Manorama Industries Ltd stock page

Manorama Industries Ltd: management guidance tracker

What management said it would deliver, when, where they said it — and what the reported numbers showed afterwards.

16 documents read Covering 31 Jul 2024 to 12 Nov 2026 Last checked against results: 20 Nov 2026
Delivery score
71%
Moderate · 23 settled promises
Promises tracked
120
65 direct · 15 indirect · 40 hints
✓ Achieved
17
+ 1 partly
✗ Missed
5
Still open
97
8 on track · 2 behind
Walked back
2
target cut or date pushed
How to read this page — 30 seconds
  1. Latest guidance is what management said at its most recent results call, presentation or interview, next to what it had said before. Raised or Lowered tells you which way expectations moved.
  2. Other open guidance lists earlier promises that have not fallen due, soonest first, with the latest reported figure.
  3. Track record compares each promise that has fallen due with what the company actually delivered. That is the best guide to how much weight to give the new guidance.
Direct: an explicit number for a periodIndirect: a number that follows from what was said (“double in 5 years” → ~14.9% a year)Hint: a direction only
✓ Achieved◐ Partly achieved✗ Missed↗ On track↘ Behind⏳ Pending — not due, or not yet measurable

Select any row for management's exact words, where they said it and how the target changed over time.

Latest guidance · 12 Nov 2026

From Investor presentation — Q2FY27 (12 Nov 2026). What management guided for most recently, against what it had said before.

15 MW captive solar power plant Direct
The company is planning the development of a 15 MW captive solar power plant, with no timeline stated.
Earlier
15 MW
Not specified · 13 Aug 2026
Now
15 MW
Not specified
Change Repeated
StatusPending

In management's words

“Planning the development of a 15 MW captive solar power plant as part of Manorama's renewable energy transition and decarbonization strategy.”

How it was checked

Capacity is not in the stored financial tables.

Condition attached by management: Planning stage

How this guidance changed

  1. 13 Aug 2026 — 15 MW for Not specified First stated
    Investor presentation · Pending
  2. 12 Nov 2026 — 15 MW for Not specified Repeated
    Investor presentation · Pending
Jabari Bestaan beneficiaries in shea-growing regions Direct
The Jabari Bestaan programme will extend into shea-growing regions with an objective of reaching up to 100,000 beneficiaries.
Earlier
≤ 100,000 beneficiaries
Not specified · 13 Aug 2026
Now
≤ 100,000 beneficiaries
Not specified
Change Repeated
StatusPending

In management's words

“will be extended into shea-growing regions with the objective of reaching up to 100,000 beneficiaries”

How it was checked

Other is not in the stored financial tables.

How this guidance changed

  1. 13 Aug 2026 — ≤ 100,000 beneficiaries for Not specified First stated
    Investor presentation · Pending (actual approximately 30,000 beneficiaries)
  2. 12 Nov 2026 — ≤ 100,000 beneficiaries for Not specified Repeated
    Investor presentation · Pending
FY28 target commissioning for the major projects Indirect
Target commissioning of the major capex projects is FY28, subject to Board-recommended modifications.
Earlier
First time stated
Now
milestone
FY28
Change New
StatusPending

In management's words

“FY28 target commissioning for the major projects”

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Subject to Board Recommended Modifications

How this guidance changed

Stated once in the documents read so far.

Translating expanded capacities into sustainable growth Hint
Management is focused on translating its expanded capacities into sustainable growth, with no number or period given.
Earlier
to improve
FY27 · 18 Aug 2026
Now
to improve
FY27
Change Repeated
StatusPending

In management's words

“We are now focused on translating our expanded capacities into sustainable growth, supported by an increasingly diversified global customer base”
Deep Saraf, Managing Director · Investor presentation — Q2FY27 (12 Nov 2026), p. 5 · 12 Nov 2026

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

  1. 22 Oct 2025 — to improve for FY27 First stated
    Concall transcript · Pending
  2. 16 May 2026 — to improve for FY27 Repeated
    Concall transcript · Pending
  3. 18 Aug 2026 — to improve for FY27 Repeated
    Concall transcript · Pending
  4. 12 Nov 2026 — to improve for FY27 Repeated
    Investor presentation · Pending

Other open guidance · soonest due first

Earlier promises that have not fallen due yet, with the latest figure where one has been reported.

Utilisation of new capacity · new 25,000 MT capacity Direct
Utilisation of the new capacity is expected at 60% to 70% for the rest of FY25.
Target
60–70%
Due
by FY25
result by 30 May 2025
Said
31 Jul 2024
Concall transcript
StatusAwaiting data

In management's words

“For the new capacity, we expect our utilization to be around 60%-70%.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q1FY25 (Aug 2024), p. 7 · 31 Jul 2024

How it was checked

Capacity utilisation is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Wallet share of CBE · cocoa butter equivalent Direct
Management aims to raise its wallet share of CBE in its product mix to 20%-30% in FY25.
Target
20–30%
Due
FY25
result by 30 May 2025
Said
31 Jul 2024
Concall transcript
StatusAwaiting data

In management's words

“So, we aim to increase our wallet share of CBE to 20%-30% for the current financial year.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q1FY25 (Aug 2024), p. 7 · 31 Jul 2024

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

CBE volume (seasonal run-rate) · cocoa butter equivalent Direct
CBE volume is expected to be around 5,000 metric tons in the current going-forward season.
Target
~5,000 metric tons
Due
by FY25
result by 30 May 2025
Said
31 Jul 2024
Concall transcript
StatusAwaiting data

In management's words

“And we expect in the current going forward season the CBE should be around 5,000 metric tons.”
Ashish Saraf, President · Concall transcript — Q1FY25 (Aug 2024), p. 6 · 31 Jul 2024

How it was checked

Production is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Production commencement in Brazil · Brazil (Latin America) Hint
CBE production with partner DEKEL in Brazil is expected to commence in November 2025.
Target
milestone
Due
by Nov 2025
result by 14 Feb 2026
Said
17 Oct 2025
Concall presentation
StatusAwaiting data

In management's words

“with production expected to commence in November 2025.”

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Production through partnership with DEKEL Agroindustria at its Itapolis facility.

How this guidance changed

Stated once in the documents read so far.

Optimum utilisation of the new plant · new 25,000 MT capacity Hint
Management has committed to reaching optimum utilisation of the new plant in FY26, with the company seeing potential for it.
Target
milestone
Due
FY26
result by 30 May 2026
Said
31 Jul 2024
Concall transcript
StatusAwaiting data

In management's words

“So, on a safer side, we have committed to FY '26.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q1FY25 (Aug 2024), p. 15 · 31 Jul 2024

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Management said it would update as the quarters progress.

How this guidance changed

Stated once in the documents read so far.

Net debt Hint
Management's endeavour is to reduce net debt from the March 2025 level of about INR 380 crore, with no figure given.
Target
to come down
Due
FY26
result by 30 May 2026
Said
28 Apr 2025
Concall transcript
StatusAwaiting data

In management's words

“Going forward, our endeavour is to reduce the net debt from here on.”
Ashok Jain, CFO · Concall transcript — Q4FY25 (May 2025), p. 5 · 28 Apr 2025

How it was checked

Net debt is not in the stored financial tables.

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Construction start Hint
Management is hopeful of starting construction on the announced projects during the current year.
Target
milestone
Due
FY26
result by 30 May 2026
Said
28 Apr 2025
Concall transcript
StatusAwaiting data

In management's words

“we are very hopeful to start the construction also this year.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q4FY25 (May 2025), p. 14 · 28 Apr 2025

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Board approval of the capex plan

How this guidance changed

Stated once in the documents read so far.

Employee expenses Direct
Employee expenses are expected to rise by around 5-10% or more.
Target
5–10% growth
Due
FY26
result by 30 May 2026
Said
28 Apr 2025
Concall transcript
StatusAwaiting data

In management's words

“So, we can expect around 5% to 10% or maybe more jump.”
Ashish Saraf, Chairman and Managing Director · Concall transcript — Q4FY25 (May 2025), p. 8 · 28 Apr 2025

How it was checked

Other is not in the stored financial tables.

Condition attached by management: if the company needs good people to increase market share and sales

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Efficiencies and cost reductions Hint
Management anticipates substantial benefits from improved efficiencies and cost reductions as it expands production capacity.
Target
to improve
Due
FY26
result by 30 May 2026
Said
6 Aug 2025
Annual report
StatusAwaiting data

In management's words

“it anticipates substantial benefits from improved efficiencies and cost reductions.”
Gautam Kumar Pal, Whole Time Director · Annual report FY25, p. 132 · 6 Aug 2025

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Total integrated capacity (MTPA), blending station and packing · Blending Station and Packing Direct
Blending station and packing capacity, currently under process, is expected to be increased to 30,000 MTPA in 2025-26.
Target
30,000 MTPA
Due
FY26
result by 30 May 2026
Said
6 Aug 2025
Annual report
StatusAwaiting data

In management's words

“Expected to be Increased to 30,000 in 2025-26”
Annual report FY25, p. 69 · 6 Aug 2025

How it was checked

Capacity is not in the stored financial tables.

Condition attached by management: Project marked as under process.

How this guidance changed

Stated once in the documents read so far.

Next phase of growth (forward and backward integration projects) Hint
Management is actively evaluating its next phase of growth for 2025-26 to 2030-31, including forward and backward integration projects.
Target
milestone
Due
FY26
result by 30 May 2026
Said
6 Aug 2025
Annual report
StatusAwaiting data

In management's words

“we are actively evaluating our next phase of growth for the period between 2025-26 and 2030-31.”
Annual report FY25, p. 68 · 6 Aug 2025

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Projects are selected on strategic alignment and payback period.

How this guidance changed

Stated once in the documents read so far.

Contract pricing and margin · cocoa butter equivalent and specialty fats Hint
Management does not expect margin reduction from cocoa-linked price changes over the next two quarters, given fixed contract pricing.
Target
to hold or improve
Due
by Q4FY26
result by 30 May 2026
Said
22 Oct 2025
Concall transcript
StatusAwaiting data

In management's words

“we do not see that kind of a margin reduction because of the price change in the products for the next 2 quarters coming up.”
Ekta Soni, AVP Investor Relations · Concall transcript — Q2FY26 (22 Oct 2025), p. 11 · 22 Oct 2025

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Contracts of 9-12 months with fixed volume and price

Assumptions made in reading this

  • 'next quarter' counted from Q2FY26, the quarter being reported at the time

How this guidance changed

Stated once in the documents read so far.

Inventory days · Burkina Faso backward integration Hint
Management expects inventory days and working capital cycle to improve once the Burkina Faso extraction project is running.
Target
to come down
Due
FY26
result by 30 May 2026
Said
22 Oct 2025
Concall transcript
StatusAwaiting data

In management's words

“it will be a better management of inventory and it will be a better working capital cycle also will be improved and our inventory days are also going to be improved with this project.”
Ekta Soni, AVP Investor Relations · Concall transcript — Q2FY26 (22 Oct 2025), p. 16 · 22 Oct 2025

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Depends on the Burkina Faso project

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Mexico plant volume · Mexico plant Direct
Mexico plant expected to deliver more than 2,000 tons this year.
Target
≥ 2,000 tonnes
Due
FY26
result by 30 May 2026
Said
28 Jan 2026
Concall transcript
StatusAwaiting data

In management's words

“More than 2,000 tons, we hope that this year will be delivered approximate.”
Ashok Jain, Director & CFO · Concall transcript — Q3FY26 (Jan 2026), p. 15 · 28 Jan 2026

How it was checked

Volume is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Final dividend Direct
Board recommends a final dividend of Rs 0.80 per equity share for FY26, subject to shareholder approval.
Target
₹0.8
Due
FY26
result by 30 May 2026
Said
27 Aug 2026
Annual report
StatusAwaiting data

In management's words

“The Board of Directors is pleased to recommend a Final Dividend of 40% i.e., C 0.80 (Indian Rupees Eighty Paisa only) per equity share of face value C 2/- (Indian Rupees Two only) each”
Annual report FY26, p. 86 · 27 Aug 2026

How it was checked

Dividend is not in the stored financial tables.

Condition attached by management: Subject to shareholder approval at AGM

How this guidance changed

Stated once in the documents read so far.

Proposed dividend for the year ended on 31 March 2026 Direct
The Board proposed a final dividend of Rs 0.80 per share for the year ended 31 March 2026, subject to shareholder approval at the AGM.
Target
₹0.8
Due
by Mar 2026
result by 30 May 2026
Said
27 Aug 2026
Annual report
StatusAwaiting data

In management's words

“Proposed dividend for the year ended on 31 March 2026: C 0.80 per share (31 March 2025: C 0.60 per share)”
Annual report FY26, p. 251 · 27 Aug 2026

How it was checked

Dividend is not in the stored financial tables.

Condition attached by management: Subject to approval of members at the annual general meeting

How this guidance changed

Stated once in the documents read so far.

Condensate water recovery Direct
Improve boiler efficiency by raising condensate water recovery to at least 80% by June 2026 via a condensate recovery system.
Target
≥ 80%
Due
by Jun 2026
result by 14 Aug 2026
Said
6 Aug 2025
Annual report
StatusAwaiting data

In management's words

“Improve boiler efficiency by increasing condensate water recovery to at least 80% by June 2026 through the implementation of a condensate recovery system.”
Annual report FY25, p. 131 · 6 Aug 2025

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Implementation of a condensate recovery system

How this guidance changed

Stated once in the documents read so far.

Upgraded facility expanded capacity · upgraded facility (12,000 MT) Direct
The 12,000 metric ton expanded capacity of the upgraded facility is expected to be available from Q1 FY27.
Target
milestone
Due
Q1FY27
result by 14 Aug 2026
Said
28 Jan 2026
Concall transcript
StatusAwaiting data

In management's words

“So that facility expanded capacity will be available from the Q1 onwards to the company.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 11 · 28 Jan 2026

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Still in process at time of call.

How this guidance changed

Stated once in the documents read so far.

Dependency on conventional energy sources Direct
Reduce dependency on conventional energy sources by 40% by December 2026 through solar energy and rice husk biomass.
Target
40%
Due
by Dec 2026
result by 14 Feb 2027
Said
6 Aug 2025
Annual report
StatusPending

In management's words

“Reduce dependency on conventional energy sources by 40% by December 2026 through the adoption of solar energy for electricity needs and by increasing the use of rice husk biomass to supply 100% of fuel for boiler operations.”
Annual report FY25, p. 131 · 6 Aug 2025

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Adoption of solar energy and increased use of rice husk biomass

How this guidance changed

Stated once in the documents read so far.

Debottlenecking (additional fractionation capacity) Direct
Balance of about 4,500 tons of fractionation debottlenecking is intended to be implemented around Q3 FY27, subject to operational timelines.
Target
4,500 tons
Due
Q3FY27
result by 14 Feb 2027
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“the balance is intended to be implemented in a manner during FY27 around Quarter 3 of this financial year, subject to operational time lines.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 5 · 18 Aug 2026

How it was checked

Capacity is not in the stored financial tables.

Condition attached by management: Subject to operational timelines

How this guidance changed

Stated once in the documents read so far.

Final dividend Direct
Rs 0.80 per share final dividend for FY26 to be paid on or before October 20, 2026, if approved by members at the AGM.
Target
₹0.8
Due
by Oct 2026
result by 14 Feb 2027
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“The said dividend will be paid at par on or before Tuesday, October 20, 2026.”
Annual report FY26, p. 308 · 27 Aug 2026

How it was checked

Dividend is not in the stored financial tables.

Condition attached by management: Subject to approval by members at the 21st AGM; record date September 14, 2026.

How this guidance changed

Stated once in the documents read so far.

Optimum utilisation of new capacity · new expansion Indirect
Management expects the new expansion to reach optimum utilisation by end of FY27 at today's pricing.
Target
milestone
Due
by FY27
result by 30 May 2027
Said
31 Jul 2024
Concall transcript
StatusPending

In management's words

“At today's pricing, we expect we should reach our optimum utilization of the new capacity by the end of FY'27.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q1FY25 (Aug 2024), p. 9 · 31 Jul 2024

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: At today's pricing.

How this guidance changed

Stated once in the documents read so far.

Working capital cycle Direct
Working capital cycle targeted at about 75 days over the next two years, down from 97 days.
Target
~75 days
Due
by FY27
result by 30 May 2027
Said
22 Oct 2025
Concall transcript
StatusBehind
So far: 98 days (FY26)

In management's words

“from 151 days, we have come to 97 days now and we target to 75 kind of days for our working capital cycle given the model of the business.”
Ekta Soni, AVP Investor Relations · Concall transcript — Q2FY26 (22 Oct 2025), p. 11 · 22 Oct 2025

How it was checked

FY26: 98 days against 75 days targeted by FY27 — behind the pace required.

Condition attached by management: Given the model of the business

Assumptions made in reading this

  • horizon counted from FY25 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Project on-stream timing · INR 450 crore project Indirect
The INR 450 crore project is expected to come on stream within the next two years.
Target
milestone
Due
by FY27
result by 30 May 2027
Said
22 Oct 2025
Concall transcript
StatusPending

In management's words

“we hope to see our project getting on stream in the next 2 years.”
Ekta Soni, AVP Investor Relations · Concall transcript — Q2FY26 (22 Oct 2025), p. 7 · 22 Oct 2025

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Subject to finalising the funding structure

Assumptions made in reading this

  • horizon counted from FY25 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Margin on new forward integration products · forward integration projects Hint
New forward integration products are not expected to dilute margins and are targeted at the current or better margin level.
Target
to hold or improve
Due
FY27
result by 30 May 2027
Said
28 Jan 2026
Concall transcript
StatusPending

In management's words

“we are looking for the same sustainable margin level what we have currently in our business, even we are looking for a better level.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 7 · 28 Jan 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Top-line growth rate Direct Walked back
Management said the 25%-30% growth rate proposed by an analyst is the company's aim for FY27.
Target
25–30% growth
Due
FY27
result by 30 May 2027
Said
16 May 2026
Concall transcript · 2× since 28 Jan 2026
StatusOn track
So far: 40.78% growth (Q1FY27–Q2FY27)

In management's words

“That is the company aim also.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 7 · 16 May 2026

What it implies in numbers

25–30% growth on ₹1,367 Cr (FY26) implies about ₹1,709 Cr to ₹1,777 Cr for FY27.

How it was checked

Year to date (Q1FY27–Q2FY27) growth is 40.8% against the guided 25–30% for FY27.

Condition attached by management: Analyst's range adopted by management in response; not stated as a formal guidance figure.

How this guidance changed

  1. 28 Jan 2026 — ≥ 30% growth for FY27 First stated
    Concall transcript · On track (actual 40.78% growth)
  2. 16 May 2026 — 25–30% growth for FY27 Lowered
    Concall transcript · On track (actual 40.78% growth)
Capacity utilisation on 52,000 tons · Solvent fractionation Direct
Management is targeting about 85%-90% utilisation of the 52,000 tonne fractionation capacity in FY27.
Target
85–90%
Due
FY27
result by 30 May 2027
Said
16 May 2026
Concall transcript
StatusBehind
So far: around 80% utilisation in Q1FY27

In management's words

“Utilization, we are expecting of 52,000 tons of around 85%- 90% for this fiscal year as well.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 14 · 16 May 2026

How it was checked

Q1FY27 utilisation of about 80% sits below the 85%-90% target range. The FY27 deadline has not passed, and no later full-year figure is given. (judged from later company statements)

Evidence (18 Aug 2026): “we have done a utilization of around 80% on our capacity for this quarter.” — Concall transcript — Q1FY27 (18 Aug 2026)

Evidence (27 Aug 2026): “Existing capacity was running at approximately 85% utilisation on the pre-debottleneck base” — Annual report FY26

How this guidance changed

Stated once in the documents read so far.

Margin from Burkina Faso raw material processing · Burkina Faso backward integration project Hint
Management expects the Burkina Faso project to deliver a sustainable margin that should reflect in numbers going forward.
Target
to hold or improve
Due
FY27
result by 30 May 2027
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“So, we are very hopeful of making a sustainable margin, and it should reflect in our numbers going forward”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 5 · 16 May 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Volume-accretive growth Direct
Management said the calculation points to about 30% volume-accretive growth over the current and coming fiscal year.
Target
~30% growth
Due
FY27
result by 30 May 2027
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“there is a clear output which is visible of a 30% volume accretive growth and 5%-10% could be our price realization benefit also.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 9 · 16 May 2026

How it was checked

Volume is not in the stored financial tables.

Condition attached by management: Based on utilisation of new debottlenecked capacity.

How this guidance changed

Stated once in the documents read so far.

Price realization growth Direct
Management expects price realisation growth of 5%-10% over the current and coming fiscal year.
Target
5–10% growth
Due
FY27
result by 30 May 2027
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“we expect a price realization growth also of 5%-10%.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 9 · 16 May 2026

How it was checked

ARPU / realisation is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Balance debottlenecking of 4,500 tons · Solvent fractionation Hint
Management expects the balance debottlenecking of about 4,500 tons to be completed in FY27.
Target
milestone
Due
FY27
result by 30 May 2027
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“Yes, we are expecting that also to be streamlined in this financial year only.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 14 · 16 May 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Debottlenecking of solvent fractionation plant 1 · Solvent fractionation plant 1 Hint
A similar debottlenecking initiative for solvent fractionation plant 1 (15,000 metric tons) will be taken in this fiscal year.
Target
milestone
Due
FY27
result by 30 May 2027
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“a similar debottlenceking initiative will be taken in this fiscal year.”
Ashish Saraf, Chairman and Managing Director · Concall transcript — Q4FY26 (16 May 2026), p. 4 · 16 May 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Subsidiary setup costs · International subsidiaries Hint
Management expects the start-up costs of its subsidiaries to normalise as operations scale up.
Target
to come down
Due
FY27
result by 30 May 2027
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“these costs arc largely one time or transitional in nature and are expected to normalize as operation is scale up.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 11 · 16 May 2026

How it was checked

Other is not in the stored financial tables.

Condition attached by management: As operations scale up.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Fractionation capacity Direct
Management expects fractionation capacity to reach 52,000 TPA in FY27 through debottlenecking.
Target
52,000 TPA
Due
FY27
result by 30 May 2027
Said
13 Aug 2026
Investor presentation
StatusOn track
So far: 47,500 MTPA fractionation capacity now, against the 52,000 TPA target

In management's words

“Debottleneck fractionation to 52,000* TPA; add 75,000 TPA Fractionation Plant-3 and new CBA / ESOS capacity”

How it was checked

Capacity is already at 47,500 MTPA after debottlenecking, with the remaining debottlenecking balance still planned. The FY27 deadline has not passed. (judged from later company statements)

Evidence (27 Aug 2026): “Our total fractionation capacity at year-end stands at 47,500 MTPA” — Annual report FY26

Evidence (18 Aug 2026): “we already have done a portion of our additional capacity of 7,500, which is already have been operationalized.” — Concall transcript — Q1FY27 (18 Aug 2026)

How this guidance changed

Stated once in the documents read so far.

Margin range Hint
Underlying margin range is expected to hold broadly stable, with quarterly movement possible from mix and one-offs.
Target
to hold or improve
Due
FY27
result by 30 May 2027
Said
18 Aug 2026
Concall transcript · 3× since 28 Jan 2026
StatusPending

In management's words

“But the underlying lens range is expected to hold broadly stable.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 11 · 18 Aug 2026

Condition attached by management: Quarter-to-quarter movement depends on mix and one-off items

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

  1. 28 Jan 2026 — to improve for FY27 First stated
    Concall presentation · Pending
  2. 16 May 2026 — to hold or improve for FY27 Raised
    Concall transcript · Pending
  3. 18 Aug 2026 — to hold or improve for FY27 Repeated
    Concall transcript · Pending
Ballpark capex for this year Direct
FY27 capex is expected to be around INR 225 to 250 crore.
Target
₹225 Cr – ₹250 Cr
Due
FY27
result by 30 May 2027
Said
18 Aug 2026
Concall transcript · 2× since 28 Jan 2026
StatusPending

In management's words

“So ballpark capex guidance for this year should be around INR 225 crores to INR 250-odd crores of investment in financial year approximately in FY27.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 12 · 18 Aug 2026

What it implies in numbers

Reaching ₹225 Cr by FY27 from ₹59 Cr (FY26) needs about 281.4% growth a year.

How this guidance changed

  1. 28 Jan 2026 — ₹100 Cr – ₹150 Cr for FY27 First stated
    Concall transcript · Pending
  2. 18 Aug 2026 — ₹225 Cr – ₹250 Cr for FY27 Raised
    Concall transcript · Pending
Annual fractionation capacity Direct
Annual fractionation capacity is expected to rise from 47,500 tons to around 52,000 tons per annum this financial year after debottlenecking.
Target
~52,000 tons per annum
Due
FY27
result by 30 May 2027
Said
18 Aug 2026
Concall transcript
StatusOn track
So far: 47,500 MTPA, with around 52,000 tons per annum expected after debottlenecking

In management's words

“our current capacity of 47,500 tons will be going to around approximately to around 52,000 tons per annum.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 11 · 18 Aug 2026

How it was checked

Capacity is currently 47,500 MTPA and the FY27 deadline has not passed. Reaching about 52,000 tons still depends on the remaining debottlenecking. (judged from later company statements)

Evidence (27 Aug 2026): “the enhancement of installed capacity at Solvent Fractionation Plant 2” — Annual report FY26

Evidence (27 Aug 2026): “Our total fractionation capacity at year-end stands at 47,500 MTPA” — Annual report FY26

Condition attached by management: Depends on completion of debottlenecking

How this guidance changed

Stated once in the documents read so far.

Full-year fractionation capacity utilisation Direct
Full-year FY27 utilisation of fractionation capacity is expected to be around 80% to 85%.
Target
80–85%
Due
FY27
result by 30 May 2027
Said
18 Aug 2026
Concall transcript
StatusOn track
So far: around 80% utilisation in Q1FY27

In management's words

“So we expect our to be around 80%, 85% for full year for this year.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 8 · 18 Aug 2026

How it was checked

Q1FY27 utilisation of about 80% sits at the bottom of the 80%-85% full-year range. The FY27 deadline has not passed and Q2 shows higher utilisation of upgraded capacity. (judged from later company statements)

Evidence (18 Aug 2026): “we have done a utilization of around 80% on our capacity for this quarter.” — Concall transcript — Q1FY27 (18 Aug 2026)

Evidence (12 Nov 2026): “increased utilization of the upgraded fractionation capacity.” — Investor presentation — Q2FY27 (12 Nov 2026)

Condition attached by management: Depends on debottlenecking of the second plant around Q3

How this guidance changed

Stated once in the documents read so far.

Drag on consolidated margins from subsidiaries · Subsidiaries (West Africa and Brazil) Hint
Subsidiary losses are expected to reduce as entities scale and eventually turn into contributors, with no timeline given.
Target
to come down
Due
FY27
result by 30 May 2027
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“directionally, their drag on consolidated margins should reduce and over time, turn into a contributor.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 12 · 18 Aug 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: As subsidiaries scale

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Brazil commercial production ramp-up · Brazil Hint
Brazil production is expected to pick up gradually over the next 2 to 4 quarters, with no revenue quantified.
Target
to improve
Due
FY27
result by 30 May 2027
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“slowly, it will pick up maybe in another 2, 3, 4 quarters”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 9 · 18 Aug 2026

How it was checked

Production is not in the stored financial tables.

Condition attached by management: Depends on production shipped from the Indian plant

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

EBITDA margin Direct
Management considers an EBITDA margin in the 25-27% band sustainable.
Target
25–27%
Due
FY27
result by 30 May 2027
Said
27 Aug 2026
Annual report · 3× since 28 Jan 2026
StatusOn track
So far: 25.96% (Q1FY27–Q2FY27)

In management's words

“a margin profile that management considers sustainable in the 25–27% band”
Ashish Saraf, Chairman and Managing Director · Annual report FY26, p. 17 · 27 Aug 2026

How it was checked

Year to date (Q1FY27–Q2FY27) ebitda / operating margin is 26.0% against the guided 25–27% for FY27.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

  1. 28 Jan 2026 — 25–27% for FY27 First stated
    Concall transcript · On track (actual 25.96%)
  2. 16 May 2026 — 25–27% for FY27 Repeated
    Concall transcript · On track (actual 25.96%)
  3. 27 Aug 2026 — 25–27% for FY27 Repeated
    Annual report · On track (actual 25.96%)
2026-27 year of progress Hint
FY27 is expected to be another year of strong progress, supported by higher utilisation of expanded capacity, better product mix and sustained demand.
Target
to improve
Due
FY27
result by 30 May 2027
Said
27 Aug 2026
Annual report
StatusOn track

In management's words

“Looking ahead, 2026-27 is expected to be another year of strong progress, supported by higher utilisation of our expanded capacity base, continued improvement in product mix”
Ashish Saraf, Chairman and Managing Director · Annual report FY26, p. 18 · 27 Aug 2026

How it was checked

Q2FY27 growth was supported by higher utilisation of upgraded capacity and a stronger product mix. The FY27 deadline has not passed, though the claim is qualitative. (judged from later company statements)

Evidence (12 Nov 2026): “increased utilization of the upgraded fractionation capacity.” — Investor presentation — Q2FY27 (12 Nov 2026)

Evidence (12 Nov 2026): “Utilised towards funding of working capital facilities” — Use-of-proceeds report — Q2FY27 (12 Nov 2026)

How this guidance changed

Stated once in the documents read so far.

Share of renewable energy in operations Direct
The company aims to increase the share of renewable energy in its operations by 10% to 15% in upcoming years.
Target
10–15% growth
Due
FY27
result by 30 May 2027
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“Renewable Energy: Increase the share of renewable energy in operations by 10% to 15% in upcoming years”
Annual report FY26, p. 160 · 27 Aug 2026

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Direct procurement from marginalized forest dwellers and women SHGs Direct
The company targets maintaining 100% direct procurement from marginalized forest dwellers and women SHGs in FY 2026-27.
Target
100% growth
Due
FY27
result by 30 May 2027
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“Maintain 100% direct procurement from marginalized forest dwellers and women SHGs in FY 2026-27.”
Annual report FY26, p. 160 · 27 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Zero Lost Time Injuries (LTI) target Direct
The company aims to maintain zero lost time injuries across all locations during FY2026-27.
Target
0 lost time injuries
Due
FY27
result by 30 May 2027
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“efforts to maintain Zero Lost Time Injuries (LTI) target across all company’s location during FY2026-27”
Annual report FY26, p. 160 · 27 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Total waste generation Direct
The company aims to reduce total waste generation by 20% and increase use of recyclable materials, with no timeline stated.
Target
20% growth
Due
FY27
result by 30 May 2027
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“Reduce total waste generation by 20% and increase the use of recyclable materials.”
Annual report FY26, p. 160 · 27 Aug 2026

How it was checked

Production is not in the stored financial tables.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Strategic capital expenditure plan Hint
The company has outlined a strategic capex plan for forward and backward integration, refining and a West Africa processing facility, with no amount or timeline given.
Target
to improve
Due
FY27
result by 30 May 2027
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“the Company has outlined a strategic capital expenditure plan aimed at driving forward and backward integration, expanding refining capabilities, and strengthening global sourcing infrastructure, including the establishment of a processing facility in West Africa.”
Annual report FY26, p. 157 · 27 Aug 2026

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Future capacity expansion Hint
Management says it continues to focus on future capacity expansion, with no quantity or timeline stated.
Target
to improve
Due
FY27
result by 30 May 2027
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“alongside continued focus on future capacity expansion”
Annual report FY26, p. 157 · 27 Aug 2026

How it was checked

Capacity is not in the stored financial tables.

Assumptions made in reading this

  • no time frame was stated; checked on FY27, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Commissioning of solvent fractionation 3 and refinery · India Hint
Solvent fractionation 3 and the refinery are targeted for commissioning around Q3 FY28.
Target
milestone
Due
Q3FY28
result by 14 Feb 2028
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“on the solvent fractionation 3 and our refinery are being targeted for commissioning around FY 28, around Q3 of that financial year.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 5 · 18 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Debt Indirect
Management plans to become completely debt-free within three to four years.
Target
milestone
Due
FY27–FY28
result by 30 May 2028
Said
31 Jul 2024
Concall transcript
StatusOn track
So far: Prepaid FY26 debt repayment obligations; not yet debt-free

In management's words

“The clear intention of Manorama is to be 100% debt-free. We already have INR 95 crores of fixed deposits in the bank also and our plan is to be debt-free in the next three to four years.”
Ashish Saraf, President · Concall transcript — Q1FY25 (Aug 2024), p. 11 · 31 Jul 2024

How it was checked

The deadline of FY28 has not passed. Prepaying FY26 debt obligations is consistent with the debt-free path, but full debt-free status is not shown. (judged from later company statements)

Evidence (27 Mar 2026): “The company has already prepaid the debt repayment obligations for FY26.” — Credit-rating note — CARE Ratings (27 Mar 2026)

Assumptions made in reading this

  • horizon counted from FY24 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Commencement of production capacity Indirect
All four new production capacities are to be commissioned approximately by FY28, in phases.
Target
milestone
Due
by FY28
result by 30 May 2028
Said
28 Jan 2026
Concall transcript
StatusPending

In management's words

“we intend to commence all our production capacity approximately by the financial year FY'28.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 18 · 28 Jan 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Revenue growth from existing and debottlenecked capacity Indirect
About 40-45% growth is still available from 30% new capacity and 15% existing headroom over the next one to two years.
Target
40–45% growth
Due
FY27–FY28
result by 30 May 2028
Said
28 Jan 2026
Concall transcript
StatusPending

In management's words

“So almost 40% to 45% growth is still there to be done in the next 1 or 2 years.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 19 · 28 Jan 2026

How it was checked

Capacity is not in the stored financial tables.

Assumptions made in reading this

  • horizon counted from FY26 (statement made in its last quarter)

How this guidance changed

Stated once in the documents read so far.

Project commissioning Hint
All the capex projects are targeted to be commissioned by FY28, over a two-to-three-year window.
Target
milestone
Due
by FY28
result by 30 May 2028
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“All our projects are targeted to be commissioned by the financial year 128, in that particular way.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 8 · 16 May 2026

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Phased implementation.

How this guidance changed

Stated once in the documents read so far.

Cash conversion cycle and working capital days Hint
Management aims to maintain working capital days and inventory days reported in FY26 going forward.
Target
to hold or improve
Due
FY27–FY28
result by 30 May 2028
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“we remain confident of maintaining this working capital days and inventory days which we have reported this quarter.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 6 · 16 May 2026

Condition attached by management: Subject to quarterly updates on headwinds.

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Target commissioning for the major projects Indirect
Management targets FY28 commissioning for the major projects in the growth plan.
Target
milestone
Due
FY28
result by 30 May 2028
Said
13 Aug 2026
Investor presentation
StatusPending

In management's words

“FY28 target commissioning for the major projects”

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

~₹460 crore phased capex programme Direct
Phased capex programme of about Rs 460 crore is targeted for commissioning by 2027-28.
Target
~₹460 Cr
Due
by FY28
result by 30 May 2028
Said
27 Aug 2026
Annual report · 4× since 28 Jan 2026
StatusPending

In management's words

“Our ~₹460 crore phased capex programme, targeted for commissioning by 2027-28, is designed to do exactly that.”
Ashish Saraf, Chairman and Managing Director · Annual report FY26, p. 17 · 27 Aug 2026

What it implies in numbers

Reaching ₹460 Cr by FY28 from ₹59 Cr (FY26) needs about 179.2% growth a year.

How it was checked

Due with FY28 results; nothing reported since the statement yet.

How this guidance changed

  1. 28 Jan 2026 — ₹460 Cr for FY28–FY29 First stated
    Concall transcript · Pending
  2. 27 Mar 2026 — ~₹460 Cr for FY28–FY29 Repeated
    Credit-rating note (the rating agency's words) · Pending
  3. 16 May 2026 — ~₹460 Cr for FY28–FY29 Repeated
    Concall transcript · Pending
  4. 27 Aug 2026 — ~₹460 Cr for by FY28 Deadline brought forward
    Annual report · Pending
A new Solvent Fractionation facility (SF3) · India Direct
A new SF3 solvent fractionation facility of 75,000 MTPA is planned in India as part of the expansion programme.
Target
75,000 MTPA
Due
by FY28
result by 30 May 2028
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“A new Solvent Fractionation facility (SF3) — 75,000 MTPA”
Ashish Saraf, Chairman and Managing Director · Annual report FY26, p. 17 · 27 Aug 2026

How it was checked

Capacity is not in the stored financial tables.

Condition attached by management: Part of the ~₹460 crore programme

How this guidance changed

Stated once in the documents read so far.

A new Shea nut and Mango kernel processing facility · Burkina Faso Direct
A new shea nut and mango kernel processing facility of about 90,000 MTPA is planned in Burkina Faso.
Target
~90,000 MTPA
Due
by FY28
result by 30 May 2028
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“A new Shea nut and Mango kernel processing facility — 90,000 MTPA”
Ashish Saraf, Chairman and Managing Director · Annual report FY26, p. 17 · 27 Aug 2026

How it was checked

Capacity is not in the stored financial tables.

Condition attached by management: Supported by MoU with the Government of Burkina Faso; part of the ~₹460 crore programme

How this guidance changed

Stated once in the documents read so far.

Capex funding source Hint
Management intends to fund the capex mainly from internal accruals, with external financing considered only if necessary.
Target
milestone
Due
FY28–FY29
result by 30 May 2029
Said
28 Jan 2026
Concall transcript
StatusOn track
So far: Rs 52 crore deployed, funded entirely from internal accruals

In management's words

“we intend to do all through our internal accruals.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 7 · 28 Jan 2026

How it was checked

The FY29 deadline has not passed, and spend to date is reported as funded entirely from internal accruals. (judged from later company statements)

Evidence (27 Aug 2026): “As of May 2026, ₹52 crore had already been deployed, funded entirely from internal accruals” — Annual report FY26

Evidence (16 May 2026): “we already have spent around INR 52 crores out of which INR 16 crores is the work in progress towards capex investment.” — Concall transcript — Q4FY26 (16 May 2026)

Condition attached by management: External financing may be considered selectively if necessary.

Assumptions made in reading this

  • horizon counted from FY26 (statement made in its last quarter)

How this guidance changed

Stated once in the documents read so far.

Payback period (Burkina Faso plant) · Burkina Faso Direct
Management expects the Burkina Faso plant to pay back in around 3 years once operational.
Target
~3 years
Due
by FY29
result by 30 May 2029
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“we see a payback period, which should be around 3 years once the plant is operational in Burkina Faso.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 8 · 18 Aug 2026

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Once the Burkina Faso plant is operational

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Operating leverage Hint
Management expects operating leverage to kick in over the next 2 to 3 years as capacity expands, without giving numbers.
Target
to improve
Due
FY28–FY29
result by 30 May 2029
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“we are in a good shape and operating leverage should come into the picture.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 17 · 18 Aug 2026

Condition attached by management: Management declined to quantify

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Vision: trusted global supplier and preferred partner Hint
Over the next five years, management aims to establish Manorama as a trusted global supplier in every country and preferred partner to leading chocolate and cosmetic brands.
Target
milestone
Due
by FY30
result by 30 May 2030
Said
6 Aug 2025
Annual report
StatusPending

In management's words

“Over the next five years, our vision is to firmly establish Manorama as a trusted global supplier in every country and a preferred partner for the world's leading chocolate and cosmetic brands”
Ashish Saraf, Chairman and Managing Director · Annual report FY25, p. 26 · 6 Aug 2025

How it was checked

Milestone guidance is checked against later documents.

Assumptions made in reading this

  • horizon counted from FY25 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Growth visibility Hint
Management sees growth visibility for 4 to 5 years from current and planned capex.
Target
to improve
Due
FY30–FY31
result by 30 May 2031
Said
28 Jan 2026
Concall transcript
StatusPending

In management's words

“So overall, we have a plan and visibility with this capex for the next 4 to 5 years of growth.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 7 · 28 Jan 2026

Assumptions made in reading this

  • horizon counted from FY26 (statement made in its last quarter)

How this guidance changed

Stated once in the documents read so far.

EBITDA margin trajectory Hint
Management expects margins to improve over the medium and longer term from forward and backward integration projects.
Target
to improve
Due
FY29–FY31
result by 30 May 2031
Said
28 Jan 2026
Concall transcript
StatusPending

In management's words

“we are in the trajectory to improve over the medium term and in the longer term because there are multi-level strategies.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 11 · 28 Jan 2026

Condition attached by management: Depends on the new forward and backward integration projects.

Assumptions made in reading this

  • horizon counted from FY26 (statement made in its last quarter)
  • 'medium term' read as 3 to 5 years

How this guidance changed

Stated once in the documents read so far.

Good, steady, healthy growth over 3 to 5 years Indirect
New capex is expected to support steady, healthy growth over the 3 to 5 year vision through FY30-31.
Target
to improve
Due
FY29–FY31
result by 30 May 2031
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“But we are very much positive that our new investments in terms of our proposed capex plan should give us a good, steady, healthy growth for our near term vision for our 3 to 5 years for FY 30, 31, we should be there.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 16 · 18 Aug 2026

How it was checked

Other is not in the stored financial tables.

Condition attached by management: Depends on the proposed capex plan

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)

How this guidance changed

Stated once in the documents read so far.

Long-term growth prospects Hint
The Chairman says management remains confident in the company's long-term growth prospects.
Target
to improve
Due
FY31–FY33
result by 30 May 2033
Said
13 Aug 2026
Investor presentation
StatusPending

In management's words

“we remain confident in the long-term growth prospects of our business”
Ashish Saraf, Chairman and Managing Director · Investor presentation — Q1FY27 (13 Aug 2026), p. 23 · 13 Aug 2026

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • horizon counted from FY26 (last completed year at the statement date)
  • 'long term' read as 5 to 7 years

How this guidance changed

Stated once in the documents read so far.

Peak revenue from new expansion · new expansion Direct
At peak utilisation, the new expansion is expected to generate revenue of INR 600-800 crore, at an asset turnover of 6 to 8.
Target
₹600 Cr – ₹800 Cr
Due
Not specified
Said
31 Jul 2024
Concall transcript
StatusPending

In management's words

“At peak utilization, the new expansion should generate a revenue which is close to INR600 crores to INR800 crores on an asset turnover ratio of ranges between 6 to 8.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q1FY25 (Aug 2024), p. 9 · 31 Jul 2024

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: At peak utilisation and today's pricing.

How this guidance changed

Stated once in the documents read so far.

Project pipeline Hint
Management has a couple of further projects in the pipeline, subject to feasibility and board approval.
Target
milestone
Due
Not specified
Said
31 Jul 2024
Concall transcript
StatusPending

In management's words

“And there are a couple of projects in pipeline which companies preparing the plan and working on the feasibility and details”
Ashish Saraf, President · Concall transcript — Q1FY25 (Aug 2024), p. 11 · 31 Jul 2024

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Subject to feasibility studies and board approval.

How this guidance changed

Stated once in the documents read so far.

Capex plan Hint
Management will share the capex plan and detailed financials via exchange filings after the Board approves it.
Target
milestone
Due
Not specified
Said
28 Apr 2025
Concall transcript
StatusPending

In management's words

“We will share a comprehensive report on these projects detailed financial plan with our esteemed shareholders through exchange filings once our management Board approves”
Ashish Saraf, Chairman and Managing Director · Concall transcript — Q4FY25 (May 2025), p. 4 · 28 Apr 2025

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Board approval of the capex plan

How this guidance changed

Stated once in the documents read so far.

Transition to renewable energy Hint
Management intends to transition to renewable energy sources such as wind, water and solar power in the future.
Target
milestone
Due
Not specified
Said
6 Aug 2025
Annual report
StatusPending

In management's words

“Transition to renewable energy sources such as wind, water, and solar power in the future.”
Annual report FY25, p. 131 · 6 Aug 2025

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

New ventures in Africa and Latin America · Africa and Latin America Hint
New ventures in Africa and Latin America are expected to deepen the company's global presence.
Target
milestone
Due
Not specified
Said
17 Oct 2025
Concall presentation
StatusPending

In management's words

“new ventures in Africa and Latin America will deepen the Company’s global presence.”
Ashish Saraf, Chairman and Managing Director · Concall presentation — Q2FY26 (Oct 2025), p. 6 · 17 Oct 2025

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

New factory in Burkina Faso · Burkina Faso Hint
An MoU has been signed with the Burkina Faso government for setting up a new shea and mango kernel processing factory.
Target
milestone
Due
Not specified
Said
17 Oct 2025
Concall presentation
StatusPending
So far: about 10 hectares of land acquired in Burkina Faso; regulatory approvals pending

In management's words

“MoU Signed with the Burkina Faso’s Government for setting up a new factory”

How it was checked

Land has been acquired for the facility, but regulatory approvals are pending, so the factory is progressing without being completed. (judged from later company statements)

Evidence (18 Aug 2026): “we acquired approximately 10 hectares, 24 acres of land in Burkina Faso for a shea nut and mango nut processing facility” — Concall transcript — Q1FY27 (18 Aug 2026)

Condition attached by management: Through proposed wholly owned subsidiary Manorama Burkina Industries SA.

How this guidance changed

Stated once in the documents read so far.

Total capital expenditure · other project (not the 52,000 MT upgrade) Direct
Total capex for the additional projects is estimated at about INR 450 crore, with funding mix still being finalised.
Target
~₹450 Cr
Due
Not specified
Said
22 Oct 2025
Concall transcript
StatusPending

In management's words

“the total capital expenditure is estimated at approximately INR 450 crores.”
Ekta Soni, AVP Investor Relations · Concall transcript — Q2FY26 (22 Oct 2025), p. 7 · 22 Oct 2025

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Funding structure (internal accruals, debt, equity) yet to be finalised; project-wise breakup pending approvals

How this guidance changed

Stated once in the documents read so far.

Gross margin (GP margin) Direct
Gross margin is expected to stay within a 45-50% range, which management asks analysts to use in models.
Target
45–50%
Due
Not specified
Said
28 Jan 2026
Concall transcript
StatusPending

In management's words

“But the gross margins are in the range bound of 45% to 50%.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 6 · 28 Jan 2026

How it was checked

Gross margin is not in the stored financial tables.

Condition attached by management: Variation driven by freight costs and by-product realisation.

How this guidance changed

Stated once in the documents read so far.

Asset turnover · forward integration projects Direct
Asset turnover of more than 5x is targeted on the forward integration investments.
Target
≥ 5x
Due
Not specified
Said
28 Jan 2026
Concall transcript
StatusPending

In management's words

“we are targeting an asset turnover of more than five with our investments.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 8 · 28 Jan 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Capex attributable to forward integration projects · forward integration projects Direct
About INR 300-330 crores of the INR 450 crore capex plan goes to the forward integration projects.
Target
₹300 Cr – ₹330 Cr
Due
Not specified
Said
28 Jan 2026
Concall transcript
StatusPending

In management's words

“approximately INR 300 crores to INR 330 crores would be attributed to this forward integration projects”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 8 · 28 Jan 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

Condition attached by management: Management cited INR 450 crores as the total plan in this answer, versus INR 460 crores stated earlier.

How this guidance changed

Stated once in the documents read so far.

Working capital for new projects · forward integration projects Direct
Working capital need for the new forward integration projects is about 1-2 months of cycle, much lower than the existing business.
Target
1–2 months
Due
Not specified
Said
28 Jan 2026
Concall transcript
StatusPending

In management's words

“Yes, 1 to 2 months.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 8 · 28 Jan 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Forward integration refining capacity · Raipur forward integration - refining Indirect
Planned forward integration at Raipur includes 90,000 MTPA refining capacity, with no completion date stated.
Target
90,000 MTPA
Due
Not specified
Said
27 Mar 2026
Credit-rating note (the rating agency's words)
StatusPending

In management's words

“forward integration facilities (90,000 MTPA refining capacity, 75,000 MTPA fractionation capacity and 75,000 MTPA CBE capacity) for value-added products at its Raipur location”
CARE Ratings, rating agency · Credit-rating note — CARE Ratings (27 Mar 2026), p. 3 · 27 Mar 2026

How it was checked

Capacity is not in the stored financial tables.

Assumptions made in reading this

  • reported by CARE Ratings in its rating note, not stated by management directly

How this guidance changed

Stated once in the documents read so far.

Forward integration fractionation capacity · Raipur forward integration - fractionation Indirect
Planned forward integration at Raipur includes 75,000 MTPA fractionation capacity, with no completion date stated.
Target
75,000 MTPA
Due
Not specified
Said
27 Mar 2026
Credit-rating note (the rating agency's words)
StatusPending

In management's words

“forward integration facilities (90,000 MTPA refining capacity, 75,000 MTPA fractionation capacity and 75,000 MTPA CBE capacity) for value-added products at its Raipur location”
CARE Ratings, rating agency · Credit-rating note — CARE Ratings (27 Mar 2026), p. 3 · 27 Mar 2026

How it was checked

Capacity is not in the stored financial tables.

Assumptions made in reading this

  • reported by CARE Ratings in its rating note, not stated by management directly

How this guidance changed

Stated once in the documents read so far.

Forward integration CBE capacity · Raipur forward integration - CBE Indirect
Planned forward integration at Raipur includes 75,000 MTPA CBE capacity, with no completion date stated.
Target
75,000 MTPA
Due
Not specified
Said
27 Mar 2026
Credit-rating note (the rating agency's words)
StatusPending

In management's words

“forward integration facilities (90,000 MTPA refining capacity, 75,000 MTPA fractionation capacity and 75,000 MTPA CBE capacity) for value-added products at its Raipur location”
CARE Ratings, rating agency · Credit-rating note — CARE Ratings (27 Mar 2026), p. 3 · 27 Mar 2026

How it was checked

Capacity is not in the stored financial tables.

Assumptions made in reading this

  • reported by CARE Ratings in its rating note, not stated by management directly

How this guidance changed

Stated once in the documents read so far.

Backward integration shea nut processing factory · Burkina Faso backward integration Indirect
Planned backward integration in Burkina Faso includes a 90,000 MTPA shea nut processing factory, via new subsidiary Taang Kaam Industries SA, with no completion date stated.
Target
90,000 MTPA
Due
Not specified
Said
27 Mar 2026
Credit-rating note (the rating agency's words)
StatusPending

In management's words

“backward integration project (90,000 MTPA shea nut processing factory) in Burkina Faso, West Africa.”
CARE Ratings, rating agency · Credit-rating note — CARE Ratings (27 Mar 2026), p. 3 · 27 Mar 2026

How it was checked

Capacity is not in the stored financial tables.

Assumptions made in reading this

  • reported by CARE Ratings in its rating note, not stated by management directly

How this guidance changed

Stated once in the documents read so far.

Minimum liquidity Indirect
Management states it will maintain minimum liquidity of ₹100 crore as a policy.
Target
≥ ₹100 Cr
Due
Not specified
Said
27 Mar 2026
Credit-rating note (the rating agency's words)
StatusPending

In management's words

“As enunciated by the management, the company will maintain minimum liquidity of ₹100 crore as a policy providing additional comfort.”
CARE Ratings, rating agency · Credit-rating note — CARE Ratings (27 Mar 2026), p. 3 · 27 Mar 2026

How it was checked

Other is not in the stored financial tables.

Assumptions made in reading this

  • reported by CARE Ratings in its rating note, not stated by management directly

How this guidance changed

Stated once in the documents read so far.

Capex for Burkina Faso backward integration project · Burkina Faso backward integration project Direct
Capex for the Burkina Faso backward integration project is envisaged at around INR 120 crore.
Target
~₹120 Cr
Due
Not specified
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“we are envisaging these cxpenses or capex amount of around INR 120 odd crores towards our Burkina Faso project”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 5 · 16 May 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Fractionation capacity after debottlenecking · Solvent fractionation Direct
Debottlenecking of 40,000 tons is expected to take capacity to 52,000 tons per annum.
Target
52,000 metric tons per annum
Due
Not specified
Said
16 May 2026
Concall transcript
StatusPending
So far: 47,500 MTPA, including 7,500 MTPA added by debottlenecking

In management's words

“We have said that we have debottlenecking capacity on 40,000 tons, which will take our capacity to 52,000 tons per annum.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 9 · 16 May 2026

How it was checked

Capacity has risen to 47,500 MTPA with a further 4,500 tons of debottlenecking still to come, so the 52,000 target is not yet reached. No deadline is stated. (judged from later company statements)

Evidence (13 Aug 2026): “47,500 MTPA (Includes 25,000 MTPA commercialized in July 2025, plus 7,500 MTPA via debottlenecking in Mar 2026)” — Investor presentation — Q1FY27 (13 Aug 2026)

Evidence (27 Aug 2026): “Our total fractionation capacity at year-end stands at 47,500 MTPA” — Annual report FY26

Evidence (18 Aug 2026): “we already have done a portion of our additional capacity of 7,500, which is already have been operationalized.” — Concall transcript — Q1FY27 (18 Aug 2026)

How this guidance changed

Stated once in the documents read so far.

Asset turn on forward integration project · Forward integration project (CBE, solvent fractionation 3, refinery) Direct
Management expects asset turn of more than 6x on the forward integration project, which is around INR 330-340 crore of total capex.
Target
≥ 6x
Due
Not specified
Said
16 May 2026
Concall transcript
StatusPending

In management's words

“we are expecting more than 6x of asset turn on our forward integration project, which is around INR 330-340 Crores of the tofal capex amount.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q4FY26 (16 May 2026), p. 8 · 16 May 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Fractionation Plant-3 Direct
Management plans to add a 75,000 TPA Fractionation Plant-3, with no timeframe stated.
Target
75,000 TPA
Due
Not specified
Said
13 Aug 2026
Investor presentation
StatusPending

In management's words

“add 75,000 TPA Fractionation Plant-3”

How it was checked

Capacity is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Refining capability Direct
Management plans to add 300 TPD of refining capability, including a planned 90,000 TPA refinery, with no timeframe stated.
Target
300 TPD
Due
Not specified
Said
13 Aug 2026
Investor presentation
StatusPending

In management's words

“Add 300 TPD refining capability, including the planned 90,000 TPA refinery”

How it was checked

Capacity is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Burkina Faso facility capex · Burkina Faso Direct
Burkina Faso facility capex is expected to be around INR 120 to 130 crore.
Target
₹120 Cr – ₹130 Cr
Due
Not specified
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“that Burkina Faso facility will be around INR120 crores, INR 130 odd crores approximately”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 13 · 18 Aug 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Employee cost run rate per quarter Direct
Quarterly employee cost run rate is expected to be around INR 14 to 15 crore going forward.
Target
₹14 Cr – ₹15 Cr
Due
Not specified
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“the run rate, which we can take should be around INR 14 crores to INR 15 crores per quarter going forward.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 9 · 18 Aug 2026

How it was checked

Other is not in the stored financial tables.

How this guidance changed

Stated once in the documents read so far.

Equity dilution Hint
Management does not expect to need another equity dilution in the next quarter or two; additional working capital is to come from bank limits.
Target
milestone
Due
Not specified
Said
18 Aug 2026
Concall transcript
StatusPending

In management's words

“we don't need that equity dilution again in a quarter or 2 for that.”
Ekta Soni, Associate Vice President, Investor Relations · Concall transcript — Q1FY27 (18 Aug 2026), p. 17 · 18 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

Condition attached by management: Working capital funded via existing bankers and sanctioned limits

How this guidance changed

Stated once in the documents read so far.

Asset turnover on the forward-integration project · forward integration project Direct
Management targets asset turnover of more than 6x on the forward-integration project.
Target
≥ 6x
Due
Not specified
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“Management targets an asset turnover of more than 6x on the forward-integration project.”
Ashish Saraf, Chairman and Managing Director · Annual report FY26, p. 17 · 27 Aug 2026

How it was checked

Segment-level guidance cannot be read from company-level numbers.

How this guidance changed

Stated once in the documents read so far.

Solvent Fractionation Plant-I enhancement · Solvent Fractionation Plant-I Hint
Similar debottlenecking enhancements are planned for Solvent Fractionation Plant-I.
Target
milestone
Due
Not specified
Said
27 Aug 2026
Annual report
StatusPending

In management's words

“Similar enhancement initiatives are planned for Solvent Fractionation Plant- I”
Annual report FY26, p. 83 · 27 Aug 2026

How it was checked

Milestone guidance is checked against later documents.

How this guidance changed

Stated once in the documents read so far.

Jabari Bestaan beneficiaries in West Africa · West Africa Direct
The Jabari Bestaan programme is targeted to reach up to 100,000 beneficiaries in shea-growing regions of West Africa.
Target
≤ 100,000 beneficiaries
Due
Not specified
Said
27 Aug 2026
Annual report
StatusPending
So far: approximately 30,000 beneficiaries

In management's words

“with a target of reaching up to 100,000 beneficiaries”
Annual report FY26, p. 51 · 27 Aug 2026

How it was checked

Programme currently reaches about 30,000 beneficiaries against a target of up to 100,000 in West Africa; no deadline was set. (judged from later company statements)

Evidence (12 Nov 2026): “currently impacting approximately 30,000 beneficiaries across its areas of operation” — Investor presentation — Q2FY27 (12 Nov 2026)

How this guidance changed

Stated once in the documents read so far.

Track record · promised vs delivered

Guidance whose deadline has passed, most recent first: how management performed after giving it.

Margins Hint
Management expects to sustain healthy margins going forward, with no numeric margin target given.
Promised
to hold or improve
for FY26
Delivered
up 2.3%
FY26
ResultAchieved
Said
22 Oct 2025
Concall transcript

In management's words

“we remain very confident in the structural strength of the business, of the products, and of course, the model and our ability to sustain the healthy margins.”
Ekta Soni, AVP Investor Relations · Concall transcript — Q2FY26 (22 Oct 2025), p. 6 · 22 Oct 2025

How it was checked

EBITDA / operating margin rose by 2.3 pp in FY26 from FY25 — in line with what management indicated (annual result).

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

  1. 31 Jul 2024 — to improve for FY26 First stated
    Concall transcript · Achieved (actual up 2.3%)
  2. 28 Apr 2025 — to hold or improve for FY26 Raised
    Concall transcript · Achieved (actual up 2.3%)
  3. 6 Aug 2025 — to improve for FY26 Raised
    Annual report · Achieved (actual up 2.3%)
  4. 22 Oct 2025 — to hold or improve for FY26 Raised
    Concall transcript · Achieved (actual up 2.3%)
Combined capacity utilization · fractionation Direct Walked back
Combined fractionation capacity utilisation is projected at about 75-85% for FY26.
Promised
75–85%
for FY26
Delivered
about 85% full-year FY26
ResultAchieved
Said
28 Apr 2025
Concall transcript

In management's words

“Going ahead, the combined capacity utilization for financial year '26 is projected at nearly approximately 75% to 85%.”
Ashish Saraf, Chairman and Managing Director · Concall transcript — Q4FY25 (May 2025), p. 4 · 28 Apr 2025

How it was checked

FY26 fractionation utilisation was about 85%, which is within the 75%-85% combined range projected for FY26. (judged from later company statements)

Evidence (16 May 2026): “For the fractionation output, around 85% stands the utilization on a full year basis.” — Concall transcript — Q4FY26 (16 May 2026)

Evidence (27 Aug 2026): “Existing capacity was running at approximately 85% utilisation on the pre-debottleneck base” — Annual report FY26

How this guidance changed

  1. 31 Jul 2024 — 80–85% for FY26 First stated
    Concall transcript · Achieved (actual about 85% full-year FY26)
  2. 28 Apr 2025 — 75–85% for FY26 Lowered
    Concall transcript · Achieved (actual about 85% full-year FY26)
Revenue guidance Direct
FY26 revenue guidance raised from INR 1,150 crores to INR 1,300 crores.
Promised
₹1,300 Cr
for FY26
Delivered
₹1,367 Cr
FY26
ResultAchieved · beat
Said
28 Jan 2026
Concall transcript

In management's words

“we are excited to announce that we have upwardly revised our financial year '26 revenue guidance from INR 1,150 crores to INR 1,300 crores.”
Ashish Saraf, Chairman & Managing Director · Concall transcript — Q3FY26 (Jan 2026), p. 4 · 28 Jan 2026

What it implies in numbers

Reaching ₹1,300 Cr by FY26 from ₹771 Cr (FY25) needs about 68.6% growth a year.

How it was checked

FY26 actual ₹1,367 Cr — ahead of the guided ₹1,300 Cr (annual result).

How this guidance changed

  1. 28 Apr 2025 — ₹1,050 Cr for FY26 First stated
    Concall transcript · Achieved (actual ₹1,367 Cr)
  2. 6 Aug 2025 — ≥ ₹1,050 Cr for FY26 Repeated
    Annual report · Achieved (actual ₹1,367 Cr)
  3. 22 Oct 2025 — ≥ ₹1,150 Cr for FY26 Raised
    Concall transcript · Achieved (actual ₹1,367 Cr)
  4. 28 Jan 2026 — ₹1,300 Cr for FY26 Raised
    Concall transcript · Achieved (actual ₹1,367 Cr)
Receivable days Direct
Management is looking for receivable days of around 30 in FY26.
Promised
~30 days
for FY26
Delivered
17 days
FY26
ResultAchieved · beat
Said
28 Apr 2025
Concall transcript

In management's words

“So, we are looking for around 30 days receivables for financial year '25-'26.”
Ashok Jain, CFO · Concall transcript — Q4FY25 (May 2025), p. 7 · 28 Apr 2025

How it was checked

FY26 actual 17 days — ahead of the guided ~30 days (reported ratio).

How this guidance changed

Stated once in the documents read so far.

Volume growth Direct
FY26 volume expected to grow about 25-30% year on year.
Promised
25–30% growth
for FY26
Delivered
volume growth around 80%-90% in FY26
ResultAchieved
Said
22 Oct 2025
Concall transcript

In management's words

“So, we expect 85% this year. So, it is the growth of volume. It is around 25%-30%, approx.”
Ekta Soni, AVP Investor Relations · Concall transcript — Q2FY26 (22 Oct 2025), p. 19 · 22 Oct 2025

How it was checked

FY26 volume growth was around 80%-90%, which exceeds the guided 25%-30%. (judged from later company statements)

Evidence (16 May 2026): “Volume growth of this financial year '25, '26, around 80%-90% and 5%-10% is the price growth.” — Concall transcript — Q4FY26 (16 May 2026)

How this guidance changed

  1. 28 Apr 2025 — 25–30% growth for FY26 First stated
    Concall transcript · Achieved (actual volume growth around 80%-90% YoY in FY26)
  2. 22 Oct 2025 — 25–30% growth for FY26 Repeated
    Concall transcript · Achieved (actual volume growth around 80%-90% in FY26)
Price realization growth Direct
About 5-10 percentage points of FY26 top-line growth is expected to come from price realisation.
Promised
5–10% growth
for FY26
Delivered
price growth about 5%-10% in FY26
ResultAchieved
Said
28 Apr 2025
Concall transcript

In management's words

“So largely 25% to 30% should come from the volume growth and the rest 5% to 10% should come from the price realization growth approximately.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q4FY25 (May 2025), p. 10 · 28 Apr 2025

How it was checked

The same concall states price growth of 5%-10%, which matches the guided 5-10 point price contribution. (judged from later company statements)

Evidence (16 May 2026): “Volume growth of this financial year '25, '26, around 80%-90% and 5%-10% is the price growth.” — Concall transcript — Q4FY26 (16 May 2026)

How this guidance changed

Stated once in the documents read so far.

Top line growth Direct
Management says the FY26 revenue guidance implies top-line growth of around 35-40%.
Promised
~35% growth
for FY26
Delivered
77.3% growth
FY26
ResultAchieved · beat
Said
28 Apr 2025
Concall transcript

In management's words

“If you see the guidance which we have given on the top line shows the growth of around 35%, 40%, 36% something.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q4FY25 (May 2025), p. 10 · 28 Apr 2025

What it implies in numbers

35% growth on ₹771 Cr (FY25) implies about ₹1,041 Cr for FY26.

How it was checked

FY26 actual 77.3% — ahead of the guided ~35% (annual result).

How this guidance changed

Stated once in the documents read so far.

Share of CBE in revenue · CBE Hint
Management is focused on increasing the share of CBE in revenue.
Promised
to improve
for FY26
Delivered
CBE about 30% of revenue, up from about 10% two years earlier
ResultAchieved
Said
6 Aug 2025
Annual report

In management's words

“we are focused on increasing the share of CBE in our revenue.”
Annual report FY25, p. 74 · 6 Aug 2025

How it was checked

CBE's share of revenue is reported at about 30%, up from about 10% two years earlier, consistent with an increasing share. (judged from later company statements)

Evidence (16 May 2026): “CBE has contributed around 30% to our top linc.” — Concall transcript — Q4FY26 (16 May 2026)

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

  1. 28 Apr 2025 — to improve for FY26 First stated
    Concall transcript · Partly achieved (actual CBE contributed around 30% of FY26 revenue, up from 27% in FY25)
  2. 6 Aug 2025 — to improve for FY26 Repeated
    Annual report · Achieved (actual CBE about 30% of revenue, up from about 10% two years earlier)
Capacity utilisation Direct
Capacity utilisation expected to reach about 85% in FY26, up from about 63% last year.
Promised
~85%
for FY26
Delivered
about 85% full-year FY26, up from about 63% last year
ResultAchieved
Said
22 Oct 2025
Concall transcript

In management's words

“So, if you see the capacity utilization was around 63% last year. So, we expect 85% this year.”
Ekta Soni, AVP Investor Relations · Concall transcript — Q2FY26 (22 Oct 2025), p. 19 · 22 Oct 2025

How it was checked

FY26 capacity utilisation was about 85% on a full-year basis, matching the ~85% guided for FY26. (judged from later company statements)

Evidence (16 May 2026): “For the fractionation output, around 85% stands the utilization on a full year basis.” — Concall transcript — Q4FY26 (16 May 2026)

Evidence (27 Aug 2026): “Existing capacity was running at approximately 85% utilisation on the pre-debottleneck base” — Annual report FY26

How this guidance changed

  1. 6 Aug 2025 — 75–85% for FY26 First stated
    Annual report · Achieved (actual about 85% utilisation in FY26)
  2. 22 Oct 2025 — ~85% for FY26 Raised
    Concall transcript · Achieved (actual about 85% full-year FY26, up from about 63% last year)
Earnings growth Hint
Management says it is well positioned for earnings growth in the years ahead.
Promised
to improve
for FY26
Delivered
up 104.5%
FY26
ResultAchieved
Said
6 Aug 2025
Annual report

In management's words

“we are well positioned to achieve sustained margin expansion and earnings growth in the years ahead.”
Annual report FY25, p. 74 · 6 Aug 2025

How it was checked

Net profit (PAT) rose by 104.5% in FY26 from FY25 — in line with what management indicated (annual result).

Condition attached by management: Linked to rising capacity utilization, a richer product mix and deeper global partnerships.

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Expanded capacity commissioning · fractionation Direct
The additional 12,000 metric ton capacity is expected to be live from Q4 FY26, after work starts in December.
Promised
milestone
for Q4FY26
Delivered
7,500 MTPA added via debottlenecking in March 2026 versus 12,000 guided
ResultPartly achieved
Said
22 Oct 2025
Concall transcript

In management's words

“So, we will be taking this in December Q3 and maybe from Q4 we can see it.”
Ekta Soni, AVP Investor Relations · Concall transcript — Q2FY26 (22 Oct 2025), p. 16 · 22 Oct 2025

How it was checked

About 7,500 MTPA was added by March 2026, which is part of the 12,000 MTPA guided for Q4FY26. (judged from later company statements)

Evidence (13 Aug 2026): “47,500 MTPA (Includes 25,000 MTPA commercialized in July 2025, plus 7,500 MTPA via debottlenecking in Mar 2026)” — Investor presentation — Q1FY27 (13 Aug 2026)

Evidence (18 Aug 2026): “we already have done a portion of our additional capacity of 7,500, which is already have been operationalized.” — Concall transcript — Q1FY27 (18 Aug 2026)

Evidence (27 Aug 2026): “Our total fractionation capacity at year-end stands at 47,500 MTPA” — Annual report FY26

How this guidance changed

Stated once in the documents read so far.

Working capital management Hint
Management expects further working capital improvement going forward through better cycle and inventory management.
Promised
to come down
for FY26
Delivered
down 4.9%
FY26
ResultAchieved
Said
22 Oct 2025
Concall transcript

In management's words

“So, we see in going forward better working capital management.”
Ashok Jain, CFO · Concall transcript — Q2FY26 (22 Oct 2025), p. 9 · 22 Oct 2025

How it was checked

Working capital days fell by 4.9% in FY26 from FY25 — in line with what management indicated (reported ratio).

Assumptions made in reading this

  • no time frame was stated; checked on FY26, the year ahead at the time

How this guidance changed

Stated once in the documents read so far.

Fractionation capacity · Fractionation Direct
Fractionation output to rise 30% via debottlenecking, reaching 52,000 MTPA by end of FY26.
Promised
~52,000 MTPA
for by FY26
Delivered
Total fractionation capacity 47,500 MTPA at year-end FY26
ResultMissed
Said
28 Jan 2026
Concall presentation

In management's words

“we are increasing the output of our existing fractionation capacity by 30% through debottlenecking, aiming to reach 52,000 metric tonnes per annum (MTPA) by the end of FY26.”
ASHISH SARAF, Chairman and Managing Director · Concall presentation — Q3FY26 (Jan 2026), p. 6 · 28 Jan 2026

How it was checked

The target was about 52,000 MTPA by end FY26, but year-end capacity was 47,500 MTPA, short of target. (judged from later company statements)

Evidence (27 Aug 2026): “Our total fractionation capacity at year-end stands at 47,500 MTPA” — Annual report FY26

Evidence (13 Aug 2026): “47,500 MTPA (Includes 25,000 MTPA commercialized in July 2025, plus 7,500 MTPA via debottlenecking in Mar 2026)” — Investor presentation — Q1FY27 (13 Aug 2026)

How this guidance changed

Stated once in the documents read so far.

Capex in this financial year Direct
Planned capex spend in FY26 is about INR 70-80 crores.
Promised
₹70 Cr – ₹80 Cr
for FY26
Delivered
≈ ₹59 Cr
FY26
ResultMissed
Said
28 Jan 2026
Concall transcript

In management's words

“We plan to invest approximately INR 70 to 80 crores in this financial year to build capex.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 9 · 28 Jan 2026

What it implies in numbers

Reaching ₹70 Cr by FY26 from ₹32 Cr (FY25) needs about 118.8% growth a year.

How it was checked

FY26 actual ₹59 Cr (estimate) — short of the guided ₹70 Cr – ₹80 Cr (change in fixed assets and CWIP plus depreciation).

How this guidance changed

Stated once in the documents read so far.

Installed fractionation capacity increase Direct
Installed fractionation capacity is to increase by 30% by FY26-end through debottlenecking.
Promised
30% growth
for FY26
Delivered
Total fractionation capacity 47,500 MTPA at FY26 year-end
ResultMissed
Said
27 Mar 2026
Credit-rating note (the rating agency's words)

In management's words

“amid increase in installed fractionation capacity by 30% in FY26-end through debottlenecking.”
CARE Ratings, rating agency · Credit-rating note — CARE Ratings (27 Mar 2026), p. 2 · 27 Mar 2026

How it was checked

A 30% increase by FY26-end was targeted, but year-end capacity of 47,500 MTPA is about 19% above the 40,000 base, short of 30%. (judged from later company statements)

Evidence (27 Aug 2026): “Our total fractionation capacity at year-end stands at 47,500 MTPA” — Annual report FY26

Evidence (13 Aug 2026): “47,500 MTPA (Includes 25,000 MTPA commercialized in July 2025, plus 7,500 MTPA via debottlenecking in Mar 2026)” — Investor presentation — Q1FY27 (13 Aug 2026)

Evidence (28 Jan 2026): “It is around 85% capacity utilization for our plant combined.” — Concall transcript — Q3FY26 (Jan 2026)

Condition attached by management: Achieved through debottlenecking.

Assumptions made in reading this

  • reported by CARE Ratings in its rating note, not stated by management directly

How this guidance changed

Stated once in the documents read so far.

Qualified Institutions Placement Indirect
Board approved raising up to ₹500 crore through a QIP in one or more tranches, disclosed to BSE on March 12, 2026.
Promised
≤ ₹500 Cr
for Not specified
Delivered
₹500 crore
ResultAchieved
Said
27 Mar 2026
Credit-rating note (the rating agency's words)

In management's words

“the Board approved the proposal to raise up to ₹500 crore through a Qualified Institutions Placement (QIP) in one or more tranches.”
CARE Ratings, rating agency · Credit-rating note — CARE Ratings (27 Mar 2026), p. 1 · 27 Mar 2026

How it was checked

The QIP of about ₹500 crore was completed and received in Q1FY27, which is within the approved up-to ₹500 crore limit; no deadline was set. (judged from later company statements)

Evidence (18 Aug 2026): “We have raised INR 500 crores for that.” — Concall transcript — Q1FY27 (18 Aug 2026)

Condition attached by management: One or more tranches.

Assumptions made in reading this

  • reported by CARE Ratings in its rating note, not stated by management directly

How this guidance changed

Stated once in the documents read so far.

Working capital cycle Direct
Working capital cycle expected to settle at 90-100 days after new capacity comes online, down from about 120 days.
Promised
90–100 days
for Not specified
Delivered
98 days
FY26
ResultAchieved
Said
28 Jan 2026
Concall transcript

In management's words

“So you can take 90 to 100 days working capital cycle days going forward after this new capacity, it will be reduced around 10, 20 days more.”
Ashok Jain, Director & CFO · Concall transcript — Q3FY26 (Jan 2026), p. 17 · 28 Jan 2026

How it was checked

No deadline was given; reached in FY26.

Condition attached by management: After new capacity is in place.

How this guidance changed

  1. 28 Apr 2025 — 120–140 days for Not specified First stated
    Concall transcript · Achieved (actual 98 days)
  2. 28 Jan 2026 — 90–100 days for Not specified Lowered
    Concall transcript · Achieved (actual 98 days)
Value-added products share of sales Indirect
Value-added products are to rise to about 85-90% of sales going forward, with an intent of 90-95%.
Promised
85–90%
for Not specified
Delivered
₹1,367 Cr
FY26
ResultAchieved · beat
Said
28 Jan 2026
Concall transcript

In management's words

“we intend to do approximately 85%, 90% of our sales with respect to value-added going forward”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q3FY26 (Jan 2026), p. 18 · 28 Jan 2026

How it was checked

No deadline was given; reached in FY26.

How this guidance changed

Stated once in the documents read so far.

Fractionation capacity · fractionation Direct
A planned Q3 FY26 plant modification and maintenance shutdown is expected to expand fractionation capacity from 40,000 to about 52,000 MTPA.
Promised
~52,000 MTPA
for Q3FY26
Delivered
total fractionation capacity 47,500 MTPA at FY26 year-end, versus about 52,000 targeted
ResultMissed
Said
17 Oct 2025
Concall presentation

In management's words

“A scheduled plant modification and maintenance shutdown in Q3 FY26 will enhance plant efficiency as well as lead to expansion in the fractionation capacity from 40,000 to 52,000 MTPA approx. without affecting overall growth plans.”
Ashish Saraf, Chairman and Managing Director · Concall presentation — Q2FY26 (Oct 2025), p. 6 · 17 Oct 2025

How it was checked

Capacity reached 47,500 MTPA via a 7,500 MTPA debottleneck completed in March 2026, short of the 52,000 MTPA target and after the Q3FY26 deadline. (judged from later company statements)

Evidence (27 Aug 2026): “Our total fractionation capacity at year-end stands at 47,500 MTPA” — Annual report FY26

Evidence (13 Aug 2026): “47,500 MTPA (Includes 25,000 MTPA commercialized in July 2025, plus 7,500 MTPA via debottlenecking in Mar 2026)” — Investor presentation — Q1FY27 (13 Aug 2026)

Condition attached by management: Shutdown is scheduled; management says overall growth plans are not affected.

How this guidance changed

Stated once in the documents read so far.

Fractionation capacity · fractionation Direct
Fractionation capacity to be expanded from about 40,000 to 52,000 metric tons annually via a Q3 shutdown, with no impact on revenue guidance.
Promised
~52,000 metric tons per annum
for Q3FY26
Delivered
total fractionation capacity 47,500 MTPA at year-end FY26
ResultMissed
Said
22 Oct 2025
Concall transcript

In management's words

“to enhance efficiency and facilitate expansion in our current fractionation capacity from 40,000 metric tons annually to 52,000 metric tons annually approximately.”
Ashish Saraf, Chairman and Managing Director · Concall transcript — Q2FY26 (22 Oct 2025), p. 4 · 22 Oct 2025

How it was checked

Capacity reached 47,500 MTPA, short of the ~52,000 MTPA guided by Q3FY26, and the 7,500 MTPA addition came only in March 2026. (judged from later company statements)

Evidence (27 Aug 2026): “Our total fractionation capacity at year-end stands at 47,500 MTPA” — Annual report FY26

Evidence (13 Aug 2026): “47,500 MTPA (Includes 25,000 MTPA commercialized in July 2025, plus 7,500 MTPA via debottlenecking in Mar 2026)” — Investor presentation — Q1FY27 (13 Aug 2026)

How this guidance changed

Stated once in the documents read so far.

Guidance Direct
Revenue guidance for FY25 is raised to INR 750 crore plus, attributed to the expanded fractionation capacity.
Promised
≥ ₹750 Cr
for FY25
Delivered
₹771 Cr
FY25
ResultAchieved
Said
31 Jul 2024
Concall transcript

In management's words

“Thus, we are upgrading our guidance to INR 750 crores plus for the fiscal year 2025 along with an increase in profitability”
Ashish Saraf, President · Concall transcript — Q1FY25 (Aug 2024), p. 5 · 31 Jul 2024

What it implies in numbers

Reaching ₹750 Cr by FY25 from ₹457 Cr (FY24) needs about 64.1% growth a year.

How it was checked

FY25 actual ₹771 Cr — met the guided ≥ ₹750 Cr (annual result).

How this guidance changed

Stated once in the documents read so far — management described it as “raised” against earlier guidance.

EBITDA margin (blended) Direct
EBITDA margin is expected to be maintained in a 20% to 22% range in FY25, with upside possible.
Promised
20–22%
for FY25
Delivered
24.12%
FY25
ResultAchieved · beat
Said
31 Jul 2024
Concall transcript

In management's words

“the company will try to maintain this margin in the range of 20% to 22% in the coming financial year and it could of course can surpass more”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q1FY25 (Aug 2024), p. 8 · 31 Jul 2024

How it was checked

FY25 actual 24.12% — ahead of the guided 20–22% (annual result).

Condition attached by management: Management describes this as guidance on a blended level and says it will update as quarters progress.

How this guidance changed

Stated once in the documents read so far.

Capacity utilisation (existing plant and new capacity) · fractionation Direct
Overall fractionation capacity utilisation is expected at 50% to 70% in FY25.
Promised
50–70%
for FY25
Delivered
about 62.5% average for full-year FY25
ResultAchieved
Said
31 Jul 2024
Concall transcript

In management's words

“we expect our capacity utilization to be around in the range of 50%-70% in the financial year FY '25.”
Ekta Soni, AVP, Investor Relations · Concall transcript — Q1FY25 (Aug 2024), p. 6 · 31 Jul 2024

How it was checked

Combined fractionation utilisation averaged about 62.5% for FY25, which is inside the 50%-70% guided range. (judged from later company statements)

Evidence (28 Apr 2025): “Combined capacity utilization stood at approximately 62.5% for full year '25.” — Concall transcript — Q4FY25 (May 2025)

Condition attached by management: Existing plant expected at about 100%; new 40,000 MT total capacity.

How this guidance changed

Stated once in the documents read so far.

Key points from each document

The main takeaways, newest document first.

Use-of-proceeds report — Q2FY27 (12 Nov 2026) · 12 Nov 2026
  • Rs 33,539.81 lakh of QIP net proceeds remained unutilised at 30 September 2026.
  • The company raised Rs 500 crore through a QIP with equity allotted on 2 July 2026, and no deviation from the stated objects was reported for the quarter.
  • Of the Rs 50,000 lakh QIP proceeds, Rs 15,000 lakh had been used for working capital facilities by 30 September 2026, with no utilisation during the quarter.
  • Issue expenses of Rs 1,460.19 lakh were fully utilised, leaving the QIP's original Rs 40,000 lakh working capital and Rs 8,539.81 lakh general corporate allocations unchanged.
Investor presentation — Q2FY27 (12 Nov 2026) · 12 Nov 2026
  • Q2FY27 consolidated revenue grew 41.9% YoY to Rs 4,589 million and PAT rose 51.8%, with H1FY27 revenue up 40.8%.
  • Gross margin fell 577 bps YoY to 42.5% in Q2FY27, and EBITDA margin fell 144 bps to 25.8%, even as revenue grew strongly.
  • The company proposes capex over the next 2-3 years, with target commissioning of major projects in FY28, subject to Board-recommended modifications.
  • Exports were 61% of H1FY27 revenue, with the domestic-to-export mix at 39:61.
  • Management says the focus is on turning expanded capacity into sustainable growth and deepening global customer relationships.
  • Consolidated current borrowings rose to Rs 4,863 million at 30 Sep 2026 from Rs 3,218 million at March 2026, while cash and bank balances rose to Rs 4,690 million.
  • A leadership transition is underway, which management says strengthens governance and creates a stronger foundation to execute growth plans.
  • The company is planning a 15 MW captive solar power plant as part of its renewable energy and decarbonisation strategy.
  • Other income was Rs 96.9 million in Q2FY27 against Rs 0.8 million a year earlier, and it supported PBT growth.
Annual report FY26 · 27 Aug 2026
  • FY26 revenue from operations rose 76.1% to Rs 1,357.7 crore and PAT more than doubled to Rs 233.2 crore, a record year.
  • A phased capex programme of about Rs 460 crore is targeted for commissioning by 2027-28, adding fractionation, refinery, CBA and Burkina Faso shea and mango processing capacity.
  • Management says FY26 revenue beat the Rs 1,050 crore target it set a year earlier by about 29%, which is the main evidence of delivery against guidance.
  • EBITDA margin expanded 230 bps to 27.1%, and management describes a 25-27% band as sustainable.
  • CBE contribution to revenue rose from about 10% two years ago to nearly 30%, which management says reflects structural rather than cyclical growth.
  • Shareholders approved a QIP of up to INR 500 crore, and the Board later approved allotment of 34,01,360 equity shares to QIBs aggregating INR 500 crore.
  • Management has outlined a strategic capex plan for forward and backward integration, refining capacity and a processing facility in West Africa, without disclosing amounts.
  • Revenue from operations rose to Rs 1,35,769.73 lacs in FY26 from Rs 77,084.19 lacs in FY25, with profit before tax at Rs 31,595.90 lacs.
  • Net debt fell to Rs 26,410.52 lacs from Rs 38,611.64 lacs, and the net debt to equity ratio improved to 0.38 from 0.84.
  • Revenue from operations rose sharply to Rs 136,673.89 lacs in FY26 from Rs 77,084.19 lacs in FY25.
  • Profit for the period increased to Rs 22,491.80 lacs in FY26 from Rs 10,978.95 lacs in FY25.
  • Net debt to equity ratio fell to 0.38 at March 2026 from 0.84 a year earlier, as net debt reduced and equity increased.
  • Short-term working capital bank borrowings reduced to Rs 31,245.35 lacs from Rs 42,659.67 lacs.
  • Net cash from operating activities turned strongly positive at Rs 25,041.77 lacs, against a cash outflow of Rs 5,689.74 lacs in FY25.
Concall transcript — Q1FY27 (18 Aug 2026) · 18 Aug 2026
  • Management guided FY27 capex of about INR 225 to 250 crore, with about INR 70 crore spent to date and about INR 220 crore more planned this financial year.
  • Q1FY27 revenue rose 39.5% year-on-year to INR 404 crores, which management attributed to a richer value-added mix and higher traction from expanded fractionation capacity.
  • Fractionation capacity is set to rise from 47,500 tons to about 52,000 tons per annum, with the remaining 4,500 tons of debottlenecking targeted around Q3 FY27.
  • The proposed INR 460 crore capex plan covers Indian solvent fractionation and refinery projects, plus a Burkina Faso facility of about INR 120 to 130 crore, targeted for commissioning around Q3 FY28.
  • Management said underlying margins should hold broadly stable, but declined to give numeric margin or EBITDA guidance and flagged that quarterly movements depend on mix and one-offs.
  • Management guided full-year FY27 utilisation of about 80% to 85%, while telling shareholders to plan on 80%, which creates ambiguity against the 85-90% figure in the investor presentation.
  • After the INR 500 crore QIP, management said no further equity dilution is planned, with working capital for the new capacity to come from existing bank limits led by SBI.
  • Other income of about INR 16 crore was mainly forex gain (INR 13 crore), so part of the quarter's profit uplift is non-operating and may not recur.
  • Management acknowledged that African export bans and freight or geopolitical disruptions can affect the company indirectly, although it said sourcing is diversified across many African countries.
  • The Brazil partnership began trial production, with management expecting gradual ramp-up over the next 2 to 4 quarters and declining to quantify its revenue contribution yet.
  • Management expects loss-making African and Brazil subsidiaries to reduce their drag on consolidated margins over time as they scale, though they remain in build-out phase.
  • Pricing on value-added products was described as largely stable, in line with the company's costing model that passes through raw-material inflation.
Investor presentation — Q1FY27 (13 Aug 2026) · 13 Aug 2026
  • Consolidated revenue grew 39.5% YoY in Q1FY27, and the company passed INR 4,000 million in a quarter for the first time.
  • Management proposes INR 460 crore of capex over the next 2-3 years, but this is subject to Board recommended modifications.
  • Fractionation capacity is 47,500 MTPA after 7,500 MTPA of debottlenecking in March 2026, with a plan to reach 52,000 TPA in FY27.
  • Consolidated EBITDA margin rose 49 bps YoY to 26.3% in Q1FY27, and PAT margin expanded to 19.5%.
  • The company completed a INR 500 crore QIP in July 2026 at INR 1,470 per share, which it says strengthens the balance sheet ahead of the FY28 capex cycle.
  • A Burkina Faso Shea processing site has been acquired, but regulatory clearances are still pending.
  • The Chairman says the company remains confident in its long-term growth prospects, without quantifying a target.
  • The Brazil partnership with Dekel achieved first commercial production of CBE and specialty fats, and trial samples have gone to customers.
Board Meeting Outcome for Outcome Of Board Meeting To Close QIP Issue. · 2 Jul 2026
  • Board approved closure of the QIP equity issue on July 2, 2026, after receiving applications and escrow funds from eligible QIBs.
  • Board allotted 34,01,360 equity shares to eligible QIBs at an issue price of Rs 1,470 per share.
  • The issue price is stated as a discount to a floor price of Rs 1,547.18 per share, calculated under SEBI ICDR Regulation 176(1).
  • Board approved and adopted the Placement Document dated July 2, 2026 for the QIP.
  • Board approved the allocation confirmation note to be sent to eligible QIBs; the Issue opened on June 29, 2026.
Disclosure under Regulation 30A of LODR · 2 Jul 2026
  • Board approved issue and allotment of 34,01,360 equity shares to eligible QIBs under a Qualified Institutions Placement at Rs 1,470 per share.
  • The QIP is stated to aggregate Rs 50,000 lakhs (Rs 500 crore), with the issue price at a 4.99% discount to the floor price.
  • Paid-up equity share capital rises from Rs 11,94,17,060 to Rs 12,62,19,780 after allotment, taking shares outstanding to 6,31,09,890.
  • Discount to floor price is Rs 77.18 per share, equal to 4.99% of the floor price.
  • Largest allottees are AIF and FPI investors, with VQ FasterCap Fund and ValueQuest India each taking more than 5% of the issue.
  • The issue opened on June 29, 2026 and closed on July 2, 2026, with the insider trading window closed for the purpose of the issue.
  • The shareholding pattern before and after the issue will be filed with the listing application under Regulation 31.
Concall transcript — Q4FY26 (16 May 2026) · 16 May 2026
  • Management plans approximately INR 460 crore of capex over two to three years for new fractionation, cocoa butter alternative, refining and Burkina Faso capacity, to be phased.
  • Standalone FY26 revenue was reported at INR 1,357 crore, up 76.1% year-on-year, driven by volume growth and improved product mix.
  • Management reiterated a sustainable EBITDA margin range of 25%-27% and said it expects to maintain margins, with quarterly updates on any adverse change.
  • Consolidated margins were diluted by start-up costs of nine newly formed subsidiaries, which management calls largely one-time or transitional; consolidated EBITDA margin was about 26% versus 27% standalone.
  • Working capital cycle improved to about 125 days in FY26 from 151 days, and operating cash flow was INR 259 crore, a highlight management wants to sustain.
  • Management expects FY27 to be a strong growth year, led mainly by volume from debottlenecking and some price realisation of 5%-10%.
  • Foreign exchange losses: cumulative mark-to-market provision of INR 23.3 crore in FY26, with about 60% of net forex exposure hedged.
  • Capex is being funded mainly from internal accruals; a QIP enabling resolution of up to INR 500 crore is approved but no transaction has been finalised.
  • The company said a revised financial statement file was uploaded inadvertently by mistake and was purely corrective.
  • Management sees only indirect near-term effects from geopolitical tensions, mainly freight and energy costs; Middle East exposure is 2%-3% of revenue.
Credit-rating note — CARE Ratings (27 Mar 2026) · 27 Mar 2026
  • Company plans about ₹460 crore of capex over the next 2–3 years, phased, covering Raipur forward integration and a Burkina Faso shea processing project.
  • Board approved raising up to ₹500 crore through a Qualified Institutions Placement in one or more tranches, to improve financial flexibility.
  • Installed fractionation capacity is to rise 30% by FY26-end through debottlenecking, with higher plant utilisation expected to support scale.
  • Forward and backward integration projects are planned to ramp up scale and improve operating margins.
  • PBILDT margin rose to 27.15% in 9MFY26 from 23.63% in 9MFY25, driven by margin-accretive products and operating leverage.
  • Timely completion of the capex without time or cost overrun, and stabilisation of the ongoing projects, is a key rating monitorable.
  • Management states it will maintain minimum liquidity of ₹100 crore as a policy, and debt repayments for FY26 have already been prepaid.
  • 9MFY26 TOI reached ₹975.40 crore and PBILDT ₹264.86 crore, against ₹538.04 crore and ₹127.15 crore in 9MFY25.
Concall presentation — Q3FY26 (Jan 2026) · 28 Jan 2026
  • Management raised FY26 revenue guidance to over INR 1,300 crore from INR 1,150 crore, citing strong demand and the upgraded fractionation facility.
  • Board approved about INR 460 crore capex over the next 2-3 years in phases for forward and backward integration, funded from internal resources for the recent land and plant work.
  • Q3FY26 revenue rose 73.3% YoY to INR 3,625 million and 9MFY26 PAT rose 148.9% YoY, with EBITDA margin at 27.1% in the quarter.
  • Fractionation output to be raised about 30% through debottlenecking, reaching 52,000 MTPA by end of FY26.
  • Management attributes demand to chocolate, confectionery and cosmetics customers, and expects supply-chain integration to support margin stability.
  • Management expects economies of scale and operating leverage from the new capacity to drive operational efficiencies in the coming years, without a stated margin figure.
  • Brazil CBE production through the Dekel partnership produced its first commercial batch in Q3FY26, with trial samples sent to customers.
  • Company plans to diversify into chocolate and confectionery business, leveraging its CBE expertise.
Concall transcript — Q3FY26 (Jan 2026) · 28 Jan 2026
  • Management raised FY26 revenue guidance from INR 1,150 crores to INR 1,300 crores, citing strong Q3 and 9M performance.
  • The company plans capex of INR 460 crores over the next 2 to 3 years across four projects in India and Burkina Faso, to be funded from internal accruals.
  • Management indicated FY27 revenue growth of roughly 30% or more, backed by new capacity and debottlenecking, though no formal number was given.
  • Q3 revenue was INR 363 crores, up 73.3% YoY, and 9M revenue was INR 975 crores, up 81.3%, mainly from volume growth after the upgraded facility ramped up.
  • Debottlenecking will lift fractionation capacity by about 30% to 52,000 metric tons per annum, expected to be complete by FY26.
  • Management calls the 25-27% EBITDA margin sustainable and expects gross margin to stay in a 45-50% range, with margin improvement over the medium term.
  • Capex is to be funded mainly from internal accruals, with no immediate plans for external debt or equity financing.
  • Gross margin moved from 52.8% to 44.3% QoQ; management attributes this to freight and by-product realisation, and says EBITDA margin is unaffected.
  • Q3 other income jumped on forex gains from imports of shea nuts and butters, which is a non-operating item that may not recur.
  • Value-added products are about 75% of sales, and management intends to take this to about 85-90% over time.
  • Working capital cycle is about 120 days today and is expected to fall to 90-100 days after the new capacity comes online.
  • The company expects its Mexico plant to deliver more than 2,000 tons this year.
Concall transcript — Q2FY26 (22 Oct 2025) · 22 Oct 2025
  • Management raised FY26 revenue guidance from INR 1,050 crore to INR 1,150 crore plus, citing strong performance and business momentum.
  • Fractionation capacity is to rise from about 40,000 to 52,000 metric tons after a Q3 shutdown, with the extra capacity expected to be live from Q4.
  • A further INR 450 crore capex project is planned, with funding mix (internal accruals, debt, equity) still being finalised and commissioning expected within about two years.
  • Management expects FY26 volume growth of roughly 25-30% as utilisation rises from about 63% to 85%.
  • Working capital days are down from 151 to 97 and management targets about 75 days over the next two years.
  • Management reaffirmed its margin outlook, saying it is confident of sustaining healthy margins, but gave no numeric margin target.
  • Management said contracts run 9-12 months with fixed prices and volumes, so it sees no cocoa butter equivalent price drift or margin hit for the next two quarters.
  • Backward integration in West Africa (Burkina Faso extraction plant, about 70,000 tons) is expected to lower costs, improve inventory days and cash flow.
  • Management declined to give FY27 or FY28 guidance and said it will be provided in the March quarter.
  • About 58% of revenue is exports, and US exports are only 2-3%, so management sees no material tariff impact.

Documents read

← Back to the Manorama Industries Ltd stock page All companies tracked

Guidance is extracted from company documents and interviews by an AI model and then checked against reported numbers by rule. It can contain errors or miss context, and the stored figures may differ from the basis management guided on. This page is information only and is not investment advice.

𝕏