GSM Foils Ltd: management guidance tracker
What management said it would deliver, when, where they said it — and what the reported numbers showed afterwards.
How to read this page — 30 seconds
- Latest guidance is what management said at its most recent results call, presentation or interview, next to what it had said before. Raised or Lowered tells you which way expectations moved.
- Other open guidance lists earlier promises that have not fallen due, soonest first, with the latest reported figure.
- Track record compares each promise that has fallen due with what the company actually delivered. That is the best guide to how much weight to give the new guidance.
Select any row for management's exact words, where they said it and how the target changed over time.
Latest guidance · 20 Jul 2026 – 21 Jul 2026
From Concall transcript — Q1FY27 (24 Jul 2026), Concall presentation — Q1FY27 (Jul 2026). What management guided for most recently, against what it had said before.
Cap revenue · ROPP caps
Direct
Management expects ROPP caps revenue of about INR30-35 crore this year, FY27.
Earlier
First time stated
Now₹30 Cr – ₹35 CrFY27
Change
New
StatusPending
In management's words
“So this year, cap revenue would be around INR30 to INR35 crores.”
What it implies in numbers
Reaching ₹30 Cr by FY27 from ₹258 Cr (FY26) needs about 88.4% decline a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Capacity utilization · Ahmedabad plant
Direct
Management expects Ahmedabad plant capacity utilisation to exceed 80% by the end of FY27.
Earlier
First time stated
Now≥ 80%FY27
Change
New
StatusPending
In management's words
“we are confident of achieving over 80% capacity utilization by the end of this financial year, which will further enhance our operating leverage”
How it was checked
Capacity utilisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
PAT
Direct
Management expects PAT of around INR35-38 crore in FY27, assuming a PAT margin of about 7.5%.
Earlier
First time stated
Now₹35 Cr – ₹38 CrFY27
Change
New
StatusBehind
So far: ₹7.62 Cr
In management's words
“PAT at around 7.5% , that would generate us around INR35 to INR38 crores.”
What it implies in numbers
Reaching ₹35 Cr by FY27 from ₹20 Cr (FY26) needs about 75.0% growth a year.
How it was checked
₹7.62 Cr booked in Q1FY27 — 22% of the ₹35 Cr guided for FY27 with 25% of the period gone (simple pro-rata, ignores seasonality).
Condition attached by management: Assumes PAT margin of about 7.5%.
How this guidance changed
Stated once in the documents read so far.
Revenue
Direct
Management is aiming for FY27 revenue of INR450-500 crore.
Earlier
₹400 Cr – ₹450 CrFY27 · 22 Apr 2026
Now₹450 Cr – ₹500 CrFY27
Change
Raised
StatusBehind
So far: ₹96.89 Cr
In management's words
“So INR450 to INR500 crores, that is what we are aiming at.”
What it implies in numbers
Reaching ₹450 Cr by FY27 from ₹258 Cr (FY26) needs about 74.4% growth a year.
How it was checked
₹96.89 Cr booked in Q1FY27 — 22% of the ₹450 Cr guided for FY27 with 25% of the period gone (simple pro-rata, ignores seasonality).
How this guidance changed
- 22 Apr 2026 — ₹400 Cr – ₹450 Cr for FY27
First stated
Concall transcript · On track (actual ₹96.89 Cr)
- 21 Jul 2026 — ₹450 Cr – ₹500 Cr for FY27
Raised
Concall transcript · Behind (actual ₹96.89 Cr)
Utilization target · Ahmedabad unit (Unit 2)
Direct
The Ahmedabad unit is targeted to reach 80% or more capacity utilisation by March 2027.
Earlier
First time stated
Now≥ 80%by Mar 2027
Change
New
StatusPending
In management's words
“80%+ Utilization target by March 2027”
How it was checked
Capacity utilisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Cap revenue · ROPP caps
Direct
Management plans to increase ROPP caps revenue to INR60-65 crore next year, FY28.
Earlier
First time stated
Now₹60 Cr – ₹65 CrFY28
Change
New
StatusPending
In management's words
“And next year, the planning is to increase to INR60 to INR65 crores.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Turnover
Direct
Management aims to cross turnover of INR750-800 crore in the next financial year, FY28.
Earlier
First time stated
Now₹750 Cr – ₹800 CrFY28
Change
New
StatusPending
In management's words
“we are aiming to cross a turnover of around INR750 to INR800 crores for the next financial year.”
What it implies in numbers
Reaching ₹750 Cr by FY28 from ₹258 Cr (FY26) needs about 70.5% growth a year.
Condition attached by management: Depends on additional borrowing and working capital, per management.
How this guidance changed
Stated once in the documents read so far.
Additional debt
Direct
Walked back
Management plans to raise about INR40-50 crore of additional bank debt to fund units 3 and 4.
Earlier
₹2 Cr – ₹3 CrNot specified · 6 Nov 2025
Now₹40 Cr – ₹50 CrNot specified
Change
Raised
StatusPending
In management's words
“already our talks are going on with different banks to like incur more debt of around INR40 to INR50 crores.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Subject to bank sanction, expected in a month or two.
How this guidance changed
- 6 Nov 2025 — ₹2 Cr – ₹3 Cr for Not specified
First stated
Concall transcript · Pending (actual ₹44 Cr)
- 21 Jul 2026 — ₹40 Cr – ₹50 Cr for Not specified
Raised
Concall transcript · Pending
Capex for Mumbai ROPP plant · ROPP caps
Direct
Management expects capex of about INR50-60 lakh for the ROPP caps plant after 6 to 8 months of running it.
Earlier
First time stated
Now₹0.5 Cr – ₹0.6 CrNot specified
Change
New
StatusPending
In management's words
“we'll run that plant for 6 to 8 month and everything goes well, then we'll provide them capex that would be roughly around INR50 to INR60 lakhs only.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Depends on the plant running well for 6 to 8 months.
How this guidance changed
Stated once in the documents read so far.
Potential annual revenue · ROPP Caps
Direct
The ROPP caps unit has the potential to generate about Rs 50 crore annual revenue at peak capacity utilisation.
Earlier
First time stated
Now~₹50 CrNot specified
Change
New
StatusPending
In management's words
“the facility has the potential to generate approximately ₹50 crore in annual revenue”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: At peak capacity utilisation
How this guidance changed
Stated once in the documents read so far.
New manufacturing facility operational
Indirect
A new manufacturing facility is targeted to become operational in the first half of FY27.
Earlier
First time stated
NowmilestoneH1FY27
Change
New
StatusPending
In management's words
“We are planning to establish a new manufacturing facility, targeted to be operational in the first half of FY27.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Top line from Ahmedabad plant · Ahmedabad plant
Indirect
Walked back
Management expects the Ahmedabad plant to cross INR30 crore top line once it reaches about 80% capacity.
Earlier
₹30 Cr – ₹35 CrNot specified · 22 Apr 2026
Now≥ ₹30 CrNot specified
Change
Lowered
StatusPending
In management's words
“Once we do that, we'll be able to cross INR30 crores top line over there also.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Conditional on Ahmedabad reaching about 80% capacity utilisation.
How this guidance changed
- 6 Nov 2025 — ₹8 Cr – ₹10 Cr for Not specified
First stated
Concall transcript · Pending (actual about INR6-7 crore monthly at 35% utilisation (July 2026))
- 22 Apr 2026 — ₹30 Cr – ₹35 Cr for Not specified
Raised
Concall transcript · Pending
- 21 Jul 2026 — ≥ ₹30 Cr for Not specified
Lowered
Concall transcript · Pending
Start of production at acquired export plant · export
Hint
Management expects production to start at the acquired Vasai export plant by the end of August 2026.
Earlier
First time stated
Nowmilestoneby Q2FY27
Change
New
StatusPending
In management's words
“max to max by August ending we'll start production over there.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Subject to shifting the plant and completing compliance steps.
How this guidance changed
Stated once in the documents read so far.
Geographic expansion
Hint
The company plans to expand into additional Indian states to grow its customer base.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“we plan to expand into additional states across India”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Gross margin
Hint
Management sees scope to raise gross margin from about 15-16% through operating leverage once Ahmedabad ramps up.
Earlier
to hold or improveFY27 · 2 Feb 2026
Nowto improveFY27
Change
Raised
StatusPending
In management's words
“There is scope, yes, with more operating leverage.”
How it was checked
Gross margin is not in the stored financial tables.
Condition attached by management: Depends on Ahmedabad plant ramp-up and utilisation.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 2 Feb 2026 — to hold or improve for FY27
First stated
Concall transcript · Pending
- 21 Jul 2026 — to improve for FY27
Raised
Concall transcript · Pending
Improved profitability from forward integration
Hint
Forward integration into printing and conversion is expected to enable higher value-added products and improved profitability.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“expanding specialized printing and conversion capabilities, enabling higher value-added products and improved profitability”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Margin on ROPP caps · ROPP caps
Hint
Management expects the ROPP caps business to earn higher margins than the existing foil portfolio.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“Importantly, this business is expected to operate at higher margin profile than our existing product portfolio”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Margin on export orders · export
Hint
Management expects export orders to earn better margins than domestic sales, though it will refine the estimate after a quarter or two.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“But definitely export has much better margin compared to domestics.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Management will refine the estimate after a quarter or two.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Margin profile · Ahmedabad unit (Unit 2)
Hint
The Ahmedabad unit is likely to run a slightly improved margin profile as utilisation scales up.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“the Ahmedabad unit is likely to operate with a slightly improved margin profile as utilization scales up”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: As utilisation scales up
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Strong growth · ROPP Caps
Hint
The ROPP caps unit is expected to deliver strong growth.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“is expected to deliver strong growth with attractive margins”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Operating cash flow
Hint
If growth slows to about 20-30%, management expects operating cash flow to turn positive within a year or two.
Earlier
First time stated
Nowto improveFY27–FY28
Change
New
StatusPending
In management's words
“If the company starts growing at around 20-30%, then obviously you can assume like within a year or two the cash flows like operating cash flow and everything would be positive.”
Condition attached by management: Only if growth slows to around 20-30% from the current 80-90%.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Other open guidance · soonest due first
Earlier promises that have not fallen due yet, with the latest figure where one has been reported.
Production and sales turnover
Hint
Management says the company has an opportunity to increase production and sales turnover, given acceptance of its products by major pharma companies.
Targetto improve
DueFY25
result by 30 May 2025
Said4 Sep 2024
Annual report
StatusAwaiting data
In management's words
“Company has opportunity to increase production and sales turnover due to acceptance of product by most of the major Pharma Companies in India, Bangladesh and other countries.”
How it was checked
Production is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY25, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Settlement of income tax liability of GSM Foils LLP
Hint
The LLP income tax liability is to be settled in the current financial year by the directors through their personal accounts.
Targetmilestone
DueFY25
result by 30 May 2025
Said4 Sep 2024
Annual report
StatusAwaiting data
In management's words
“The said transaction will be settled in the current financial year by the directors of GSM Foils Limited, who were previously partners in GSM Foils LLP, through their personal accounts.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Capex plans (Ahmedabad replication and Lamitube)
Direct
Management will finalise its capex plans, including the Ahmedabad replication and Lamitube expansion, by end of Q2 FY26.
Targetmilestone
DueQ2FY26
result by 14 Nov 2025
Said21 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“which will be finalized by the end of Q2.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: if the market supports the Ahmedabad plan and the Lamitube trading clicks
How this guidance changed
Stated once in the documents read so far.
Capex for value addition / Lamitube manufacturing · Lamitube manufacturing
Direct
Lamitube manufacturing capex is expected to be around INR 3-4 crore, planned by end of Q3 FY26.
Target₹3 Cr – ₹4 Cr
DueQ3FY26
result by 14 Feb 2026
Said9 May 2025
Concall transcript
StatusAwaiting data
In management's words
“The amount of capex would be around INR3 crores to INR4 crores.”
What it implies in numbers
Reaching ₹3 Cr by Q3FY26 from ₹1 Cr (Q4FY25) needs about 332.7% growth a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: If the Lamitube trading market response is positive
How this guidance changed
Stated once in the documents read so far.
Acquisition of LDPE plant
Indirect
Management plans to acquire an LDPE plant, which currently supplies most of its raw material, by end of Q3 FY26.
Targetmilestone
DueQ3FY26
result by 14 Feb 2026
Said9 May 2025
Concall transcript
StatusAwaiting data
In management's words
“Maybe by end of Q3, we are planning to acquire that.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: If everything goes well
How this guidance changed
Stated once in the documents read so far.
Capex in Lamitube manufacturing · Lamitube manufacturing
Indirect
Management intends to invest in Lamitube manufacturing capex by end of Q2 or Q3 FY26.
Targetmilestone
DueFY26
result by 30 May 2026
Said9 May 2025
Concall transcript
StatusAwaiting data
In management's words
“we intend to invest a decent amount in the capex of Lamitube manufacturing by the end of Quarter 2 or Quarter 3 of this financial year”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Subject to the trading business gaining market acceptance
How this guidance changed
Stated once in the documents read so far.
Direct exports
Hint
Management plans to begin direct exports this year, having not exported so far.
Targetto improve
DueFY26
result by 30 May 2026
Said9 May 2025
Concall transcript
StatusAwaiting data
In management's words
“We might explore it like directly we are not exporting anything now, but definitely that thing is in plan. We may do this year.”
How it was checked
Exports is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Performance
Hint
Management is confident of sustaining Q1 FY26's strong performance throughout FY26.
Targetto hold or improve
DueFY26
result by 30 May 2026
Said21 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“With steady demand, scalable infrastructure and clear focus on margin-accelerated growth, we are confident of sustaining this performance throughout FY26.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Manufacturing facility extension of Lamitubes · Lamitubes
Hint
Management intends to extend the Lamitube manufacturing facility by the end of FY26.
Targetmilestone
DueFY26
result by 30 May 2026
Said21 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“we also intend to extend the manufacturing facility of Lamitubes by the end of this financial year to ensure value addition and improved margin control.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Gross margin
Direct
Management is looking at gross margin of roughly 11-12% for the year and sees it as sustainable.
Target11–12%
DueFY26
result by 30 May 2026
Said21 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“So we are certainly looking at, if you're talking about gross margin, then roughly around 11% to 12%, which is quite sustainable.”
How it was checked
Gross margin is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
New debt for Ahmedabad plant · Ahmedabad plant
Direct
Management plans debt of Rs 12-15 crore for the Ahmedabad plant, to be raised within six months.
Target₹12 Cr – ₹15 Cr
Dueby Q4FY26
result by 30 May 2026
Said21 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“So debt of around INR12 crores to INR15 crores we are planning.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: bank approval
How this guidance changed
Stated once in the documents read so far.
Lamitube revenue on a monthly basis · Lamitube
Indirect
Management aims for Lamitube revenue of Rs 8-10 crore per month about a year out, if expansion and capex go ahead.
Target₹8 Cr – ₹10 Cr
Dueby FY26
result by 30 May 2026
Said21 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“if I say one year down the line, then definitely a revenue of around INR8 crores to INR10 crores can be developed from the Lamitube business on a monthly basis.”
What it implies in numbers
Reaching ₹8 Cr by FY26 from ₹134 Cr (FY25) needs about 94.0% decline a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: if the Lamitube expansion and capex go through
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Margin after reaching near 100% utilisation
Direct
Management expects margins to be 100-200 bps above current levels once capacity utilisation nears 100%.
Target+100–200 bps
DueFY26
result by 30 May 2026
Said21 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“definitely 100 to 200 basis points than what we are currently, we will be able to achieve that.”
How it was checked
Capacity utilisation is not in the stored financial tables.
Condition attached by management: after capacity utilisation nears 100%
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Lamitube capex · Lamitubes
Hint
Lamitube capex would be done by year-end if the desired margin is achieved and backward integration looks better.
Targetmilestone
Dueby FY26
result by 30 May 2026
Said21 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“And if the certain desired profit margin is achieved and we see a better scope in backward integration, then definitely by end of this year, a capex of that would be done.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: if the desired profit margin is achieved and backward integration looks better
How this guidance changed
Stated once in the documents read so far.
Sustained growth and long-term shareholder value
Hint
Management is confident of delivering sustained growth and long-term shareholder value.
Targetto improve
DueFY26
result by 30 May 2026
Said3 Sep 2025
Annual report
StatusAwaiting data
In management's words
“the Company is confident of delivering sustained growth and long-term shareholder value.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Cash generation / working capital
Hint
Management expects operating cash flow to turn positive over time as margins rise and working capital and capex fall.
Targetto improve
DueFY26
result by 30 May 2026
Said6 Nov 2025
Concall transcript · 2× since 3 Sep 2025
StatusAwaiting data
In management's words
“But yes, over the period of time definitely there would be much better.”
How it was checked
Production is not in the stored financial tables.
Condition attached by management: Depends on debtors and inventory.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
- 3 Sep 2025 — to improve for FY26
First stated
Annual report · Awaiting data
- 6 Nov 2025 — to improve for FY26
Repeated
Concall transcript · Awaiting data
Local and export business results
Hint
Management expects a very good result from new customer wins in local and export markets within 2 to 3 months.
Targetto improve
DueFY26
result by 30 May 2026
Said6 Nov 2025
Concall transcript
StatusAwaiting data
In management's words
“We'll see definitely a very good result in 2 to 3 months on both local and export markets both.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Mumbai expansion · Mumbai
Hint
Management expects to finalise a Mumbai expansion (two to four proposals) within a month or two, with no capacity or cost committed.
Targetmilestone
Dueby FY26
result by 30 May 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“That will be finalized within a month or two, but I won't commit you now.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Machine speed capex (Vasai) · Vasai plant
Hint
Management said slight capex to raise Vasai machine speed is planned for the current month, to reach the remaining 10-15% capacity.
Targetmilestone
Dueby FY26
result by 30 May 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“No, this is planned for the current month, sir.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
FY26 performance
Hint
Management is confident of sustaining 9M FY26 performance through the rest of FY26.
Targetto hold or improve
DueFY26
result by 30 May 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“we are confident of sustaining this performance throughout Financial Year 26.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Ahmedabad plant contribution · Ahmedabad plant
Hint
Management says it plans for the Ahmedabad plant to have contributed significantly by H1 FY27.
Targetmilestone
DueH1FY27
result by 14 Nov 2026
Said6 Nov 2025
Concall transcript
StatusPending
In management's words
“Definitely. That's our plan. To be very frank with you, that's our plan and we'll make sure it happens.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Margin
Hint
Management expects margin improvement once Ahmedabad reaches 50-60% utilisation and further capex is done, six to eight months out.
Targetto improve
Dueby Q2FY27
result by 14 Nov 2026
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“six months or eight months down the line, we are planning to do more capex and do more efficiency kind of business over there, then margin improvement will definitely come into picture.”
Condition attached by management: Ahmedabad reaches 50-60% utilisation and further capex is executed.
How this guidance changed
Stated once in the documents read so far.
Next debt decision
Hint
Management will decide on new debt after Q2 FY27, and says current facilities last about six months.
Targetmilestone
DueQ2FY27
result by 14 Nov 2026
Said22 Apr 2026
Concall transcript
StatusPending
In management's words
“So the next decision would come in post like second quarter ending, we will look at something new.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Depends on market volatility and aluminium prices
How this guidance changed
Stated once in the documents read so far.
Growth plan 1 to 1.5 years out
Indirect
Management is confident of achieving a 100% capex in the same premises structure in Vasai and Ahmedabad within 1-1.5 years.
Targetmilestone
DueFY26–FY27
result by 30 May 2027
Said21 Jul 2025
Concall transcript
StatusPending
In management's words
“But we are definitely talking about growth plan for 1, 1.5 year down the line. Then 100% capex in the same premises and the same structure like us in Vasai and in Ahmedabad. We are quite confident of achieving that.”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Entire debt
Indirect
Management expects cash flows sufficient to extinguish all debts within two years.
Targetmilestone
Dueby FY27
result by 30 May 2027
Said3 Sep 2025
Annual report
StatusBehind
So far: INR15 crore ICICI debt facility obtained
In management's words
“sufficient cash flows to extinguish all debts within two years, the Company remains financially resilient.”
How it was checked
The deadline is FY27 and has not passed. A new INR15 crore debt facility was obtained, so the path to extinguishing all debt within two years is not yet evidenced. (judged from later company statements)
Evidence (22 Apr 2026): “we got a debt facility from ICICI Bank of around INR15 crores during that phase.” — Concall transcript — Q4FY26 (Apr 2026)
How this guidance changed
Stated once in the documents read so far.
Turnover
Direct
After FY26, revenue could rise around 60-70% in FY27 once Ahmedabad is fully operational, described as a lower-end figure.
Target60–70% growth
DueFY27
result by 30 May 2027
Said6 Nov 2025
Concall transcript
StatusOn track
So far: 86.33% growth (Q1FY27)
In management's words
“Definitely, once we reach that and once this Ahmedabad plant becomes completely operational then we may see a significant jump of around 60%-70% on a very lower side in that year also.”
What it implies in numbers
60–70% growth on ₹258 Cr (FY26) implies about ₹413 Cr to ₹439 Cr for FY27.
How it was checked
Year to date (Q1FY27) growth is 86.3% against the guided 60–70% for FY27.
Condition attached by management: FY26 target reached and Ahmedabad plant completely operational.
How this guidance changed
Stated once in the documents read so far.
Lamitubes backward integration · Lamitubes
Hint
No aggressive move into backward integration of Lamitubes is planned for at least two quarters.
Targetto hold or improve
DueFY27
result by 30 May 2027
Said6 Nov 2025
Concall transcript
StatusPending
In management's words
“we are not taking any aggressive step into backward integration of Lamitubes currently at least for two quarters”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Capacity utilization · Ahmedabad plant
Direct
Management aims for 100% utilisation of the Ahmedabad plant by end of next March, i.e. March 2027.
Target100%
Dueby FY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusBehind
So far: Operating at 35% capacity utilisation in July 2026
In management's words
“and then 100% capacity utilization by the end of next March in Ahmedabad.”
How it was checked
The March 2027 deadline has not passed, but the plant was at 35% in July 2026, far from the 100% target. (judged from later company statements)
Evidence (21 Jul 2026): “currently operating at 35% capacity utilization” — Concall transcript — Q1FY27 (24 Jul 2026)
Condition attached by management: Management said it would 'see how far we go'.
How this guidance changed
Stated once in the documents read so far.
Monthly run rate · Ahmedabad plant
Direct
Ahmedabad plant expected to reach a Rs 28-30 crore monthly run rate about one year from the call.
Target₹28 Cr – ₹30 Cr
Dueby FY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusBehind
So far: About INR6-7 crore of monthly revenue in July 2026
In management's words
“And one year down the line, even INR28-INR30 crores monthly run rate from the Ahmedabad plant.”
What it implies in numbers
Reaching ₹28 Cr by FY27 from ₹258 Cr (FY26) needs about 89.1% decline a year.
How it was checked
The 28-30 crore monthly run rate is due by March 2027, but Ahmedabad was at about 6-7 crore per month in July 2026, far below that level. (judged from later company statements)
Evidence (21 Jul 2026): “Its around INR6 to INR7 crores.” — Concall transcript — Q1FY27 (24 Jul 2026)
How this guidance changed
Stated once in the documents read so far.
Gross margin differential · Ahmedabad plant (vs Vasai)
Direct
Management expects Ahmedabad plant gross margin to be 100-200 bps higher than Vasai, due to lower cost structure.
Target+100–200 bps
DueFY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“So, 100 to 200 basis point improvement is definitely possible, We expect this level of difference in the cost structure itself, To be very frank with you.”
How it was checked
Gross margin is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
New products
Direct
Management expects two or three new laminate products in FY27, after the Ahmedabad plant reaches 50-60% efficiency.
Target2–3 laminate products
DueFY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“but that would be in the next financial year.”
How it was checked
New launches is not in the stored financial tables.
Condition attached by management: Once Ahmedabad plant runs 50-60% without much interference.
How this guidance changed
Stated once in the documents read so far.
Further expansion in Ahmedabad · Ahmedabad plant
Hint
Management said more expansion at Ahmedabad would come by Diwali or next year, after Mumbai expansion is announced.
Targetmilestone
Dueby FY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“By the end of this month, we'll definitely give you good news regarding more expansion in our Mumbai-based unit and post that by this Diwali or by next year, more expansion in our Ahmedabad plant also.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Subject to finalising Mumbai proposals.
How this guidance changed
Stated once in the documents read so far.
Cash flow from operations
Hint
Management said cash flow may improve if it tightens credit or rates fall, but it is not currently prioritising this.
Targetto improve
DueFY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“then you may see an improvement in cash flow.”
Condition attached by management: Policy changes, falling rates, or better opportunities with less credit.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Export sales via merchant exporters · Export
Hint
Management plans more export sales through merchant exporters to markets including Yemen, Vietnam, Europe and US.
Targetto improve
DueFY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“We are planning more sales in that part also.”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: Dependent on merchant exporters.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Optimum Utilization target · Ahmedabad facility
Indirect
Management targets optimum utilisation of the Ahmedabad facility by March 2027.
Targetmilestone
Dueby Mar 2027
result by 30 May 2027
Said21 Apr 2026
Concall presentation
StatusPending
In management's words
“Optimum Utilization target by March 2027”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Margin profile · Ahmedabad facility
Hint
Ahmedabad unit is expected to run at a slightly improved margin profile than Vasai as utilisation scales up.
Targetto improve
DueFY27
result by 30 May 2027
Said21 Apr 2026
Concall presentation
StatusPending
In management's words
“the Ahmedabad unit is likely to operate with a slightly improved margin profile as utilization scales up”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: as utilization scales up
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Expansion into new and underpenetrated regions
Hint
Management plans to strengthen its footprint across India by entering new and underpenetrated regions.
Targetto improve
DueFY27
result by 30 May 2027
Said21 Apr 2026
Concall presentation
StatusPending
In management's words
“We aim to strengthen our footprint across India by entering new and underpenetrated regions.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Expanding product range within aluminum foil segment
Hint
Management is committed to expanding its aluminium foil product range with new variants.
Targetto improve
DueFY27
result by 30 May 2027
Said21 Apr 2026
Concall presentation
StatusPending
In management's words
“We are committed to expanding our product range within the aluminum foil segment by introducing new variants”
How it was checked
New launches is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Optimal utilization level (Ahmedabad facility) · Ahmedabad plant
Hint
Management aims to reach optimal utilisation at the Ahmedabad facility by the end of FY27.
Targetto improve
DueFY27
result by 30 May 2027
Said22 Apr 2026
Concall transcript
StatusOn track
So far: Operating at 35% capacity utilisation in July 2026
In management's words
“aim to achieve an optimal utilization level at the end of next financial year”
How it was checked
The FY27 deadline has not passed; utilisation rose from about 25-30% in April 2026 to 35% in July 2026, but 'optimal' is undefined. (judged from later company statements)
Evidence (21 Jul 2026): “currently operating at 35% capacity utilization” — Concall transcript — Q1FY27 (24 Jul 2026)
How this guidance changed
Stated once in the documents read so far.
Aluminium price increase
Direct
Management expects aluminium prices to rise around 5-7% next year, which affects input costs.
Target5–7% growth
DueFY27
result by 30 May 2027
Said22 Apr 2026
Concall transcript
StatusPending
In management's words
“Next year also we are expecting a increase around 5% to 7%.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Quarter-on-quarter revenue
Hint
If aluminium volatility eases, quarterly revenue should hold or rise quarter-on-quarter as Ahmedabad ramps up.
Targetto improve
DueFY27
result by 30 May 2027
Said22 Apr 2026
Concall transcript
StatusPending
In management's words
“it would remain same or it would increase.”
Condition attached by management: Applies if the aluminium situation normalises as expected
How this guidance changed
Stated once in the documents read so far.
Debt requirement after backward integration
Indirect
Management expects the business to be self-sustained in about three years, with backward integration in place and no further debt needed.
Targetmilestone
Dueby FY28
result by 30 May 2028
Said9 May 2025
Concall transcript
StatusBehind
So far: INR15 crore ICICI debt facility obtained
In management's words
“Post that, we will be at a good position where maybe no more debt would be required.”
How it was checked
The guidance was for no further debt by FY28. The deadline has not passed, and a new INR15 crore debt facility was obtained, moving away from the no-debt trajectory. (judged from later company statements)
Evidence (22 Apr 2026): “we got a debt facility from ICICI Bank of around INR15 crores during that phase.” — Concall transcript — Q4FY26 (Apr 2026)
Condition attached by management: Backward integration capex completed
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Main board listing
Indirect
Management is aiming to move to the main board, which it expects to take 1.5-2 years.
Targetmilestone
DueFY28–FY28
result by 30 May 2028
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“It will take 1.5-2 years, but we are definitely aiming at the main board.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Subject to figures and planning.
Assumptions made in reading this
- horizon counted from FY26 (statement made in its last quarter)
How this guidance changed
Stated once in the documents read so far.
Fundraise amount
Direct
Next fundraise is expected to be around INR 10-12 crore, possibly up to INR 15 crore, for Lamitube capex and working capital.
Target₹10 Cr – ₹15 Cr
DueNot specified
Said9 May 2025
Concall transcript
StatusPending
In management's words
“So, fundraise will be around INR 10 crores to INR 12 crores, higher in INR 15 crores.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Depends on how the capex plan and working capital need progress
How this guidance changed
Stated once in the documents read so far.
Machine speed / output increase
Indirect
A nominal Rs 50-60 lakh capex on spares could lift output in the same premises by at least 40-45%.
Target40–45%
DueNot specified
Said21 Jul 2025
Concall transcript
StatusPending
In management's words
“on a lower end, then at least 40% to 45%, we can do more in the same premises with the same machinery that we have.”
How it was checked
Capacity utilisation is not in the stored financial tables.
Condition attached by management: nominal capex of INR50 lakhs to INR60 lakhs on spares and heating/chilling parts
How this guidance changed
Stated once in the documents read so far.
QIP
Hint
Management plans a QIP in the near future, with the merchant banker to be finalised that week.
Targetmilestone
DueNot specified
Said21 Jul 2025
Concall transcript
StatusPending
In management's words
“Correct, yes, in the near future. Yes.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Capacity expansion in current premises and Ahmedabad
Hint
Management expects to finish the current premises in 6-7 months, then add capacity here and in Ahmedabad.
Targetmilestone
DueNot specified
Said21 Jul 2025
Concall transcript
StatusPending
In management's words
“We will be done with this premises in like 6 to 7 months, I am telling you”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Monthly revenue at 100% capacity
Indirect
Management confirmed monthly revenue of Rs 24-25 crore in these premises at 100% utilisation.
Target₹24 Cr – ₹25 Cr
DueNot specified
Said21 Jul 2025
Concall transcript
StatusPending
In management's words
“So 18 plus 7 would roughly around INR24 crores to INR25 crores in this premises, monthly?”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: only at 100% capacity utilisation in the current premises
How this guidance changed
Stated once in the documents read so far.
Lamitube marketing push · Lamitubes
Hint
Management plans to start marketing the Lamitube business from Diwali.
Targetmilestone
DueNot specified
Said21 Jul 2025
Concall transcript
StatusPending
In management's words
“So to expand that more, I need to do more marketing that which we plan to start from this Diwali.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Fund raising by way of rights issue of equity shares
Direct
Board approved raising up to Rs 2,310 lakh through a rights issue of equity shares of Rs 10 face value.
Target≤ ₹23.1 Cr
DueNot specified
Said3 Sep 2025
Annual report
StatusPending
In management's words
“for an aggregate amount not exceeding Rs. Rs. 2,310.00 Lakhs (Rupees Twenty Three Crores and Ten Lakhs) on Right issue basis.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Subject to issue completion; no shares allotted as of report date
How this guidance changed
Stated once in the documents read so far.
Major capex
Hint
After Ahmedabad is ready, no major capex is planned for at least 6 to 8 months.
Targetmilestone
DueNot specified
Said6 Nov 2025
Concall transcript
StatusPending
In management's words
“post that at least for 6 to 8 months we are not looking at any major CAPEX.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Ahmedabad unit completed.
How this guidance changed
Stated once in the documents read so far.
Working capital days
Direct
Walked back
Management plans to keep working capital days between 60 and 70 days despite the Ahmedabad expansion.
Target60–70 days
DueNot specified
Said2 Feb 2026
Concall transcript · 2× since 21 Jul 2025
StatusPending
So far: 83 days (FY26)
In management's words
“we'll try to keep it between 60 days to 70 days only because that model has been really working well for us.”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
- 21 Jul 2025 — 60–65 days for Not specified
First stated
Concall transcript · Pending (actual 83 days)
- 2 Feb 2026 — 60–70 days for Not specified
Raised
Concall transcript · Pending (actual 83 days)
Capex for Rs 30 crore monthly business
Direct
Management said about Rs 4-5 crore of capex would support a monthly business of around Rs 30 crore.
Target₹4 Cr – ₹5 Cr
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
So far: ₹3 Cr (FY26)
In management's words
“So to do a business of around INR30 crores monthly, you need a capex of around INR4-INR5 crores only.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: For a monthly business of around Rs 30 crore.
How this guidance changed
Stated once in the documents read so far.
Customers onboarded · Ahmedabad plant
Direct
Management plans to onboard five or six good pharma companies for the Ahmedabad plant.
Target5–6 companies
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“So, definitely in Ahmedabad plant, we'll onboard five or six good companies.”
How it was checked
Customers / subscribers is not in the stored financial tables.
Condition attached by management: Only with customers paying within 45-60 days.
How this guidance changed
Stated once in the documents read so far.
Total Capital Expenditure · Ahmedabad facility
Direct
Total capital expenditure for the Ahmedabad facility is about Rs 5-6 crore.
Target₹5 Cr – ₹6 Cr
DueNot specified
Said21 Apr 2026
Concall presentation
StatusPending
In management's words
“*Total Capital Expenditure: ~ 5-6 cr”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Backward and forward integration
Hint
Management plans backward integration into rolling mills and forward integration via distribution depots in Gujarat and Bangalore.
Targetmilestone
DueNot specified
Said21 Apr 2026
Concall presentation
StatusPending
In management's words
“we plan to implement both backward integration - by venturing into the rolling mill segment - and forward integration - by establishing distribution depots in key locations like Gujarat and Bangalore”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Additional revenue from Vasai plant · Vasai plant
Indirect
Walked back
Vasai plant could add around INR6-7 crore of revenue after using about 10% spare and up to 20% extra capacity.
Target₹6 Cr – ₹7 Cr
DueNot specified
Said22 Apr 2026
Concall transcript · 3× since 6 Nov 2025
StatusPending
In management's words
“we can increase it up to 20%, so more around INR6 to INR7 crores revenue can be pulled from the Vasai plant.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Requires few spares and additions
How this guidance changed
- 6 Nov 2025 — ₹25 Cr – ₹26 Cr for Not specified
First stated
Concall transcript · Pending
- 2 Feb 2026 — ₹28 Cr – ₹30 Cr for Not specified
Raised
Concall transcript · Pending
- 22 Apr 2026 — ₹6 Cr – ₹7 Cr for Not specified
Lowered
Concall transcript · Pending
Capex announcement
Hint
A major capex announcement for forward integration may come within a quarter or two; plans are under way.
Targetmilestone
DueNot specified
Said22 Apr 2026
Concall transcript
StatusPending
In management's words
“With like a quarter or two we may come up with a very good announcement of capex also, but currently things are under plan.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Plans not yet fully finalised
How this guidance changed
Stated once in the documents read so far.
Track record · promised vs delivered
Guidance whose deadline has passed, most recent first: how management performed after giving it.
Revenue
Direct
Walked back
Management said the FY26 revenue target of Rs 240 crore is on track and it is confident of achieving it.
Promised₹240 Crfor FY26
Delivered₹258 CrFY26
ResultAchieved · beat
Said2 Feb 2026Concall transcript
In management's words
“Sir, it is on track. We are quite confident that it will happen.”
What it implies in numbers
Reaching ₹240 Cr by FY26 from ₹134 Cr (FY25) needs about 79.1% growth a year.
How it was checked
FY26 actual ₹258 Cr — ahead of the guided ₹240 Cr (annual result).
How this guidance changed
- 9 May 2025 — ₹240 Cr – ₹250 Cr for FY26
First stated
Concall transcript · Achieved (actual ₹258 Cr)
- 21 Jul 2025 — ₹240 Cr – ₹260 Cr for FY26
Range widened
Concall transcript · Achieved (actual ₹258 Cr)
- 6 Nov 2025 — ₹230 Cr – ₹250 Cr for FY26
Lowered
Concall transcript · Achieved (actual ₹258 Cr)
- 2 Feb 2026 — ₹240 Cr for FY26
Range narrowed
Concall transcript · Achieved (actual ₹258 Cr)
Sustainable growth
Hint
Management is confident of attaining sustainable growth in FY26.
Promisedto improvefor FY26
Deliveredup 92.5%FY26
ResultAchieved
Said9 May 2025Concall transcript
In management's words
“We are confident of attaining sustainable growth in the financial year 26 also.”
How it was checked
Revenue rose by 92.5% in FY26 from FY25 — in line with what management indicated (annual result).
How this guidance changed
Stated once in the documents read so far.
Planned debt for the year
Direct
Management plans to add about Rs 10-12 crore of debt this year.
Promised₹10 Cr – ₹12 Crfor FY26
Delivered₹44 CrFY26
ResultMissed
Said21 Jul 2025Concall transcript
In management's words
“We are planning a more debt of around INR10 crores to INR12 crores in this year.”
What it implies in numbers
Reaching ₹12 Cr by FY26 from ₹18 Cr (FY25) needs about 33.3% decline a year.
How it was checked
FY26 actual ₹44 Cr — short of the guided ₹10 Cr – ₹12 Cr (balance sheet).
How this guidance changed
- 9 May 2025 — ≤ ₹30 Cr for FY26
First stated
Concall transcript · Missed (actual ₹44 Cr)
- 21 Jul 2025 — ₹10 Cr – ₹12 Cr for FY26
Lowered
Concall transcript · Missed (actual ₹44 Cr)
Capacity utilisation
Hint
Management expects plant to reach optimal capacity utilisation around post Q2 or early Q3 FY26 after more funding.
Promisedto improvefor FY26
Delivered85-87% utilisation (Vasai), about 10% capacity still unused in April 2026
ResultMissed
Said9 May 2025Concall transcript
In management's words
“So, we will reach optimal capacity maybe by post Q2 or early Q3.”
How it was checked
Optimal utilisation was expected by Q2/early Q3 FY26, but Vasai was only at 85-87% in early 2026, still had about 10% unused in April 2026, and had only crossed 85% by July 2026. (judged from later company statements)
Evidence (2 Feb 2026): “So, we have almost reached 85% to 87% last month. So, more 10% to 12% is here.” — Concall transcript — Q3FY26 (Feb 2026)
Evidence (21 Jul 2026): “So currently, sir, Vasai we are already crossed 85% capacity.” — Concall transcript — Q1FY27 (24 Jul 2026)
Condition attached by management: Dependent on additional fund flow for expansion
How this guidance changed
Stated once in the documents read so far.
Credit to debtors
Hint
Management will try to reduce the credit extended to debtors, which is the main reason working capital is negative.
Promisedto come downfor FY26
Deliveredup 44.6%FY26
ResultMissed
Said9 May 2025Concall transcript
In management's words
“We will try to optimize and bring it down to a reasonable level.”
How it was checked
Debtor days rose by 44.6% in FY26 from FY25 — against what management indicated (reported ratio).
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Hint
Management is confident of sustaining the current performance, including margins, throughout FY26.
Promisedto hold or improvefor FY26
Deliveredup 0.4%FY26
ResultAchieved
Said6 Nov 2025Concall transcript
In management's words
“we are confident of sustaining this performance throughout Financial Year 2026.”
How it was checked
EBITDA / operating margin rose by 0.4 pp in FY26 from FY25 — in line with what management indicated (annual result).
How this guidance changed
- 9 May 2025 — to hold or improve for FY26
First stated
Concall transcript · Achieved (actual up 0.4%)
- 6 Nov 2025 — to hold or improve for FY26
Repeated
Concall transcript · Achieved (actual up 0.4%)
Margin on inventory price fall
Direct
If aluminium prices fall, management expects margin to decline by only about 0.5-2 percentage points.
Promised−50–200 bpsfor FY26
Delivered43 bpsFY26
ResultAchieved · beat
Said6 Nov 2025Concall transcript
In management's words
“Even if it goes down, there would be hardly between 0.5% or 1% or maximum 2% but even that can be absorbed, sir.”
What it implies in numbers
A change of 50–200 bps on 11.2% (FY25) implies ebitda / operating margin of about 11.7% to 13.2% in FY26.
How it was checked
FY26 actual 43 bps — ahead of the guided 50–200 bps (annual result).
Condition attached by management: Aluminium prices fall.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
- 21 Jul 2025 — +100–200 bps for FY26
First stated
Concall transcript · Missed (actual 43 bps)
- 6 Nov 2025 — −50–200 bps for FY26
Lowered
Concall transcript · Achieved (actual 43 bps)
PAT margin
Indirect
Management is quite confident PAT margin can rise a further 100-200 bps in subsequent quarters from 7.37%.
Promised+100–200 bpsfor FY26
Delivered0 bpsFY26
ResultMissed
Said21 Jul 2025Concall transcript
In management's words
“100 or 200 basis points, we are quite confident of achieving that.”
What it implies in numbers
A change of 100–200 bps on 7.8% (FY26) implies net profit margin of about 8.8% to 9.8% in FY26.
How it was checked
FY26 actual 0 bps — short of the guided 100–200 bps (annual result).
How this guidance changed
Stated once in the documents read so far.
Capacity utilisation
Direct
Management expects to reach near 100% capacity utilisation about six months out, if funds arrive.
Promised100%for by Q4FY26
DeliveredVasai 85-87% in Feb 2026; crossed 85% by Jul 2026
ResultMissed
Said21 Jul 2025Concall transcript
In management's words
“then 6 months down the line, we will be able to reach 100% capacity over here.”
How it was checked
Near 100% capacity utilisation was guided for about six months out, by Q4FY26. Vasai was only 85-87% in Feb 2026 and remained around 85% in July 2026. (judged from later company statements)
Evidence (2 Feb 2026): “So, we have almost reached 85% to 87% last month. So, more 10% to 12% is here.” — Concall transcript — Q3FY26 (Feb 2026)
Evidence (21 Jul 2026): “So currently, sir, Vasai we are already crossed 85% capacity.” — Concall transcript — Q1FY27 (24 Jul 2026)
Condition attached by management: if funds come in
How this guidance changed
Stated once in the documents read so far.
Machinery capex for Ahmedabad plant · Ahmedabad plant
Direct
Machinery capex of around Rs 4-5 crore is planned for the Ahmedabad plant, with the related debt expected within six months.
Promised₹4 Cr – ₹5 Crfor by Q4FY26
DeliveredAhmedabad capex of around Rs 4.5-5 crore incurred
ResultAchieved
Said21 Jul 2025Concall transcript
In management's words
“So firstly would be machinery capex of around INR4 crores to INR5 crores, then the working capital also.”
How it was checked
Ahmedabad machinery capex of Rs 4.5-5 crore was reported as incurred in Nov 2025, within the Rs 4-5 crore guided range and before the Q4FY26 deadline. (judged from later company statements)
Evidence (6 Nov 2025): “Around 4.5 crores to 5 crores.” — Concall transcript — Q2FY26 (Nov 2025)
Condition attached by management: bank loan approval, which takes one or two months
How this guidance changed
Stated once in the documents read so far.
Turnover
Direct
FY26 revenue is expected to grow about 80-90% from the FY25 base of Rs 133 crore.
Promised80–90% growthfor FY26
Delivered92.54% growthFY26
ResultAchieved · beat
Said6 Nov 2025Concall transcript
In management's words
“This year we are aiming almost 80% to 90% jump.”
What it implies in numbers
80–90% growth on ₹134 Cr (FY25) implies about ₹241 Cr to ₹255 Cr for FY26.
How it was checked
FY26 actual 92.54% — ahead of the guided 80–90% (annual result).
How this guidance changed
Stated once in the documents read so far.
Utilization · Vasai plant
Direct
Management is quite optimistic that the Vasai plant will reach 100% capacity within a month or two.
Promised100%for by FY26
DeliveredVasai crossed 85% capacity utilisation in July 2026
ResultMissed
Said2 Feb 2026Concall transcript
In management's words
“which we are quite optimistic to reach within a month or two”
How it was checked
Management expected 100% within a month or two of February 2026, but Vasai was still at about 85% by July 2026, after the FY26 deadline. (judged from later company statements)
Evidence (22 Apr 2026): “Vasai has already reached around INR25 crores to INR28 crores, still there is 10% more capacity left in that.” — Concall transcript — Q4FY26 (Apr 2026)
Evidence (21 Jul 2026): “So currently, sir, Vasai we are already crossed 85% capacity.” — Concall transcript — Q1FY27 (24 Jul 2026)
How this guidance changed
- 6 Nov 2025 — ≥ 90% for by FY26
First stated
Concall transcript · Missed (actual Vasai utilisation 85-87% in Feb 2026, with about 10% still unused in Apr 2026)
- 2 Feb 2026 — 100% for by FY26
Raised
Concall transcript · Missed (actual Vasai crossed 85% capacity utilisation in July 2026)
Target utilization · Ahmedabad plant
Direct
Ahmedabad plant targeted to reach 40-50% capacity utilisation by the end of FY26.
Promised40–50%for by FY26
DeliveredAbout 25-30% utilisation in April 2026 and 35% in July 2026
ResultMissed
Said2 Feb 2026Concall transcript
In management's words
“The plant is already operational with an annual capacity of more than 10,000 metric tons, with a target utilization of 40% to 50% by the end of this financial year.”
How it was checked
The 40-50% utilisation target by end FY26 was not reached; utilisation was about 25-30% in April 2026, well short of the target. (judged from later company statements)
Evidence (22 Apr 2026): “We have reached almost 25% to 30% over there.” — Concall transcript — Q4FY26 (Apr 2026)
Evidence (21 Jul 2026): “currently operating at 35% capacity utilization” — Concall transcript — Q1FY27 (24 Jul 2026)
How this guidance changed
- 6 Nov 2025 — 40–50% for by Q4FY26
First stated
Concall transcript · Missed (actual Ahmedabad utilisation 20-30% in Feb 2026 and 25-30% in Apr 2026)
- 2 Feb 2026 — 40–50% for by FY26
Repeated
Concall transcript · Missed (actual About 25-30% utilisation in April 2026 and 35% in July 2026)
Debt / borrowings
Hint
The company does not plan to take new debt until March 2026.
Promisedto hold or improvefor by Q4FY26
Deliveredup 144.4%Q4FY26
ResultMissed
Said6 Nov 2025Concall transcript
In management's words
“currently we are not looking at any debt till March.”
How it was checked
Borrowings (gross debt) rose by 144.4% in Q4FY26 from Q2FY26 — against what management indicated (balance sheet).
How this guidance changed
Stated once in the documents read so far.
Monthly sale · Ahmedabad plant
Direct
Ahmedabad plant expected to generate Rs 10-12 crore of monthly revenue by March 2026 at about 50% utilisation.
Promised₹10 Cr – ₹12 Crfor by FY26
DeliveredAbout INR5-5.5 crore of revenue in March 2026
ResultMissed
Said2 Feb 2026Concall transcript
In management's words
“certainly a revenue of INR10 crores to INR12 crores can be achieved by this March.”
What it implies in numbers
Reaching ₹10 Cr by FY26 from ₹134 Cr (FY25) needs about 92.5% decline a year.
How it was checked
The guidance was 10-12 crore monthly revenue by March 2026, but March 2026 revenue was about 5-5.5 crore, roughly half the target. (judged from later company statements)
Evidence (22 Apr 2026): “Around INR5, INR5.5, INR5 and a half.” — Concall transcript — Q4FY26 (Apr 2026)
Condition attached by management: If the plant reaches about 50% utilisation.
How this guidance changed
- 6 Nov 2025 — ≥ ₹5 Cr for by FY26
First stated
Concall transcript · Achieved (actual About INR5-5.5 crore of revenue in March 2026)
- 2 Feb 2026 — ₹10 Cr – ₹12 Cr for by FY26
Raised
Concall transcript · Missed (actual About INR5-5.5 crore of revenue in March 2026)
Utilization · Vasai plant
Direct
Management said the existing Vasai plant can reach 100% utilisation within FY26.
Promised100%for FY26
DeliveredVasai crossed 85% capacity utilisation in July 2026
ResultMissed
Said2 Feb 2026Concall transcript
In management's words
“This year only, yes.”
How it was checked
The 100% utilisation target within FY26 was not met; Vasai had crossed only 85% by July 2026, with about 10% capacity still unused. (judged from later company statements)
Evidence (22 Apr 2026): “Vasai has already reached around INR25 crores to INR28 crores, still there is 10% more capacity left in that.” — Concall transcript — Q4FY26 (Apr 2026)
Evidence (21 Jul 2026): “So currently, sir, Vasai we are already crossed 85% capacity.” — Concall transcript — Q1FY27 (24 Jul 2026)
Condition attached by management: Slight machine-speed capex planned for the current month (page 10).
How this guidance changed
Stated once in the documents read so far.
Ahmedabad plant operational · Ahmedabad plant
Direct
The Ahmedabad plant is expected to become operational in the first or second week of December 2025.
Promisedmilestonefor Q3FY26
DeliveredPlant had started operations about a month before 2 Feb 2026, i.e. around January 2026
ResultMissed
Said6 Nov 2025Concall transcript
In management's words
“Ahmedabad would be operational by December 1st week or 2nd week”
How it was checked
Guidance was operational by early December 2025, but the February 2026 call says operations began only about a month earlier, after the 31 Dec 2025 deadline. (judged from later company statements)
Evidence (2 Feb 2026): “So currently it's between 20% to 30%. We are expecting to reach 50% by the end of this year.” — Concall transcript — Q3FY26 (Feb 2026)
Evidence (2 Feb 2026): “So, we already reached INR5 crores monthly sale in the last month.” — Concall transcript — Q3FY26 (Feb 2026)
How this guidance changed
Stated once in the documents read so far.
Key points from each document
The main takeaways, newest document first.
Business update — Q2FY27 (6 Nov 2026) · 6 Nov 2026
- GSM Foils reported October 2026 net sales of Rs 14,63,47,636 and April-October 2026 net sales of Rs 1,59,69,98,607.
- The document contains no forward-looking guidance, margin, capex or order book commentary.
- The update is a routine monthly sales disclosure filed under SEBI Regulation 30 for the NSE listing.
- The update is signed by Managing Director Mohansingh Parmar.
Business update — Q1FY27 (6 Aug 2026) · 5 Aug 2026
- GSM Foils reported July 2026 net sales of Rs. 24.18 crore, marking a 27.62% YoY growth compared to July 2025.
- Cumulative net sales for the April to July 2026 period reached Rs. 121.07 crore.
Concall transcript — Q1FY27 (24 Jul 2026) · 21 Jul 2026
- Management targets FY27 revenue of INR450-500 crore, with Q1 revenue of INR96.9 crore already reported as a run-rate base.
- Management aims to cross INR750-800 crore turnover in the next financial year, funded by about INR40-50 crore of new debt and internal accruals.
- Ahmedabad plant is at 35% utilisation and management expects over 80% by the end of FY27, the main driver of operating leverage.
- Management says the Q1 EBITDA margin of about 12% should be sustained in Q2 and Q3, with aluminium volatility seen as manageable.
- The new ROPP caps unit began commercial production in June 2026, with FY27 revenue of INR30-35 crore and FY28 of INR60-65 crore, at higher margins.
- The company is acquiring a running Vapi-Sarigam plant to shift to Vasai for export, with production targeted by August 2026 and sales via merchant exporters initially.
- Management plans roughly INR40-50 crore of additional bank debt, subject to sanction in one to two months, to fund the new units.
- Aluminium prices hit multi-year highs in the quarter, creating temporary input-cost pressure that management says it managed through inventory and procurement.
- Management says negative operating cash flow is due to inventory and debtors while growing 80-90%, and expects positive cash flow only if growth slows to 20-30%.
Concall presentation — Q1FY27 (Jul 2026) · 20 Jul 2026
- Q1 FY27 standalone revenue rose 86.3% year on year to Rs 9,688.6 lakh, and PAT rose 98.8% to Rs 761.8 lakh.
- EBITDA margin improved to 11.9% in Q1 FY27 from 11.2% a year earlier, a 70 bps gain, while gross margin rose 60 bps.
- Finance cost rose sharply to Rs 123.2 lakh in Q1 FY27 from Rs 38.2 lakh, as short-term borrowings grew to Rs 4,439.1 lakh at March 2026.
- Operating cash flow was negative in FY26 at Rs -3,679.3 lakh, driven by working capital build-up, with trade receivables rising to Rs 9,431.5 lakh.
- The company entered aluminium ROPP caps through a MoU with AAPL Solutions; commercial production began in June 2026, with potential revenue of about Rs 50 crore at peak utilisation.
- The Ahmedabad unit is targeted to reach 80%+ utilisation by March 2027, with management expecting margin improvement as utilisation scales.
- A new manufacturing facility is targeted to be operational in the first half of FY27, according to the strategic roadmap.
- Management plans geographic expansion into additional states and forward integration into printing and conversion to lift value-added products and profitability.
- Management cites pharma packaging demand tailwinds such as India's pharma exports and blister packaging growth, but these are industry views rather than company targets.
Business update — Q1FY27 (3 Jul 2026) · 3 Jul 2026
- June 2026 net sales were Rs 350,659,254, up 92.92% year on year from Rs 181,760,119 in June 2025.
- Net sales for April to June 2026 totalled Rs 966,883,472 as reported in the monthly update.
- The company filed its June 2026 monthly sales announcement with NSE under Regulation 30 of the SEBI Listing Regulations.
- The update reports monthly sales figures only; it gives no forward-looking targets or guidance for FY27.
Concall transcript — Q4FY26 (Apr 2026) · 22 Apr 2026
- Q4FY26 revenue was INR8,168.9 lakh, up 79.1% YoY, and FY26 revenue was INR25,815.4 lakh, up 92.9%.
- Management said FY27 topline would be around INR400-450 crore even in an average year, and confirmed this is for FY27.
- The Ahmedabad plant is at roughly 25-30% utilisation, with management targeting optimal utilisation by end FY27 and a INR60 crore monthly run-rate by March 2027.
- Q4 EBITDA margin fell 120 bps to 11.5%; management said it will try to sustain the current level in FY27 if commodity conditions allow.
- Aluminium and petrochemical input costs are rising sharply due to the Middle East conflict; management says cost is passed on monthly but partly absorbed.
- Receivables rose in March as pharma clients faced payment delays, but around INR30-40 crore was collected in April and a INR15 crore ICICI facility was added.
- No fresh debt is planned for now; management will reassess after Q2 and says the current facilities are enough for about six months.
- Management is planning forward integration (printing or conversion units) rather than backward integration, with a capex announcement possible within a quarter or two.
- There are no long-term contracts or LOIs; orders are placed monthly on a PO basis, so order visibility is limited.
Concall presentation — Q4FY26 (Apr 2026) · 21 Apr 2026
- FY26 revenue from operations rose to Rs 25,815.4 lacs, up 92.9% year on year, and Q4 FY26 revenue rose 79.1% year on year.
- Net cash from operating activities was negative Rs 3,679.3 lacs in FY26 as working capital absorbed Rs 6,657.6 lacs.
- Gross profit margin fell to 15.1% in FY26 from 16.4% in FY25, while EBITDA margin was broadly flat at 11.5%.
- Short-term borrowings rose to Rs 4,439.1 lacs at March 2026 from Rs 1,782.0 lacs a year earlier, with trade receivables at Rs 9,431.5 lacs.
- The Ahmedabad facility has 10k+ MT annual capacity, with optimum utilisation targeted by March 2027 and total capex of about Rs 5-6 crore.
- Management expects the Ahmedabad unit to run at a slightly improved margin profile as utilisation scales up, given lower overheads than Vasai.
- Management plans to enter new Indian states, add backward integration into rolling mills and forward integration through distribution depots in Gujarat and Bangalore.
- The presentation gives no headline numeric FY27 revenue, margin or profit guidance; forward statements are qualitative.
Concall transcript — Q3FY26 (Feb 2026) · 2 Feb 2026
- Management targets Ahmedabad plant utilisation of 40-50% by end of FY26, with about 50% implying Rs 10-12 crore monthly sales, after Rs 5 crore monthly sales were already reached.
- Management said the FY26 revenue target of Rs 240 crore is on track and it is confident it will be achieved.
- Ahmedabad is targeted to reach 100% utilisation by end of next March, with a monthly run rate of Rs 28-30 crore one year out, per management's answers.
- Vasai plant was at 85-87% utilisation, and management aims to reach full 100% capacity within FY26, after a slight machine-speed capex.
- Management expects Ahmedabad to deliver 100-200 bps better gross margin than Vasai because of its leaner cost structure.
- Aluminium price moves pass through via Hindalco monthly letters; management says a 1-2% dip can be absorbed and margins held for a quarter or two, but gives no firm margin commitment.
- Further capacity in Mumbai (Vasai) is under evaluation with 2-4 proposals; management said a decision would take a month or two and gave no capacity or timing commitment.
- Two or three new laminate products are expected next financial year, only after the Ahmedabad plant reaches 50-60% efficiency.
- Management is comfortable with rising debtors and inventory, targets 60-70 working capital days, and does not focus on operating cash flow, which is negative.
- Management avoids large pharma customers with 90-150 day payment terms and low margins, focusing instead on tried clients and smaller firms paying in 30-60 days.
Concall transcript — Q2FY26 (Nov 2025) · 6 Nov 2025
- Management targets FY26 revenue of roughly Rs 230-250 crore and says 230-240 crore is practically achievable, with Ahmedabad possibly adding upside.
- Q2FY26 revenue was Rs 58 crore, up 86% year-on-year, with EBITDA margin up 115 bps to 11.43%.
- Management says FY26 revenue could rise 80-90% over FY25's Rs 133 crore, and FY27 could grow 60-70% at a lower bound once Ahmedabad is fully operational.
- The Ahmedabad leased plant costs about Rs 4.5-5 crore and is targeted to reach 40-50% utilisation by March 2026, with operations starting in December.
- Cash flow from operations is negative because of inventory and credit sales; management expects it to turn positive only over time.
- Ahmedabad margins are expected to start below Vasai levels because of initial set-up costs, and improve only after a quarter or two of full operation.
- The company does not plan new debt until March 2026; any term loan would be small (Rs 2-3 crore) and tied to a capex subsidy.
- Part of margin gain came from aluminium price rises on inventory; management says a price fall would cut margin by only about 0.5-2 points.
- Management declined to give formal FY27 numbers and repeatedly said it would not commit to figures on the call.
- Lamitubes backward integration is deferred for at least two quarters so that capex and focus go to the Ahmedabad plant.
Annual report FY25 · 3 Sep 2025
- Revenue from operations rose to Rs 13,379.99 lakh in FY25 from Rs 4,083.39 lakh, and profit after tax reached Rs 965.10 lakh.
- The board decided to raise up to Rs 2,310 lakh through a rights issue of equity shares, and NSE gave in-principle approval.
- Management says cash flows are sufficient to repay all debt within two years, so the company stays financially resilient.
- The directors do not recommend a dividend for FY25, citing current profitability and the need to conserve resources.
- Management says the company is well positioned to scale up production, expand turnover and gain market share, citing product acceptance with pharma customers.
- A possible anti-dumping duty on foil stock imports from China could raise raw material costs and hurt margins.
- Management cites industry forecasts of 6%-8% annual aluminium demand growth in India, driven by low per-capita consumption.
- Falling metal and granule prices may lead customers to demand price cuts from the company.
- Management says it is confident of sustained growth and long-term shareholder value, though it gives no numeric targets.
Concall transcript — Q1FY26 (Jul 2025) · 21 Jul 2025
- Management raised its FY26 revenue aim to Rs 240-260 crore, conditional on two or three pending items closing by Q2 end or early Q3.
- Q1FY26 revenue was about Rs 52 crore, up 148% year on year, with EBITDA margin at 11.20% and PAT margin at 7.37%.
- Management expects gross margin of 11-12% this year and a further 100-200 bps PAT margin improvement from Q1's 7.37% if things go well.
- Current utilisation is 65-68%; management says spares and a Rs 50-60 lakh capex could lift throughput 40-45% in the existing premises.
- Two capex plans are being evaluated: replicating the Vasai plant in Ahmedabad and a Lamitube capacity expansion, with finalisation targeted by end-Q2.
- Management names working capital cycle management as the key risk: a slowdown in fund churn would lower sales and raise debtor days.
- Management plans new debt of Rs 12-15 crore for the Ahmedabad plant and Rs 10-12 crore for the year, and sees a 0.6-0.7 debt-to-equity ratio as comfortable.
- A QIP is planned in the near future, following a merchant banker meeting that week.
- Lamitube trading is small at 3-5% of revenue; management targets Rs 8-10 crore monthly revenue from Lamitube about a year out, contingent on capex.
- Management said it has not planned beyond five years and is focused on a 1-1.5 year growth plan built around replicating capacity.
Concall transcript — Q4FY25 (May 2025) · 9 May 2025
- Management guided FY26 top line of INR 240-250 crore, calling INR 190-200 crore achievable even at zero growth on recent monthly run-rates.
- Revenue rose from about INR 42 crore to about INR 133 crore in FY25, and Q4 revenue grew about 234% year-on-year.
- Management is comfortable with total debt up to INR 30 crore this year, after about INR 20 crore of borrowing with a further INR 10 crore planned.
- An equity fundraise of about INR 10-15 crore is planned to fund Lamitube capex and working capital, as operating cash flow has been negative since December 2023.
- Working capital is stretched: the company pre-buys aluminium in cash and sells on 45-60 day credit, so operating cash flow has been negative.
- Q4 EBITDA margin widened about 649 bps to 12.72%, and management says it aims to keep overall profitability at the same level going ahead.
- A small INR 3-4 crore Lamitube capex is planned by about Q3 FY26, contingent on the trading business gaining market traction.
- Plant utilisation is about 68-70%, and management expects to reach optimal capacity around post-Q2 or early Q3 FY26 with more funding.
- Management is pursuing backward integration, Lamitube trading, and a possible LDPE plant acquisition, and expects to be self-funded in about three years.
Documents read
- Business update — Q2FY27 (6 Nov 2026) · Business update · 6 Nov 2026
- Business update — Q1FY27 (6 Aug 2026) · Business update · 5 Aug 2026
- Concall transcript — Q1FY27 (24 Jul 2026) · Concall transcript · 21 Jul 2026 · 14 statements
- Concall presentation — Q1FY27 (Jul 2026) · Concall presentation · 20 Jul 2026 · 8 statements
- Business update — Q1FY27 (3 Jul 2026) · Business update · 3 Jul 2026
- Concall transcript — Q4FY26 (Apr 2026) · Concall transcript · 22 Apr 2026 · 9 statements
- Concall presentation — Q4FY26 (Apr 2026) · Concall presentation · 21 Apr 2026 · 6 statements
- Concall transcript — Q3FY26 (Feb 2026) · Concall transcript · 2 Feb 2026 · 24 statements
- Concall transcript — Q2FY26 (Nov 2025) · Concall transcript · 6 Nov 2025 · 20 statements
- Annual report FY25 · Annual report · 3 Sep 2025 · 4 statements
- Concall transcript — Q1FY26 (Jul 2025) · Concall transcript · 21 Jul 2025 · 24 statements
- Concall transcript — Q4FY25 (May 2025) · Concall transcript · 9 May 2025 · 16 statements
- Annual report FY24 · Annual report · 4 Sep 2024 · 3 statements
Guidance is extracted from company documents and interviews by an AI model and then checked against reported numbers by rule. It can contain errors or miss context, and the stored figures may differ from the basis management guided on. This page is information only and is not investment advice.