E2E Networks Ltd: management guidance tracker
What management said it would deliver, when, where they said it — and what the reported numbers showed afterwards.
How to read this page — 30 seconds
- Latest guidance is what management said at its most recent results call, presentation or interview, next to what it had said before. Raised or Lowered tells you which way expectations moved.
- Other open guidance lists earlier promises that have not fallen due, soonest first, with the latest reported figure.
- Track record compares each promise that has fallen due with what the company actually delivered. That is the best guide to how much weight to give the new guidance.
Select any row for management's exact words, where they said it and how the target changed over time.
Latest guidance · 16 Oct 2026
From Concall transcript — Q2FY27 (Oct 2026), Concall presentation — Q2FY27 (Oct 2026). What management guided for most recently, against what it had said before.
1,024 plus B200 planned GPUs
Direct
Management expects deployment of 1,024 B200 GPUs to go through in the current quarter.
Earlier
First time stated
Now1,024 GPUsQ3FY27
Change
New
StatusPending
In management's words
“This quarter, we expect the deployment to go through for the 1,024.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Direct
Management expects the business to sustain an EBITDA margin of 70% or more over the medium and long term.
Earlier
First time stated
Now≥ 70%FY29–FY31
Change
New
StatusPending
In management's words
“overall, we are looking at this as a 70% plus EBITDA margin business. That's what we feel for the medium term and the long term.”
How it was checked
Due with FY31 results; nothing reported since the statement yet.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'medium term' read as 3 to 5 years
How this guidance changed
Stated once in the documents read so far.
1024+ B200s planned · AI infrastructure (GPU cloud)
Direct
The company plans to add at least 1,024 B200 GPUs as part of its Blackwell scale-up, currently in deployment.
Earlier
First time stated
Now≥ 1,024 B200 GPUsNot specified
Change
New
StatusPending
In management's words
“IN DEPLOYMENT Blackwell scale-up 1024+ B200s planned”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Next lot of B200 go-live
Indirect
The next lot of B200 GPUs is expected to go live in the current quarter, with timing described as hopefully soon.
Earlier
First time stated
NowmilestoneQ3FY27
Change
New
StatusPending
In management's words
“So the next lot of B200 which we have already announced is expected to go live this quarter, hopefully soon.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: hopefully soon
How this guidance changed
Stated once in the documents read so far.
Official launch of Blaze, Endpoint and Jarvis lab inference products
Indirect
Management expects the official launch of the recently soft-released inference products to occur in a few weeks.
Earlier
First time stated
NowmilestoneQ3FY27
Change
New
StatusPending
In management's words
“Obviously, the official launch might be a few weeks or so away.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: might be
How this guidance changed
Stated once in the documents read so far.
Earnings · uncontracted and short-term contracted GPU capacity
Hint
Management expects earnings to grow from existing assets for uncontracted and short-term contracted GPU capacity.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“But as we go forward, for our uncontracted capacity or short-term contracted capacity, we obviously expect the earnings to grow from the same assets that we have.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Scaling Blackwell capacity · AI infrastructure (GPU cloud)
Hint
The company says it is further scaling Blackwell GPU capacity, with no number or timeline given.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“Further, scaling Blackwell Capacity”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Other open guidance · soonest due first
Earlier promises that have not fallen due yet, with the latest figure where one has been reported.
Chennai GPU cluster operational · Chennai
Hint
Chennai GPU cluster expected to be operational around end of July 2025.
Targetmilestone
Dueby Q2FY26
result by 14 Nov 2025
Said22 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“to get the Chennai operational up and running hopefully by end of July.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Resolution of large-cluster technical issues with technology partners
How this guidance changed
Stated once in the documents read so far.
Impact of bursty training workloads
Hint
Management expects the revenue effect of bursty training workloads to become muted as the company scales.
Targetto come down
DueFY26
result by 30 May 2026
Said22 Jan 2025
Concall transcript
StatusAwaiting data
In management's words
“We anticipate the effect of bursty training workloads would eventually become muted at a larger scale”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Depends on scaling up the business.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
EBITDA margin for AI Mission and sovereign cloud · AI Mission and sovereign cloud
Hint
Management expects AI Mission and sovereign cloud EBITDA margins to be close to the company's overall margin of about 60%.
Targetto hold or improve
DueFY26
result by 30 May 2026
Said17 Apr 2025
Concall transcript
StatusAwaiting data
In management's words
“It would not be very, very far. I think the difference would not be very high.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Exit MRR
Direct
Exit MRR of Rs 32-38 crore by March 2026, which management says it is on track to achieve.
Target₹32 Cr – ₹38 Cr
DueFY26
result by 30 May 2026
Said22 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“We believe that we are on track to achieve an exit MRR anywhere between, say, Rs. 32 crores to Rs. 38 crores by the end of the year in March.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Year-end MRR
Direct
Year-end MRR target for March 2026 of around Rs 35 crore, on the current capacity base.
Target~₹35 Cr
Dueby Mar 2026
result by 30 May 2026
Said22 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“Year-end MRR, we are targeting in March ‘26, is like somewhere between (+/-35) something.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Based on current capacity; utilisation of 75% to 90%
How this guidance changed
Stated once in the documents read so far.
Blackwell GPU order placement
Hint
Blackwell GPU orders targeted for around end of Q3 or Q4 FY26, with 6-12 week procurement cycle.
Targetmilestone
Dueby FY26
result by 30 May 2026
Said22 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“we are definitely looking at either the end of third quarter or the last quarter to kind of try and get that capacity orders placed.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Depends on technology version chosen
How this guidance changed
Stated once in the documents read so far.
Margins on INDIAai Mission business · INDIAai Mission
Hint
INDIAai Mission business is expected to carry some margin contraction.
Targetto come down
DueFY26
result by 30 May 2026
Said22 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“there would be some amount of margin contraction for sure, but obviously we would like to do some level of support”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Revenue from INDIAai Mission · INDIAai Mission
Hint
More significant INDIAai Mission revenue expected over the current and next quarter.
Targetto improve
DueFY26
result by 30 May 2026
Said22 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“hopefully this quarter, next quarter we should start seeing more significant revenues coming our way from INDIAai Mission.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Depends on INDIAai Mission filling its empanelled capacity
How this guidance changed
Stated once in the documents read so far.
MRR growth
Hint
MRR growth seen this quarter is expected to continue over the next couple of quarters.
Targetto improve
DueFY26
result by 30 May 2026
Said22 Jul 2025
Concall transcript
StatusAwaiting data
In management's words
“we are hopeful that that will continue as planned over the next couple of quarters.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Internal accruals and debt funding for infrastructure capacity
Hint
The company plans to use a combination of internal accruals and debt to expand infrastructure capacity while maintaining operational stability.
Targetto improve
DueFY26
result by 30 May 2026
Said4 Sep 2025
Annual report · 2× since 22 Jan 2025
StatusAwaiting data
In management's words
“The market potential warrants leveraging a combination of internal accruals and debt to expand infrastructure capacity while maintaining operational stability.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: maintaining operational stability
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
- 22 Jan 2025 — to improve for FY26
First stated
Concall transcript · Awaiting data
- 4 Sep 2025 — to improve for FY26
Repeated
Annual report · Awaiting data
Scale into large enterprise opportunities
Hint
The milestones provide the foundation for E2E to scale meaningfully into large enterprise opportunities.
Targetto improve
DueFY26
result by 30 May 2026
Said4 Sep 2025
Annual report
StatusAwaiting data
In management's words
“These milestones provide the foundation for E2E to scale meaningfully into large enterprise opportunities where compute performance, data sovereignty, and trusted infrastructure partners are mission-critical.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Debt facility utilisation
Direct
Management expects the Rs 450 crore debt facility to be fully utilised by end-March or early April 2026.
Targetmilestone
Dueby FY26
result by 30 May 2026
Said11 Nov 2025
Concall transcript
StatusAwaiting data
In management's words
“by end of March or earlier April, that completely should be utilized.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Per vendor payment terms
How this guidance changed
Stated once in the documents read so far.
India AI Mission revenue contribution · India AI Mission
Hint
Management expects India AI Mission contribution to MRR in Q4 FY26 to be much higher than in the prior quarter.
Targetto improve
DueQ4FY26
result by 30 May 2026
Said16 Jan 2026
Concall transcript
StatusAwaiting data
In management's words
“we expect, obviously, Q4 to be massively different as the -- both the customers won through India AI mission continue to scale up in January.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: India AI customers scale up in January
How this guidance changed
Stated once in the documents read so far.
AI infrastructure expansion funding
Hint
Management is deploying large-scale GPU infrastructure and enabling funding arrangements to accelerate AI infrastructure expansion.
Targetto improve
DueQ1FY27
result by 14 Aug 2026
Said21 Jul 2026
Concall presentation
StatusAwaiting data
In management's words
“Deploying large-scale GPU infrastructure and enabling funding arrangements to accelerate AI infrastructure expansion.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
GPUs added to platform
Indirect
Management expects to add at least about 6,000 GPUs within the next two years.
Target≥ 6,000 GPUs
Dueby FY27
result by 30 May 2027
Said17 Apr 2025
Concall transcript
StatusBehind
So far: About 1,400 added (from about 3,700 in Apr 2025 to about 5,100 by Jun 2026)
In management's words
“anywhere next 2 years we should be to add anywhere between 6,000 or so GPUs maybe even more.”
How it was checked
The FY27 deadline has not passed. About 1,400 GPUs were added against a target of at least 6,000, leaving roughly 4,600 to add in about nine months. (judged from later company statements)
Evidence (21 Jul 2026): “approx. cloud GPUs live at Q1 FY27 exit” — Concall presentation — Q1FY27 (Jul 2026)
Evidence (22 Jul 2026): “nearly 5,100 is the current capacity, which is live on our platform today.” — Concall transcript — Q1FY27 (Jul 2026)
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Software licensing revenue · software licensing
Hint
Software licensing revenue not expected in FY26; expected to start in FY27.
Targetmilestone
DueFY27
result by 30 May 2027
Said22 Jul 2025
Concall transcript
StatusPending
In management's words
“we expect that to kind of come somewhere online in the next financial year only.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Utilization
Indirect
Management targets 80-90% utilisation at some point during FY27.
Target80–90%
DueFY27
result by 30 May 2027
Said16 Jan 2026
Concall transcript
StatusOn track
So far: 80% plus in March 2026, below 85%
In management's words
“we continue to target somewhere between 80% to 90% of the utilization to be done at some point of time in the -- in the course of the next financial year.”
How it was checked
March 2026 utilisation was already around 80% plus, which points toward the 80-90% FY27 target, but FY27 figures are not yet reported. (judged from later company statements)
Evidence (20 Apr 2026): “I would say only in the March month, we are looking at 80% plus kind of utilization. Certainly less than 85%.” — Concall transcript — Q4FY26 (Apr 2026)
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Indirect
Management expects EBITDA margin to move toward about 70% once scale is established, versus 55-60% today.
Target~70%
DueFY27
result by 30 May 2027
Said16 Jan 2026
Concall transcript
StatusOn track
So far: 75.85% (Q1FY27–Q2FY27)
In management's words
“it's a matter of establishing the scale at which point we will be able to hit the expected number as per the business, which is closer to 70 than closer to 55 to 60 today.”
How it was checked
Year to date (Q1FY27–Q2FY27) ebitda / operating margin is 75.9% against the guided ~70% for FY27.
Condition attached by management: Achieving sufficient scale
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
2,048 plus some spares GPUs to deploy
Direct
Management plans to deploy 2,048 B200 GPUs plus some spares during FY27, starting May 2026.
Target≥ 2,048 GPUs
DueFY27
result by 30 May 2027
Said20 Apr 2026
Concall transcript
StatusBehind
So far: 1,024 B200 GPUs live as of Q2FY27; 2,048 not yet reached
In management's words
“2,048 plus some spares that we are planning to deploy in this financial year, starting from May where the first lot of 1024 is expected to go live.”
How it was checked
By October 2026 only 1,024 B200s were live, so the 2,048-plus target for FY27 has half its capacity still outstanding with five months left. (judged from later company statements)
Evidence (16 Oct 2026): “~5,100 cloud GPUs live including 1,024 NVIDIA B200s” — Concall presentation — Q2FY27 (Oct 2026)
Evidence (21 Jul 2026): “B200 1024 LIVE” — Concall presentation — Q1FY27 (Jul 2026)
Condition attached by management: Plans are subject to deployment timing and supply chain.
How this guidance changed
Stated once in the documents read so far.
Second 1024-GPU cluster deployment
Hint
Another 1024-GPU cluster, already planned, expected to be deployed about two months after the first B200 cluster.
Targetmilestone
Dueby FY27
result by 30 May 2027
Said20 Apr 2026
Concall transcript
StatusBehind
So far: still 1,024 B200 GPUs live in Q2FY27; second cluster not evidenced
In management's words
“in a couple of months, we are expecting to be able to deploy another cluster of 1024 which has already been planned.”
How it was checked
The second 1024-GPU cluster was expected about two months after the first, but October 2026 figures still show only one 1,024-GPU B200 cluster. (judged from later company statements)
Evidence (16 Oct 2026): “~5,100 cloud GPUs live including 1,024 NVIDIA B200s” — Concall presentation — Q2FY27 (Oct 2026)
Evidence (21 Jul 2026): “B200 1024 LIVE” — Concall presentation — Q1FY27 (Jul 2026)
Condition attached by management: Depends on first cluster going live.
How this guidance changed
Stated once in the documents read so far.
GPU contribution of MRR · GPU
Direct
GPU share of MRR expected to reach about 85-90% over the next couple of quarters.
Target85–90%
Dueby FY27
result by 30 May 2027
Said20 Apr 2026
Concall transcript
StatusPending
In management's words
“in another couple of quarters, I think GPU contribution would be closer to 85%-90% over coming quarters.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Management said these numbers are dynamic and the sample size is small.
How this guidance changed
Stated once in the documents read so far.
Reported profitability
Hint
Management expects revenue to progressively outpace depreciation as utilisation ramps, improving reported profitability.
Targetto improve
DueFY27
result by 30 May 2027
Said20 Apr 2026
Concall transcript
StatusPending
In management's words
“As utilization continues to ramp up, revenue will progressively outpace depreciation, improving reported profitability.”
Condition attached by management: Depends on utilisation ramping up.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
MRR lumpiness
Hint
Management expects MRR lumpiness to decrease as the GPU base grows.
Targetto come down
DueFY27
result by 30 May 2027
Said20 Apr 2026
Concall transcript
StatusPending
In management's words
“the lumpiness will continue to decrease as we continue to build more and more volume of GPUs under our management.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Depends on growth in GPU volume.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Capacity at FY27 end (CPU, GPU and storage combined)
Indirect
Management said about 6,000 units of capacity is the minimum visible by FY27 end, without setting a limit.
Target≥ 6,000 capacity units (CPU, GPU and storage com
Dueby FY27
result by 30 May 2027
Said20 Apr 2026
Concall transcript
StatusPending
In management's words
“I would not want to place a limiting number over there, but you could say that that is the minimum number.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Management declined to set a limiting number; figure was proposed by an analyst and accepted as minimum.
How this guidance changed
Stated once in the documents read so far.
GPU pricing / realisation
Hint
Management sees GPU rental pricing as stable to slightly rising rather than falling.
Targetto improve
DueFY27
result by 30 May 2027
Said20 Apr 2026
Concall transcript
StatusPending
In management's words
“there are I think good set of tailwinds which are slowly inching up the prices rather than a decrease in pricing.”
How it was checked
ARPU / realisation is not in the stored financial tables.
Condition attached by management: Management also said short-term pricing is balanced against supporting Indian customers.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Revenue growth
Hint
Management expects the major share of future revenue growth to come from capacity additions rather than from price increases.
Targetto improve
DueFY27
result by 30 May 2027
Said22 Jul 2026
Concall transcript · 2× since 16 Jan 2026
StatusPending
In management's words
“Now that being said, the major growth will come from capacity additions as opposed to majorly on the price hike side is what we believe.”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 16 Jan 2026 — to improve for FY27
First stated
Concall transcript · Pending
- 22 Jul 2026 — to improve for FY27
Repeated
Concall transcript · Pending
B200 deliveries
Hint
Management expects the next lot of B200 GPUs to arrive within the next couple of months.
Targetmilestone
Dueby FY27
result by 30 May 2027
Said22 Jul 2026
Concall transcript
StatusPending
In management's words
“So, we expect them to be here in the next couple of months.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Electricity cost in data-centre cost
Hint
Management expects the electricity portion of data-centre cost to keep rising as usage increases.
Targetto improve
DueFY27
result by 30 May 2027
Said22 Jul 2026
Concall transcript
StatusPending
In management's words
“So, the electricity portion would keep on increasing.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Rises with usage.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
AI infrastructure expansion
Hint
Company intends to scale accelerated computing, networking and storage infrastructure to meet growing AI workload demand.
Targetto improve
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report · 3× since 20 Apr 2026
StatusOn track
In management's words
“Expand AI Infrastructure: Scale accelerated computing, networking and storage infrastructure to meet growing demand for AI workloads, while evaluating evolving compute platforms.”
How it was checked
The FY27 deadline has not passed. Live GPUs grew from about 3,900 to over 5,100 in FY26, and about 12.8 MW of additional data centre capacity was secured. (judged from later company statements)
Evidence (12 Nov 2026): “the Company has secured approximately 12.8 MW of additional data centre capacity” — E2E Networks Limited Has informed About Securing Approximately 12.8 MW Of Additional Data Centre Capacity Over And Above The Company''s Existing Data Centre Cap
Condition attached by management: while evaluating evolving compute platforms
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 20 Apr 2026 — to improve for FY27
First stated
Concall transcript · Pending
- 22 Jul 2026 — to improve for FY27
Repeated
Concall transcript · Pending
- 5 Sep 2026 — to improve for FY27
Repeated
Annual report · On track
Investment in AI infrastructure
Hint
Company intends to keep investing in AI infrastructure, cloud orchestration software and developer platforms.
Targetto improve
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report
StatusPending
In management's words
“Going forward, the Company intends to invest in AI infrastructure, cloud orchestration software and developer platforms supporting AI training, fine-tuning, inference and deployment.”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Demand for sovereign AI infrastructure
Hint
Company expects demand for sovereign AI infrastructure from organisations needing data control and compliance to increase.
Targetto improve
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report
StatusOn track
In management's words
“The Company expects increasing demand for sovereign AI infrastructure from organisations requiring data control, regulatory compliance and secure AI environments.”
How it was checked
The FY27 deadline has not passed. A nearly INR1,000 crore multiyear sovereign AI deal was signed, which is consistent with rising demand, though demand growth itself is not measured. (judged from later company statements)
Evidence (16 Oct 2026): “So we signed a nearly INR1,000 crores deal with a Sovereign AI company for the Blackwell cluster, which lasts through June 2029.” — Concall transcript — Q2FY27 (Oct 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Growth
Hint
Management says its strong cash flows position the Company for sustained growth in the coming years.
Targetto improve
DueFY27
result by 30 May 2027
Said5 Sep 2026
Annual report
StatusPending
In management's words
“The strong cash flows position the Company for sustained growth in the coming years.”
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Loan outstanding
Hint
Management expects the loan balance, currently about INR 450 crore, to rise in the near term as the loan for the next B200 lot comes in.
Targetto improve
Dueby Q1FY28
result by 14 Aug 2027
Said22 Jul 2026
Concall transcript
StatusPending
In management's words
“So, the loan, which stands as of now is broadly INR 450 crores, which with the other lot coming in picture, it would be increasing across in the near term.”
Condition attached by management: Depends on the next B200 lot being financed by loan.
Assumptions made in reading this
- 'near term' read as the next four quarters
How this guidance changed
Stated once in the documents read so far.
Data centre cost
Hint
Management expects data-centre costs to rise in coming quarters, but not by a very large percentage.
Targetto improve
Dueby Q1FY28
result by 14 Aug 2027
Said22 Jul 2026
Concall transcript
StatusPending
In management's words
“And in the coming quarters, some of that cost would increase, but I don't think that would be a very massive percentage.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- 'near term' read as the next four quarters
How this guidance changed
Stated once in the documents read so far.
GPUs on platform
Indirect
Management targets about 10,000 GPUs on its platform within the next two to three years, from about 3,700 today.
Target~10,000 GPUs
DueFY27–FY28
result by 30 May 2028
Said17 Apr 2025
Concall transcript
StatusBehind
So far: About 5,100 cloud GPUs live (Q1FY27 exit), versus ~10,000 target
In management's words
“So, if we look at like, say next 2-3 years, we would be targeting anywhere close to 10,000 GPUs plus overall on our platform. Today we are at 3,700.”
How it was checked
The FY27–FY28 deadline has not passed. Live GPUs are about 5,100, roughly half of the ~10,000 target, with growth slow relative to the remaining time. (judged from later company statements)
Evidence (22 Jul 2026): “nearly 5,100 is the current capacity, which is live on our platform today.” — Concall transcript — Q1FY27 (Jul 2026)
Evidence (21 Jul 2026): “approx. cloud GPUs live at Q1 FY27 exit” — Concall presentation — Q1FY27 (Jul 2026)
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Market share within IndiaAI Mission · IndiaAI Mission
Direct
Management aims for 20-25% market share within IndiaAI Mission over a three-year period.
Target20–25%
Dueby FY28
result by 30 May 2028
Said17 Apr 2025
Concall transcript
StatusPending
In management's words
“over the long term over a three-year period, we are obviously trying to be a major player in the IndiaAI Mission. So, we would definitely try and target somewhere between 20%, 25% of the market share within IndiaAI Mission.”
How it was checked
Market share is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Demand for advanced AI solutions
Hint
Management anticipates a resurgence in demand for advanced AI solutions over the medium term.
Targetto improve
DueFY28–FY30
result by 30 May 2030
Said22 Jan 2025
Concall transcript
StatusPending
In management's words
“We anticipate a resurgence in demand for advanced AI solutions over medium term.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY25 (statement made in its last quarter)
- 'medium term' read as 3 to 5 years
How this guidance changed
Stated once in the documents read so far.
Impact of large customers declining training needs
Hint
Management expects one or two large customers reducing training needs to stop hurting results over the medium term, as the customer base grows.
Targetto come down
DueFY28–FY30
result by 30 May 2030
Said22 Jan 2025
Concall transcript
StatusPending
In management's words
“the effect of like 1 or 2 large customers declining their training needs should not impact us. So, that is subject to growth of our overall scale.”
How it was checked
Customers / subscribers is not in the stored financial tables.
Condition attached by management: Subject to growth of overall scale.
Assumptions made in reading this
- horizon counted from FY25 (statement made in its last quarter)
- 'medium term' read as 3 to 5 years
How this guidance changed
Stated once in the documents read so far.
Enterprise and large-customer share of revenue · enterprise
Hint
Management expects a shift toward larger enterprise customers, with the L&T partnership, over the medium term.
Targetto improve
DueFY28–FY30
result by 30 May 2030
Said22 Jan 2025
Concall transcript
StatusPending
In management's words
“I think that natural change will come over like medium term where we start working with larger customers in conjunction with our partners including L&T”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- horizon counted from FY25 (statement made in its last quarter)
- 'medium term' read as 3 to 5 years
How this guidance changed
Stated once in the documents read so far.
Revenue impact of Mumbai outage
Hint
Management does not expect a material revenue impact from the Mumbai outage over the medium and long term.
Targetto hold or improve
DueFY29–FY31
result by 30 May 2031
Said16 Jan 2026
Concall transcript
StatusPending
In management's words
“So we don't see -- we don't expect to see a material revenue impact over the medium term and the long term.”
Condition attached by management: Migration to newer infrastructure
Assumptions made in reading this
- horizon counted from FY26 (statement made in its last quarter)
- 'medium term' read as 3 to 5 years
How this guidance changed
Stated once in the documents read so far.
Jarvis scale-up outside India · Jarvis Lab (global)
Hint
Management expects Jarvis to scale up outside India in the medium term.
Targetmilestone
DueFY29–FY31
result by 30 May 2031
Said16 Jan 2026
Concall transcript
StatusPending
In management's words
“we expect Jarvis to get scaled up in the medium term outside India and add to the overall capabilities of the E2E platform.”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- horizon counted from FY26 (statement made in its last quarter)
- 'medium term' read as 3 to 5 years
How this guidance changed
Stated once in the documents read so far.
Medium-term workload sustainability
Hint
Management expects current GPU customers' workloads to be sustainable over the medium term and sees little near-term lumpiness.
Targetto hold or improve
DueFY29–FY31
result by 30 May 2031
Said20 Apr 2026
Concall transcript
StatusPending
In management's words
“We do expect to have sustainability for these workloads over the medium term.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'medium term' read as 3 to 5 years
How this guidance changed
Stated once in the documents read so far.
Gross margins
Hint
Management believes the current high margin levels are sustainable over the medium term and potentially the long term.
Targetto hold or improve
DueFY29–FY31
result by 30 May 2031
Said22 Jul 2026
Concall transcript
StatusPending
In management's words
“So, I do believe that this is quite sustainable over the medium term and potentially the long term.”
How it was checked
Gross margin is not in the stored financial tables.
Condition attached by management: Depends on utilisation, robust demand and a judicious mix of contracted and on-demand revenue.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'medium term' read as 3 to 5 years
How this guidance changed
Stated once in the documents read so far.
International expansion
Hint
Management will look for opportunities to expand beyond India over the medium and long term, possibly through software and services.
Targetto improve
DueFY30–FY32
result by 30 May 2032
Said22 Jan 2025
Concall transcript
StatusPending
In management's words
“over the medium and long term, obviously, we will continue to look for opportunities to expand out of India into other markets as well.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY25 (statement made in its last quarter)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Direct
Management reiterated a medium- to long-term EBITDA margin of around 70 percent as volumes grow.
Target~70%
DueFY30–FY32
result by 30 May 2032
Said11 Nov 2025
Concall transcript
StatusBehind
So far: 51.22% (FY26)
In management's words
“ultimately, what we are targeting from an EBITDA perspective is to be somewhere in the range of 70-plus/minus something over the medium and long term as the volumes grow”
How it was checked
FY26: 51.22% against 70% targeted by FY32 — behind the pace required.
Condition attached by management: As volumes grow
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
GPU monetisation period
Indirect
Management expects to monetise GPUs over roughly a 5 to 6 year life cycle, with a stated minimum of 6 years for all GPU generations.
Target5–6 years
DueFY31–FY32
result by 30 May 2032
Said22 Jul 2026
Concall transcript
StatusPending
In management's words
“So, where we believe that long life cycle is conducive to monetize those GPUs through almost like 5 to 6 years.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Useful life of GPU assets
Indirect
Management is hopeful that 7 to 8 years is a reasonable operating life for the GPU assets.
Target7–8 years
DueFY33–FY34
result by 30 May 2034
Said16 Jan 2026
Concall transcript
StatusPending
In management's words
“we are very, very hopeful that 7 to 8 years is a very reasonable expectation for these assets to continue to generate business for us.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (statement made in its last quarter)
How this guidance changed
Stated once in the documents read so far.
Useful life of each hardware generation
Indirect
Management expects each hardware generation to typically sustain a 6-8 year useful life.
Target6–8 years
DueFY32–FY34
result by 30 May 2034
Said5 Sep 2026
Annual report
StatusPending
In management's words
“Management's experience across compute generations indicates that each generation of hardware can typically sustain a 6-8 year useful life as it finds its own price-performance niche”
How it was checked
Production is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Build-out horizon for capacity and platform
Hint
Management is building capacity and platform for a decade of AI demand rather than a single cycle.
Targetmilestone
Dueby FY36
result by 30 May 2036
Said5 Sep 2026
Annual report
StatusPending
In management's words
“we're building our capacity and our platform for a decade of this, not a cycle.”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Data centre ownership model
Hint
Management intends to keep an asset-light model and continue relying on co-location rather than building its own data centers.
Targetmilestone
DueNot specified
Said22 Jan 2025
Concall transcript
StatusPending
In management's words
“So, we obviously have always preferred not to build physical data centers. So, we will continue to rely on co-location.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Monthly recurring revenue growth
Indirect
Management sets an aggressive goal of tripling monthly recurring revenue, with no time frame stated.
Target3x (triple)
DueNot specified
Said17 Apr 2025
Concall transcript
StatusPending
In management's words
“we are setting a very aggressive goal of three times monthly recurring revenue growth”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
Stated once in the documents read so far.
Gross margin profile on sovereign cloud platform · sovereign cloud platform
Direct
Management expects the sovereign cloud platform to earn a gross margin of about 75-80%.
Target75–80%
DueNot specified
Said17 Apr 2025
Concall transcript
StatusPending
In management's words
“you are looking at 80% to 75% kind of a gross margin profile on sovereign cloud platform.”
How it was checked
Gross margin is not in the stored financial tables.
Condition attached by management: Apart from support, sales and marketing costs.
How this guidance changed
Stated once in the documents read so far.
Share of IndiaAI Mission market · IndiaAI Mission
Direct
Management will target at least 10% of the roughly INR3,500 crore annual IndiaAI Mission revenue, and potentially 20%.
Target≥ 10%
DueNot specified
Said17 Apr 2025
Concall transcript
StatusPending
In management's words
“we would obviously go and target minimally about 10% of this revenue. And hopefully, we could even top that 10% to maybe even do maybe potentially 20%.”
How it was checked
Market share is not in the stored financial tables.
Condition attached by management: Dependent on how the bid plays out.
How this guidance changed
Stated once in the documents read so far.
GPU capacity additions
Hint
Management is aggressive on adding GPU capacity and will add more if required.
Targetmilestone
DueNot specified
Said22 Jul 2025
Concall transcript
StatusPending
In management's words
“So, we are aggressive on our capacity addition part.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Subject to utilisation or anchored demand
How this guidance changed
Stated once in the documents read so far.
Blackwell GPU investment
Hint
Management intends to invest in Blackwell GPUs, though the exact model and timing are not fixed.
Targetmilestone
DueNot specified
Said22 Jul 2025
Concall transcript
StatusPending
In management's words
“We obviously intend to invest into Blackwell.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Model choice (B200, GB200, B300, GB300) still to be decided
How this guidance changed
Stated once in the documents read so far.
Independent director meetings
Hint
The company and its independent directors will endeavour to hold two meetings without non-independent directors and management going forward.
Targetmilestone
DueNot specified
Said4 Sep 2025
Annual report
StatusPending
In management's words
“The Company and its Independent Directors shall endeavour to hold two such meetings going forward, in line with the regulatory guidance.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: in line with regulatory guidance
How this guidance changed
Stated once in the documents read so far.
GP margin on newly deployed assets · newly deployed capacity
Indirect
Management expects gross margin on newly deployed GPU assets to range from 80 to 85 percent.
Target80–85%
DueNot specified
Said11 Nov 2025
Concall transcript
StatusPending
In management's words
“from a GP margin perspective, what we foresee across our GP margin should be ranging from 80% to 85% across on that newly deployed assets.”
How it was checked
Gross margin is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Billing commencement for IndiaAI projects
Hint
Management is hopeful billing for the two IndiaAI projects will start very soon but gave no date.
Targetmilestone
DueNot specified
Said11 Nov 2025
Concall transcript
StatusPending
In management's words
“I think it should be sooner than later, but like we cannot put an immediate date to that, but like we are very, very hopeful that it could be very, very soon.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
ARR from 1,024 Blackwell · Blackwell GPUs (1,024 units)
Indirect
Management sees ARR of about INR250 crore per year from the 1,024 Blackwell GPUs.
Target~₹250 Cr
DueNot specified
Said16 Jan 2026
Concall transcript
StatusPending
In management's words
“From an ARR perspective, we are looking at somewhere close to maybe about INR250-odd crores per year or so with 1,024 Blackwell.”
How it was checked
ARPU / realisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Capex for Blackwell series · Blackwell GPUs (1,024 units)
Direct
Management puts the capex for the Blackwell series at roughly INR600-650 crore, partly term-loan funded.
Target₹600 Cr – ₹650 Cr
DueNot specified
Said16 Jan 2026
Concall transcript
StatusPending
In management's words
“So for the Blackwell series, roughly the capex would be in the range of INR600 crores to INR650 crores, part of which is funded through a term loan”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Per hour rent for Blackwell
Indirect
Management is hoping to achieve international per-hour rates of about USD 3-4 for longer-term Blackwell contracts.
Target$0 mn – $0 mn
DueNot specified
Said16 Jan 2026
Concall transcript
StatusPending
In management's words
“Broadly, what we are seeing in the international market today is anywhere between $3 to $4 approximately for slightly longer-term contracts. So we are also hoping to kind of achieve those kind of numbers.”
How it was checked
ARPU / realisation is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Next-generation compute (B300 / Vera Rubin)
Hint
Management is planning next-generation B300 and Vera Rubin compute, with no volume or timing given.
Targetmilestone
DueNot specified
Said21 Jul 2026
Concall presentation
StatusPending
In management's words
“Next-generation Compute planning underway”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Funding for announced GPUs
Hint
Management says funding for the GPUs already announced is fully arranged through debt, internal accruals or prior equity.
Targetmilestone
DueNot specified
Said22 Jul 2026
Concall transcript
StatusPending
In management's words
“whatever GPUs we have already announced, their funding is fully arranged and backstopped by debt or internal accruals or previous equity raises.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Deployment of large-scale AI infrastructure and funding
Hint
Company plans to deploy large-scale AI infrastructure backed by appropriate funding while maintaining disciplined capital allocation.
Targetmilestone
DueNot specified
Said5 Sep 2026
Annual report
StatusPending
In management's words
“Develop Scalable Infrastructure: Deploy large-scale AI infrastructure and appropriate funding arrangements while maintaining disciplined capital allocation.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: while maintaining disciplined capital allocation
How this guidance changed
Stated once in the documents read so far.
International expansion beyond India · international
Hint
Company is beginning to take its platform beyond India, with a Delaware entity set up to serve international customers.
Targetmilestone
DueNot specified
Said5 Sep 2026
Annual report
StatusPending
In management's words
“set up a Delaware entity to serve international customers and manage alliances directly outside India as we begin taking this platform beyond our home market.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Track record · promised vs delivered
Guidance whose deadline has passed, most recent first: how management performed after giving it.
Training to inference revenue mix
Indirect
Management expects the training-to-inference revenue mix to move to about 50:50 or 60:40 in favour of training over the medium and long term.
Promised~50 ratiofor FY30–FY32
Delivered₹164 CrFY25
ResultAchieved · beat · early
Said22 Jan 2025Concall transcript
In management's words
“I think it should become more like 50:50 or maybe 60:40 in favor of like training.”
How it was checked
Reached in FY25, before the FY32 deadline ahead of the stated window.
Assumptions made in reading this
- horizon counted from FY25 (statement made in its last quarter)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Depreciation run rate
Indirect
Management agreed that quarterly depreciation should stay on the same line as the roughly Rs 50 crore run rate.
Promised~₹50 Crfor by Q2FY27
Delivered₹47.65 CrQ3FY26
ResultAchieved · early
Said11 Nov 2025Concall transcript
In management's words
“Yes, should be on the same line.”
What it implies in numbers
Reaching ₹50 Cr by Q2FY27 from ₹43 Cr (Q2FY26) needs about 16.3% growth a year.
How it was checked
Reached in Q3FY26, before the Q2FY27 deadline.
Assumptions made in reading this
- 'near term' read as the next four quarters
How this guidance changed
Stated once in the documents read so far.
Blackwell scale-up, B200s planned
Direct
Walked back
Management plans 1,024 or more NVIDIA B200 GPUs for the Blackwell scale-up, with no timeline stated.
Promised≥ 1,024 B200 GPUsfor Not specified
Delivered1,024 B200 GPUs live
ResultAchieved
Said21 Jul 2026Concall presentation
In management's words
“1024+ B200s planned”
How it was checked
The guidance was at least 1,024 B200s with no timeline. The Q1 presentation reports 1,024 B200 GPUs live, and the Q2 presentation confirms 1,024 B200s live. (judged from later company statements)
Evidence (16 Oct 2026): “~5,100 cloud GPUs live including 1,024 NVIDIA B200s” — Concall presentation — Q2FY27 (Oct 2026)
How this guidance changed
- 22 Jan 2025 — ~10.2 megawatts for Not specified
First stated
Concall transcript · Achieved (actual Existing data centre capacity of 14.6 MW, with about 27.4 MW total after 12.8 MW added)
- 17 Apr 2025 — ≥ 2,000 GPUs for Not specified
Raised
Concall transcript · Pending
- 22 Jul 2025 — ≥ 8,000 GPUs for Not specified
Raised
Concall transcript · Pending
- 21 Jul 2026 — ≥ 1,024 B200 GPUs for Not specified
Lowered
Concall presentation · Achieved (actual 1,024 B200 GPUs live)
Cluster 1 B200 1024 go-live
Direct
Cluster 1 B200 1024 GPU cluster expected to go live around mid-May 2026.
Promisedmilestonefor Q1FY27
Delivered1,024 NVIDIA B200 GPUs live by end of Q1FY27
ResultAchieved
Said20 Apr 2026Concall transcript
In management's words
“We expect our Cluster 1 B200 1024 to go live somewhere in the mid-May, and in a couple of months, we are expecting to be able to deploy another cluster of 1024”
How it was checked
The B200 1024 cluster was reported live in Q1FY27, and the live fleet at June 30, 2026 included Blackwell infrastructure, before the Q1FY27 deadline. (judged from later company statements)
Evidence (21 Jul 2026): “B200 1024 LIVE” — Concall presentation — Q1FY27 (Jul 2026)
Evidence (5 Sep 2026): “its live GPU fleet exceeding 5,100 GPUs as of June 30, 2026, including Blackwell-based infrastructure.” — Annual report FY26
Evidence (22 Jul 2026): “So, 1,024 Blackwell that we received during last few months went online, and they were put on revenue.” — Concall transcript — Q1FY27 (Jul 2026)
Condition attached by management: Subject to global supply chain component delivery; management said it was keeping fingers crossed.
How this guidance changed
Stated once in the documents read so far.
Depreciation next quarter
Hint
Depreciation expected to rise next quarter because of the B200 cluster, but by less than the analyst's INR25 crore-a-quarter assumption.
Promisedto improvefor Q1FY27
Deliveredup 19.6%Q1FY27
ResultAchieved
Said20 Apr 2026Concall transcript
In management's words
“So there would be an increase in that depreciation, but not to that significant effect that what you are telling about.”
How it was checked
Depreciation rose by 19.6% in Q1FY27 from Q4FY26 — in line with what management indicated (quarterly result).
Condition attached by management: Tied to the B200 cluster going live around mid-May.
How this guidance changed
Stated once in the documents read so far.
Blackwell GPU capacity · Blackwell GPUs
Hint
Management intends to build a significant amount of Blackwell GPU capacity once the chips are available; no orders have been placed yet.
Promisedto improvefor FY26
Delivered1,024 Blackwell (B200) GPUs went live, completed in Q1FY27
ResultMissed
Said22 Jan 2025Concall transcript
In management's words
“we do intend to build a significant amount of capacity on the Blackwell range as and when it becomes available.”
How it was checked
The FY26 deadline (Mar 2026) passed. The 1,024 Blackwell GPUs only went live in Q1FY27, after the deadline. (judged from later company statements)
Evidence (21 Jul 2026): “B200 1024 LIVE” — Concall presentation — Q1FY27 (Jul 2026)
Evidence (22 Jul 2026): “So, 1,024 Blackwell that we received during last few months went online, and they were put on revenue.” — Concall transcript — Q1FY27 (Jul 2026)
Condition attached by management: As and when Blackwell becomes available.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Monthly run rate
Direct
Management reiterated a monthly revenue run rate of Rs 35-40 crore by March 2026 and said IndiaAI orders give confidence.
Promised₹35 Cr – ₹40 Crfor by FY26
Delivered₹246 CrFY26
ResultAchieved · beat
Said11 Nov 2025Concall transcript
In management's words
“we had made a guidance for FY26 March for the monthly run rate where we mentioned a number of anywhere say between 35 and 40 CR per month.”
What it implies in numbers
Reaching ₹35 Cr by FY26 from ₹164 Cr (FY25) needs about 78.7% decline a year.
How it was checked
FY26 actual ₹246 Cr — ahead of the guided ₹35 Cr – ₹40 Cr (annual result).
Condition attached by management: Depends on IndiaAI and customer workloads going live
How this guidance changed
- 17 Apr 2025 — ₹35 Cr – ₹40 Cr for by Mar 2026
First stated
Concall transcript · Achieved (actual ₹246 Cr)
- 11 Nov 2025 — ₹35 Cr – ₹40 Cr for by FY26
Repeated
Concall transcript · Achieved (actual ₹246 Cr)
EBITDA margin
Direct
EBITDA margin of 65-75% should be achievable at the March 2026 exit run-rate, as capacity converts to revenue.
Promised65–75%for FY26
Delivered51.22%FY26
ResultMissed
Said22 Jul 2025Concall transcript
In management's words
“let's say, 65% to 75% should be doable from EBITDA margin perspective with the capacity that we are expecting to kind of convert to revenue by March exit month”
How it was checked
FY26 actual 51.22% — short of the guided 65–75% (annual result).
Condition attached by management: Capacity expected to convert to revenue by March 2026 exit
How this guidance changed
- 17 Apr 2025 — 60% for FY26
First stated
Concall transcript · Missed (actual 51.22%)
- 22 Jul 2025 — 65–75% for FY26
Raised
Concall transcript · Missed (actual 51.22%)
Revenue from MRR
Indirect
Management expects revenue next year to be about 1.5x to 1.7x the current MRR run rate.
Promised1.5–1.7xfor FY26
Delivered1.5xFY26
ResultAchieved
Said17 Apr 2025Concall transcript
In management's words
“we do expect to improve our showing next year from whatever current number we have to maybe about 1.5x to 1.7x of that.”
What it implies in numbers
1.5x revenue from ₹164 Cr (FY25) means about ₹246 Cr by FY26 — roughly 50.0% growth a year.
How it was checked
FY26 actual 1.5x — met the guided 1.5–1.7x (annual result).
How this guidance changed
Stated once in the documents read so far.
Debt funding of expansion
Hint
Management intends to use debt aggressively to fund the capacity expansion.
Promisedto improvefor FY26
Deliveredup 117.8%FY26
ResultAchieved
Said17 Apr 2025Concall transcript
In management's words
“we'll continue to be very, very aggressive in terms of being able to arrange whatever capital is required for our expansion, either as debt.”
How it was checked
Borrowings (gross debt) rose by 117.8% in FY26 from FY25 — in line with what management indicated (balance sheet).
Condition attached by management: Once cash flows start to be generated.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Next-generation GPU build
Direct
Management says it might build about 4,000 GPUs in the next generation next year, depending on demand.
Promised~4,000 GPUsfor FY26
DeliveredLive fleet grew by about 1,200 in FY26 (3,900 to 5,100), versus ~4,000 planned
ResultMissed
Said17 Apr 2025Concall transcript
In management's words
“hopefully next year, we might be talking about maybe do 4,000 GPUs in the next generation.”
How it was checked
The FY26 deadline (Mar 2026) passed. FY26 fleet growth was about 1,200 GPUs, well short of the ~4,000 next-generation build. (judged from later company statements)
Evidence (5 Sep 2026): “its live GPU fleet exceeding 5,100 GPUs as of June 30, 2026, including Blackwell-based infrastructure.” — Annual report FY26
Evidence (22 Jul 2026): “So, 1,024 Blackwell that we received during last few months went online, and they were put on revenue.” — Concall transcript — Q1FY27 (Jul 2026)
Condition attached by management: Depends on demand for the next generation.
How this guidance changed
Stated once in the documents read so far.
Capacity utilisation
Direct
GPU capacity utilisation expected to reach 75-90% by Q4 FY26, up from 50-60% today.
Promised75–90%for Q4FY26
Delivered80%+ utilisation in March 2026, below 85%
ResultAchieved
Said22 Jul 2025Concall transcript
In management's words
“Yes, anywhere between 75% to 90% utilization is what we are expecting.”
How it was checked
The Q4FY26 target was 75–90%. Management reported utilisation of 80%+ in March 2026, within the range, up from 60–65% in December. (judged from later company statements)
Evidence (20 Apr 2026): “I would say only in the March month, we are looking at 80% plus kind of utilization. Certainly less than 85%.” — Concall transcript — Q4FY26 (Apr 2026)
Evidence (16 Jan 2026): “I think at the December end, we are touching the utilization roughly around 60% to 65%.” — Concall transcript — Q3FY26 (Jan 2026)
How this guidance changed
Stated once in the documents read so far.
Operating margin
Hint
Operating margins are expected to improve, as no major cost-structure changes are anticipated.
Promisedto improvefor FY26
DeliveredunchangedFY26
ResultPartly achieved
Said22 Jul 2025Concall transcript
In management's words
“Hopefully, they should improve because we are not expecting any significant major changes to our cost structure.”
How it was checked
EBITDA / operating margin was unchanged in FY26 from FY26 — roughly in line with what management indicated (annual result).
Condition attached by management: No significant change to cost structure
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Blackwell capacity go-live
Hint
Management hopes to take the already procured Blackwell GPUs live before the end of Q4 FY26.
Promisedmilestonefor Q4FY26
Delivered1,024 B200 GPUs went live after the Q4FY26 deadline
ResultMissed
Said16 Jan 2026Concall transcript
In management's words
“hopefully, before the end of Q4, we should be able to go live with the Blackwell that we have already procured”
How it was checked
The 1,024 B200 cluster was completed in Q1FY27, after the March 31, 2026 deadline for going live in Q4 FY26. (judged from later company statements)
Evidence (21 Jul 2026): “B200 1024 LIVE” — Concall presentation — Q1FY27 (Jul 2026)
Evidence (22 Jul 2026): “So, 1,024 Blackwell that we received during last few months went online, and they were put on revenue.” — Concall transcript — Q1FY27 (Jul 2026)
How this guidance changed
- 22 Jul 2025 — milestone for Q4FY26
First stated
Concall transcript · Awaiting data
- 16 Jan 2026 — milestone for Q4FY26
Repeated
Concall transcript · Missed (actual 1,024 B200 GPUs went live after the Q4FY26 deadline)
Aggressive infrastructure expansion
Hint
The company intends to pursue aggressive infrastructure expansion to meet rising demand from enterprises, startups and GCCs.
Promisedto improvefor FY26
Delivereddown 18.5%FY26
ResultMissed
Said4 Sep 2025Annual report
In management's words
“The Company intends to pursue aggressive infrastructure expansion to meet rising demand from enterprises, startups, and GCCs seeking scalable, high-performance, and cost-effective cloud solutions.”
How it was checked
Capital expenditure fell by 18.5% in FY26 from FY25 — against what management indicated (change in fixed assets and CWIP plus depreciation).
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Monthly run rate
Hint
Management hopes to reach the monthly run rate target well before March 2026 because of the IndiaAI orders.
Promisedto improvefor FY26
Deliveredup 50.0%FY26
ResultAchieved
Said11 Nov 2025Concall transcript
In management's words
“it looks like potentially we should be able to meet our monthly run rate number hopefully much earlier than March.”
How it was checked
Revenue rose by 50.0% in FY26 from FY25 — in line with what management indicated (annual result).
Condition attached by management: IndiaAI orders go live soon
How this guidance changed
- 4 Sep 2025 — to improve for FY26
First stated
Annual report · Achieved (actual up 50.0%)
- 11 Nov 2025 — to improve for FY26
Repeated
Concall transcript · Achieved (actual up 50.0%)
Utilisation of current infrastructure
Direct
Management targets 80-90 percent utilisation of current infrastructure by March 2026, supported by IndiaAI orders.
Promised80–90%for by FY26
Delivered80% plus in March 2026, below 85%
ResultAchieved
Said11 Nov 2025Concall transcript
In management's words
“we are very hopeful that by March for the current infrastructure that is already there, that utilization will get to about 80%-90%.”
How it was checked
Utilisation reached about 80% plus in March 2026, within the targeted 80-90% range, up from roughly 60-65% in December. (judged from later company statements)
Evidence (20 Apr 2026): “I would say only in the March month, we are looking at 80% plus kind of utilization. Certainly less than 85%.” — Concall transcript — Q4FY26 (Apr 2026)
Evidence (16 Jan 2026): “I think at the December end, we are touching the utilization roughly around 60% to 65%.” — Concall transcript — Q3FY26 (Jan 2026)
Condition attached by management: IndiaAI Mission orders allocated
How this guidance changed
Stated once in the documents read so far.
Blackwell GPUs acquired
Indirect
Management expects 2,048 to 4,096 Blackwell GPUs on an immediate basis, with the upper end possible before March 2026.
Promised2,048–4,096 GPUsfor by FY26
Delivered1,024 B200 GPUs live, short of the 2,048-4,096 range
ResultMissed
Said11 Nov 2025Concall transcript
In management's words
“we might decide to kind of like double up that number all the way to 4,096 before March.”
How it was checked
Only 1,024 Blackwell GPUs went live, and only after March 2026, so the 2,048-4,096 target before March 2026 was not met. (judged from later company statements)
Evidence (21 Jul 2026): “B200 1024 LIVE” — Concall presentation — Q1FY27 (Jul 2026)
Evidence (16 Oct 2026): “~5,100 cloud GPUs live including 1,024 NVIDIA B200s” — Concall presentation — Q2FY27 (Oct 2026)
Evidence (22 Jul 2026): “So, 1,024 Blackwell that we received during last few months went online, and they were put on revenue.” — Concall transcript — Q1FY27 (Jul 2026)
Condition attached by management: Depends on capacity utilisation and market input
How this guidance changed
Stated once in the documents read so far.
MRR
Direct
Management continues to target a monthly revenue run rate of INR35-40 crore around March 2026.
Promised₹35 Cr – ₹40 Crfor by Mar 2026
Delivered₹96 CrQ4FY26
ResultAchieved · beat
Said16 Jan 2026Concall transcript
In management's words
“we continue to hold our target of being able to hit somewhere close to INR35 crores to INR40 crores of MRR around March 2026 or thereabouts.”
What it implies in numbers
Reaching ₹35 Cr by Q4FY26 from ₹70.02 Cr (Q3FY26) needs about 93.8% decline a year.
How it was checked
Q4FY26 actual ₹96 Cr — ahead of the guided ₹35 Cr – ₹40 Cr (quarterly result).
How this guidance changed
Stated once in the documents read so far.
Utilization
Hint
Management expects utilisation to rise from about 60-65% in the next quarter.
Promisedto improvefor Q4FY26
Delivered80% plus in March 2026
ResultAchieved
Said16 Jan 2026Concall transcript
In management's words
“hopefully, in the next quarter, that utilization percentage should increase.”
How it was checked
Utilisation rose from roughly 60-65% in December to 80% plus in March 2026, within the next-quarter period. (judged from later company statements)
Evidence (20 Apr 2026): “I would say only in the March month, we are looking at 80% plus kind of utilization. Certainly less than 85%.” — Concall transcript — Q4FY26 (Apr 2026)
How this guidance changed
Stated once in the documents read so far.
2,048 GPUs going live in production
Indirect
Management expects the 2,048 GPUs under work in progress to go live in production in Q1FY26.
Promisedmilestonefor Q1FY26
DeliveredNearly 3,000 GPUs operational in Jul 2025; Chennai 1,024-GPU cluster still in CWIP
ResultMissed
Said17 Apr 2025Concall transcript
In management's words
“Yes. In Q1, everything will go live.”
How it was checked
The Q1FY26 (Jun 2025) deadline passed. The July 2025 call showed only nearly 3,000 of about 3,900 GPUs operational, with a 1,024-GPU cluster still in CWIP. (judged from later company statements)
Evidence (11 Nov 2025): “our Chennai location went live from 1st of August. Now, all of our capacity today is completely online and available for use by our customers.” — Concall transcript — Q2FY26 (Nov 2025)
How this guidance changed
Stated once in the documents read so far.
Chennai data centre production go-live · Chennai data centre
Hint
Management expects the Chennai data centre to start accepting production customers very soon.
Promisedmilestonefor Not specified
DeliveredChennai location went live on 1 August 2025 and accepts customers
ResultAchieved
Said17 Apr 2025Concall transcript
In management's words
“So, we should go into production mode very, very soon.”
How it was checked
No deadline was given. The Nov 2025 call says the Chennai location went live on 1 August and all capacity is available to customers. (judged from later company statements)
Evidence (11 Nov 2025): “our Chennai location went live from 1st of August. Now, all of our capacity today is completely online and available for use by our customers.” — Concall transcript — Q2FY26 (Nov 2025)
How this guidance changed
Stated once in the documents read so far.
Second data center (Chennai) operational
Hint
The second data center near Chennai is expected to become operational in Q4FY25, with full deployment of services in the first quarter still uncertain.
Promisedmilestonefor Q4FY25
DeliveredChennai went live on 1 August 2025
ResultMissed
Said22 Jan 2025Concall transcript
In management's words
“We are trying to do it as soon as possible. I guess like during the next quarter, it would get operationalized whether we will be able to deploy all the services in the first quarter itself, like remains to be seen.”
How it was checked
The Q4FY25 (Mar 2025) deadline passed. Chennai clusters were still in CWIP in July 2025 and went live on 1 August 2025. (judged from later company statements)
Evidence (22 Jul 2025): “So, nearly 3,000 of them are up and running. And Chennai has a capacity of 1,024 single large clusters.” — Concall transcript — Q1FY26 (Jul 2025)
Condition attached by management: Full deployment of services in the first quarter remains to be seen.
How this guidance changed
Stated once in the documents read so far.
Key points from each document
The main takeaways, newest document first.
E2E Networks Limited Has informed About Securing Approximately 12.8 MW Of Additional Data Centre Capacity Over And Above The Company''s Existing Data Centre Cap · 12 Nov 2026
- E2E has secured about 12.8 MW of additional data centre capacity on top of its existing 14.6 MW.
- The additional capacity is about an 88% increase, taking total data centre capacity to roughly 27.4 MW.
- The company says the expansion responds to growing business requirements and rising demand for AI computing and cloud infrastructure services.
- Management links the new capacity to strengthening infrastructure and serving demand for GPU cloud and other AI services.
- The filing is a general update to the exchanges with no revenue, margin, or timing figures for the new capacity.
Concall presentation — Q2FY27 (Oct 2026) · 16 Oct 2026
- Q2 FY27 operational revenue was INR 2,238 Mn, up 410.8% YoY and 42.7% QoQ, with EBITDA margin at 76.6%.
- A binding term sheet worth about INR 1,000 Cr (excl. taxes) with an India-based sovereign AI company for Blackwell GPUs is valid up to June 2029.
- Management says the contract gives long-term visibility and allows deployed capacity to shift from pay-as-you-go to longer-term commitments.
- The company plans a Blackwell scale-up of 1024+ B200s and is scaling Blackwell capacity, with next-generation B300 / Vera Rubin planning underway.
- EBITDA margin rose to 76.6% in Q2 FY27 from 75.2% in Q1 FY27 and 41.1% a year earlier.
- Borrowings rose to INR 4,504 Mn at Sep-26 from INR 1,032 Mn at Mar-26, alongside GPU build-out.
- Preferential issue proceeds of INR 15,919 Mn have INR 1,024 Mn still unutilised as of Q2 FY27.
- Several senior hires were announced, including a Chief Revenue Officer, Head of Founder's Office and SVP Field CTO.
- The company is positioning itself as an India-based sovereign GPU cloud provider with in-house AI platforms TIR and Jarvislabs.ai.
- Depreciation rose to INR 740 Mn in Q2 FY27 from INR 606 Mn in Q1 FY27 as GPU capacity was deployed, which weighs on PAT.
Concall transcript — Q2FY27 (Oct 2026) · 16 Oct 2026
- Q2FY27 revenue was INR2,238 million, up 411% year-on-year and 43% quarter-on-quarter, with EBITDA margin at 76.6%.
- A nearly INR1,000 crore multiyear contract with a sovereign AI company for the existing Blackwell cluster runs through June 2029, improving revenue visibility.
- Management reiterated a 70%-plus EBITDA margin as the medium- and long-term target, while declining to endorse an 85% gross margin figure.
- The next B200 lot, including 1,024 GPUs, is expected to go live this quarter, but the company has not yet decided how that capacity will be contracted.
- Management will not give MRR, exit or quarterly guidance, and prefers to report past performance rather than forward targets.
- Management does not give speculative capex guidance and will announce capex upgrades only once deployment plans are firm.
- Management declined to give contracted-revenue share, inference revenue, utilisation and GPU-supply visibility, calling these metrics volatile and not trackable.
- India AI customers were roughly 13% to 15% of Q2 revenue and international customers roughly 20% to 25%.
- Management has no defined debt ceiling and says comfort depends on the ability to repay and lender covenants.
- Management says there is no direct competition in a large global TAM and declined to compare the platform with peers on performance.
Annual report FY26 · 5 Sep 2026
- FY26 revenue grew 49.78% to Rs. 245.58 Cr and EBITDA grew 30.63% to Rs. 126.26 Cr, driven by a much larger live GPU fleet.
- Depreciation rose 181.69% to Rs. 169.23 Cr, swinging PAT to a loss of Rs. 15.57 Cr versus a profit of Rs. 47.49 Cr a year earlier.
- Revenue from operations rose 49.78% to Rs 24,558.01 lakh, which management attributes to higher business volumes, expanded cloud offerings and deeper market penetration.
- Company swung to a loss before tax of Rs 2,119.95 lakh, which management attributes mainly to a sharp rise in depreciation from the GPU and cloud expansion.
- Cash spent on purchase of fixed assets including assets under development was Rs 1,26,245.03 lakh in FY26, versus Rs 12,593.03 lakh in FY25.
- Management says E2E built capacity ahead of demand, and the accounting loss reflects depreciation on that capacity.
- Live GPU fleet rose from roughly 3,900 to over 5,100 units within FY26, including new B200 clusters.
- Monthly Revenue Run-rate rose from Rs. 160 million in March 2025 to Rs. 374 million in March 2026.
- Management expects the AI infrastructure build-out to be long-running and is building capacity for a decade rather than a single cycle.
- Management assumes each hardware generation can sustain a 6-8 year useful life, a key assumption behind the value of infrastructure investments.
- EBITDA rose 30.63% in absolute terms, but the EBITDA margin moderated because of higher operating costs incurred to scale GPU and cloud capabilities.
- A Rs 107 crore Qualified Institutions Placement was completed in FY26, with proceeds earmarked mainly for cloud GPU and compute infrastructure.
- Management says the AI infrastructure opportunity is shifting from training toward continuous inference and agentic workloads, which it sees as expanding demand for its platform.
- Strategic priorities include scaling AI infrastructure, building software platforms, and advancing sovereign AI and international expansion, while keeping India as the primary market.
Concall transcript — Q1FY27 (Jul 2026) · 22 Jul 2026
- Q1FY27 revenue rose to INR1,568 million, up 334% year-on-year and 64% quarter-on-quarter, driven by utilisation and capacity additions.
- EBITDA margin reached 75.2%, expanding 1,450 basis points versus Q4, which management attributes to operating leverage and the B200 cluster going live.
- The 1,024 Blackwell GPUs that came online were put on revenue, and management says utilisation of the new capacity is at a maximal level.
- Management positions sovereign AI, built on open-weight models and its AI factory, as the core growth strategy, with value captured across several software and infrastructure layers.
- Borrowings are about INR 450 crore and will rise near term as the loan for the next B200 lot is drawn; management declined to quantify peak debt for the year.
- Management says funding for all announced GPUs is fully arranged through debt, internal accruals or prior equity, and any future equity raise would be disclosed when it happens.
- Data-centre power costs will keep rising with usage, and some further cost increase is expected in coming quarters, though management does not expect it to be very large.
- Management declined to give MRR or exit-MRR guidance and asked investors to track past quarterly exit MRR instead.
- Customers increasingly want longer contracts of one to three years, which management expects to add revenue predictability, though no target mix has been set.
- Management says it is confident of growing through the AI cycle, while acknowledging that good and bad cycles will occur in the cloud business.
Concall presentation — Q1FY27 (Jul 2026) · 21 Jul 2026
- E2E reports about 5,100 cloud GPUs live at the Q1 FY27 exit, including 1,024 B200s, and plans a Blackwell scale-up of 1,024+ B200s.
- Q1 FY27 operational revenue was INR 1,568 Mn, up 334.3% YoY and 64.0% QoQ, with exit monthly revenue run-rate of INR 718 Mn in June 2026.
- EBITDA margin rose to 75.2% in Q1 FY27 from 60.7% in Q4 FY26, while PAT margin reached 28.0%.
- Management plans to deploy large-scale GPU infrastructure and enable funding arrangements to accelerate AI infrastructure expansion.
- FY26 capex includes CWIP of INR 5,334 Mn for GPUs deployed in May 2026, reflecting the heavy investment in AI infrastructure.
- About INR 1,327 Mn of preferential-issue proceeds remains unutilised, with INR 1,024 Mn of the Q4 FY26 raise still to be deployed.
- Next-generation compute (B300 / Vera Rubin) is in roadmap stage with planning underway, with no timeline or volume given.
- Alok Ohrie, former President & MD of Dell Technologies India, joined as Strategic Advisor, and further senior hires are underway.
Concall transcript — Q4FY26 (Apr 2026) · 20 Apr 2026
- Management plans to deploy 2,048 B200 GPUs plus spares in FY27, starting with a 1024-GPU cluster expected to go live in mid-May.
- Management declined to give a FY27 capacity target but said about 6,000 units is the minimum visible by FY27 end.
- Management says GPU utilisation was around 80% in March 2026 across CPU, GPU and storage, with headroom to rise towards 85%.
- Q4FY26 revenue rose 186% YoY to INR956 million and EBITDA margin expanded to 60.7%, though FY26 PAT was a loss of INR156 million due to GPU depreciation.
- Management expects revenue to outpace depreciation as utilisation ramps, which should improve reported profitability.
- Management is exploring asset-light and private-credit financing models, and a non-exclusive MOU with L&T, to expand GPU capacity without full balance-sheet funding.
- Revenue is lumpy at the current small GPU base; management expects lumpiness to fall as the GPU count grows.
- Management says it will not give a MRR or per-GPU pricing guidance, and declined to split revenue by customer or contract tenor.
- Management sees GPU pricing stable to firming and expects demand to stay strong, though it did not give a pricing outlook for the company's own contracts.
- Management says it met or exceeded the operating target it gave a couple of quarters earlier.
Concall transcript — Q3FY26 (Jan 2026) · 16 Jan 2026
- Management reiterated a target of roughly INR35-40 crore monthly revenue run rate around March 2026, saying it is 70-80% of the way there.
- Operational revenue was INR700 million in Q3FY26, up 68.3% year-on-year and 59.8% quarter-on-quarter, with December 2025 monthly run rate at INR280 million.
- EBITDA margin was 56.6%; management says the business is closer to 70% margins at scale, versus 55-60% today.
- The Q3 net loss of INR57 million was driven by higher depreciation from GPU commissioning and higher finance cost from the term loan.
- Capex for the 1,024 Blackwell GPUs is roughly INR600-650 crore, partly funded by a term loan from Axis and HDFC Bank.
- 1,024 B200 GPUs were received in Chennai, and deployment is expected to finish in Q4 with Blackwell capacity going live before quarter end.
- Utilisation was about 60-65% at December end, and management targets 80-90% at some point in the next financial year.
- India AI Mission workloads are expected to ramp in late January, making Q4 India AI contribution much higher than in December.
- A December Mumbai outage prompted migration of customers; management does not expect a material revenue impact over the medium and long term.
- Management declined to give FY26/FY27 capex or MRR guidance, promising details in a couple of weeks or at the next quarter.
Concall transcript — Q2FY26 (Nov 2025) · 11 Nov 2025
- Management reiterated its target of Rs 35-40 crore monthly revenue run rate by March 2026 and said two IndiaAI orders could bring it earlier.
- E2E is placing orders for about 2,048 Blackwell GPUs, with a possible increase to 4,096 before March 2026, funded by internal accruals, prior fundraise and institutional debt.
- Management reiterated a medium- to long-term EBITDA margin target of around 70 percent plus or minus something, and said gross margin on new assets should be 80-85 percent.
- Management targets 80-90 percent utilisation of existing infrastructure by March 2026, versus 35-40 percent in the prior quarter, supported by IndiaAI orders.
- E2E received two IndiaAI Mission orders worth Rs 88 crore and Rs 177 crore, but billing start dates were not given and realisation appears lower.
- The Rs 450 crore debt facility is expected to be fully drawn by end-March or early April 2026 in line with vendor payment terms.
- Management declined to give a Blackwell capex figure or a timeline for IndiaAI billing and said no near-term software revenue visibility exists.
- Q2FY26 revenue was Rs 43.8 crore, up 21 percent quarter on quarter, and EBITDA margin rose to 41 percent from 29 percent.
Annual report FY25 · 4 Sep 2025
- FY25 revenue rose 74% year on year to Rs 164.0 Cr, driven by rising demand for AI compute and platform reliability.
- EBITDA grew 102% to Rs 96.7 Cr in FY25, with EBITDA margin expanding to 59%, and PAT rose 117% to Rs 47.5 Cr.
- Revenue from operations rose 73.55% to Rs 16,396.08 lakh in FY25, with EBITDA up 101.66% and PAT up 117.23%.
- Larsen & Toubro invested Rs 1,079 Cr as a strategic investment, alongside a Rs 405 Cr preferential allotment, strengthening the balance sheet for expansion.
- The company plans aggressive GPU capacity expansion and a mix of internal accruals and debt to fund infrastructure, without compromising balance sheet strength.
- Management intends to pursue an aggressive growth strategy, investing heavily in cloud infrastructure to handle large-scale workloads, citing the size and growth of the Indian IaaS market.
- Operating profit margin rose to 58.95% from 50.75%, and net profit margin to 28.97% from 23.15%, which management attributes to higher revenue and improved operating margin.
- Management plans to fund infrastructure expansion with a mix of internal accruals and debt while maintaining operational stability.
- Capital work-in-progress of Rs 63,618.46 lakh reflects assets bought in March 2025 that are still awaiting deployment, and capital commitments stand at Rs 90,430 lakh.
- Of the Rs 1,079 Cr L&T issue proceeds, Rs 962.47 Cr was unutilised at March 31, 2025, with Rs 722.79 Cr earmarked for IT equipment capex.
- The Board retained all FY25 profit and recommended no dividend, citing the need to conserve resources for growth and expansion.
- Management expects the company to capitalise on India's public cloud and AI infrastructure growth, citing an IDC projected 22.6% CAGR to 2029.
- Management sees strong demand from AI, ML and GPU workloads and plans to deepen its expertise in high-performance GPU clusters.
- Management flags hyperscaler pricing pressure and GPU technology churn as risks, and cites hardware refresh cycles and GPU leasing as mitigants.
Concall transcript — Q1FY26 (Jul 2025) · 22 Jul 2025
- Management targets an exit MRR of Rs 32-38 crore by March 2026, later narrowed to about Rs 35 crore plus or minus, versus Rs 14.5 crore in June 2025.
- The Chennai GPU cluster deployment slipped, and management now expects it to go live around end-July, a timeline it has already moved once.
- Q1 revenue fell 12.6% year on year to Rs 361 million, as the delayed Chennai rollout hit the quarter.
- Management guides EBITDA margin of 65-75% on capacity expected to convert to revenue by the March 2026 exit, but Q1 EBITDA margin was 29.1%.
- GPU utilisation was 50-60% in Q1, and management expects 75-90% by Q4 FY26, which underpins the MRR target.
- Software licensing revenue is not in this year's plan; management expects it to start showing up only in the next financial year.
- INDIAai Mission revenue is still small and unquantified; management expects it to become more significant over the next one to two quarters.
- Blackwell GPU orders are targeted for around end of Q3 or Q4 FY26, with any capacity expansion most likely landing in the last quarter.
- Management says INDIAai Mission work will bring some margin contraction but not a material hit to overall company margins.
Concall transcript — Q4FY25 (May 2025) · 17 Apr 2025
- Management is targeting monthly recurring revenue of INR35-40 crore by March 2026, up from about INR11 crore, after MRR stayed flat from December to March.
- E2E has about 3,700 GPUs, with a further 2,048 H200 GPUs procured around March 2025 and expected to go live in Q1FY26.
- Management targets roughly 10,000 GPUs on the platform within 2-3 years, adding at least 2,000 GPUs per generation.
- EBITDA margin fell to 40% in the quarter because GPUs on trial and POCs earned no revenue; management intends to return to 60% at steady state.
- Management targets 10% to 20% of the IndiaAI Mission GPU market, and 20% to 25% over three years, against a stated INR10,500 crore three-year demand.
- Management expects sovereign cloud platform gross margins of about 75-80%, with most of that flowing to EBITDA after support and sales costs.
- Long-cycle enterprise sales make conversion timing hard to predict; management says predictability is expected only over a yearly cycle.
- Management plans to fund the expansion aggressively, mainly through debt, once cash flows are generated.
- The Chennai data centre is almost live and is expected to accept production customers very soon.
Documents read
- E2E Networks Limited Has informed About Securing Approximately 12.8 MW Of Additional Data Centre Capacity Over And Above The Company''s Existing Data Centre Cap · Exchange announcement · 12 Nov 2026 · 1 statement
- Concall presentation — Q2FY27 (Oct 2026) · Concall presentation · 16 Oct 2026 · 3 statements
- Concall transcript — Q2FY27 (Oct 2026) · Concall transcript · 16 Oct 2026 · 5 statements
- Annual report FY26 · Annual report · 5 Sep 2026 · 11 statements
- Concall transcript — Q1FY27 (Jul 2026) · Concall transcript · 22 Jul 2026 · 9 statements
- Concall presentation — Q1FY27 (Jul 2026) · Concall presentation · 21 Jul 2026 · 3 statements
- Concall transcript — Q4FY26 (Apr 2026) · Concall transcript · 20 Apr 2026 · 12 statements
- Concall transcript — Q3FY26 (Jan 2026) · Concall transcript · 16 Jan 2026 · 17 statements
- Concall transcript — Q2FY26 (Nov 2025) · Concall transcript · 11 Nov 2025 · 10 statements
- Annual report FY25 · Annual report · 4 Sep 2025 · 6 statements
- Concall transcript — Q1FY26 (Jul 2025) · Concall transcript · 22 Jul 2025 · 17 statements
- Concall transcript — Q4FY25 (May 2025) · Concall transcript · 17 Apr 2025 · 16 statements
- Concall transcript — Q3FY25 (Jan 2025) · Concall transcript · 22 Jan 2025 · 11 statements
Guidance is extracted from company documents and interviews by an AI model and then checked against reported numbers by rule. It can contain errors or miss context, and the stored figures may differ from the basis management guided on. This page is information only and is not investment advice.