EPack Prefab Technologies Ltd: management guidance tracker
What management said it would deliver, when, where they said it — and what the reported numbers showed afterwards.
How to read this page — 30 seconds
- Latest guidance is what management said at its most recent results call, presentation or interview, next to what it had said before. Raised or Lowered tells you which way expectations moved.
- Other open guidance lists earlier promises that have not fallen due, soonest first, with the latest reported figure.
- Track record compares each promise that has fallen due with what the company actually delivered. That is the best guide to how much weight to give the new guidance.
Select any row for management's exact words, where they said it and how the target changed over time.
Latest guidance · 4 Nov 2026
From Concall transcript — Q2FY27 (7 Nov 2026). What management guided for most recently, against what it had said before.
Average order value (PEB) · PEB
Direct
Management expects average order value in PEB to be INR10 to 12 crores this year.
Earlier
First time stated
Now₹10 Cr – ₹12 CrFY27
Change
New
StatusPending
In management's words
“So overall, this year we'll have an average order value of over INR10 crores to INR12 crores, between that range in PEB segment.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Direct
Walked back
FY27 EBITDA margin outlook of 10% to 10.5% is maintained.
Earlier
10.5%FY27 · 31 Aug 2026
Now10–10.5%FY27
Change
Lowered
StatusOn track
So far: 9.8%
In management's words
“On guidance, we are maintaining our FY27 outlook of INR1900 crores of revenue with a 10% to 10.5% EBITDA margin.”
How it was checked
Year to date (Q1FY27–Q2FY27) ebitda / operating margin is 9.8% against the guided 10–10.5% for FY27.
How this guidance changed
- 22 Jan 2026 — 10.5–11.5% for FY27
First stated
Concall transcript · Behind (actual 9.8%)
- 18 May 2026 — ≥ 10% for FY27
Lowered
Concall transcript · On track (actual 9.8%)
- 31 Aug 2026 — 10.5% for FY27
Raised
Annual report · Behind (actual 9.8%)
- 4 Nov 2026 — 10–10.5% for FY27
Lowered
Concall transcript · On track (actual 9.8%)
Order booking
Direct
FY27 order booking target is INR2000 crores, with INR1124 crores already booked in H1.
Earlier
≥ ₹2,000 CrFY27 · 18 May 2026
Now≥ ₹2,000 CrFY27
Change
Repeated
StatusPending
In management's words
“our target was to do order booking of INR2000 crores in this financial year.”
How it was checked
Order inflow is not in the stored financial tables.
How this guidance changed
- 18 May 2026 — ≥ ₹2,000 Cr for FY27
First stated
Concall transcript · On track (actual INR1,124 crore H1 FY27 order inflow)
- 4 Nov 2026 — ≥ ₹2,000 Cr for FY27
Repeated
Concall transcript · Pending
Revenue
Direct
FY27 revenue outlook of INR1900 crores is maintained.
Earlier
₹1,925 Cr – ₹1,950 CrFY27 · 31 Aug 2026
Now≥ ₹1,900 CrFY27
Change
Repeated
StatusBehind
So far: ₹867 Cr
In management's words
“On guidance, we are maintaining our FY27 outlook of INR1900 crores of revenue with a 10% to 10.5% EBITDA margin.”
What it implies in numbers
Reaching ₹1,900 Cr by FY27 from ₹1,525 Cr (FY26) needs about 24.6% growth a year.
How it was checked
₹867 Cr booked in Q1FY27–Q2FY27 — 46% of the ₹1,900 Cr guided for FY27 with 50% of the period gone (simple pro-rata, ignores seasonality).
How this guidance changed
- 22 Jan 2026 — ~₹1,800 Cr for FY27
First stated
Concall transcript · On track (actual ₹867 Cr)
- 18 May 2026 — ₹1,925 Cr – ₹1,950 Cr for FY27
Raised
Concall presentation · Behind (actual ₹867 Cr)
- 31 Aug 2026 — ₹1,925 Cr – ₹1,950 Cr for FY27
Repeated
Annual report · Behind (actual ₹867 Cr)
- 4 Nov 2026 — ≥ ₹1,900 Cr for FY27
Repeated
Concall transcript · Behind (actual ₹867 Cr)
Capacity utilization
Direct
Management targets capacity utilisation of 80% to 85% across plants in FY27-FY28.
Earlier
~80%Not specified · 22 Jan 2026
Now80–85%Not specified
Change
Raised
StatusPending
In management's words
“So, in ‘27, ‘28, basically we'd be utilizing, the idea would be to utilize all the plants and do a capacity utilization of 80% to 85% there.”
How it was checked
Capacity utilisation is not in the stored financial tables.
How this guidance changed
- 22 Jan 2026 — ~80% for Not specified
First stated
Concall transcript · Pending (actual Average capacity utilisation 74%-plus over three months; FY26 PEB utilisation 71.7%)
- 4 Nov 2026 — 80–85% for Not specified
Raised
Concall transcript · Pending
Working capital days
Direct
Walked back
Management's working capital guidance range is 40 to 55 days.
Earlier
~35 daysNot specified · 22 Jan 2026
Now40–55 daysNot specified
Change
Raised
StatusPending
In management's words
“Our guidance has always been around 40 days to 55 days would be the working capital.”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
- 24 Oct 2025 — ~35 days for Not specified
First stated
Concall transcript · Achieved (actual 15 days)
- 22 Jan 2026 — ~35 days for Not specified
Repeated
Concall transcript · Achieved (actual 15 days)
- 4 Nov 2026 — 40–55 days for Not specified
Raised
Concall transcript · Pending
Revenue potential at full capacity
Indirect
Management says total capacity, after current and pending capex, can support revenue of about INR2,800 to 3,000 crores.
Earlier
First time stated
Now₹2,800 Cr – ₹3,000 Crby FY27
Change
New
StatusPending
In management's words
“we can easily get a revenue of around INR2,800 to INR3,000 crores going, that's combining both the PEB as well as the sandwich panel capacities that we have.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Completion of pending capex by March end
How this guidance changed
Stated once in the documents read so far.
Growth CAGR
Indirect
Management expects revenue growth of 25% to 30% a year for the next couple of years.
Earlier
First time stated
Now25–30% a year (CAGR)FY28–FY29
Change
New
StatusPending
In management's words
“we are growing at 25% to 30% CAGR, and going forward also, that will be our endeavor to grow at 25% to 30%.”
What it implies in numbers
25–30% a year on ₹1,525 Cr (FY26) compounds to about ₹2,979 Cr to ₹3,35 Cr by FY29.
How it was checked
Due with FY29 results; nothing reported since the statement yet.
Condition attached by management: Driven by current demand cycle and order intake
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Margins
Hint
Management expects Q3 FY27 margins to be better than the H1 FY27 average.
Earlier
First time stated
Nowto improveQ3FY27
Change
New
StatusPending
In management's words
“we expect our margins in the current quarter to be better than what we have delivered in the entire H1.”
Condition attached by management: Orders repriced at current input costs and inventory built ahead of steel increases
How this guidance changed
Stated once in the documents read so far.
Working capital
Hint
Management expects working capital to normalise in Q3 FY27 as LC-backed milestone receivables are collected.
Earlier
First time stated
Nowto come downQ3FY27
Change
New
StatusPending
In management's words
“we expect this to normalize in this quarter three.”
Condition attached by management: LC process delays being resolved
How this guidance changed
Stated once in the documents read so far.
Capacity utilisation (sandwich panels) · Sandwich panels (Ghiloth)
Hint
Management expects the Ghiloth sandwich panel line to ramp up over the remaining five months of FY27.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“the new sandwich panel line ramp-up will definitely happen over the next 5 months of this financial year.”
How it was checked
Capacity utilisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Capacity utilisation (sandwich panels) · Sandwich panels (Mambattu)
Hint
Management expects sandwich panel capacity utilisation to be much better in H2 FY27 than in H1.
Earlier
First time stated
Nowto improveH2FY27
Change
New
StatusPending
In management's words
“So, we can see the ramp-up in H2 and it will be much better in terms of capacity utilization compared to H1.”
How it was checked
Capacity utilisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Capex
Hint
Management says no new capex is needed in FY27-FY28, with focus on utilising new plants.
Earlier
First time stated
Nowto come downFY27
Change
New
StatusPending
In management's words
“For ‘27, ‘28, actually we won't need any capex, new capex.”
Condition attached by management: Would add capacity, possibly brownfield, if order book stays strong in FY27-FY28
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Customer payment terms
Hint
Management expects better customer payment terms to show over the next two to three quarters.
Earlier
First time stated
Nowto improveby Q4FY27
Change
New
StatusPending
In management's words
“over a period of next 2 quarters to 3 quarters, we will start to see the changes as well.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Scale and pricing power allowing better terms
Assumptions made in reading this
- 'next quarter' counted from Q2FY27, the quarter being reported at the time
How this guidance changed
Stated once in the documents read so far.
Gross margin
Hint
Management expects gross margin to improve in Q3 and Q4 FY27.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“we will be able to improve upon our gross margin in this quarter and the quarter next to this.”
How it was checked
Gross margin is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Gujarat plant commissioning · Gujarat plant
Hint
Management plans to commission the Gujarat greenfield plant in Q4 FY27.
Earlier
First time stated
NowmilestoneQ4FY27
Change
New
StatusPending
In management's words
“we plan to get this new plant in Gujarat commissioned in the fourth quarter of the current financial year.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Margin
Hint
Management expects H2 FY27 margin to be better than H1, from inventory built to protect against steel price rises.
Earlier
First time stated
Nowto improveH2FY27
Change
New
StatusPending
In management's words
“Revenue, because we already have a strong order book and margins, because we have built the inventory to protect us from any steel price increase which may affect our margins.”
How this guidance changed
Stated once in the documents read so far.
Margins during ramp-up · Sandwich panels (Ghiloth)
Hint
During the Ghiloth ramp-up, management intends to prioritise volume, keeping margins at historical levels.
Earlier
First time stated
Nowto hold or improveFY27
Change
New
StatusPending
In management's words
“So, margins would be the same as it has been in the past.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Volume prioritised over margin during ramp-up
How this guidance changed
Stated once in the documents read so far.
Pending capex
Hint
Management plans to complete the pending capex by March 2027.
Earlier
First time stated
Nowmilestoneby FY27
Change
New
StatusPending
In management's words
“the pending capex that we will be doing by March end”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Revenue
Hint
Management expects H2 FY27 revenue to be better than H1, supported by the order book.
Earlier
First time stated
Nowto improveH2FY27
Change
New
StatusPending
In management's words
“H2 will be better in terms of -- both in terms of revenue as well as in terms of margin.”
How this guidance changed
Stated once in the documents read so far.
Other open guidance · soonest due first
Earlier promises that have not fallen due yet, with the latest figure where one has been reported.
Efficiency improvement from TDR activities
Direct
Teardown and re-engineering activities are expected to deliver a 5% to 10% efficiency improvement in the current quarter.
Target5–10% growth
DueQ3FY26
result by 14 Feb 2026
Said24 Oct 2025
Concall transcript
StatusAwaiting data
In management's words
“gives us efficiency to the level of 5% to 10% improvement. So, that will happen in this quarter as well”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Depends on capacity utilisation.
How this guidance changed
Stated once in the documents read so far.
Order booking in H2
Hint
Management expects order booking in H2 FY26 to be much better than in H1.
Targetto improve
DueH2FY26
result by 30 May 2026
Said24 Oct 2025
Concall transcript
StatusAwaiting data
In management's words
“And as Sanjayji mentioned, the order booking in H2 is much better than the H1.”
How it was checked
Order inflow is not in the stored financial tables.
Condition attached by management: Tailwinds in pipeline
How this guidance changed
Stated once in the documents read so far.
EPS packaging business growth · EPS packaging
Direct
Management expects EPS packaging business to grow 6-7% going forward, tied to LG Electronics' growth.
Target6–7% growth
DueFY26
result by 30 May 2026
Said24 Oct 2025
Concall transcript
StatusAwaiting data
In management's words
“going forward also we believe that it will continue to grow at 6% to 7%”
What it implies in numbers
6–7% growth on ₹1,134 Cr (FY25) implies about ₹1,202 Cr to ₹1,213 Cr for FY26.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Depends on LG Electronics growth at Greater Noida; about 50% of packaging revenue from one customer
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Structural steel capacity added in Q4 (Mambattu) · structural steel fabrication
Direct
Mambattu Brownfield expansion is expected to add 28,000-32,000 tons of structural steel capacity from Q4 FY26.
Target28,000–32,000 tons
DueQ4FY26
result by 30 May 2026
Said24 Oct 2025
Concall transcript
StatusAwaiting data
In management's words
“So, that would add another 28,000 tons to 32,000 tons of capacity for us.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Later answer referred to 32,000 rather than 37,000 tons of capacity
How this guidance changed
Stated once in the documents read so far.
EPS packaging margin · EPS packaging
Hint
Management says the EPS packaging margin expansion is sustainable and will stay in the recent range.
Targetto hold or improve
DueFY26
result by 30 May 2026
Said24 Oct 2025
Concall transcript
StatusAwaiting data
In management's words
“And this margin expansion is sustainable, and it will continue to remain in that range.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Based on biofuel-run multi-fuel turbine lowering power and fuel costs
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
PEB production volume
Direct
Management targets PEB output of more than 1 lakh MT in FY26.
Target≥ ₹0.01 Cr
DueFY26
result by 30 May 2026
Said15 Jan 2026
Concall presentation
StatusAwaiting data
In management's words
“Target to do more than 1 lacs MT PEB this year”
How it was checked
Volume is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Mambattu expansion capex work · Mambattu (AP) - Unit 4
Direct
Work on the Mambattu capex of INR 581 Mn is expected to be completed in Q4 FY26.
Target₹58.1 Cr
DueQ4FY26
result by 30 May 2026
Said15 Jan 2026
Concall presentation
StatusAwaiting data
In management's words
“Work has Started and expected to be done in Q4 FY 26”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Structural steel fabrication capacity (Unit-4, Mumbattu) · Structural steel, Mumbattu (Andhra Pradesh)
Hint
Unit-4 structural steel capacity at Mumbattu is expected to be commercialised in Q4 FY26.
Targetmilestone
DueQ4FY26
result by 30 May 2026
Said22 Jan 2026
Concall transcript
StatusAwaiting data
In management's words
“The capacity will be commercialized within this fourth quarter of this financial year”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Rajasthan expansion capacity (Mumbattu and Ghiloth combined) · Mumbattu and Ghiloth
Direct
The 33,000-ton capacity across Mumbattu and Ghiloth is expected to be commissioned within Q4 FY26.
Targetmilestone
DueQ4FY26
result by 30 May 2026
Said22 Jan 2026
Concall transcript
StatusAwaiting data
In management's words
“it will be commissioned with 33,000 tons, which comprises of two locations, Mumbattu and Ghiloth, will be commissioned within this quarter.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Big orders
Hint
Management expects to book big orders in Q4 FY26, citing a strong pipeline and enquiries.
Targetmilestone
DueQ4FY26
result by 30 May 2026
Said22 Jan 2026
Concall transcript
StatusAwaiting data
In management's words
“for sure, we are on track of booking big orders in this quarter as well.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
H2 versus H1 performance
Hint
Management expects H2 to be better than H1 on a generally seasonal basis, with Q4 typically the strongest quarter.
Targetto improve
DueH2FY26
result by 30 May 2026
Said22 Jan 2026
Concall transcript
StatusAwaiting data
In management's words
“generally, if we see in the half yearly basis, the H2 is better than the H1. So, generally, that is the trend.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Depends on seasonality and other factors that may vary.
Assumptions made in reading this
- no year stated; taken as H2FY26
How this guidance changed
Stated once in the documents read so far.
Revenue from sandwich panel capacity · sandwich panels (Mambattu line)
Direct
The newer sandwich panel capacity is expected to generate revenue close to Rs 100 crore in the next 5-6 months.
Target~₹100 Cr
DueQ4FY26–Q1FY27
result by 14 Aug 2026
Said24 Oct 2025
Concall transcript
StatusAwaiting data
In management's words
“that is, again, one capacity which will give revenue close to maybe Rs. 100 crores for us in the next 5 to 6 months.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Recovery of packaging revenue loss · EPS packaging
Indirect
If consumer durable demand recovers, management expects to recoup about 20% of lost packaging revenue over the next 6 months.
Target~20% growth
Dueby Q1FY27
result by 14 Aug 2026
Said24 Oct 2025
Concall transcript
StatusAwaiting data
In management's words
“If the consumer durable market comes up strong, then I think we will be able to make up for this loss of revenue of around 20% there in the next 6 months.”
What it implies in numbers
20% growth on ₹295 Cr (Q1FY26) implies about ₹354 Cr for Q1FY27.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Depends on consumer durable market recovering
How this guidance changed
Stated once in the documents read so far.
Ghiloth greenfield project commencement · Ghiloth (Rajasthan) - Unit 3
Direct
Greenfield project at Ghiloth is expected to commence by end of Q2 FY27.
Targetmilestone
Dueby Q2FY27
result by 14 Nov 2026
Said15 Jan 2026
Concall presentation
StatusPending
In management's words
“The brownfield expansion at Mambattu and the greenfield project at Ghiloth are progressing rapidly and expected to commence by March 2026 and end of 2nd Quarter of FY 27 respectively.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Ghiloth expansion capex work · Ghiloth (Rajasthan) - Unit 3
Direct
Work on the Ghiloth capex of INR 1,016 Mn started in Q4 and is expected to be done by Q3 FY27.
Target₹102 Cr
DueQ3FY27
result by 14 Feb 2027
Said15 Jan 2026
Concall presentation
StatusPending
In management's words
“Work started in Q4 and is expected to be done by Q3 FY 27”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Sandwich panel capacity (Ghiloth) · Sandwich panels, Ghiloth (Rajasthan)
Direct
The 8 lakh sq m sandwich panel line at Ghiloth is expected to be commercialised in Q3 FY27, despite NGT-related delays.
Targetmilestone
DueQ3FY27
result by 14 Feb 2027
Said22 Jan 2026
Concall transcript
StatusPending
In management's words
“that will also be commercialized in the third quarter of FY27.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: subject to civil work and NGT/Delhi NCR construction restrictions
How this guidance changed
Stated once in the documents read so far.
Greenfield CAPEX for sandwich panels (Ghiloth) · Sandwich panels, Ghiloth
Direct
The Ghiloth sandwich panel greenfield capex is about Rs 101 crore, with operations expected in Q3 FY27.
Target~₹101 Cr
Dueby Q3FY27
result by 14 Feb 2027
Said22 Jan 2026
Concall transcript
StatusPending
In management's words
“We are doing Rs.101-odd crores there, where we have already started the plan at this location, and it will be operational by the third quarter of the next financial year.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
New northern sandwich panel line commissioning · Sandwich panels
Hint
The new northern sandwich panel line is expected to be commissioned by Nov/Dec 2026.
Targetmilestone
Dueby Dec 2026
result by 14 Feb 2027
Said18 May 2026
Concall presentation
StatusOn track
In management's words
“we expect our new northern line to be commissioned by Nov/Dec 2026 to capture the peak cold storage cycle”
How it was checked
E18 reports a sandwich panel line commissioned at Ghiloth ahead of the Dec 2026 deadline, though it is not confirmed as the northern line. (judged from later company statements)
Evidence (31 Aug 2026): “Panel utilisation of 44.1% in FY 26 is the clearest margin opportunity in the business.” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Ghiloth greenfield facility work · Ghiloth, Rajasthan
Hint
Ghiloth facility work, started in Q4, is expected to be completed by Q3 FY27.
Targetmilestone
DueQ3FY27
result by 14 Feb 2027
Said18 May 2026
Concall presentation
StatusPending
In management's words
“Work started in Q4 and is expected to be done by Q3 FY 27”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Ghiloth continuous sandwich panel line · Sandwich panels
Hint
The Ghiloth panel line is likely to be commissioned by October 2026.
Targetmilestone
Dueby Oct 2026
result by 14 Feb 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“The Ghiloth panel line is likely to be commissions by October 2026.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Ghiloth PIR/PUR line commissioning · Sandwich panels
Hint
Walked back
The Ghiloth PIR/PUR panel line is expected to commission in Nov/Dec 2026. This conflicts with the October 2026 date given elsewhere.
Targetmilestone
Dueby Dec 2026
result by 14 Feb 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Ghiloth PIR/PUR line: North India cold chain - commissioning Nov/Dec 2026”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
Gujarat Phase 1 expansion commencement · Gujarat
Hint
Phase 1 expansion in Gujarat is planned to commence during FY2027.
Targetmilestone
DueFY27
result by 30 May 2027
Said15 Jan 2026
Concall presentation
StatusPending
In management's words
“We plan to commence Phase 1 expansion during FY 2027.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Gujarat Phase 1 expansion capacity · Gujarat
Direct
Phase 1 expansion in Gujarat is expected to add 50,000 MTPA of pre-engineered capacity by end of FY27.
Target50,000 MTPA
Dueby Q4FY27
result by 30 May 2027
Said15 Jan 2026
Concall presentation
StatusPending
In management's words
“50,000 MTPA Phase 1 Expansion in Gujarat by end of FY 27”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Return ratios (RoCE/RoE)
Hint
Returns from the IPO-funded expansion are expected to be seen in FY27.
Targetto improve
DueFY27
result by 30 May 2027
Said15 Jan 2026
Concall presentation
StatusPending
In management's words
“Expected Return to be seen in FY 27”
How it was checked
Guided on an adjusted basis, which the stored numbers do not carry.
How this guidance changed
Stated once in the documents read so far.
Revenue growth
Direct
FY27 revenue is guided to grow at least 20% over FY26.
Target≥ 20% growth
DueFY27
result by 30 May 2027
Said22 Jan 2026
Concall transcript
StatusBehind
So far: 18.93% growth (Q1FY27–Q2FY27)
In management's words
“Our revenue guidance for the next FY27, which we are giving is a minimum 20% of growth over the '26.”
What it implies in numbers
20% growth on ₹1,525 Cr (FY26) implies about ₹1,830 Cr for FY27.
How it was checked
Year to date (Q1FY27–Q2FY27) growth is 18.9% against the guided ≥ 20% for FY27.
How this guidance changed
Stated once in the documents read so far.
CAPEX (Gujarat plant) · Gujarat (Vithlapur)
Direct
Gujarat plant capex of about Rs 55-60 crore is expected in FY27 for an initial 50,000 ton capacity.
Target₹55 Cr – ₹60 Cr
DueFY27
result by 30 May 2027
Said22 Jan 2026
Concall transcript
StatusPending
In management's words
“which needs a CAPEX of around Rs.55 crores to Rs.60 crores. So, that will also be done in the next financial year.”
What it implies in numbers
Reaching ₹55 Cr by FY27 from ₹86 Cr (FY25) needs about 20.0% decline a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
OPM (commodity price impact)
Hint
Management does not foresee steel price increases affecting operating margin, citing inventory, mill orders and weekly order pricing.
Targetto hold or improve
DueFY27
result by 30 May 2027
Said22 Jan 2026
Concall transcript
StatusPending
In management's words
“I do not foresee any impact of this commodity price increase in our OPM.”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
ROE
Hint
Management expects a small dip in ROE in FY27 because capex will be executed in that year.
Targetto come down
DueFY27
result by 30 May 2027
Said22 Jan 2026
Concall transcript
StatusPending
In management's words
“Obviously, you will see a little blip in the ROE in the FY27 because the CAPEX will be happening there.”
How this guidance changed
Stated once in the documents read so far.
Gujarat plant capacity to start with · Gujarat (Vithlapur)
Direct
The Gujarat plant is planned to start with 50,000 tons of capacity, with the capex expected in FY27.
Target50,000 tons
DueFY27
result by 30 May 2027
Said22 Jan 2026
Concall transcript
StatusPending
In management's words
“the idea is, like to put up a capacity of 50,000 tons to start with, so which needs a CAPEX of around Rs.55 crores to Rs.60 crores.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Year-on-year growth endeavour
Direct
Management says 30-35% yearly growth is its endeavour, dependent on technology adoption and other factors.
Target30–35% growth
DueFY27
result by 30 May 2027
Said22 Jan 2026
Concall transcript
StatusBehind
So far: H1 FY27 revenue grew 19%
In management's words
“30-35% year-on-year, that will be our endeavor, like, that depends on the technology adoption and a lot of other factors.”
How it was checked
The FY27 endeavour of 30-35% growth is not yet due, but H1 FY27 revenue growth of 19% is running below the target range. (judged from later company statements)
Evidence (4 Nov 2026): “The revenue of the company for H1 grew by 19% to INR 867 crores. And quarter two was our biggest quarter ever at INR501 crores revenue.” — Concall transcript — Q2FY27 (7 Nov 2026)
Condition attached by management: depends on technology adoption and a lot of other factors
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
CAPEX utilisation of IPO funds for Mumbattu and Ghiloth · Mumbattu and Ghiloth
Direct
Management expects to use the Rs 160 crore IPO-funded capex in the Mumbattu and Ghiloth plants in FY27.
Target₹160 Cr
DueFY27
result by 30 May 2027
Said22 Jan 2026
Concall transcript
StatusOn track
So far: Rs 1,548 Mn (about Rs 155 Cr) of IPO proceeds spent by end FY26
In management's words
“we will be utilizing all the CAPEX, like to raise to IPO of Rs.160 crores in the two plants in Mumbattu and Ghiloth.”
How it was checked
About Rs 155 Cr of the Rs 160 Cr IPO capex was spent by end FY26, with management saying on track; the FY27 deadline has not passed. (judged from later company statements)
Evidence (18 May 2026): “Spent Rs. 1,548 Mn Until the end of FY 26” — Concall presentation — Q4FY26 (May 2026)
How this guidance changed
Stated once in the documents read so far.
Growth of 30% in our Prefab division · Prefab division
Direct
Prefab division revenue to grow 30% in FY27.
Target30% growth
DueFY27
result by 30 May 2027
Said18 May 2026
Concall transcript
StatusBehind
So far: company revenue grew 19% in H1FY27
In management's words
“So this FY27, we are targeting a growth of 30% in our Prefab division.”
What it implies in numbers
30% growth on ₹1,525 Cr (FY26) implies about ₹1,982 Cr for FY27.
How it was checked
H1 FY27 company revenue grew 19%, below the 30% prefab growth target, though prefab-specific growth is not reported. (judged from later company statements)
Evidence (4 Nov 2026): “The revenue of the company for H1 grew by 19% to INR 867 crores. And quarter two was our biggest quarter ever at INR501 crores revenue.” — Concall transcript — Q2FY27 (7 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Revenue for this year (Prefab division) · Prefab division
Direct
Prefab division revenue of about INR1,920-1,950 crore in FY27.
Target₹1,920 Cr – ₹1,950 Cr
DueFY27
result by 30 May 2027
Said18 May 2026
Concall transcript
StatusBehind
So far: H1FY27 revenue of INR867 crore
In management's words
“So it will take us to around INR1,920 to INR1,950 crores kind of a revenue for this year.”
What it implies in numbers
Reaching ₹1,920 Cr by FY27 from ₹1,525 Cr (FY26) needs about 25.9% growth a year.
How it was checked
H1 revenue of Rs 867 crore with Q2 at Rs 501 crore implies roughly Rs 1,000 crore for the year, short of the Rs 1,920-1,950 crore target. (judged from later company statements)
Evidence (4 Nov 2026): “The revenue of the company for H1 grew by 19% to INR 867 crores. And quarter two was our biggest quarter ever at INR501 crores revenue.” — Concall transcript — Q2FY27 (7 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
PEB revenue for this year · PEB business
Direct
Revenue target for FY27 restated as INR1,925-1,950 crore in reply to an analyst.
Target₹1,925 Cr – ₹1,950 Cr
DueFY27
result by 30 May 2027
Said18 May 2026
Concall transcript
StatusBehind
So far: H1FY27 revenue of INR867 crore
In management's words
“INR1,925 crores to INR1,950 crores, yes. Correct.”
What it implies in numbers
Reaching ₹1,925 Cr by FY27 from ₹1,525 Cr (FY26) needs about 26.2% growth a year.
How it was checked
H1 revenue of Rs 867 crore points to roughly Rs 1,000 crore at the Q2 run rate, well short of the Rs 1,925-1,950 crore target, though PEB-only revenue is not reported. (judged from later company statements)
Evidence (4 Nov 2026): “The revenue of the company for H1 grew by 19% to INR 867 crores. And quarter two was our biggest quarter ever at INR501 crores revenue.” — Concall transcript — Q2FY27 (7 Nov 2026)
Evidence (31 Aug 2026): “PEB Capacity Utilisation 71.7%” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Net Working Capital
Direct
Management targets net working capital of 35–38 days for FY27.
Target35–38 days
DueFY27
result by 30 May 2027
Said18 May 2026
Concall presentation
StatusPending
In management's words
“Net Working Capital: 35–38 days”
How this guidance changed
Stated once in the documents read so far.
Sandwich panel capacity utilisation · Sandwich panels
Hint
Management is working to increase sandwich panel capacity utilisation, with no number or timing given.
Targetto improve
DueFY27
result by 30 May 2027
Said18 May 2026
Concall presentation
StatusOn track
So far: sandwich panel utilisation rose from 29% to 43% in Q4FY26 and Mambattu rose to 47-48% in Q2FY27
In management's words
“We are working to increase capacity utilization of Sandwich Panel”
How it was checked
Utilisation is trending up (sandwich 44.1% FY26, Mambattu 35% to 47-48%), but no numeric target was given. (judged from later company statements)
Evidence (31 Aug 2026): “Panel utilisation of 44.1% in FY 26 is the clearest margin opportunity in the business.” — Annual report FY26
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Revenue share from supply to green buildings construction sector
Hint
Management intends to increase the company's revenue share from supply to the green buildings construction sector. No number or timeline is given.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report · 2× since 24 Oct 2025
StatusPending
In management's words
“Going forward we intend to increase our revenue share f rom supply to green buildings construction sector.”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 24 Oct 2025 — to improve for FY27–FY27
First stated
Concall transcript · Pending
- 31 Aug 2026 — to improve for FY27
Repeated
Annual report · Pending
FY 27 Capex
Direct
FY27 capex is planned at about ₹150 crore, funded from internal accruals and existing IPO proceeds.
Target~₹150 Cr
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report · 2× since 18 May 2026
StatusPending
In management's words
“Our planned capex for FY 27 is approximately ₹150 crores, funded through internal accruals and existing IPO proceeds.”
What it implies in numbers
Reaching ₹150 Cr by FY27 from ₹133 Cr (FY26) needs about 12.8% growth a year.
Condition attached by management: Funded from internal accruals and existing IPO proceeds; no new debt
How this guidance changed
- 18 May 2026 — ~₹150 Cr for FY27
First stated
Concall presentation · Pending
- 31 Aug 2026 — ~₹150 Cr for FY27
Repeated
Annual report · Pending
Total PEB Capacity · PEB
Direct
PEB capacity is targeted to reach 220,000 MTPA by end of FY27, driven by Gujarat phases 1 and 2.
Target220,000 MTPA
Dueby FY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Our target is 220,000 MTPA by end of FY 2027, driven by Gujarat Phase 1 & 2.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Driven by Gujarat Phase 1 & 2
How this guidance changed
Stated once in the documents read so far.
Ghiloth plant commissioning
Direct
The Ghiloth plant is targeted for commissioning during FY27.
Targetmilestone
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“while the Ghiloth plant is targeted for commissioning during FY 2026-27.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
PAT Margin
Direct
FY27 PAT margin is guided at 6.5% to 7.0%.
Target6.5–7%
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusBehind
So far: 5.54% (Q1FY27–Q2FY27)
In management's words
“FY 27 PAT Margin 6.5% to 7.0% FY 27”
How it was checked
Year to date (Q1FY27–Q2FY27) net profit margin is 5.5% against the guided 6.5–7% for FY27.
How this guidance changed
Stated once in the documents read so far.
Mambattu Continuous Panel Utilisation · Sandwich panels
Direct
Mambattu continuous panel utilisation is targeted to reach 70%+ by end of FY27, up from 39.6%.
Target≥ 70%
Dueby FY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusOn track
So far: about 47% to 48% in Q2FY27
In management's words
“Target: 70%+ utilisation at Mambattu by FY 27 end”
How it was checked
Mambattu utilisation rose to 47-48% in Q2FY27 from 35%, but reaching 70%+ by FY27 end needs a further large gain. (judged from later company statements)
Evidence (4 Nov 2026): “current order book is also above 5 lakh square meters pending order book in hand for sandwich panels.” — Concall transcript — Q2FY27 (7 Nov 2026)
Condition attached by management: Through renewable, cold chain, food processing and data centre focus
How this guidance changed
Stated once in the documents read so far.
Repeat-order relationships in data centres · Data centres
Direct
The company is targeting 3 repeat-order relationships in data centres by FY27 end.
Target≥ 3 repeat-order relationships
Dueby FY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Targeting 3 repeat-order relationships by FY 27 end”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Gujarat expansion phase 1
Hint
Gujarat expansion phase 1 is expected to be completed in FY27, funded through internal accruals.
Targetmilestone
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Simultaneously, the Company is also working on its Gujarat expansion phase 1 through internal accruals”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Funded through internal accruals
How this guidance changed
Stated once in the documents read so far.
Installed capacity
Hint
Management intends to increase installed capacity through proposed expansions to capitalise on industry growth. No number or timeline is given.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusOn track
So far: 13,000 tons of steel processing capacity added at Ghiloth Unit 5
In management's words
“Increasing our installed capacity through proposed expansions to capitalize on the rapid growth of the pre-engineered steel buildings industry to increase our presence throughout the country.”
How it was checked
The guidance has no numeric target and the deadline is FY27, which has not passed. E1 reports added processing capacity at Ghiloth Unit 5, but it is steel processing capacity, not confirmed installed capacity. (judged from later company statements)
Evidence (4 Nov 2026): “on 30th of October, about 3, 4 last week only, we have added 13,000 tons of steel capacity, processing capacity at our Ghiloth Greenfield project that is Unit 5” — Concall transcript — Q2FY27 (7 Nov 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Ghiloth Plant (Rajasthan) start
Hint
The company expects to start the Ghiloth Plant in Rajasthan during FY27, which is funded partly from IPO proceeds.
Targetmilestone
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“expecting to start the Ghiloth Plant (Rajasthan) during FY 27”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Finance costs
Hint
Management expects finance costs to continue declining after the ₹70 crore debt repayment.
Targetto come down
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Continuing to reduce finance costs following the ₹70 Crore debt repayment funded from IPO proceeds”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Export market expansion
Hint
Management is looking to expand into export markets where feasible.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Looking to expand into export market where ever feasible.”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: Where feasible
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Investment in technology infrastructure and design capabilities
Hint
Management will continue to invest in technology infrastructure, design capabilities and AI in marketing. No amount or timeline is given.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Continue to invest in technology infrastructure and design capabilities to enhance in-house design and engineering, and manufacturing capabilities along with AI Implementation in our Marketing Process”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Participation in data centre infrastructure · data centre
Hint
Management believes its expertise gives it a strong foundation to participate in the growing data centre infrastructure market. No number or timeline is given.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Provides a strong foundation to participate in this growing market opportunity”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Participation in emerging growth opportunities
Hint
Management says EPACK Prefab is positioned to participate in emerging growth opportunities, including expansion across industrial and infrastructure sectors. No number or timeline is given.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“EPACK Prefab is positioned to participate in emerging growth opportunities.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Capex for Brownfield expansion · structural steel fabrication (Mambattu)
Direct
Management plans capex of Rs 58 crore for the Mambattu Brownfield structural steel expansion.
Target₹58 Cr
DueNot specified
Said24 Oct 2025
Concall transcript
StatusPending
In management's words
“the Rs. 58 crores which we are putting for the Brownfield expansion of structural steel fabrication in Mambattu”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Funded from IPO proceeds
How this guidance changed
Stated once in the documents read so far.
Capex for Greenfield sandwich panel line · insulated sandwich panel (Ghiloth, Rajasthan)
Direct
Greenfield sandwich panel line capex at Ghiloth is about Rs 102 crore.
Target~₹102 Cr
DueNot specified
Said24 Oct 2025
Concall transcript
StatusPending
In management's words
“there the CAPEX is about Rs. 102 crores.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Market share
Direct
Management aims to raise market share from about 5-5.5% to at least 10%.
Target≥ 10%
DueNot specified
Said24 Oct 2025
Concall transcript
StatusPending
In management's words
“Our market share is around 5%-5.5% right now, which we want to take it to say 10% kind of a level, minimum.”
How it was checked
Market share is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Revenue from Brownfield expansion · structural steel fabrication (Mambattu Brownfield)
Indirect
Management expects the Rs 58 crore Brownfield expansion to generate revenue of over Rs 300 crore, based on 6.5-7x asset turnover.
Target≥ ₹300 Cr
DueNot specified
Said24 Oct 2025
Concall transcript
StatusPending
In management's words
“there we can expect the revenue of Rs. 300 plus crores coming in from that expansion.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Based on asset turnover of 6.5x to 7x; no timeframe given
How this guidance changed
Stated once in the documents read so far.
Revenue from Greenfield sandwich panel line · insulated sandwich panel (Ghiloth)
Indirect
Management says the Greenfield sandwich panel line can generate a maximum of about Rs 250 crore revenue at 2.5x asset turnover.
Target≤ ₹250 Cr
DueNot specified
Said24 Oct 2025
Concall transcript
StatusPending
In management's words
“maximum Rs. 250 crores kind of revenue can come from there as well.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Based on asset turnover of 2.5
How this guidance changed
Stated once in the documents read so far.
Finance cost
Direct
Management expects finance cost to be in the range of 1% to 1.5% going forward.
Target1–1.5%
DueNot specified
Said24 Oct 2025
Concall transcript
StatusPending
So far: ₹31 Cr (FY26)
In management's words
“So, it should be in the range of about a couple of 1.5% going forward as well, the finance cost, 1% to 1.5%.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Term loan now about Rs 50 crore and WCDL about Rs 60 crore, which can move with business needs
How this guidance changed
Stated once in the documents read so far.
Capacity utilisation, Mambattu sandwich panel line · sandwich panels (Mambattu line)
Direct
Management expects the Mambattu sandwich panel line to reach about 50-55% annualised utilisation once a large project is won.
Target50–55%
DueNot specified
Said24 Oct 2025
Concall transcript
StatusPending
So far: around 47% to 48% in Q2FY27
In management's words
“once we get this project, so I understand that we will be able to utilize that capacity on an annualized basis by about 50%-55%.”
How it was checked
Mambattu utilisation rose from about 35% in Q1 to 47-48% in Q2FY27, still below the 50-55% target but moving toward it. No deadline was set. (judged from later company statements)
Evidence (22 Jan 2026): “what we have given in the presentation is the nine months capacity utilization close to about 69%.” — Concall transcript — Q3FY26 (Jan 2026)
Condition attached by management: Requires winning large modular housing project with corporates
How this guidance changed
Stated once in the documents read so far.
ROE
Direct
Once capex is complete and the business reaches steady state, management expects ROE of close to 18%, about 17-18%.
Target~18%
DueNot specified
Said22 Jan 2026
Concall transcript
StatusPending
So far: 12.67% (FY26)
In management's words
“we should be able to deliver our ROE close to about 18%. Obviously, you will see a little blip in the ROE in the FY27 because the CAPEX will be happening there. But as it steadies, we will see about”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Once capex is completed and steady state is reached.
How this guidance changed
Stated once in the documents read so far.
Capex for Gujarat capacity · Gujarat capacity (50,000)
Direct
Total capex for the Gujarat 50,000-capacity plant is close to INR100-110 crore.
Target₹100 Cr – ₹110 Cr
DueNot specified
Said18 May 2026
Concall transcript
StatusPending
In management's words
“Close to about INR100-INR110 crores, out of which we have already spent about INR38 crores on the land and the balance like I said is about INR60-INR65 crores we will spend on building the capacity.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Planned greenfield expansion Phase 1 (Gujarat) · Gujarat
Direct
Gujarat greenfield expansion Phase 1 is planned to add approximately 50K PEB capacity; timing not stated.
Target~50 MTPA PEB capacity
DueNot specified
Said18 May 2026
Concall presentation
StatusPending
In management's words
“Planned Greenfield expansion Phase 1 of approx. 50K PEB Capacity”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
New facility in the West · West India
Hint
Management plans a new facility in western India to serve Maharashtra, Gujarat and nearby markets; timing not stated.
Targetmilestone
DueNot specified
Said18 May 2026
Concall presentation
StatusPending
In management's words
“we now plan to replicate this success with a new facility in the West”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Payback period on FY27 capex
Indirect
Expected payback on FY27 capex is 18–24 months after commissioning.
Target18–24 months
DueNot specified
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Expected Payback 18–24 months Post commissioning”
How it was checked
Guided in a unit the stored tables do not hold.
Condition attached by management: After commissioning
How this guidance changed
Stated once in the documents read so far.
CEO role separation
Hint
Separation of the MD and CEO roles with an external industry veteran is planned.
Targetmilestone
DueNot specified
Said31 Aug 2026
Annual report
StatusPending
In management's words
“Senior leadership strengthened with external industry veteran MD/CEO role separation planned.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Track record · promised vs delivered
Guidance whose deadline has passed, most recent first: how management performed after giving it.
ROC
Direct
Walked back
Management looks forward to delivering ROC of close to 22-25% over the next few years.
Promised22–25%for FY28–FY30
Delivered22%FY26
ResultAchieved · early
Said22 Jan 2026Concall transcript
In management's words
“And on the ROC front, we are still very, very optimistic, and we look forward to delivering close to 22% to 25% ROC over the next few years.”
How it was checked
Reached in FY26, before the FY30 deadline ahead of the stated window.
Assumptions made in reading this
- horizon counted from FY26 (statement made in its last quarter)
- 'few years' read as 2 to 4 years
How this guidance changed
- 24 Oct 2025 — 23–25% for Not specified
First stated
Concall transcript · Pending (actual 22%)
- 22 Jan 2026 — 22–25% for FY28–FY30
Lowered
Concall transcript · Achieved (actual 22%)
Commercial production from Greenfield sandwich panel line · insulated sandwich panel (Ghiloth, Rajasthan)
Hint
Commercial production at the Ghiloth sandwich panel greenfield plant is targeted for Q2 FY27.
Promisedmilestonefor Q2FY27
DeliveredSandwich panel line commissioned at Ghiloth around late October 2026
ResultMissed
Said24 Oct 2025Concall transcript
In management's words
“And the target is to start commercial production in that plant as well from second quarter of next financial year.”
How it was checked
Target was Q2 FY27 (by 30 September 2026). Evidence shows the Ghiloth sandwich panel line was commissioned in late October, after the deadline, and was previously delayed. (judged from later company statements)
Evidence (4 Nov 2026): “on 30th of October, about 3, 4 last week only, we have added 13,000 tons of steel capacity, processing capacity at our Ghiloth Greenfield project that is Unit 5” — Concall transcript — Q2FY27 (7 Nov 2026)
Evidence (22 Jan 2026): “there is certain delay on account of NGT ban and graft in Delhi NCR.” — Concall transcript — Q3FY26 (Jan 2026)
Condition attached by management: CFO later said the plant will ideally start operating at the end of Q2 FY27
How this guidance changed
Stated once in the documents read so far.
PEB capacity post brownfield expansion
Direct
PEB capacity is likely to rise to 1,70,722 MTPA after the Mambattu and Ghiloth brownfield expansions by end of March/April 2026.
Promised170,722 MTPAfor by Apr 2026
Delivered—
ResultMissed
Said15 Jan 2026Concall presentation
In management's words
“Capacity Likely post brown field expansion of Mambattu & Ghiloth by end of March/April 2026”
How it was checked
Mambattu started production on April 29, but the Ghiloth steel capacity was only added on October 30, 2026, and no total of 170,722 MTPA is reported by the April 2026 deadline. (judged from later company statements)
Evidence (31 Aug 2026): “The Mambattu expansion commenced commercial production on April 29, 2026” — Annual report FY26
Evidence (4 Nov 2026): “on 30th of October, about 3, 4 last week only, we have added 13,000 tons of steel capacity, processing capacity at our Ghiloth Greenfield project that is Unit 5” — Concall transcript — Q2FY27 (7 Nov 2026)
Evidence (22 Jan 2026): “there is certain delay on account of NGT ban and graft in Delhi NCR.” — Concall transcript — Q3FY26 (Jan 2026)
How this guidance changed
Stated once in the documents read so far.
Margins
Direct
Margins are guided to stay range-bound at 10.5-11.5% for FY26.
Promised10.5–11.5%for FY26
Delivered10.49%FY26
ResultAchieved
Said22 Jan 2026Concall transcript
In management's words
“Our guidance has always been that the margins would be range-bound between 10.5% to 11.5%, and we continue to stand by this guidance, not only for this year, but also for the next year.”
How it was checked
FY26 actual 10.49% — met the guided 10.5–11.5% (annual result).
How this guidance changed
- 24 Oct 2025 — 10.5–11.5% for FY26
First stated
Concall transcript · Achieved (actual 10.49%)
- 22 Jan 2026 — 10.5–11.5% for FY26
Repeated
Concall transcript · Achieved (actual 10.49%)
Commercial production from Brownfield expansion · structural steel fabrication (Mambattu)
Direct
Commercial production from the Mambattu Brownfield structural steel expansion is targeted for Q4 FY26.
Promisedmilestonefor Q4FY26
DeliveredCommercial production started April 29, 2026 (Q1FY27)
ResultMissed
Said24 Oct 2025Concall transcript
In management's words
“we are very hopeful to start the commercial production from this Brownfield expansion in the 4th Quarter of this financial year.”
How it was checked
Guidance was Q4 FY26 (by 31 March 2026), but commercial production at Mambattu began on 29 April 2026, after the deadline. (judged from later company statements)
Evidence (31 Aug 2026): “Company has also Started Commercial Production of Mambatu Expansion Plant as one of the IPO Object of Capital expenditure on 29th April 2026” — Annual report FY26
Evidence (31 Aug 2026): “The Mambattu expansion commenced commercial production on April 29, 2026” — Annual report FY26
Condition attached by management: Work commenced about 15 days before the call
How this guidance changed
Stated once in the documents read so far.
H2 revenue versus H1
Hint
Management expects H2 FY26 revenue to be better than H1 FY26.
Promisedto improvefor H2FY26
Deliveredup 9.2%H2FY26
ResultAchieved
Said24 Oct 2025Concall transcript
In management's words
“And the second half will definitely be better than the first half.”
How it was checked
Revenue rose by 9.2% in H2FY26 from H1FY26 — in line with what management indicated (sum of 2 quarters).
How this guidance changed
Stated once in the documents read so far.
Growth versus industry
Hint
Management expects the company to keep growing faster than the prefab industry.
Promisedto improvefor FY26
Deliveredup 34.5%FY26
ResultAchieved
Said24 Oct 2025Concall transcript
In management's words
“we have always beaten the industry growth and will continue to do that as well in the future.”
How it was checked
Revenue rose by 34.5% in FY26 from FY25 — in line with what management indicated (annual result).
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Capacity utilisation on annualised basis, structural steel fabrication · structural steel fabrication
Direct
Management assumes at least 80% annualised utilisation of structural steel fabrication capacity in FY26.
Promised≥ 80%for FY26
DeliveredPEB capacity utilisation 71.7% in FY26
ResultMissed
Said24 Oct 2025Concall transcript
In management's words
“At this time, in this financial year, we assume that you'll be able to utilize at least 80% of the capacity overall on an annualized basis for structural steel fabrication.”
How it was checked
FY26 guidance was at least 80% annualised utilisation. Reported figures were 71.7% for FY26 and about 69% for nine months, both below 80%. (judged from later company statements)
Evidence (31 Aug 2026): “PEB Capacity Utilisation 71.7%” — Annual report FY26
Evidence (22 Jan 2026): “what we have given in the presentation is the nine months capacity utilization close to about 69%.” — Concall transcript — Q3FY26 (Jan 2026)
Evidence (22 Jan 2026): “our average capacity utilization of the last three months across all the three plants put together is 74%-plus.” — Concall transcript — Q3FY26 (Jan 2026)
How this guidance changed
Stated once in the documents read so far.
Operating cash flow
Hint
Management intends to maintain healthy positive operating cash flow going forward.
Promisedto hold or improvefor FY26
Deliveredup 142.9%FY26
ResultAchieved
Said24 Oct 2025Concall transcript
In management's words
“the idea from a management side will always be to maintain a healthy cash flow from operation going forward as well.”
How it was checked
Operating cash flow rose by 142.9% in FY26 from FY25 — in line with what management indicated (cash flow statement).
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
PBT level / PBT margin
Direct
Repaying the INR 70 crore loan is expected to improve PBT margin by about 0.4%, based on an illustrative revenue of INR 1500 crore.
Promised+~40 bpsfor FY26
Delivered86 bpsFY26
ResultAchieved · beat
Said24 Oct 2025Concall transcript
In management's words
“On a revenue cycle of let's say INR 1500 crores this translates to about 0.4%.”
What it implies in numbers
A change of 40 bps on 7.1% (FY25) implies pbt margin of about 7.5% in FY26.
How it was checked
FY26 actual 86 bps — ahead of the guided ~40 bps (annual result).
Condition attached by management: Illustrative revenue of INR 1500 crore; interest saving from loan repayment.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
PAT margin / post-tax expansion
Direct
After tax, the loan repayment is expected to add about 0.3% expansion to PAT margin.
Promised+~30 bpsfor FY26
Delivered9 bpsFY26
ResultAchieved · beat
Said24 Oct 2025Concall transcript
In management's words
“So, yes, I mean that's the kind of expansion, PBT level will improve and post-tax another 75% will get added to PAT. So, that's about 0.3% expansion should happen on account of that.”
What it implies in numbers
A change of 30 bps on 5.2% (FY25) implies net profit margin of about 5.5% in FY26.
How it was checked
FY26 actual 9 bps — ahead of the guided ~30 bps (annual result).
Condition attached by management: Based on the loan repayment and an illustrative revenue of INR 1500 crore; post-tax effect of about 75% of the PBT gain.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Mambattu brownfield expansion commencement · Mambattu (AP) - Unit 4
Hint
Brownfield expansion at Mambattu is expected to commence by March 2026.
Promisedmilestonefor by Mar 2026
DeliveredCommercial production commenced April 29, 2026
ResultMissed
Said15 Jan 2026Concall presentation
In management's words
“The brownfield expansion at Mambattu and the greenfield project at Ghiloth are progressing rapidly and expected to commence by March 2026 and end of 2nd Quarter of FY 27 respectively.”
How it was checked
Guidance was commencement by March 2026, but the Mambattu expansion commenced commercial production on April 29, 2026, after the deadline. (judged from later company statements)
Evidence (31 Aug 2026): “The Mambattu expansion commenced commercial production on April 29, 2026” — Annual report FY26
Evidence (31 Aug 2026): “Company has also Started Commercial Production of Mambatu Expansion Plant as one of the IPO Object of Capital expenditure on 29th April 2026” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Prefab growth · Prefab
Direct
Management expects Prefab revenue growth in FY26 to remain over 41%.
Promised≥ 41% growthfor FY26
DeliveredPrefab revenue grew 45% YoY in FY26
ResultAchieved
Said15 Jan 2026Concall presentation
In management's words
“In FY 26 Prefab growth Continues to be over 41%”
What it implies in numbers
41% growth on ₹1,134 Cr (FY25) implies about ₹1,599 Cr for FY26.
How it was checked
Guidance was prefab growth over 41% in FY26; reported FY26 prefab revenue growth was 45%. (judged from later company statements)
Evidence (18 May 2026): “Revenue Growth in Prefab 45% YoY” — Concall presentation — Q4FY26 (May 2026)
How this guidance changed
Stated once in the documents read so far.
Revenue (annual guidance)
Direct
FY26 revenue is guided to Rs 1,500-1,550 crore, and management stands by this range.
Promised₹1,500 Cr – ₹1,550 Crfor FY26
Delivered₹1,525 CrFY26
ResultAchieved
Said22 Jan 2026Concall transcript
In management's words
“Our annual guidance has always been in the range-bound between Rs.1,500 to 1,550 crores and we stick by it.”
What it implies in numbers
Reaching ₹1,500 Cr by FY26 from ₹1,134 Cr (FY25) needs about 32.3% growth a year.
How it was checked
FY26 actual ₹1,525 Cr — met the guided ₹1,500 Cr – ₹1,550 Cr (annual result).
How this guidance changed
Stated once in the documents read so far.
Revenue growth for the entire year
Direct
FY26 revenue growth guidance is about 38-39%, which management says nine-month growth of 41% is ahead of.
Promised38–39% growthfor FY26
Delivered34.48% growthFY26
ResultPartly achieved
Said22 Jan 2026Concall transcript
In management's words
“Our guidance of revenue growth was around 38%, 39% percent for the entire year.”
What it implies in numbers
38–39% growth on ₹1,134 Cr (FY25) implies about ₹1,565 Cr to ₹1,576 Cr for FY26.
How it was checked
FY26 actual 34.48% — narrowly short of the guided 38–39% (annual result).
How this guidance changed
Stated once in the documents read so far.
Finance cost as % of revenue
Direct
Finance cost is guided to close to 2% of revenue for the full year FY26, down from about 2.2% for nine months.
Promised~2%for FY26
Delivered₹31 CrFY26
ResultMissed
Said22 Jan 2026Concall transcript
In management's words
“Yes. Full year guidance is close to 2%.”
How it was checked
FY26 actual ₹31 Cr — short of the guided ~2% (annual result).
Condition attached by management: after a Rs.70 crore term loan reduction and lower LC/bill discounting costs
How this guidance changed
Stated once in the documents read so far.
Revenue for the quarter
Direct
Management says quarterly revenue of Rs 300-450 crore is quite possible in Q4 FY26, helped by Rs 35-40 crore of carried inventory.
Promised₹300 Cr – ₹450 Crfor Q4FY26
Delivered₹471 CrQ4FY26
ResultAchieved · beat
Said22 Jan 2026Concall transcript
In management's words
“Yes. See, Rs.300 crores to Rs.450 crores for this quarter is quite possible”
What it implies in numbers
Reaching ₹300 Cr by Q4FY26 from ₹325 Cr (Q3FY26) needs about 27.4% decline a year.
How it was checked
Q4FY26 actual ₹471 Cr — ahead of the guided ₹300 Cr – ₹450 Cr (quarterly result).
Condition attached by management: dependent on project-level execution and design approvals
How this guidance changed
Stated once in the documents read so far.
In-house consumption of sandwich panel capacity · sandwich panels
Direct
Management plans to use about 60% of sandwich panel capacity in-house and sell the remaining 40% to the market.
Promised~60%for by Q4FY26
DeliveredSandwich panel utilisation 44.1% in FY26 (43% in Q4)
ResultMissed
Said22 Jan 2026Concall transcript
In management's words
“we are planning to utilize almost 60% of the capacity of panels in-house and balance 40% we will be selling as a product to the market.”
How it was checked
The plan to utilise about 60% of sandwich panel capacity by Q4 FY26 was not met; utilisation was 43% in Q4 and 44.1% for FY26. (judged from later company statements)
Evidence (31 Aug 2026): “Panel utilisation of 44.1% in FY 26 is the clearest margin opportunity in the business.” — Annual report FY26
Evidence (18 May 2026): “Quarter 4 Utilization at 43%” — Concall presentation — Q4FY26 (May 2026)
Evidence (18 May 2026): “71.7%/44.1% Prefab / **Sandwich Panel Capacity Utilization in FY 26” — Concall presentation — Q4FY26 (May 2026)
How this guidance changed
Stated once in the documents read so far.
Cash conversion cycle
Direct
Management is maintaining its guidance of a cash conversion cycle of about 35 days.
Promised~35 daysfor Not specified
Delivered26 daysFY26
ResultAchieved · beat
Said22 Jan 2026Concall transcript
In management's words
“it is about 35-day cash conversion cycle. So, the way it works is when we get an order from our customer, we typically get 15% to 20% advance”
How it was checked
No deadline was given; reached in FY26.
How this guidance changed
Stated once in the documents read so far.
Employee expenses as % of revenue
Direct
Employee expenses are expected to fall back to about 9% of revenue as revenue catches up with hiring.
Promised~9%for Not specified
Delivered₹1,525 CrFY26
ResultAchieved · beat
Said22 Jan 2026Concall transcript
In management's words
“But as the revenue catches up, the percentage of employee expenses will be around 9% which has been there traditionally.”
How it was checked
No deadline was given; reached in FY26.
Condition attached by management: as revenue catches up with headcount
How this guidance changed
Stated once in the documents read so far.
Q3 revenue
Hint
Management expects Q3 FY26 revenue to be similar to or slightly above Q2 levels, aided by debottlenecking.
Promisedto hold or improvefor Q3FY26
Delivereddown 25.1%Q3FY26
ResultMissed
Said24 Oct 2025Concall transcript
In management's words
“that will either be a similar kind of revenue, a little more than this.”
How it was checked
Revenue fell by 25.1% in Q3FY26 from Q2FY26 — against what management indicated (quarterly result).
Condition attached by management: Debottlenecking activities underway
How this guidance changed
Stated once in the documents read so far.
Key points from each document
The main takeaways, newest document first.
Concall transcript — Q2FY27 (7 Nov 2026) · 4 Nov 2026
- Management reiterated FY27 revenue of INR1900 crores and an EBITDA margin of 10% to 10.5%, and said H1 revenue of INR867 crores leaves the balance to be delivered in H2.
- Working capital rose to about 60 days, above the 40 to 55 day range management has guided to, with receivables up about INR144 crores and steel inventory adding about INR92 crores.
- Gross margin fell about 2.3% as steel costs rose faster than they could be passed through on existing orders; Q2 EBITDA margin recovered to 10.1% from 9.4% in Q1.
- Management expects Q3 margins to be better than the H1 average and aims to restore gross margin in Q3 and Q4, citing repriced new orders and inventory built ahead of steel increases.
- Management expects the receivable build-up to normalise in Q3 because the milestone receivables are backed by letters of credit, and will report working capital to investors every quarter.
- H1 order inflow rose about 71% to INR1124 crores, and the order book stands at INR1462 crores, giving visibility for 8 to 9 months. The FY27 order-booking target was INR2000 crores.
- Management says it will grow 25% to 30% a year for the next couple of years, and that no new capex is needed in FY27-FY28 beyond utilising recently added plants, with 80% to 85% utilisation targeted.
- Gujarat greenfield plant is planned for commissioning in Q4 FY27 with a first phase of 50,000 tons, and the Ghiloth sandwich panel line was commissioned recently.
- Management sees no pushback on customer capex from steel-driven price increases and cites a strong pipeline, including a first data-centre structural order this quarter.
- Price escalation clauses are not yet standard; management says some customers agreed, so it will not claim this as established practice.
Annual report FY26 · 31 Aug 2026
- Management guides FY27 revenue of ₹1,925–₹1,950 crore, against FY26 revenue of ₹1,525 crore.
- PEB capacity is to rise from 147,122 MTPA to 220,000 MTPA by end of FY27, driven by Gujarat phases 1 and 2.
- FY27 guidance is an EBITDA margin of 10.5% and a PAT margin of 6.5% to 7.0%.
- FY27 capex is planned at about ₹150 crore, funded from internal accruals and existing IPO proceeds with no new debt.
- Sandwich panel utilisation was 44.1% in FY26, and management targets 70%+ at Mambattu by FY27 end, calling it the clearest margin opportunity.
- The company repaid ₹107 crore of debt in FY26 and ended with a net cash position of about ₹201 crore.
- Revenue reached ₹1,525 crore in FY26 and net profit rose 56.2% to ₹93 crore, with Prefab revenue up about 45%.
- Pre-Fab net order book for the year was Rs 1,579 crore against Rs 1,209 crore in FY25, while pending order book reached Rs 1,113 crore.
- Revenue from operations grew 34.5% in FY26 to Rs 1,525 crore, with EBITDA of Rs 160 crore and PAT of Rs 93 crore.
- Sandwich insulated panel capacity was raised to 13,10,000 SQM in FY26 from 5,10,000 SQM, while pre-engineered capacity stayed flat at 1,33,922 MTPA.
- Secured non-current borrowings fell sharply to Rs 3,240.17 lakh at March 2026 from Rs 10,212.52 lakh a year earlier.
- The company raised money through an IPO during the year and reports that unutilised IPO proceeds have been parked in fixed deposits.
- The company expects to start the Ghiloth Plant in Rajasthan during FY27, after Mambattu expansion commercial production began in April 2026.
- Out of IPO proceeds, the company has repaid INR 7,000 lakh of term loans, and the balance of unutilised money is parked in fixed deposits with scheduled commercial banks.
Concall presentation — Q4FY26 (May 2026) · 18 May 2026
- FY26 revenue rose 34.5% to ₹15,253 Mn, with prefab revenue up 45%, EBITDA up 35.6% and PAT up 56.2%.
- Management targets FY27 prefab growth of 30% and overall revenue of ₹1,925–₹1,950 Cr.
- Pending order book stood at ₹11,127 Mn on 31 March 2026, up 21.5% year on year.
- EBITDA margin improved to 10.5% and PAT margin was 6.1% in FY26.
- Operating cash flow of ₹1,357 Mn was about 85% of EBITDA, helped by lower working capital days.
- The company reports net cash of about ₹2,007 Mn, including short-term investments of treasury money.
- Sandwich panel capacity utilisation is low, at about 29% of available capacity last year, though Q4 reached 43%.
- A new northern sandwich panel line is expected to be commissioned by Nov/Dec 2026 to capture the peak cold storage cycle.
- FY27 capex is planned at about ₹150 Cr across Ghiloth, Mambattu and Gujarat.
- Management says EPACK's growth pace is more than four times the industry's growth rate.
- Management acknowledges that leadership depth and execution capability are key priorities as the company scales.
Concall transcript — Q4FY26 (20 May 2026) · 18 May 2026
- Management guides Prefab division revenue up 30% in FY27, to about INR1,920-1,950 crore, and says it is guiding the market to 30% growth.
- Management guides EBITDA margin of at least 10% through FY27, within a 10.5-11.5% range, after a 70-80 bps Q4 decline from steel price increases.
- Order book stood at about INR1,117-1,127 crore, with a FY27 order booking target of INR2,000 crore-plus; the two order book figures given differ.
- Steel price spikes after import duties hit Q4 margins; management says 80%+ of contracts got price increases, and Q1 may see a little impact.
- Capacity rises from about 1,47,000 tonnes to about 2,20,000 tonnes PEB by end FY27 through Mambattu, Ghiloth and Gujarat, with about INR150 crore capex planned this year.
- The Mambattu sandwich panel line ran at only about 25% utilisation in FY26; management targets 75-80% this year after rebuilding the sales engine.
- About INR107-108 crore of debt was repaid in FY26, and finance cost is expected to fall 20-25 bps in FY27, lifting PAT margin toward about 6.5%.
- Q4 capacity utilisation hit 83%; management says capex demand has not been disrupted by the West Asia conflict, with strong order inflow and pipeline.
- Gujarat 50,000-capacity plant needs about INR100-110 crore capex, of which about INR38 crore is already spent on land and INR60-65 crore remains for building.
- Operating cash flow was about INR135 crore, roughly 85% of EBITDA, which management highlights as strong cash discipline.
- West market share fell to about 17-18% of order book from about 30%; a Gujarat plant is planned to rebuild it, with commissioning targeted around end FY27.
- The analyst's math on the INR5,000 crore pipeline at a 15-20% win rate does not reconcile with the INR2,000 crore order target; management says new inquiries keep the pipeline growing.
- Ghiloth and Mambattu expansions are to be funded from IPO proceeds raised earlier.
- Cash on the balance sheet is expected to fund most of the Gujarat capacity build-out.
Concall transcript — Q3FY26 (Jan 2026) · 22 Jan 2026
- Management reiterated FY26 revenue guidance of Rs 1,500-1,550 crore and said it is sticking to it despite the Q3 sequential dip.
- Management maintained its 10.5-11.5% margin range for FY26 and FY27 even though Q3 margin was 10.1%, versus 10.8% for nine months.
- FY27 guidance is a minimum 20% revenue growth over FY26, around Rs 1,800 crore, described as the same guidance given during road shows.
- Nine-month revenue grew 41% and EBITDA 57% year on year; Q3 revenue grew 22% YoY, with the prefab division up 31%.
- Q3 sequential revenue dip was blamed on monsoon delays in the south and about Rs 35-40 crore of finished goods not billed due to customer payment timing.
- Pending order book of Rs 1,215 crore as on 1 January 2026 gives about seven to eight months of runway; management expects big orders in Q4.
- Management sees no material margin impact from steel price rises, citing 30-45 days of inventory, mill orders already placed and weekly order booking at current prices.
- Order book of Rs.1,215 crore is entirely prefab, with packaging business run on long-term agreements rather than order book.
- Management expects ROE to dip in FY27 due to capex, then recover to about 17-18% once the capex cycle steadies.
- Management targets ROC of about 22-25% over the next few years, citing a no-private-equity capital history.
- Rs 70 crore term loan was repaid from IPO proceeds, and finance cost is guided to about 2% of revenue for the full year, down from 2.2% for nine months.
- Working capital days rose to 38 from 23 in Q2; management says this is abnormal and guides to a range-bound 35 days.
- Mumbattu Unit-4 structural steel capacity is due for commercialisation in Q4 FY26, while the Ghiloth sandwich panel line has slipped to Q3 FY27 due to NGT and civil delays.
- Gujarat (Vithlapur) plant is planned at 50,000 tons initially, with Rs 55-60 crore capex expected in FY27 after about Rs 40 crore land spend.
Concall presentation — Q3FY26 (Jan 2026) · 15 Jan 2026
- Management expects Prefab segment growth to continue above 41% in FY26, following 41% year-over-year prefab revenue growth reported for the quarter.
- Brownfield expansions at Mambattu and Ghiloth are expected to lift PEB capacity from 133,922 to about 170,722 MTPA by end of March/April 2026.
- Prefab order book stood at INR 12,155 Mn at 31 December 2025, and management warns some orders received during the year may be cancelled.
- IPO fresh-issue proceeds are earmarked for capex at the Ghiloth facility (INR 1,016 Mn) and the Mambattu expansion (INR 581 Mn), with Ghiloth work due by Q3 FY27.
- 9M FY26 EBITDA margin was 10.8% and PAT margin 5.9%, with absolute EBITDA and PAT growing about 38% and 59% year-over-year.
- The company has repaid INR 700 Mn of borrowings without prepayment penalty and reports a net cash position of over Rs. 1,840 Mn as of December 2025.
- Sandwich panel utilisation is low: about 34% in Q3 and 18.5% for the year, against a newly expanded capacity base.
- Management frames prefab as a bottleneck solution for India's infrastructure needs over 30 years and plans Gujarat Phase 1 expansion during FY27.
- Returns from the IPO-funded capacity are expected to show in FY27, with RoCE and RoE shown excluding IPO money.
Concall transcript — Q2FY26 (Oct 2025) · 24 Oct 2025
- Management expects EBITDA margin to stay within 10.5% to 11.5%, with the H1 improvement attributed to lower employee cost and economies of scale.
- Management's stated aim is to lift market share from about 5-5.5% to at least 10%, driving a market-penetration strategy aimed at larger projects.
- Brownfield structural steel expansion at Mambattu (Rs 58 crore) is targeted for Q4 FY26, and the Ghiloth sandwich panel greenfield line for Q2 FY27.
- Order book of about Rs 920 crore gives 7-8 months of revenue visibility, with about Rs 650 crore booked in H1 from solar, renewables, semiconductor, FMCG, warehousing and auto.
- Management expects H2 revenue to be better than H1, and H2 order booking to be much stronger than H1.
- Management says it will keep beating industry growth, which it puts at 10-12%, and is confident of sustaining that for 18-24 months.
- Management expects the loan repayment from IPO proceeds to lift PBT margin by about 0.4% and PAT margin by about 0.3%.
- Net working capital was 21 days in H1, but management is comfortable with about 35 days, and finance cost is guided at 1-1.5%.
- EPS packaging growth of 6-7% depends heavily on LG Electronics (50-60% of the division), and H1 was hit by unseasonal rains affecting consumer durables.
- Management intends to keep operating cash flow healthy going forward after a strong H1 driven by working capital management.
- Management expects strong pipeline from renewables, data centers and site infrastructure, with data centers still early and no PEB structure executed yet.
- A loan of about INR 70 crore at 8.25% interest was repaid, saving roughly INR 6 crore a year in interest cost.
- Teardown and re-engineering work is expected to deliver a 5% to 10% efficiency gain in the current quarter.
- Management foresees possible production constraints and is building a vendor base for outsourced job work to cover them.
Documents read
- Concall transcript — Q2FY27 (7 Nov 2026) · Concall transcript · 4 Nov 2026 · 20 statements
- Annual report FY26 · Annual report · 31 Aug 2026 · 22 statements
- Concall presentation — Q4FY26 (May 2026) · Concall presentation · 18 May 2026 · 9 statements
- Concall transcript — Q4FY26 (20 May 2026) · Concall transcript · 18 May 2026 · 8 statements
- Concall transcript — Q3FY26 (Jan 2026) · Concall transcript · 22 Jan 2026 · 27 statements
- Concall presentation — Q3FY26 (Jan 2026) · Concall presentation · 15 Jan 2026 · 10 statements
- Concall transcript — Q2FY26 (Oct 2025) · Concall transcript · 24 Oct 2025 · 28 statements
Guidance is extracted from company documents and interviews by an AI model and then checked against reported numbers by rule. It can contain errors or miss context, and the stored figures may differ from the basis management guided on. This page is information only and is not investment advice.