Indirect
Management plans to grow aggregate end-product capacity from 0.51 to 1.70 million TPA under a five-year blueprint.
Target1,700,000 million TPA
Dueby FY30
result by 30 May 2030
Said3 Sep 2025
Annual report
StatusOn track
In management's words
“we have drawn out a five-year blueprint to grow our aggregate manufacturing capacity of end products from 0.51 million TPA to 1.70 million TPA”
How it was checked
Management says Kesda and Sarora expansions are on track, and FY26 brownfield additions are reported, but the 1.70 million TPA total is not yet reached and the FY30 deadline has not passed. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Evidence (18 Aug 2026): “Pre-Galvanized (GP) Coil Installed Capacity doubled from 58,000 MTPA to 1,16,000 MTPA.” — Annual report FY26
Evidence (18 Aug 2026): “It undertook a brownfield capacity expansion from 58,000 MTPA to 116,000 MTPA for stainless steel.” — Annual report FY26
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Total finished product capacity
Indirect
A fully integrated facility of 1.2 million tpa finished product capacity will be developed in phases over the next 4-5 years.
Target~1,200,000 tons per annum finished product
DueFY29–FY30
result by 30 May 2030
Said10 Nov 2025
Concall transcript
StatusOn track
In management's words
“Over the next 4-5 years, a fully integrated facility with a total finished product capacity of 1.2 million tons per annum will be developed in”
How it was checked
The FY30 deadline has not passed. Management says the Kesda and Sarora expansions are on track, but evidence does not quantify progress toward the 1.2 million tpa total. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Evidence (5 Nov 2026): “350,000 MTPA for ERW pipes and tubes” — Credit-rating note — CARE Ratings (5 Nov 2026)
Condition attached by management: Developed in phases.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far — management described it as “deadline brought forward” against earlier guidance.
Carbon steel pipes and tubes capacity · MS pipes and tubes
Direct
Management targets 10 lakh tons of carbon steel pipes and tubes capacity within about four years.
Target~₹0.1 Cr
Dueby FY30
result by 30 May 2030
Said11 May 2026
Concall transcript
StatusPending
In management's words
“But what we have targeted is that for carbon steel pipes and tubes we will do 10 lakh tons in the next four years, I mean we will develop our capacity.”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Coated steel capacity · coated product
Direct
Management targets around 3 lakh tons of coated steel capacity within about four years.
Target~₹0.03 Cr
Dueby FY30
result by 30 May 2030
Said11 May 2026
Concall transcript
StatusPending
In management's words
“And around 3 lakh tons we will do in coated steel and around 7 lakh tons in stainless steel.”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Stainless steel capacity · stainless steel
Direct
Management targets around 7 lakh tons of stainless steel capacity within about four years.
Target~₹0.07 Cr
Dueby FY30
result by 30 May 2030
Said11 May 2026
Concall transcript
StatusOn track
In management's words
“And around 3 lakh tons we will do in coated steel and around 7 lakh tons in stainless steel.”
How it was checked
Stainless capacity was 116,000 MTPA per E1, well short of the 7 lakh target, but management says expansions are on track for on-time commissioning (E2), and the FY30 deadline has not passed. (judged from later company statements)
Evidence (18 Aug 2026): “It undertook a brownfield capacity expansion from 58,000 MTPA to 116,000 MTPA for stainless steel.” — Annual report FY26
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
MS carbon pipes and tubes capacity target · MS carbon pipes and tubes
Direct
The roadmap targets MS carbon pipes and tubes capacity of 1.0 MMTPA, versus 0.35 MMTPA in FY26, by FY29-30.
Target1 MMTPA
Dueby FY30
result by 30 May 2030
Said18 Aug 2026
Annual report
StatusPending
In management's words
“MMTPA, MS carbon pipes and tubes capacity as compared to 0.35 MMTPA in FY 2025-26”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Stainless steel capacity target · Stainless steel
Direct
The roadmap targets stainless steel capacity of 0.7 MMTPA, versus 0.058 MMTPA in FY26, by FY29-30.
Target0.7 MMTPA
Dueby FY30
result by 30 May 2030
Said18 Aug 2026
Annual report
StatusPending
In management's words
“MMTPA, stainless steel capacity as compared to 0.058 MMTPA in FY 2025-26”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Coated products capacity target · Coated products
Direct
The roadmap targets coated products capacity of 0.3 MMTPA, versus 0.116 MMTPA in FY26, by FY29-30.
Target0.3 MMTPA
Dueby FY30
result by 30 May 2030
Said18 Aug 2026
Annual report
StatusPending
In management's words
“MMTPA, coated products capacity as compared to 0.116 MMTPA in FY 2025-26”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Additional ERW pipe capacity via DFT · ERW pipes
Direct
The roadmap plans to commission an additional 150,000 MTPA of ERW pipe capacity through DFT.
Target150,000 MTPA
Dueby FY30
result by 30 May 2030
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Commission an additional 150,000 MTPA ERW pipe capacity.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
MS coil & pipe market share · MS coil and pipe
Direct
Management aspires to 10-12% share of the MS coil and pipe market by 2030.
Target10–12%
Dueby 2030
result by 14 Feb 2031
Said11 May 2026
Concall transcript
StatusPending
In management's words
“We will have 10% to 12% of MS coil & pipe market share and 10% to 12% of stainless steel flat products & coil market share in 2030.”
How it was checked
Market share is not in the stored financial tables.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Stainless steel flat products & coil market share · stainless steel flat products and coil
Direct
Management aspires to 10-12% share of the stainless steel flat products and coil market by 2030.
Target10–12%
Dueby 2030
result by 14 Feb 2031
Said11 May 2026
Concall transcript
StatusPending
In management's words
“We will have 10% to 12% of MS coil & pipe market share and 10% to 12% of stainless steel flat products & coil market share in 2030.”
How it was checked
Market share is not in the stored financial tables.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Market share in MS pipes · Mild steel pipes
Direct
Target ambition of 10-12% market share in MS pipes by 2030.
Target10–12%
Dueby 2030
result by 14 Feb 2031
Said18 Aug 2026
Annual report
StatusPending
In management's words
“10-12% market share in MS pipes”
How it was checked
Market share is not in the stored financial tables.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Market share in stainless steel coils · Stainless steel coils
Direct
Target ambition of 10-12% market share in stainless steel coils by 2030.
Target10–12%
Dueby 2030
result by 14 Feb 2031
Said18 Aug 2026
Annual report
StatusPending
In management's words
“10-12% market share in stainless steel coils”
How it was checked
Market share is not in the stored financial tables.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Presence in coated steel products · Coated steel products
Hint
Vision 2030 aims to establish a significant presence in coated steel products.
Targetto improve
Dueby 2030
result by 14 Feb 2031
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Establish a significant presence in coated steel products”
How it was checked
Market share is not in the stored financial tables.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Vision 2030 investment quantum
Hint
Total investment under Vision 2030 is expected to be substantially higher than the capital deployed to date.
Targetto improve
Dueby 2030
result by 14 Feb 2031
Said18 Aug 2026
Annual report
StatusPending
In management's words
“The quantum of investment envisaged under the programme is substantially higher than the capital deployed by the Company over its growth journey to date”
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Vision 2030 execution
Hint
Management believes the company is positioned to execute Vision 2030 and deliver resilient through-cycle performance.
Targetmilestone
Dueby 2030
result by 14 Feb 2031
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Sambhv believes it is positioned to execute Vision 2030, deliver resilient through-cycle performance and create sustainable long-term value for its shareholders.”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- '2030' read as calendar year 2030
How this guidance changed
Stated once in the documents read so far.
Finished products capacity
Indirect
Add 1.2 million tonnes of finished-product capacity over the next 4 to 5 years through the Kesda greenfield expansion.
Target1.2 MnT (million tonnes)
DueFY30–FY31
result by 30 May 2031
Said31 Jan 2026
Concall presentation
StatusOn track
In management's words
“aim to enhance finished products capacity by 1.2MnT in the next 4 to 5 years”
How it was checked
The FY31 deadline has not passed. Management says the Kesda expansion is on track, but no evidence quantifies progress toward the 1.2 million tonne addition. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Assumptions made in reading this
- horizon counted from FY26 (statement made in its last quarter)
How this guidance changed
Stated once in the documents read so far.
Long-term margins enhancement
Hint
Ongoing integration investments are expected to position the company for long-term margin enhancement.
Targetto improve
DueFY30–FY32
result by 30 May 2032
Said3 Sep 2025
Annual report
StatusPending
In management's words
“Ongoing investments in backward and forward integration, especially in stainless steel and galvanizing facilities, positioned the Company for long-term margins enhancement and value-addition.”
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Power self-sufficiency across major manufacturing units
Direct
Long-term objective of 100% power self-sufficiency across major manufacturing units.
Target100%
DueFY31–FY33
result by 30 May 2033
Said18 Aug 2026
Annual report
StatusPending
In management's words
“advancing its long-term objective of achieving 100% power self-sufficiency across major manufacturing units”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Share of stainless steel coil sales through co-branding network · Stainless steel coils
Direct
Long-term objective is around 50% of stainless steel coil sales through the co-branding network.
Target~50%
DueFY31–FY33
result by 30 May 2033
Said18 Aug 2026
Annual report
StatusPending
In management's words
“The Company's long-term objective was to achieve around 50% of stainless steel coil sales through the co-branding network.”
How it was checked
Revenue as a ratio is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton
Direct
After phase 1 of unit three is commissioned, management expects EBITDA per ton of upward of INR8,000.
Target≥ ₹8,000
DueNot specified
Said25 Jul 2025
Concall transcript
StatusPending
So far: ₹276 Cr (FY26)
In management's words
“Then my EBITDA will be upward of INR8,000.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Post commissioning of phase 1 of unit three
How this guidance changed
Stated once in the documents read so far.
Market share after phase 1 · stainless steel and pipes and tubes
Indirect
After phase 1, management expects to hold about 4-5% market share in stainless steel and pipes and tubes.
Target4–5%
DueNot specified
Said25 Jul 2025
Concall transcript
StatusPending
In management's words
“If we talk about the first phase, after the first phase, we will share 4% to 5% of the market, in both stainless steel and pipes and tubes.”
How it was checked
Market share is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Finished product capacity added by Kesda · Kesda greenfield project
Direct
The Kesda greenfield project is set to add 1.2 MMTPA of finished product capacity in phases.
Target1.2 MMTPA
DueNot specified
Said3 Sep 2025
Annual report
StatusPending
In management's words
“is set to add 1.2 MMTPA of finished product capacity in a phased manner”
How it was checked
Management says Kesda expansion is on track for on-time commissioning, with no specified deadline and no completed phase reported yet. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
Evidence (18 Aug 2026): “Sambhv is developing two additional captive power plants” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Annual plantation drives
Direct
Annual plantation drives are targeted to plant over 1,000 trees with high survival rates.
Target≥ 1,000 trees
DueNot specified
Said3 Sep 2025
Annual report
StatusPending
In management's words
“Annual plantation drives target the planting of over 1,000 trees with high survival rates.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Revenue potential from Phase-1 · stainless steel
Direct
Phase-1 stainless steel capacity is expected to generate revenue of Rs 2,400-2,800 crore, depending on market prices at the time.
Target₹2,400 Cr – ₹2,800 Cr
DueNot specified
Said10 Nov 2025
Concall transcript
StatusPending
In management's words
“we believe the revenue potential out of this will be around Rs. 2,400 crore to Rs. 2,800 crore depending on the market price at that point of time.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Depends on market price at the time.
How this guidance changed
Stated once in the documents read so far.
Capacity utilisation after commissioning · stainless steel
Direct
Stainless steel utilisation is expected to reach at least 70% within 6-9 months of commissioning.
Target≥ 70%
DueNot specified
Said10 Nov 2025
Concall transcript
StatusPending
In management's words
“In 6 to 9 months after commissioning, we will definitely achieve 70% utilization.”
How it was checked
Capacity utilisation is not in the stored financial tables.
Condition attached by management: After Phase-1 commissioning.
How this guidance changed
Stated once in the documents read so far.
Power plant capex · captive power
Direct
Additional 25 MW captive power plant is planned at about Rs 125 crore for cost efficiency.
Target~₹125 Cr
DueNot specified
Said10 Nov 2025
Concall transcript
StatusPending
In management's words
“around Rs. 125 crores will be invested for additional 25 MW power plant for cost efficiency.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Later stated as Rs 135 crore in the Q&A; figures are inconsistent in the call.
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton stainless steel · stainless steel
Direct
At full utilisation, stainless steel EBITDA is expected at Rs 15,000-16,000 per ton, falling to 12,000-13,000 at lower utilisation.
Target₹15,000 – ₹16,000
DueNot specified
Said10 Nov 2025
Concall transcript
StatusPending
In management's words
“When we come to full utilization, it will be around 15,000-16,000.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Full utilisation; 12,000-13,000 at lower utilisation.
How this guidance changed
Stated once in the documents read so far.
Power cost savings from captive plant
Direct
The 25 MW captive power plant is contemplated to save about Rs 2 crore per MW per year.
Target~₹2 Cr
DueNot specified
Said10 Nov 2025
Concall transcript
StatusPending
In management's words
“Rs. 2 crore per megawatt per year is the saving that we are contemplating.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Thumb-rule estimate.
How this guidance changed
Stated once in the documents read so far.
Statutory auditor change
Hint
Management intends to appoint a Big 4 auditor once profitability increases.
Targetmilestone
DueNot specified
Said10 Nov 2025
Concall transcript
StatusPending
In management's words
“Since you are talking about Big 4, once our profitability increases, we will definitely deploy that kind of auditor who costs us a little bit more.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Once profitability increases.
How this guidance changed
Stated once in the documents read so far.
Captive power plant · Sarora and Kuthrel plants
Hint
There is scope to establish a further power plant to meet the remaining power requirement of the Sarora and Kuthrel plants.
Targetmilestone
DueNot specified
Said31 Jan 2026
Concall presentation
StatusPending
So far: Two additional captive power plants under development
In management's words
“Scope for establishing Power Plant to meet the remaining power requirement of Sarora Plant and Kuthrel Plant”
How it was checked
No deadline is specified. The annual report says two additional captive power plants are being developed, consistent with the stated scope for further power generation. (judged from later company statements)
Evidence (18 Aug 2026): “Sambhv is developing two additional captive power plants” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Working capital days · stainless steel
Direct
Working capital days are expected to rise by 10-15 days initially with stainless expansion, stabilising at around 10 days.
Target10–15 days
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“I would say 10 days to 15 days is at max I think we will have initial days of increment in working capital days. Once our product gets accepted into the market I think that will be stable at around 10 days.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Once greenfield stainless steel capacity goes live.
How this guidance changed
Stated once in the documents read so far.
MOU holder stainless pipe volume · stainless steel pipes (co-branding MOUs)
Direct
Management targets taking MOU-holder volumes to 2,500 tons in the first phase, from about 700-1,000 tons now.
Target2,500 tons
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“Right now, we have MOUs of about 700 to 1,000 tons. Going forward, we will take it up to 2,500 tons. This is our target in the first phase.”
How it was checked
Volume is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Captive power plant capex · Sarora plant
Direct
A 25-30 MW captive power plant at Sarora is estimated to need INR125-150 crore of capex; it is at an early planning stage.
Target₹125 Cr – ₹150 Cr
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“there will be a capex requirement of approximately INR125 crores-INR150 crores.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Subject to approval, land acquisition and planning; at initial stage.
How this guidance changed
Stated once in the documents read so far.
Electricity bill savings from power plant · Sarora plant
Direct
The planned power plant could cut electricity bills by upward of INR50 crore.
Target≥ ₹50 Cr
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“And we can achieve upward of around INR50 crores in terms of electricity bill from that particular power plant.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Conditional on the power plant being built.
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton (blended, sustainable full-year) · ERW black pipe
Direct
On a sustainable full-year basis, blended ERW black pipe EBITDA is expected at INR6,200-6,500 per ton.
Target₹6,200 – ₹6,500
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“But on a sustainable on a full year basis, we are expecting that this should be above INR6200 to INR6500 rupees on a blended level.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Normalised figure; Q3 treated as an exception.
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton (CR stainless coil) · stainless steel CR coil
Direct
Management expects EBITDA of about INR15,000 or more per ton on bright annealed CR coil from the greenfield phase.
Target≥ ₹15,000
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“in CR bright handled coil you can expect the margin of around 15,000 plus.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Once greenfield phase 1 is operating.
How this guidance changed
Stated once in the documents read so far.
Share of pipe output from in-house coil · pipes
Indirect
Once Kesda production starts, management expects 80-90% of galvanised product to come from in-house coil.
Target80–90%
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“going forward when Kesda's production comes we will make 80% to 90% of our product from our coil”
How it was checked
Production is not in the stored financial tables.
Condition attached by management: Subject to Kesda production commissioning.
How this guidance changed
Stated once in the documents read so far.
Estimated CAPEX · 30 MW power plant at Sarora, Raipur
Direct
Estimated capex for the 30 MW round-the-clock power plant at Sarora, Raipur is INR 1,500 million.
Target~₹150 Cr
DueNot specified
Said10 May 2026
Concall presentation
StatusPending
In management's words
“Adding round-the-clock 30 MW Power Plant at Sarora, Raipur to improve cost efficiency and reduce dependency on external power sources with estimated CAPEX of INR 1,500 Million”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Estimated CAPEX · ERW pipes & tubes brownfield expansion (DFT route)
Direct
Estimated capex for the DFT-route brownfield expansion of ERW pipes and tubes is INR 500 million.
Target~₹50 Cr
DueNot specified
Said10 May 2026
Concall presentation
StatusPending
In management's words
“adding 1,50,000 MTPA capacity with an estimated CAPEX of INR 500 Million”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
ERW pipes and tubes capacity addition · ERW pipes & tubes (DFT route brownfield)
Direct
Brownfield expansion of ERW pipes and tubes via the DFT route will add 150,000 MTPA of capacity.
Target150,000 MTPA
DueNot specified
Said10 May 2026
Concall presentation
StatusPending
In management's words
“Undertaking brownfield expansion of ERW Pipes & Tubes through DFT route, adding 1,50,000 MTPA capacity”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Finished product capacity addition · Greenfield expansion at Kesda & Kuthrel Unit-II
Direct
Greenfield expansion at Kesda and Kuthrel Unit-II will add 1.2 MMTPA of finished product capacity in phases.
Target1.2 MMTPA
DueNot specified
Said10 May 2026
Concall presentation
StatusPending
In management's words
“add 1.2 MMTPA finished product capacity in phased manner”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Long-term debt to forward EBITDA
Direct
Walked back
Management will keep long-term debt at or below 1.5 times forward EBITDA as an internal borrowing limit.
Target≤ 1.5x
DueNot specified
Said11 May 2026
Concall transcript · 2× since 25 Jul 2025
StatusPending
In management's words
“my long-term debt should not be more than 1.5 times of my forward EBITDA.”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
- 25 Jul 2025 — ≤ 1x for Not specified
First stated
Concall transcript · Pending
- 11 May 2026 — ≤ 1.5x for Not specified
Raised
Concall transcript · Pending
Long-term debt to net worth
Direct
Walked back
Management will keep long-term debt at or below 1.5 times net worth as an internal borrowing limit.
Target≤ 1.5x
DueNot specified
Said11 May 2026
Concall transcript · 3× since 25 Jul 2025
StatusPending
In management's words
“our long-term debt will not be more than 1.5 times of our net worth”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
- 25 Jul 2025 — ≤ 1x for Not specified
First stated
Concall transcript · Achieved (actual 0.35x)
- 3 Sep 2025 — ≤ 0.5x for Not specified
Lowered
Annual report · Achieved (actual 0.35x)
- 11 May 2026 — ≤ 1.5x for Not specified
Raised
Concall transcript · Pending
Debt for Rs 200 crore capex
Direct
Walked back
Of the about Rs 200 crore additional capex, debt funding will be at most Rs 150 crore, with the balance from internal accruals.
Target≤ ₹150 Cr
DueNot specified
Said11 May 2026
Concall transcript · 3× since 10 Nov 2025
StatusPending
In management's words
“At maximum, we will be taking INR150 crores of debt and balance will be through our internal accrual.”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
- 10 Nov 2025 — ≤ ₹600 Cr for Not specified
First stated
Concall transcript · Achieved (actual ₹373 Cr)
- 2 Feb 2026 — ₹600 Cr – ₹650 Cr for Not specified
Raised
Concall transcript · Achieved (actual ₹373 Cr)
- 11 May 2026 — ≤ ₹150 Cr for Not specified
Lowered
Concall transcript · Pending
Total installed captive power capacity
Direct
Two additional captive power plants are being developed, which will raise total installed captive power capacity to 80 MW.
Target80 MW
DueNot specified
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Building on this progress, Sambhv is developing two additional captive power plants, increasing total installed captive power capacity to 80 MW”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Production capacity addition · Pipe mill (Sarora)
Direct
Approved pipe mill expansion is to add 150,000 MTPA of production capacity at the Sarora unit, with no timeline stated.
Target150,000 MTPA (metric tons per annum)
DueNot specified
Said18 Aug 2026
Annual report
StatusPending
In management's words
“for adding production capacity of 150,000 Metric Tons Per Annum (MTPA) at Sarora existing unit and setting up of an additional round the clock 30 Megawatt Captive Power Plant”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Additional captive power plant · Captive power (Sarora Unit-III)
Direct
Board approved setting up an additional round-the-clock 30 MW captive power plant at Sarora Unit-III, with no timeline stated.
Target30 MW (megawatt)
DueNot specified
Said18 Aug 2026
Annual report
StatusPending
In management's words
“setting up of an additional round the clock 30 Megawatt Captive Power Plant; at Village-Sarora Unit-III, Tehsil-Tilda, Dist-Raipur, Chhattisgarh”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Sarora hot rolling mill relocation outcomes · Sarora hot rolling mill
Hint
Once the Kesda facility is operational, Sarora's hot rolling mill will be dedicated to carbon steel coil production.
Targetmilestone
DueNot specified
Said18 Aug 2026
Annual report
StatusPending
In management's words
“Once operational, the Sarora hot rolling mill will be dedicated exclusively to carbon steel coil production.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Once the Kesda facility is operational
How this guidance changed
Stated once in the documents read so far.
Track record · promised vs delivered
Guidance whose deadline has passed, most recent first: how management performed after giving it.
Stainless steel CR coil debottlenecking capacity · stainless steel
Direct
Consent to operate for the stainless CR coil debottlenecking (58,000 to 1,16,000 tpa) is expected within the week of the call.
Promisedmilestonefor by FY27
Delivered116,000 MTPA
ResultAchieved
Said11 May 2026Concall transcript
In management's words
“We are expecting to receive the consent to operate in this week.”
How it was checked
The FY26 annual report says the brownfield expansion raised stainless steel capacity from 58,000 to 116,000 MTPA, matching the guided figure. (judged from later company statements)
Evidence (18 Aug 2026): “It undertook a brownfield capacity expansion from 58,000 MTPA to 116,000 MTPA for stainless steel.” — Annual report FY26
Condition attached by management: Receipt of consent to operate
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton (Q2 FY27)
Direct
EBITDA per ton for Q2 FY27 is expected in the range of INR7,500 to INR8,500.
Promised₹7,500 – ₹8,500for Q2FY27
Delivered₹101 CrQ2FY27
ResultMissed
Said8 Aug 2026Concall transcript
In management's words
“Secondly, in terms of Q2, we believe our EBITDA margin will be in terms of INR7,500 to INR8,500, so that is the range we would like to give for Q2 numbers.”
What it implies in numbers
Reaching ₹7,500 Cr by Q2FY27 from ₹95 Cr (Q1FY27) needs about 3884638599.8% growth a year.
How it was checked
Q2FY27 actual ₹101 Cr — short of the guided ₹7,500 – ₹8,500 (quarterly result).
How this guidance changed
Stated once in the documents read so far.
Sales volume (Q2 FY27)
Hint
Management will try its best to match Q1 FY27 sales volume in Q2 FY27.
Promisedto hold or improvefor Q2FY27
Deliveredabout 123,400 MT in Q2FY27 (implied: H1 230,433 MT less Q1 about 107,000 MT)
ResultAchieved
Said8 Aug 2026Concall transcript
In management's words
“we will try our best to achieve the current Q1 sales volume number in Q2 also.”
How it was checked
Q1FY27 sales were about 1.07 lakh tonnes and H1 was about 230,433 MT, implying Q2 exceeded Q1, so the target to match Q1 was met. (judged from later company statements)
Evidence (5 Nov 2026): “Sales volume increased to ~230,433 MT, supported by ramp-up of value-added products and better capacity utilisation.” — Credit-rating note — CARE Ratings (5 Nov 2026)
Evidence (27 Oct 2026): “~1.07 lakh tonne sales already registered in the first quarter of fiscal 2027” — Credit-rating note — CRISIL (27 Oct 2026)
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton
Direct
Management guides Q1FY27 EBITDA of INR7,500-8,000 per ton.
Promised₹7,500 – ₹8,000for Q1FY27
Delivered₹95 CrQ1FY27
ResultMissed
Said11 May 2026Concall transcript
In management's words
“we would like to give you a guidance of INR7,500 to INR8,000 per ton for Q1 FY27.”
What it implies in numbers
Reaching ₹7,500 Cr by Q1FY27 from ₹92 Cr (Q4FY26) needs about 4416657623.7% growth a year.
How it was checked
Q1FY27 actual ₹95 Cr — short of the guided ₹7,500 – ₹8,000 (quarterly result).
Condition attached by management: Depends on HR coil and raw material prices and market conditions
How this guidance changed
Stated once in the documents read so far.
Stainless-steel CR coil capacity · Stainless-steel CR coils
Direct
Stainless-steel CR coil capacity will rise from 58,000 to 116,000 MTPA through debottlenecking.
Promised116,000 MTPAfor Not specified
Delivered116,000 MTPA
ResultAchieved
Said10 May 2026Concall presentation
In management's words
“Undertaking brownfield expansion of Stainless-Steel CR Coils through debottlenecking to increase production capacity from 58,000 MTPA to 116,000 MTPA”
How it was checked
The FY26 annual report says the brownfield expansion raised stainless capacity from 58,000 to 116,000 MTPA. E20 attributes the same jump to GP coils, so the attribution is inconsistent. (judged from later company statements)
Evidence (18 Aug 2026): “It undertook a brownfield capacity expansion from 58,000 MTPA to 116,000 MTPA for stainless steel.” — Annual report FY26
Evidence (18 Aug 2026): “%, Stainless steel cold rolled coils capacity utilisation (as compared to 47.97% in FY 2024-25)” — Annual report FY26
How this guidance changed
- 31 Jan 2026 — 116,000 MTPA for Not specified
First stated
Concall presentation · Achieved (actual 116,000 MTPA stainless steel capacity after brownfield expansion from 58,000 MTPA)
- 10 May 2026 — 116,000 MTPA for Not specified
Repeated
Concall presentation · Achieved (actual 116,000 MTPA)
EBITDA margin
Direct
After the phase 1 expansion is commissioned, management guides EBITDA margin of about 12%.
Promised~12%for FY26
Delivered11.44%FY26
ResultAchieved
Said25 Jul 2025Concall transcript
In management's words
“So in terms of EBITDA margin, I would give a guidance in terms of 12% if I say.”
How it was checked
FY26 actual 11.44% — met the guided ~12% (annual result).
Condition attached by management: Post commissioning of phase 1 of unit three
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Stainless steel capacity · stainless steel
Direct
Stainless steel capacity is to be raised to 1,16,000 tons per annum by year-end FY26.
Promised116,000 tons per annumfor Q4FY26
Delivered116,000 MTPA
ResultAchieved
Said25 Jul 2025Concall transcript
In management's words
“Now in this year-end, we are expanding our stainless steel capacity to 1,16,000 tons and also the GP coil capacity to the 1,16,000 tons per annum.”
How it was checked
The FY26 annual report says a brownfield expansion raised stainless steel capacity from 58,000 to 116,000 MTPA, matching the guided level. (judged from later company statements)
Evidence (18 Aug 2026): “It undertook a brownfield capacity expansion from 58,000 MTPA to 116,000 MTPA for stainless steel.” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton excluding sponge iron
Direct
Management aspires to achieve EBITDA per ton of about INR8,500 excluding sponge iron in FY26, subject to market conditions.
Promised~₹8,500for FY26
Deliveredabout Rs 8,000 per tonne in FY26
ResultMissed
Said25 Jul 2025Concall transcript
In management's words
“excluding the sponge iron, we believe INR8,500 is the number what we aspire to achieve currently for this financial year.”
How it was checked
CRISIL reports FY26 EBITDA per tonne at about Rs 8,000, below the roughly INR8,500 aspiration (nine-month figure of INR6,800 in E10 is also lower). (judged from later company statements)
Evidence (27 Oct 2026): “more than Rs 9,000 in the first quarter of fiscal 2027” — Credit-rating note — CRISIL (27 Oct 2026)
Condition attached by management: If market supports it may go up; if market does not support it may go down
How this guidance changed
Stated once in the documents read so far.
Capex phasing, share of total capex
Direct
Around 30% to 40% of the total expansion capex is expected to be spent in FY26.
Promised30–40%for FY26
Delivered≈ ₹136 CrFY26
ResultMissed
Said25 Jul 2025Concall transcript
In management's words
“around 30% to 40% expenses will be for the total capex will be done in FY26.”
How it was checked
FY26 actual ₹136 Cr (estimate) — short of the guided 30–40% (change in fixed assets and CWIP plus depreciation).
How this guidance changed
Stated once in the documents read so far.
GP coil capacity · galvanized / GP coils
Direct
GP coil capacity is to be raised to 1,16,000 tons per annum by year-end FY26.
Promised116,000 tons per annumfor Q4FY26
Delivered116,000 tons per annum
ResultAchieved
Said25 Jul 2025Concall transcript
In management's words
“Now in this year-end, we are expanding our stainless steel capacity to 1,16,000 tons and also the GP coil capacity to the 1,16,000 tons per annum.”
How it was checked
Multiple FY26-era documents state GP coil capacity doubled from 58,000 to 116,000 MTPA, meeting the year-end FY26 target. (judged from later company statements)
Evidence (31 Jan 2026): “Pre-Galvanized (GP) Coil Installed Capacity doubled from 58,000 MTPA to 1,16,000 MTPA” — Concall presentation — Q3FY26 (Feb 2026)
Evidence (2 Feb 2026): “Under the Brownfield expansion, GP capacity, galvanized capacity has been increased to 1,16,000 tons per annum.” — Concall transcript — Q3FY26 (Feb 2026)
Evidence (10 May 2026): “GP Coil capacity has been doubled from 58,000 MTPA to 116,000 MTPA” — Concall presentation — Q4FY26 (May 2026)
Evidence (18 Aug 2026): “Pre-Galvanized (GP) Coil Installed Capacity doubled from 58,000 MTPA to 1,16,000 MTPA.” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Sales volume FY26
Direct
Management expects FY26 sales volume of around 3,50,000 tons across all three segments.
Promised~350,000 tonsfor FY26
Delivered396,731 MT
ResultAchieved
Said25 Jul 2025Concall transcript
In management's words
“we believe we will be at around 3,50,000 tons including all three segments.”
How it was checked
FY26 sales volume was a record 396,731 MT, above the guided around 350,000 tons. (judged from later company statements)
Evidence (18 Aug 2026): “MT, record sales volume (as compared to 290,581 in FY 2024-25)” — Annual report FY26
Evidence (18 Aug 2026): “The Company achieved its highest-ever sales volume of 396,731 MT through expanding customer reach, improved production efficiencies” — Annual report FY26
Condition attached by management: Based on optimal utilisation
How this guidance changed
Stated once in the documents read so far.
EBITDA margin from higher utilisation
Hint
Management does not expect higher capacity utilisation alone to expand EBITDA margin.
Promisedto hold or improvefor FY26
Deliveredup 1.2%FY26
ResultAchieved
Said25 Jul 2025Concall transcript
In management's words
“even if my capacity utilization increases, there is no proportionate increase in EBITDA numbers or EBITDA margin.”
How it was checked
EBITDA / operating margin rose by 1.2 pp in FY26 from FY25 — in line with what management indicated (annual result).
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Value-added products (stainless steel CR coils, GP coils, GP pipes)
Indirect
Production of stainless steel CR coils, GP coils and GP pipes from the Kuthrel cold rolling and galvanizing lines is targeted in FY 2025-26.
Promisedmilestonefor FY26
Delivered—
ResultAchieved
Said3 Sep 2025Annual report
In management's words
“Commissioning of stainless steel cold rolling and galvanizing lines at the Kuthrel facility, targeting the production of value-added products like stainless steel CR coils, GP coils and GP pipes in FY 2025-26.”
How it was checked
Kuthrel facilities producing GP coils, GP pipes and SS CR coils were operationalised, and commercial ramp-up of the new stainless and pre-galvanized facilities was achieved in FY26. (judged from later company statements)
Evidence (18 Aug 2026): “The successful commercial ramp-up of the Company’s newly commissioned stainless steel and pre-galvanized facilities at Kuthrel significantly expanded its addressable market” — Annual report FY26
Evidence (10 May 2026): “Second manufacturing facility at Kuthrel (99,940 SQM) operationalized in FY2025, expanding production of value-added products including GP coils, GP pipes, SS HRAP coils, and SS CR coils” — Concall presentation — Q4FY26 (May 2026)
Evidence (3 Sep 2025): “In Fiscal 2025, the company expanded its portfolio by commencing production of galvanized (GP) coils, pre-galvanized (GP) pipes, and stainless steel HRAP and CR coils using captively produced stainless-steel blooms/slabs.” — Annual report FY25
How this guidance changed
Stated once in the documents read so far.
Volume growth
Indirect
Company is targeting double-digit percentage volume growth, backed by planned capacity additions at Kesda and Kuthrel.
Promised≥ 10% growthfor FY26
Deliveredabout 36.5% volume growth (396,731 MT vs 290,581 MT)
ResultAchieved
Said3 Sep 2025Annual report
In management's words
“With planned capacity additions at Kesda and Kuthrel and deeper inroads into high-growth regions, the Company is targeting double-digit percentage volume growth.”
How it was checked
FY26 sales of 396,731 MT compared with 290,581 MT in FY25 is growth of about 36.5%, above the double-digit target. (judged from later company statements)
Evidence (18 Aug 2026): “MT, record sales volume (as compared to 290,581 in FY 2024-25)” — Annual report FY26
Condition attached by management: planned capacity additions at Kesda and Kuthrel and deeper inroads into high-growth regions
Assumptions made in reading this
- 'double-digit' read as 10+%
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Revenue growth
Hint
The Board expects enhanced performance and revenue growth in the upcoming year.
Promisedto improvefor FY26
Deliveredup 59.7%FY26
ResultAchieved
Said3 Sep 2025Annual report
In management's words
“The Board of Directors is confident in the Company’s promising outlook, anticipating enhanced performance and revenue growth in the upcoming year.”
How it was checked
Revenue rose by 59.7% in FY26 from FY25 — in line with what management indicated (annual result).
How this guidance changed
Stated once in the documents read so far.
Debt reduction from IPO proceeds
Hint
Management expects a large part of the IPO proceeds raised after year-end to reduce debt.
Promisedto come downfor FY26
Delivereddown 26.4%FY26
ResultAchieved
Said3 Sep 2025Annual report
In management's words
“A large part of the proceeds of this IPO is expected to reduce debt.”
How it was checked
Borrowings (gross debt) fell by 26.4% in FY26 from FY25 — in line with what management indicated (balance sheet).
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Product mix shift to value-added products
Hint
Management intends to shift the product mix from steel tubes and pipes toward value-added products such as pre-galvanised pipes and stainless steel coils.
Promisedto improvefor FY26
Delivered—
ResultAchieved
Said3 Sep 2025Annual report
In management's words
“At Sambhv, we will graduate from the manufacture of steel tubes and pipes to value-added equivalents.”
How it was checked
Value-added sales reached a record 2.6 lakh tons in nine months, up 60%, and Q3 value-added volume was the highest ever, showing the mix shift. (judged from later company statements)
Evidence (2 Feb 2026): “with value-added sales volume at 2.6 lakh tons, marking a growth of 60%.” — Concall transcript — Q3FY26 (Feb 2026)
Evidence (2 Jan 2026): “achieved its highest-ever sales volume of value-added products in Q3” — Press release — Q3FY26 (2 Jan 2026)
Evidence (3 Nov 2026): “sale volume of value added products increased by 27% year- on- year” — Concall transcript — Q2FY27 (3 Nov 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Working capital
Hint
Management intends to reduce working capital by optimising inventory buffers and cycles.
Promisedto come downfor FY26
Deliveredup 166.7%FY26
ResultMissed
Said3 Sep 2025Annual report
In management's words
“Reducing working capital by optimising inventory buffers and cycles”
How it was checked
Working capital days rose by 166.7% in FY26 from FY25 — against what management indicated (reported ratio).
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Planned expansion of stainless steel cold rolling and galvanizing capacity
Hint
A planned expansion of stainless steel cold rolling and galvanizing capacity is expected to increase volumes of value-added products.
Promisedto improvefor FY26
DeliveredWider-width cold rolling mill commissioned; GP coil capacity doubled; sales volume rose to about 230,433 MT in H1FY27
ResultAchieved
Said3 Sep 2025Annual report
In management's words
“A planned expansion of stainless steel cold rolling and galvanizing capacity will facilitate the increased volumes of value-added products”
How it was checked
The deadline of FY26 has passed. Evidence shows the CR mill was commissioned, galvanized capacity was enhanced, and value-added volumes rose. (judged from later company statements)
Evidence (18 Aug 2026): “enhancing installed capacity of galvanized products and improved the capacity utilisation of the stainless steel HRAP and CR coils” — Annual report FY26
Evidence (18 Aug 2026): “Successfully completed a planned 15-day shutdown to commission the wider-width cold rolling mill” — Annual report FY26
Evidence (18 Aug 2026): “Pre-Galvanized (GP) Coil Installed Capacity doubled from 58,000 MTPA to 1,16,000 MTPA.” — Annual report FY26
Evidence (5 Nov 2026): “Sales volume increased to ~230,433 MT, supported by ramp-up of value-added products and better capacity utilisation.” — Credit-rating note — CARE Ratings (5 Nov 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton
Direct
Walked back
Management expects full-year FY26 EBITDA per ton of around INR7,000.
Promised~₹7,000for FY26
Delivered₹276 CrFY26
ResultMissed
Said2 Feb 2026Concall transcript
In management's words
“overall FY26 EBITDA per ton, we are expecting at around INR7,000 per ton.”
What it implies in numbers
Reaching ₹7,000 Cr by FY26 from ₹154 Cr (FY25) needs about 4445.5% growth a year.
How it was checked
FY26 actual ₹276 Cr — short of the guided ~₹7,000 (annual result).
How this guidance changed
- 10 Nov 2025 — ~₹7,000 for FY26
Lowered
Concall transcript · Missed (actual ₹276 Cr)
- 2 Feb 2026 — ~₹7,000 for FY26
Repeated
Concall transcript · Missed (actual ₹276 Cr)
Proposed addition Capacity (CRM & BA line) · Cold Rolling Mill (CRM) & Bright Annealing (BA) line, Kuthrel unit
Direct
Management plans to add 58,000 MT per annum of capacity on the CRM and BA line at Kuthrel, to be added in Q4FY26.
Promised58,000 MT per annumfor Q4FY26
DeliveredPre-galvanized (GP) coil capacity doubled from 58,000 to 116,000 MTPA during FY26
ResultAchieved
Said8 Dec 2025Exchange announcement
In management's words
“Proposed addition Capacity MT per annum 58,000 58,000 Period within which proposed capacity is to be added Q4FY26”
How it was checked
The Q4FY26 deadline has passed. Sources report the 58,000 MTPA addition at Kuthrel was made, with GP coil capacity doubled during FY26 after the CR mill commissioning. (judged from later company statements)
Evidence (18 Aug 2026): “Pre-Galvanized (GP) Coil Installed Capacity doubled from 58,000 MTPA to 1,16,000 MTPA.” — Annual report FY26
Evidence (10 May 2026): “GP Coil capacity has been doubled from 58,000 MTPA to 116,000 MTPA” — Concall presentation — Q4FY26 (May 2026)
Evidence (18 Aug 2026): “Successfully completed a planned 15-day shutdown to commission the wider-width cold rolling mill” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Proposed addition Capacity (CGL) · Continuous Galvanising Line (CGL), Kuthrel unit
Direct
Management plans to add 58,000 MT per annum of capacity on the CGL at Kuthrel, to be added in Q4FY26.
Promised58,000 MT per annumfor Q4FY26
DeliveredGP coil capacity doubled from 58,000 to 116,000 MTPA during FY26
ResultAchieved
Said8 Dec 2025Exchange announcement
In management's words
“Proposed addition Capacity MT per annum 58,000 58,000 Period within which proposed capacity is to be added Q4FY26”
How it was checked
The Q4FY26 deadline has passed. Annual report and concall state galvanizing capacity doubled by 58,000 MTPA during FY26, matching the CGL addition. (judged from later company statements)
Evidence (18 Aug 2026): “Pre-Galvanized (GP) Coil Installed Capacity doubled from 58,000 MTPA to 1,16,000 MTPA.” — Annual report FY26
Evidence (10 May 2026): “GP Coil capacity has been doubled from 58,000 MTPA to 116,000 MTPA” — Concall presentation — Q4FY26 (May 2026)
How this guidance changed
Stated once in the documents read so far.
EBITDA per ton (blended)
Direct
Management expects blended EBITDA of INR7,500 per ton in Q4 FY26.
Promised₹7,500for Q4FY26
Delivered₹92 CrQ4FY26
ResultMissed
Said2 Feb 2026Concall transcript
In management's words
“If we talk about Q4, then the weighted average that I am expecting. 7500 EBITDA on a blended basis.”
What it implies in numbers
Reaching ₹7,500 Cr by Q4FY26 from ₹51 Cr (Q3FY26) needs about 46769674592.6% growth a year.
How it was checked
Q4FY26 actual ₹92 Cr — short of the guided ₹7,500 (quarterly result).
Condition attached by management: Assumes raw material cost benefits and price increases flow through in Q4.
How this guidance changed
Stated once in the documents read so far.
EBITDA margin / per-ton profitability
Hint
Management expects Q4 margins to recover as lower raw material costs flow through and prices rise.
Promisedto improvefor Q4FY26
Deliveredup 3.7%Q4FY26
ResultAchieved
Said2 Feb 2026Concall transcript
In management's words
“So, in Q4, we will get all the benefits.”
How it was checked
EBITDA / operating margin rose by 3.7 pp in Q4FY26 from Q4FY25 — in line with what management indicated (quarterly result).
Condition attached by management: Depends on coil price benefit and price increases in January and February.
How this guidance changed
Stated once in the documents read so far.
Commissioning of Phase I at Kesda and Kuthrel Unit II · Kesda and Kuthrel Unit II
Direct
Phase I of the Kesda and Kuthrel Unit II projects is on track for commissioning by Q4 FY26.
Promisedmilestonefor Q4FY26
Delivered—
ResultMissed
Said18 Aug 2026Annual report
In management's words
“keeping the projects on track for commissioning by Q4 FY 2025-26”
How it was checked
The Q4FY26 deadline has passed, and a November 2026 statement still describes Kesda and Sarora as on track for commissioning, so Phase I was not shown as commissioned. (judged from later company statements)
Evidence (3 Nov 2026): “Our expansion at Kesda and Sarora is on track for on-time commissioning.” — Concall transcript — Q2FY27 (3 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Direct
Management expects EBITDA margin to operate around 13% in the coming quarter.
Promised~13%for Q3FY26
Delivered8.66%Q3FY26
ResultMissed
Said10 Nov 2025Concall transcript
In management's words
“Bikash Agarwal this side. We believe 13% is the range upon which we will be operating in terms of EBITDA margin for the coming quarter.”
How it was checked
Q3FY26 actual 8.66% — short of the guided ~13% (quarterly result).
How this guidance changed
Stated once in the documents read so far.
316, 316L, thermo steel N grade and SN grade stainless steel · stainless steel
Indirect
Production of 316, 316L, thermo steel N grade and SN grade stainless steel is targeted for Q3 FY26.
Promisedmilestonefor Q3FY26
Deliveredabout 1,200 to 1,300 tons of 300-series stainless steel sold in Q3FY26
ResultAchieved
Said10 Nov 2025Concall transcript
In management's words
“And 316, 316L, thermos steel N grade, SN grade, that is also our target for this quarter.”
How it was checked
Q3 sales of 300-series stainless steel, which includes 316-grade products, are reported, indicating production started by the Q3 deadline, though 316 is not named explicitly. (judged from later company statements)
Evidence (2 Feb 2026): “if you see in Q3 we have sold around 1,200 to 1,300 ton of stainless steel of 300 series. We have got good feedback about it.” — Concall transcript — Q3FY26 (Feb 2026)
How this guidance changed
Stated once in the documents read so far.
Additional capacity for stainless steel cold rolled coils and galvanized coils at Kuthrel · Kuthrel plant
Hint
Management aims to commission additional stainless steel CR and galvanized coil capacity at its Kuthrel plant.
Promisedmilestonefor Not specified
Delivered—
ResultAchieved
Said3 Sep 2025Annual report
In management's words
“Sambhv aims to capitalise on its integrated steel manufacturing model with the commissioning of an additional capacity for stainless steel cold rolled coils and galvanized coils at its Kuthrel plant.”
How it was checked
A planned shutdown was completed to commission the wider-width cold rolling mill, and stainless capacity was raised to 116,000 MTPA at Kuthrel. (judged from later company statements)
Evidence (18 Aug 2026): “Successfully completed a planned 15-day shutdown to commission the wider-width cold rolling mill” — Annual report FY26
Evidence (18 Aug 2026): “It undertook a brownfield capacity expansion from 58,000 MTPA to 116,000 MTPA for stainless steel.” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Working capital days
Direct
Management plans to maintain working capital days at 20 to 25 days going forward.
Promised20–25 daysfor Not specified
Delivered6 daysFY26
ResultAchieved · beat
Said25 Jul 2025Concall transcript
In management's words
“we are planning -- we have been achieving to maintain the working capital days at 20 to 25 days.”
How it was checked
No deadline was given; reached in FY26.
How this guidance changed
Stated once in the documents read so far.
Key points from each document
The main takeaways, newest document first.
Credit-rating note — CARE Ratings (5 Nov 2026) · 5 Nov 2026
- The company is undertaking a capex programme of over ₹1,150 crore under its Vision 2030 roadmap to enhance scale, diversify products and improve integration.
- A greenfield 3.6 lakh TPA stainless-steel plant and 25 MW captive power plant at Kesda, estimated at ₹957 crore, is expected to start commercial operations from Q3FY28.
- The Kesda project is to be funded through a mix of ₹675 crore term debt and promoter or internal contribution, so the expansion adds leverage.
- A ₹100 crore warrant issue is planned, with ₹25 crore already infused in the current fiscal year and the balance to come in by FY28.
- A ₹200 crore brownfield expansion at Sarora adds a 1.5 lakh TPA DFT-based ERW pipe mill, lifting ERW capacity to 5.0 lakh TPA.
- Timely implementation and ramp-up of the expanded capacities without major cost overruns remains a key monitorable for the company.
- Total captive power capacity is expected to rise to about 80 MW on completion of the planned power plants, to improve energy security and cost competitiveness.
- An 8 MW captive solar plant at Kuthrel, costing ₹25 crore, is at the planning stage in two phases, with the debt tie-up not yet finalised.
Concall transcript — Q2FY27 (3 Nov 2026) · 3 Nov 2026
- Management is entering stainless-steel seamless pipes with a 14,400 tpa plant, targeting about 10,000 tons by FY30 and roughly INR400 crore of revenue.
- Kesda 360,000 ton stainless steel facility and its 25 MW power plant are guided live by March 2027, with Sarora and pipe capacity additions following by September 2027.
- Management guides FY28 volume of about 5.5 lakh tons and EBITDA upward of INR550 crore, rising to about 7 lakh tons and INR750 crore once Kesda is fully utilised.
- Stainless steel EBITDA of INR12,000-13,000 per ton is expected to be sustainable in Q3 and Q4 despite Chinese import pressure and QCO relaxation.
- Full-year FY27 EBITDA per ton is now targeted at INR8,000-8,500, revised upward from the earlier bracket.
- Net debt to EBITDA is expected to rise to about 1.4-1.5x during the capex cycle, up from about 1.04x in H1.
- Phase 2 and 3 capex is estimated at INR1,500-2,000 crore including power, with a rough FY31 subsidiary capex of about INR400 crore, subject to Board approval.
- Management plans a seamless pipe expansion with capex of INR150 crores, which it says includes common infrastructure and land for future capacity.
- Management targets seamless pipe production of 9,000-10,000 tons per annum by FY30, after the expansion's first year of operation.
- Management aspires to ROCE of more than 24-25% on the expansion, after combined working capital and capex of INR240-250 crores.
- Management says the plan presented in Q1 is on track, with no delays to emphasise as of the call date.
- Management says Q2 margins benefited from a tighter import environment but flags that Chinese dumping and QCO relaxation keep stainless pricing under pressure.
- Management expects FY27 value-added sales of about 4.1-4.25 lakh tons, with MS pipes above 2.4 lakh tons.
- Management aspires to a normal EBITDA margin of about 15% for the new seamless project, with lower margins expected in the initial learning years.
Investor presentation — Q2FY27 (29 Oct 2026) · 29 Oct 2026
- Management targets raising finished product capacity from 0.6 MMTPA to over 2.0 MMTPA by 2030 under Vision 2030, mainly through Kesda greenfield and Sarora brownfield projects.
- Phase I of the Kesda greenfield adds 0.36 MMTPA of stainless-steel coil capacity at an estimated capex of INR 8,100 million, targeted for commissioning by Q4FY27.
- Management plans a phased entry into stainless seamless pipes, adding 0.05 MMTPA by 2030 with 14,400 MTPA in Phase I targeted for Q4FY28.
- Q2FY27 standalone revenue rose 44% YoY to INR 8,360 million, operating EBITDA rose 68% and PAT rose 104%, which the company attributes to operating leverage.
- Commissioning timelines are slipping at the margin: the Sarora Unit III 30 MW power plant is shown as targeted for Q2FY28 on one slide, but its execution schedule lists testing and commissioning in Q2FY27 as TBC.
- Captive power and auxiliary plants (syngas, oxygen, nitrogen, acid regeneration) are expected to cut costs by about 40-50% versus external procurement, adding to future margins.
- No numeric FY27 revenue, margin, or capex guidance is given; forward statements are capacity and commissioning targets through 2030.
- Presentation is internally inconsistent on Sarora Unit III power: slide 8 cites a 60 MW environmental clearance, while later slides plan a 30 MW plant.
- Management plans to expand international footprint using its stainless seamless pipe product, with no timeline given.
Credit-rating note — CRISIL (27 Oct 2026) · 27 Oct 2026
- Rs 935 crore has been spent on a greenfield 3.6 lakh TPA integrated stainless steel unit at Kesda, which will take stainless steel capacity to about 4.8 lakh TPA.
- CRISIL reaffirmed the long-term rating at Crisil A+/Stable and assigned a Crisil A1 short-term rating, with rated bank facilities enhanced to Rs 1,527 crore.
- The company plans to raise fresh term debt of about Rs 815 crore over the medium term to fund its ongoing greenfield and brownfield capex projects.
- The company is undertaking about Rs 200 crore of brownfield capex to add 1.5 lakh TPA of ERW pipe capacity and 30 MW of captive power.
- EBITDA per tonne rose from about Rs 5,300 in FY25 to about Rs 8,000 in FY26 and exceeded Rs 9,000 in Q1 FY27, helped by higher stainless steel sales.
- Debt for the greenfield project is fully tied up, but funding for the brownfield capex has not yet been arranged.
- The brownfield projects are likely to commence from Q3 FY28 and are about 30% complete so far.
- Implementation risk on the capex is rated moderate, and offtake of the expanded stainless steel capacity will be a monitorable item.
- Q1 FY27 saw a topline above Rs 700 crore and about 1.07 lakh tonnes of sales.
- The Rs 440 crore IPO in July 2025 strengthened the balance sheet, lowering gearing to 0.4 times at March 2026.
- Margins remain exposed to volatile raw material prices, including iron ore, coal and HR coil, as well as cyclical end-user demand.
Annual report FY26 · 18 Aug 2026
- Management reports FY26 revenue up 59.67% to INR 24,132.43 million, with sales volume at a record 396,731 MT.
- Vision 2030 targets raising finished steel capacity from 0.62 to 2.03 MMTPA and reaching 10-12% market share in MS pipes and stainless steel coils.
- Management targets raising finished-products capacity to 2.03 MMTPA under Vision 2030, from 0.624 MMTPA in FY26.
- Board approved Rs 2,000 million capex for a pipe mill expansion adding 150,000 MTPA at Sarora, plus a 30 MW captive power plant.
- EBITDA margin rebounded 122 bps to 11.45% in FY26, which management attributes to a richer value-added product mix and better utilisation.
- Value-added products reached 92.66% of revenue in FY26, up from 82.86%, and are central to the company's strategy.
- IPO proceeds were used to prepay about INR 3,900 million of debt, cutting gearing to 0.36x from 1.08x and interest coverage rising to 5.43x.
- Capex fell to INR 1,225.99 million in FY26 from INR 2,770.78 million, while management says Vision 2030 spending will be substantially larger than capital deployed to date.
- Immediate priorities are commissioning Kesda and Kuthrel Unit II, the associated 25 MW captive power plant and other brownfield projects.
- Phase I greenfield work at Kesda and Kuthrel Unit II is said to be on track for commissioning by Q4 FY26, though the FY27 priorities still list commissioning of these facilities.
- The DFT-based pipe mill expansion is planned to take ERW capacity to 500,000 MTPA during FY27.
- Record FY26 sales volume of 396,731 MT, with value-added products at 355,688 MT, about 89.65% of total volume.
- Management says the IPO strengthened the balance sheet, with debt-equity falling to 0.36x from 1.08x while capex continued.
- Sambhv is developing two more captive power plants, taking installed captive capacity to 80 MW, and aims for 100% power self-sufficiency across major manufacturing units.
Concall transcript — Q1FY27 (8 Aug 2026) · 8 Aug 2026
- Management guided FY27 revenue growth of 10-15% and EBITDA growth of 10-15% over the FY26 base, calling the guidance conservative.
- FY27 EBITDA per ton is guided at INR7,500-8,500, with Q2 at the same range, after Q1 realised above INR10,000 excluding sponge iron.
- Kesda greenfield project is on track for commissioning in Q4 FY27, with INR930 crore mostly deployed this year; the 3.6 lakh tpa stainless steel line takes total capacity to 4,76,000 tpa.
- Management expects Q2 to be softer due to monsoon, moisture in raw material and price softness, and expects stainless steel pricing and margins to soften as imports normalise.
- Peak debt is expected by end FY27 at INR800-850 crore term debt plus INR200-300 crore working capital debt, with cost of debt at 7.5-8%.
- Board approved a preferential issue of fully convertible warrants of up to INR100 crore with promoter and management participation, to fund capex, working capital and the subsidiary.
- Management aims for about 10 lakh tpa of MS capacity by FY30 via Kesda phases and targets about 150 MW captive power by 2030, against 25 MW today.
- Management expects MS pipe prices to fall a further 3-5% this fiscal year and says the low-volume integrated model protects it from demand elasticity.
- Stainless steel co-branding MoU network grew to 28 partners, with supply of about 1,200 tons now and a target of about 2,500 tons by end of the year.
- Management says there is no further external fundraise planned in the near-to-medium term beyond the warrant issue.
Use-of-proceeds report — Q1FY27 (5 Aug 2026) · 5 Aug 2026
- CARE Ratings reports no deviation from the IPO objects for the quarter ended June 30, 2026, and no material deviation over earlier reports.
- Rs 1.50 crore of unutilised General Corporate Purposes funds was reallocated by the Board to raw material purchases, working capital and ordinary-course expenses.
- The Rs 390 crore pre-payment or scheduled repayment of borrowings was fully utilised with no delay against the offer document timeline.
- The GCP utilisation deadline was missed: the Rs 22.46 crore GCP proceeds were due by March 2026 and slipped by about three months.
- Total IPO utilisation stood at Rs 438.30 crore out of Rs 440 crore, with issue-related expenses of Rs 27.34 crore utilised against Rs 27.55 crore.
- The monitoring agency reports no favourable or unfavourable events affecting the viability of the objects and no other information material to investors.
Press release — Q1FY27 (2 Jul 2026) · 2 Jul 2026
- The company reports its highest-ever Q1FY27 sales volume for Value Added Products.
- Growth in value-added volumes came mainly from Pre-Galvanised coils and pipes and stainless steel coils.
- Overall volume was held stable in Q1FY27 despite a war-related global disruption that hurt the wider industry.
- The release is a routine exchange filing of sales volumes and contains no forward-looking guidance.
- The company operates installed capacity of 350,000 MTPA of ERW pipes and tubes across two facilities in Chhattisgarh.
Concall transcript — Q4FY26 (May 2026) · 11 May 2026
- Management guided Q1FY27 EBITDA of INR7,500-8,000 per ton and an FY27 average of INR7,000-8,000 per ton, both conditional on current steel price levels holding.
- Phase 1 of the Kesda greenfield (3,60,000 tpa stainless steel coil, Rs 930 crore) is on schedule for Q4FY27 commissioning, with Phase 2 and 3 to be announced later.
- Management targets about 2 million tonnes of finished steel capacity by 2030, comprising MS pipes/tubes, coated product and stainless steel, and 10-12% share in MS coil/pipe and stainless flat products.
- Management expects FY27 volume growth of 10-15% over FY26 as the existing capacity and new brownfield lines ramp up.
- Management set internal borrowing limits: long-term debt not above 1.5x net worth and not above 1.5x forward EBITDA. Peak long-term debt for announced capex is about Rs 800 crore.
- Management guides an EBITDA margin band of about 10-12% and a PAT margin of about 5% plus or minus 1% as the normal operating range.
- A further Rs 300-400 crore of capex may be announced by FY28, depending on execution of the announced projects. Peak utilisation for Kesda Phase 1 is seen at no more than 40% in its first year.
- About 90-95% of cold-rolled coil goes to galvanizing, and the remainder is converted directly into CRFH pipes.
- Stainless steel working capital cycle is expected to rise to 25-30 days once the new stainless line goes live in 2028, versus about 17 days today.
- Management described the stainless steel value chain as a three-step process: liquid metal to slabs, slabs to HR coil, and HR coil to cold rolling.
- Carbon steel has one extra step compared with stainless, because sponge iron is made before melting.
- For coated steel, cold-rolled coil is galvanized and then converted into pipes, so cold rolling comes before galvanizing.
- The closing remarks gave no numerical targets, only a general hope to meet investors again in coming quarters.
Concall presentation — Q4FY26 (May 2026) · 10 May 2026
- Management aims to scale finished products capacity from 0.62 MMTPA to 2.03 MMTPA over the next 4-5 years through greenfield and brownfield expansion.
- Phase-I greenfield expansion at Kesda and Kuthrel Unit-II, including 0.36 MMTPA stainless-steel coils, is targeted for commissioning by Q4FY27 at an estimated capex of INR 8,100 million.
- Q4FY26 revenue rose 38%, EBITDA 91% and PAT 239% YoY, with management citing improved realisations and a richer product mix.
- Captive power capacity is being added at Kesda and Sarora, with estimated capex of INR 1,250 million and INR 1,500 million respectively, to lower costs and reduce reliance on external power.
- Brownfield ERW expansion via the DFT route adds 150,000 MTPA of capacity at an estimated capex of INR 500 million.
- Stainless-steel CR coil capacity is planned to double from 58,000 to 116,000 MTPA through debottlenecking.
- The company plans to widen distribution into new states and to expand its international footprint using its ERW and GI/GP pipe expertise.
- The Kesda and Kuthrel expansion depends on delivery against a schedule with several work streams still at early civil or ordering stages.
- Management expects the new zinc-saving technology for GP coils and pipes to further improve cost efficiency.
Concall transcript — Q3FY26 (Feb 2026) · 2 Feb 2026
- Management guides FY26 EBITDA per ton of about INR7,000 blended and INR7,500 for Q4, and operating EBITDA of upward of INR260 crore at enterprise level.
- Stainless steel capacity is being raised: cold-rolled capacity doubles to 1,16,000 tpa by end-March 2026, and a 3,50,000 tpa greenfield at Kesda is due by Q4 2027, taking total stainless capacity to about 4,70,000 tons.
- Q3 EBITDA per ton fell to about INR5,500 from about INR6,100 in Q2, which management attributes to HR coil price falls, a stainless import window and a galvanising shutdown. Management expects recovery in Q4.
- Stage 1 project cost is INR930-940 crore, with INR250 crore spent by December and about INR700 crore to be spent over the next 12 months.
- Management plans to fund about INR600-650 crore of Stage 1 capex with long-term debt and about INR300 crore from internal accruals.
- The company received PLI scheme 2.0 approval for both of its stainless steel applications; the quantum will be known after the MOU with the government in February.
- The nine-month FY26 revenue rose 70% and PAT more than doubled, helped by lower financial costs after long-term debt repayment.
- Working capital days are expected to rise by 10-15 days as stainless steel volumes ramp, settling near 10 days once the product is accepted in the market.
- Mix shift toward value-added stainless products continues, with 300-series targeted at 50% of stainless mix in Q4 from about 30% and realisation expected to rise.
- Seamless stainless tubes and a 2 lakh ton DFT pipe plant are at study or planning stage, with no freeze and a separate capex to be announced later.
- A 25-30 MW captive power plant costing INR125-150 crore is under planning to cover about 45% of Sarora's grid power, with savings of upward of INR50 crore a year.
- Of an INR11.5 crore advance on a land deal, INR9 crore has been refunded and the balance of INR2.5 crore is being pursued after the land was found to be mortgaged.
Concall presentation — Q3FY26 (Feb 2026) · 31 Jan 2026
- The company aims to add 1.2 million tonnes of finished-product capacity in the next 4 to 5 years through its Kesda greenfield plant.
- Q3FY26 standalone revenue, EBITDA and PAT grew 60%, 34% and 113% YoY, with sales volumes up 34%, per the chairman's commentary.
- Management describes 9MFY26 as the company's strongest results, with revenue, EBITDA and PAT up 70%, 73% and 110% YoY.
- Phase I of the Kesda greenfield project is expected to be commissioned in FY27, with construction and equipment ordering already under way.
- Q3FY26 EBITDA margin fell to 8.68% from 10.39% in Q2FY26, while PAT margin was 4.10% versus 5.16%.
- Installed pre-galvanised coil capacity was doubled to 116,000 MTPA from 58,000 MTPA, adding to value-added product volumes.
- Stainless steel capacity utilisation is low, at about 42% to 48% for SS slabs, HR coils and CR coils as of December 2025, and management expects it to improve.
- Debt to EBITDA was 0.89x on a 9MFY26 annualised basis, down from 3.5x in FY25 as earnings grew.
- Working capital cycle lengthened to 35 to 36 days from 18 days in FY25.
- Management plans to add distributors in new states such as Kerala, Tamil Nadu and Andhra Pradesh, and to expand internationally using its ERW pipe expertise.
- The company has a 25 MW captive power plant and sees scope for a further power plant to meet the remaining needs of its Sarora and Kuthrel plants.
Documents read
- Credit-rating note — CARE Ratings (5 Nov 2026) · Credit-rating note (the rating agency's words) · 5 Nov 2026 · 12 statements
- Concall transcript — Q2FY27 (3 Nov 2026) · Concall transcript · 3 Nov 2026 · 38 statements
- Investor presentation — Q2FY27 (29 Oct 2026) · Investor presentation · 29 Oct 2026 · 15 statements
- Credit-rating note — CRISIL (27 Oct 2026) · Credit-rating note (the rating agency's words) · 27 Oct 2026 · 6 statements
- Annual report FY26 · Annual report · 18 Aug 2026 · 37 statements
- Concall transcript — Q1FY27 (8 Aug 2026) · Concall transcript · 8 Aug 2026 · 25 statements
- Use-of-proceeds report — Q1FY27 (5 Aug 2026) · Use-of-proceeds report · 5 Aug 2026 · 1 statement
- Press release — Q1FY27 (2 Jul 2026) · Press release · 2 Jul 2026
- Concall transcript — Q4FY26 (May 2026) · Concall transcript · 11 May 2026 · 17 statements
- Concall presentation — Q4FY26 (May 2026) · Concall presentation · 10 May 2026 · 13 statements
- Concall transcript — Q3FY26 (Feb 2026) · Concall transcript · 2 Feb 2026 · 21 statements
- Concall presentation — Q3FY26 (Feb 2026) · Concall presentation · 31 Jan 2026 · 6 statements
- Press release — Q3FY26 (2 Jan 2026) · Press release · 2 Jan 2026
- Disclosure Under Regulation 30 Of SEBI (LODR) Regulations, 2015 · Exchange announcement · 8 Dec 2025 · 3 statements
- Concall transcript — Q2FY26 (Nov 2025) · Concall transcript · 10 Nov 2025 · 19 statements
- Annual report FY25 · Annual report · 3 Sep 2025 · 20 statements
- Concall transcript — Q1FY26 (Jul 2025) · Concall transcript · 25 Jul 2025 · 24 statements
Guidance is extracted from company documents and interviews by an AI model and then checked against reported numbers by rule. It can contain errors or miss context, and the stored figures may differ from the basis management guided on. This page is information only and is not investment advice.