DOMS Industries Ltd: management guidance tracker
What management said it would deliver, when, where they said it — and what the reported numbers showed afterwards.
How to read this page — 30 seconds
- Latest guidance is what management said at its most recent results call, presentation or interview, next to what it had said before. Raised or Lowered tells you which way expectations moved.
- Other open guidance lists earlier promises that have not fallen due, soonest first, with the latest reported figure.
- Track record compares each promise that has fallen due with what the company actually delivered. That is the best guide to how much weight to give the new guidance.
Select any row for management's exact words, where they said it and how the target changed over time.
Latest guidance · 2 Nov 2026 – 3 Nov 2026
From Concall transcript — Q2FY27 (6 Nov 2026), Press release — Q2FY27 (2 Nov 2026), Investor presentation — Q2FY27 (2 Nov 2026). What management guided for most recently, against what it had said before.
Further capital expenditure in the remainder of the year
Direct
Management expects to invest a further INR100-125 crore of capex in H2 FY27 after over INR200 crore in H1.
Earlier
First time stated
Now₹100 Cr – ₹125 CrH2FY27
Change
New
StatusPending
In management's words
“expect to invest a further INR100 crores to INR125 crores during the remainder part of the year.”
How this guidance changed
Stated once in the documents read so far.
Guided consolidated sales growth
Direct
Walked back
Management is confident of delivering consolidated sales growth of 18% to 20% for FY27.
Earlier
18–20% growthFY27 · 9 Aug 2026
Now18–20% growthFY27
Change
Repeated
StatusOn track
So far: 18.5% growth
In management's words
“reinforcing our confidence in delivering our guided consolidated sales growth of 18% to 20% for the year.”
What it implies in numbers
18–20% growth on ₹2,326 Cr (FY26) implies about ₹2,745 Cr to ₹2,791 Cr for FY27.
How it was checked
Year to date (Q1FY27–Q2FY27) growth is 18.5% against the guided 18–20% for FY27.
Condition attached by management: Management is monitoring raw material prices and says visibility is limited.
How this guidance changed
- 11 Aug 2025 — 18–20% growth for FY27
First stated
Concall transcript · On track (actual 18.5% growth)
- 2 Feb 2026 — 18–20% growth for FY27
Repeated
Concall transcript · On track (actual 18.5% growth)
- 19 May 2026 — 17–20% growth for FY27
Lowered
Concall transcript · On track (actual 18.5% growth)
- 9 Aug 2026 — 18–20% growth for FY27
Raised
Concall transcript · On track (actual 18.5% growth)
- 3 Nov 2026 — 18–20% growth for FY27
Repeated
Concall transcript · On track (actual 18.5% growth)
Targeted EBITDA margin range
Direct
Management aims to move EBITDA margin back to a 16-17% range but gives no timing and will wait a couple of quarters before more pricing action.
Earlier
16–17%FY27 · 9 Aug 2026
Now16–17%FY27
Change
Repeated
StatusBehind
So far: 12.4%
In management's words
“Our targeted EBITDA margin range continues to be 16% to 17%.”
How it was checked
Year to date (Q1FY27–Q2FY27) ebitda / operating margin is 12.4% against the guided 16–17% for FY27.
Condition attached by management: Depends on raw material prices and the effect of pricing actions; management asks for patience over the next couple of quarters.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 9 Aug 2026 — 16–17% for FY27
First stated
Concall transcript · Behind (actual 12.4%)
- 3 Nov 2026 — 16–17% for FY27
Repeated
Concall transcript · Behind (actual 12.4%)
Revenue contribution from Reynolds-brand pen production · writing instruments (Reynolds brand)
Indirect
Reynolds-brand revenue from goods made at the new facility is expected to start in Q3 FY27 and gain momentum in Q4 FY27.
Earlier
First time stated
NowmilestoneQ3FY27
Change
New
StatusPending
In management's words
“we'll see revenues from Reynolds brand from the goods manufactured by us flowing in from third quarter FY27 and gaining momentum in fourth quarter FY27.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Depends on production ramp-up and market response.
How this guidance changed
Stated once in the documents read so far.
Wooden pencil manufacturing and further office supplies capacity · scholastic stationery and office supplies
Indirect
Management expects to add wooden pencil manufacturing and further office supplies capacity before FY27 ends.
Earlier
First time stated
NowmilestoneFY27
Change
New
StatusPending
In management's words
“We expect to add manufacturing infrastructure for wooden pencils, followed by further capacity expansion in office supplies before the close of the current financial year.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
EBITDA margin for the baby hygiene business · baby hygiene (Uniclan)
Indirect
Management wants the baby hygiene segment to earn an EBITDA margin of around 8-10% over the longer term.
Earlier
First time stated
Now8–10%FY31–FY33
Change
New
StatusPending
In management's words
“We'll want to have margins of around 8% to 10% for this business segment in the longer term.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Depends on whether further price increases are needed once raw material costs normalise.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Additional debt required in the midterm
Indirect
Management expects it will need about INR100-120 crore of additional debt in the midterm to fund ongoing capex, which could fall if cash flow recovers sooner.
Earlier
First time stated
Now₹100 Cr – ₹120 CrNot specified
Change
New
StatusPending
In management's words
“we will require at least about INR100 crores to INR120 crores of debt in the midterm to fund the ongoing capex.”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: Could come down if cash flow generation recovers faster than expected.
How this guidance changed
Stated once in the documents read so far.
Contribution to revenues from new Reynolds pen building · Reynolds pen production
Hint
The first building at the new 50-acre Reynolds pen facility is expected to start contributing to revenues from Q3FY27.
Earlier
First time stated
NowmilestoneQ3FY27
Change
New
StatusOn track
In management's words
“this building is expected to begin contributing to revenues from Q3’FY27 onwards”
How it was checked
The Q3FY27 deadline has not yet passed. First-phase construction is nearing completion and the first building was reported commissioned in Q2, so revenue contribution looks achievable. (judged from later company statements)
Evidence (2 Nov 2026): “Plan to commercialize operations at ~50+ acres – first phase construction nearing completion” — Investor presentation — Q2FY27 (2 Nov 2026)
Evidence (3 Nov 2026): “approximately 170,000 square feet of manufacturing space into operation.” — Concall transcript — Q2FY27 (6 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Baby Hygiene growth · Baby Hygiene
Hint
Management aims to accelerate growth in Baby Hygiene by optimising capacity utilisation.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“Accelerate growth in Baby Hygiene by optimizing capacity utilization in line with evolving market opportunities.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: In line with evolving market opportunities
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Further increase in debt levels
Hint
Management says debt may rise further during the large capex cycle and expects internal accruals to fund much of future expansion once margins normalise.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“may result in further increase in our debt levels. But once things normalize, I think a significant portion of our future expansion will be funded by internal accruals.”
Condition attached by management: Once margins and cash flow normalise.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Commercialisation of ~50+ acre plant
Hint
Management plans to commercialise operations at the ~50+ acre site once first-phase construction, which is nearing completion, is finished.
Earlier
milestoneNot specified · 3 Aug 2026
NowmilestoneNot specified
Change
Repeated
StatusPending
In management's words
“Plan to commercialize operations at ~50+ acres – first phase construction nearing completion”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Completion of first-phase construction
How this guidance changed
- 3 Aug 2026 — milestone for Not specified
First stated
Concall presentation · Pending
- 2 Nov 2026 — milestone for Not specified
Repeated
Investor presentation · Pending
Insurance recovery against flood-related P&L impact
Hint
Insurance recovery on the flood-related exceptional loss is expected to substantially offset the P&L impact in due course.
Earlier
First time stated
NowmilestoneNot specified
Change
New
StatusPending
In management's words
“Relevant insurance claims have been lodged and the associated recovery is expected to substantially offset the P&L impact in due course”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Insurance claims lodged; recovery subject to settlement
How this guidance changed
Stated once in the documents read so far.
Insurance recovery of flood-related P&L impact
Hint
Management expects the insurance recovery on the flood damage to substantially offset the P&L impact, with no date given.
Earlier
First time stated
NowmilestoneNot specified
Change
New
StatusPending
In management's words
“Relevant insurance claims have been lodged and the associated recovery is expected to substantially offset the P&L impact in due course”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Insurance claims lodged and recovery process
How this guidance changed
Stated once in the documents read so far.
Parallel distribution of general merchant retail universe · General Trade
Hint
Management aims to build a parallel distribution network for the general merchant retail universe within general trade.
Earlier
milestoneNot specified · 3 Aug 2026
NowmilestoneNot specified
Change
Repeated
StatusPending
In management's words
“Aim to build a parallel distribution of general merchant retail universe within the GT segment”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
- 3 Aug 2026 — milestone for Not specified
First stated
Concall presentation · Pending
- 2 Nov 2026 — milestone for Not specified
Repeated
Investor presentation · Pending
Seven SpA participation in the JV · DOMS Seven Private Limited
Hint
Seven SpA is expected to become a 50% partner in the DOMS Seven JV once apostille and the JV agreement are completed.
Earlier
First time stated
NowmilestoneNot specified
Change
New
StatusPending
In management's words
“This is going to be the vehicle in which eventually Seven SpA will participate and eventually will become a 50% partner.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Apostille from the Indian Consulate in Italy and finalisation of the JV agreement.
How this guidance changed
Stated once in the documents read so far.
Other open guidance · soonest due first
Earlier promises that have not fallen due yet, with the latest figure where one has been reported.
DOMS-branded SKIDO bags launch
Hint
Walked back
DOMS-branded bags from SKIDO are expected to launch in Q4FY25 for the back-to-school season.
Targetmilestone
DueQ4FY25
result by 30 May 2025
Said4 Feb 2025
Concall transcript
StatusAwaiting data
In management's words
“So during this quarter, the DOMS branded bags would be launched in the market.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
Fourth book machine line at Pioneer · paper stationery
Hint
The fourth book machine line at Pioneer is expected to be ready for commercial production by June end.
Targetmilestone
Dueby Q1FY26
result by 14 Aug 2025
Said20 May 2025
Concall transcript
StatusAwaiting data
In management's words
“It should be delivered at our plant in the coming month and should be ready for commercial production by June end.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Dividend payment date
Direct
The dividend is scheduled to be paid in a window running from September 22, 2025 to October 21, 2025.
Targetmilestone
Dueby Sep 2025
result by 14 Nov 2025
Said30 Aug 2025
Annual report
StatusAwaiting data
In management's words
“Between September 22, 2025 and October 21, 2025”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Subject to shareholder approval at the AGM on September 22, 2025.
How this guidance changed
Stated once in the documents read so far.
Export markets recovery
Hint
Management expects export markets, hit by Middle East and Europe weakness, to recover soon.
Targetto improve
DueFY26
result by 30 May 2026
Said4 Feb 2025
Concall transcript
StatusAwaiting data
In management's words
“we believe export markets are expected to recover soon now.”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: geopolitical situation eases
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Year-end results
Hint
Management believes FY26 year-end results should be better, helped by Uniclan's seasonality and demand, without giving a number.
Targetto improve
DueFY26
result by 30 May 2026
Said4 Feb 2025
Concall transcript
StatusAwaiting data
In management's words
“we believe that we should be able to have better year-end results in FY '26”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Uniclan seasonality and demand; no quantified guidance yet
How this guidance changed
Stated once in the documents read so far.
Commercial production at 44-acre plant
Hint
Commercial production at the 44-acre plant is slated to begin in Q4 FY26.
Targetmilestone
DueQ4FY26
result by 30 May 2026
Said20 May 2025
Concall transcript
StatusAwaiting data
In management's words
“anticipated possession of first building by Q3 FY'26 and beginning of commercial production slated in Q4 FY'26.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Paper stationery capacity from Super Treads · paper stationery
Direct
The Super Treads acquisition is expected to increase paper stationery capacity by about 30%.
Target~30% growth
DueFY26
result by 30 May 2026
Said20 May 2025
Concall transcript
StatusAwaiting data
In management's words
“that will help us to increase our capacities by another 30%-odd.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Completion of the acquisition
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Paper stationery contribution to growth · paper stationery
Hint
Management expects paper stationery to be one of the key contributors to growth in FY26.
Targetto improve
DueFY26
result by 30 May 2026
Said20 May 2025
Concall transcript
StatusAwaiting data
In management's words
“We believe it to be one of the key contributors to growth in the coming financial year.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Exports to the US · US
Hint
Management expects US export sales to increase going forward as pencil capacity comes in; no order cancellations have been seen.
Targetto improve
DueFY26
result by 30 May 2026
Said20 May 2025
Concall transcript
StatusAwaiting data
In management's words
“And with increasing capacities from pencils coming in, we believe our sales to U.S. to increase going forward.”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: Pencil capacity additions
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Wet wipes sales · Uniclan wet wipes
Hint
Management expects significant wet wipes sales from Uniclan's new plant in FY26, partly replacing trading revenue.
Targetto improve
DueFY26
result by 30 May 2026
Said20 May 2025
Concall transcript
StatusAwaiting data
In management's words
“significant sales would be added in the current financial year.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Balance FY26 capex predominantly into 44-acre project · 44-acre project
Direct
The remaining Rs 150-160 crore of FY26 capex will mainly go into the 44-acre project.
Target₹150 Cr – ₹160 Cr
DueFY26
result by 30 May 2026
Said11 Aug 2025
Concall transcript
StatusAwaiting data
In management's words
“The balance of about Rs.150 to 160 crores predominantly will go into the 44-acre project.”
What it implies in numbers
Reaching ₹150 Cr by FY26 from ₹296 Cr (FY25) needs about 49.3% decline a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Backward integration
Hint
Management aims to extend its backward-integrated manufacturing model across all product categories.
Targetto improve
DueFY26
result by 30 May 2026
Said30 Aug 2025
Annual report
StatusAwaiting data
In management's words
“Looking ahead, our goal is to systematically extend this model across all product categories.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Sewage treatment plant coverage
Hint
The company plans to further expand sewage treatment installation coverage at its production facilities. No figure or date is given.
Targetto improve
DueFY26
result by 30 May 2026
Said30 Aug 2025
Annual report
StatusAwaiting data
In management's words
“Going forward, the Company plans to further expand coverage of such installations at its production facilities.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Growth opportunities
Hint
Management is optimistic about growth opportunities ahead.
Targetto improve
DueFY26
result by 30 May 2026
Said30 Aug 2025
Annual report
StatusAwaiting data
In management's words
“Looking forward, we are optimistic about the growth opportunities.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Growth momentum
Hint
Management is confident that industry tailwinds, scale and portfolio diversity will sustain growth momentum.
Targetto hold or improve
DueFY26
result by 30 May 2026
Said30 Aug 2025
Annual report
StatusAwaiting data
In management's words
“we are confident that structural tailwinds, along with our scale and diversified portfolio, will help sustain our growth momentum”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Export opportunities · International
Hint
Management plans to capitalise on export opportunities by using its global network to enter and grow in promising international markets.
Targetto improve
DueFY26
result by 30 May 2026
Said30 Aug 2025
Annual report
StatusAwaiting data
In management's words
“Looking ahead, we plan to capitalise on export opportunities by leveraging DOMS’ global network to enter and grow in promising international markets.”
How it was checked
Exports is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Business to close at close to INR200 crores · Uniclan (Wowper)
Direct
The Wowper business is targeted to close FY26 at close to INR200 crore of sales.
Target~₹200 Cr
DueFY26
result by 30 May 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“When we invested in this company last year, they closed last full financial year at INR160-odd crores. This year, we are targeting to close -- at close to INR200 crores.”
What it implies in numbers
Reaching ₹200 Cr by FY26 from ₹1,913 Cr (FY25) needs about 89.5% decline a year.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Paper stationery performance · paper stationery
Hint
Paper stationery is expected to perform much better in the coming back-to-school season, helped by added capacity.
Targetto improve
DueQ4FY26
result by 30 May 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“we believe this segment to perform much better.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Formation of the JV with Seven SpA · JV with Seven SpA
Hint
Formation of the Seven SpA JV is expected to be completed by end of Q1 FY27.
Targetmilestone
DueQ1FY27
result by 14 Aug 2026
Said2 Feb 2026
Concall transcript
StatusAwaiting data
In management's words
“The formation of this JV is expected to be completed by end of Q1 FY '27, and we believe that the JV will likely add new growth initiatives for the company in the future.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Seven SpA joint venture formation · Seven SpA JV
Hint
Formation of the Seven SpA joint venture entity expected to be completed before end of June 2026.
Targetmilestone
Dueby Jun 2026
result by 14 Aug 2026
Said19 May 2026
Concall transcript
StatusAwaiting data
In management's words
“we are in the process of formation of the joint venture entity, and this should be completed before the end of June 2026.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Commercial production at 45-acre facility · 45-acre facility
Hint
First building at the 45-acre facility to be completed June 2027, with commercial production starting towards end of Q2 FY27.
Targetmilestone
DueQ2FY27
result by 14 Nov 2026
Said19 May 2026
Concall transcript
StatusPending
In management's words
“the first building is on track for completion in June 2027 with commercial production expected to commence towards the end of Q2 FY27.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Expansion funding
Hint
Internal accruals plus unutilised IPO proceeds (about INR 165 crore) are expected to fund expansion for the next couple of years, with no major debt raise planned.
Targetmilestone
Dueby FY27
result by 30 May 2027
Said20 May 2025
Concall transcript
StatusPending
In management's words
“Internal accruals plus IPO proceeds should be good enough to fund the expansion for the next couple of years.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Balance sheet could support more debt if required
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
EBITDA margin · Uniclan (baby hygiene / diapers)
Direct
Uniclan's full-year EBITDA margin is expected to be about 8% to 9%, after the seasonally strong Q3.
Target8–9%
DueFY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“But when you consolidate the full year numbers where Q1 is weak followed by Q4 and then Q2 and Q3, at a same level, we think this business will do about 8% to 9% annual margin.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Gross fixed asset turnover · premium backpack JV
Direct
Gross fixed asset turnover of 3x to 4x is considered achievable for the new premium backpack business within about a year.
Target3–4x
Dueby FY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“we believe that even in this business, achieving a 3x to a 4x sort of gross fixed asset turnover is something which is achievable, but it will happen across the next year or so once the buildup starts.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: once the buildup starts
Assumptions made in reading this
- horizon counted from FY26 (statement made in its last quarter)
How this guidance changed
Stated once in the documents read so far.
Lost US sales return · US exports of wooden pencils
Hint
Lost US sales of wooden pencils are expected to resume if US tariffs return to normal levels.
Targetto improve
DueFY27
result by 30 May 2027
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“So once this comes back to the normal range, again, the lost sales to U.S. will reinitiate with more capacities in place”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: if US tariffs come back to the normal range
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Ongoing broad based capacity expansion · Stationery and Art material
Hint
Management is continuing broad based capacity expansion across product categories in the stationery and art material segment.
Targetto improve
DueFY27
result by 30 May 2027
Said18 May 2026
Concall presentation
StatusOn track
In management's words
“Ongoing broad based Capacity Expansion across Product categories in Stationery & Art material segment”
How it was checked
Later filings say the greenfield project is on track, but the evidence does not directly confirm broad-based stationery and art capacity expansion. (judged from later company statements)
Evidence (3 Aug 2026): “Development at our ∼50+ acre Greenfield Project on track” — Concall presentation — Q1FY27 (Aug 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Capex plan for FY27
Direct
Capex planned at INR250-275 crore for FY27.
Target₹250 Cr – ₹275 Cr
DueFY27
result by 30 May 2027
Said19 May 2026
Concall transcript · 2× since 2 Feb 2026
StatusPending
In management's words
“we have lined up a capex plan between INR250 crores to INR275 crores for FY27.”
What it implies in numbers
Reaching ₹250 Cr by FY27 from ₹293 Cr (FY26) needs about 14.7% decline a year.
Condition attached by management: Despite geopolitical and regulatory uncertainties
How this guidance changed
- 2 Feb 2026 — ₹225 Cr – ₹250 Cr for FY27
First stated
Concall transcript · Pending
- 19 May 2026 — ₹250 Cr – ₹275 Cr for FY27
Raised
Concall transcript · Pending
Uniclan revenue growth · Uniclan
Direct
Uniclan revenue expected to grow close to 20% under the current operating plan.
Target~20% growth
DueFY27
result by 30 May 2027
Said19 May 2026
Concall transcript
StatusPending
In management's words
“we'll be able to maintain a growth of close to 20% and then again start planning for additional capital expenditure”
What it implies in numbers
20% growth on ₹2,326 Cr (FY26) implies about ₹2,791 Cr for FY27.
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Based on current operating plan and new SKUs
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Intercompany exports to FILA group · intercompany exports to FILA Group
Hint
Intercompany exports to FILA group expected to pick up as US tariffs are removed and wooden pencil capacity is added.
Targetto improve
DueFY27
result by 30 May 2027
Said19 May 2026
Concall transcript
StatusPending
In management's words
“So these exports would increase. Also with the new capacity addition that we are lining up”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: Tariffs removed and FILA recalibrating pricing
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Growth in Baby Hygiene · Baby Hygiene
Hint
Management aims to accelerate growth in Baby Hygiene by optimising capacity utilisation.
Targetto improve
DueFY27
result by 30 May 2027
Said3 Aug 2026
Concall presentation · 2× since 18 May 2026
StatusPending
In management's words
“Accelerate growth in Baby Hygiene by optimizing capacity utilization in line with evolving market opportunities.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: In line with evolving market opportunities
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 18 May 2026 — to improve for FY27
First stated
Concall presentation · On track
- 3 Aug 2026 — to improve for FY27
Repeated
Concall presentation · Pending
Broad based capacity expansion across stationery and art material · Stationery & Art material
Hint
Management is pursuing ongoing broad-based capacity expansion across product categories in the stationery and art material segment.
Targetto improve
DueFY27
result by 30 May 2027
Said3 Aug 2026
Concall presentation
StatusOn track
In management's words
“Ongoing broad based Capacity Expansion across Product categories in Stationery & Art material segment”
How it was checked
Ongoing capacity expansion is visible in the commissioning of about 170,000 sq ft of manufacturing space at the 50-acre facility. Category breadth is not confirmed. (judged from later company statements)
Evidence (3 Nov 2026): “approximately 170,000 square feet of manufacturing space into operation.” — Concall transcript — Q2FY27 (6 Nov 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Full sales potential of Reynolds brand · Reynolds brand
Hint
Management expects the full sales potential of the Reynolds brand to be realised over time as integration and manufacturing progress.
Targetto improve
DueFY27
result by 30 May 2027
Said3 Aug 2026
Concall presentation
StatusOn track
In management's words
“Full sales potential of Brand will be realized over time as integration across functions progresses as well as on commencement of manufacturing for Reynolds products”
How it was checked
Reynolds integration of personnel and assets is complete and the asset purchase is progressing. No sales-potential measure is given, so full potential is not shown. (judged from later company statements)
Evidence (9 Aug 2026): “The implementation of the asset purchase agreement is progressing as planned. The integration of Reynolds' team personnel, along with the movement of assets at our Umbergaon facility is now complete.” — Concall transcript — Q1FY27 (9 Aug 2026)
Condition attached by management: Integration across functions and commencement of manufacturing for Reynolds products
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Modern trade, e-commerce and quick commerce development · Modern trade, e-commerce, quick commerce
Hint
Management plans to develop modern trade, e-commerce and quick commerce channels in parallel with general trade.
Targetto improve
DueFY27
result by 30 May 2027
Said3 Aug 2026
Concall presentation
StatusPending
In management's words
“Parallelly focus to develop modern trade, e-commerce and quick commerce”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Completion of part-financed new manufacturing facility at Umbergaon, Gujarat
Indirect
Walked back
Completion of the Umbergaon facility, part-financed from IPO proceeds of Rs 2,800 million, is now shown for Fiscal 2027 against Fiscal 2026 in the offer document.
Targetmilestone
DueFY27
result by 30 May 2027
Said7 Aug 2026
Use-of-proceeds report
StatusBehind
In management's words
“Part financing the cost of establishing a new manufacturing facility at Umbergaon, Gujarat”
How it was checked
The facility was delayed past March 2026 and its timeline extended. Nearing completion of first phase by November suggests FY27 completion is still possible but not yet shown. (judged from later company statements)
Evidence (12 Aug 2026): “originally targeted for March 31, 2026, due to unseasonal rains during Q2 and Q3 of FY 2025–26” — Annual report FY26
Evidence (12 Aug 2026): “There has been a slight delay in the completion of construction and installation activities for the new manufacturing facility, originally targeted for March 31, 2026, due to unseasonal rains during Q2 and Q3 of FY 2025–26.” — Annual report FY26
Evidence (2 Nov 2026): “Plan to commercialize operations at ~50+ acres – first phase construction nearing completion” — Investor presentation — Q2FY27 (2 Nov 2026)
Condition attached by management: Based on management undertaking and certificate dated July 25, 2026
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
EBITDA margin trajectory from current level
Hint
Management believes the current EBITDA margin is probably the bottom for the year, with things expected to improve going forward.
Targetto improve
DueFY27
result by 30 May 2027
Said9 Aug 2026
Concall transcript · 2× since 19 May 2026
StatusPending
In management's words
“we believe that this was probably the bottom and things should be better going forward.”
Condition attached by management: Hopefully no further raw material surprises.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 19 May 2026 — to improve for FY27
First stated
Concall transcript · Pending
- 9 Aug 2026 — to improve for FY27
Repeated
Concall transcript · Pending
Exports as % of overall sales
Direct
Management expects exports to be around 13% to 15% of overall sales for the full year FY27.
Target13–15%
DueFY27
result by 30 May 2027
Said9 Aug 2026
Concall transcript
StatusPending
In management's words
“And I think for the full year, exports should be around 13% to 15% of our overall sales.”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: Pencil capacity additions and recovery in export demand.
How this guidance changed
Stated once in the documents read so far.
ESOP cost for full year
Direct
Management expects ESOP cost from the two tranches to be close to INR10 crore for the full year FY27.
Target~₹10 Cr
DueFY27
result by 30 May 2027
Said9 Aug 2026
Concall transcript
StatusPending
In management's words
“for the full year, the cost should be close to about INR10 crores.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
H2 growth from new facilities
Hint
Management expects a large part of H2 FY27 revenue growth to come from the new pencil, pen and eraser facilities.
Targetto improve
DueH2FY27
result by 30 May 2027
Said9 Aug 2026
Concall transcript
StatusPending
In management's words
“a large part of the growth for the second half of the year will come from these facilities.”
Condition attached by management: Facilities ramp up to full utilisation in about 18 to 24 months.
How this guidance changed
Stated once in the documents read so far.
Reynolds EBITDA margin · Reynolds brand
Direct
Management expects the Reynolds brand to eventually operate at about a 16% EBITDA margin, in line with its other brands.
Target~16%
DueFY27
result by 30 May 2027
Said9 Aug 2026
Concall transcript
StatusPending
In management's words
“we will want Reynolds to also operate like our other brands doing about that 16-odd percent EBITDA margin.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Control of production and costs after integration.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Greenfield capacity addition sequence
Hint
Capacity at the greenfield complex will be added first in wooden pencils, then writing instruments, pencil accessories, and later scholastic art materials.
Targetto improve
DueFY27
result by 30 May 2027
Said12 Aug 2026
Annual report
StatusPending
In management's words
“At our greenfield manufacturing complex, capacity addition will commence with wooden pencils, followed by writing instruments, pencil accessories including erasers and sharpeners, and subsequently scholastic art materials.”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Export growth from F.I.L.A. joint venture · exports
Hint
The 50:50 joint venture with Seven SpA is expected to support export growth.
Targetto improve
DueFY27
result by 30 May 2027
Said12 Aug 2026
Annual report
StatusPending
In management's words
“It is expected to support export growth while facilitating the introduction of premium back to school products in the domestic market.”
How it was checked
Exports is not in the stored financial tables.
Condition attached by management: joint venture company yet to be incorporated
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Wooden pencil capacity · wooden pencils
Direct
Wooden pencil capacity is to rise from about 5.53 million to about 8 million in the next couple of years.
Target~8,000,000 million (units not stated)
Dueby FY28
result by 30 May 2028
Said2 Feb 2026
Concall transcript
StatusOn track
In management's words
“our target to increase the capacity of our wooden pencil is from about 5.8 million that we have -- sorry, 5.53 million that we have currently to about 8 million going in the next couple of years.”
How it was checked
Deadline is FY28, not yet reached. Later filings say capacity expansion and the greenfield project are on track, but give no pencil capacity figure approaching 8 million. (judged from later company statements)
Evidence (18 May 2026): “Capacity Expansion on Track : Foundation for Future Growth progressing - first phase construction nearing completion at ∼45 acre land parcel” — Concall presentation — Q4FY26 (May 2026)
Evidence (3 Aug 2026): “Development at our ∼50+ acre Greenfield Project on track” — Concall presentation — Q1FY27 (Aug 2026)
Assumptions made in reading this
- horizon counted from FY26 (statement made in its last quarter)
How this guidance changed
Stated once in the documents read so far.
Significant growth from scholastic stationery and art materials · scholastic stationery and scholastic art materials
Hint
Significant sales growth from scholastic stationery and art materials, led by wooden pencils, is expected in FY28.
Targetto improve
DueFY28
result by 30 May 2028
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“So in the coming year and actually more in the year after, in FY'28, you'll see significant growth coming from the sales of scholastic stationery and scholastic art material”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Capital expenditure (capex)
Indirect
Capex of Rs 200–250 crore is expected each year for the next two years, for capacity and product portfolio enhancements, funded mainly from internal accruals and sanctioned limits.
Target₹200 Cr – ₹250 Cr
Dueby FY28
result by 30 May 2028
Said6 Aug 2026
Credit-rating note (the rating agency's words)
StatusPending
In management's words
“Capital expenditure (capex) of Rs 200–250 crore is expected every year for the next two years, funded primarily through internal cash accrual and backed by sanctioned limits.”
What it implies in numbers
Reaching ₹200 Cr by FY28 from ₹293 Cr (FY26) needs about 17.4% decline a year.
How it was checked
Due with FY28 results; nothing reported since the statement yet.
Condition attached by management: funded primarily through internal cash accrual and backed by sanctioned limits
Assumptions made in reading this
- reported by CRISIL in its rating note, not stated by management directly
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Sales per rupee of capex
Direct
Management targets about INR3 of sales per rupee of capex, expected to be reached 18 to 24 months after new facilities start commercial production.
Target~3x (triple)
DueFY28–FY28
result by 30 May 2028
Said9 Aug 2026
Concall transcript · 2× since 4 Feb 2025
StatusPending
In management's words
“it takes us about 18 months to 24 months to reach the full optimal level, which is about 3x on the rupee that is invested.”
What it implies in numbers
Tripling revenue from ₹2,326 Cr (FY26) means about ₹6,978 Cr by FY28 — roughly 73.2% growth a year.
How it was checked
Due with FY28 results; nothing reported since the statement yet.
Condition attached by management: Facility must start commercial production first.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
- 4 Feb 2025 — ~3x (triple) for FY27–FY28
First stated
Concall transcript · Behind (actual ₹2,326 Cr)
- 9 Aug 2026 — ~3x (triple) for FY28–FY28
Repeated
Concall transcript · Pending
Margin for FY28 back to targeted range
Direct
Management expects FY28 margins to return to the targeted range of about 16%, which may require a further 4-5% price increase if spot raw material prices persist.
Target~16%
DueFY28
result by 30 May 2028
Said9 Aug 2026
Concall transcript
StatusPending
In management's words
“that is the increase that we might have to take to ensure that our margins for FY28 to reach back to our targeted range of 16-odd percent.”
Condition attached by management: Current spot raw material prices persist; a 4-5% gap is assumed.
How this guidance changed
Stated once in the documents read so far.
FY28 revenue growth momentum
Hint
Management believes the revenue growth momentum in FY28 should remain similar to FY27, though it is too early to guide a number.
Targetto hold or improve
DueFY28
result by 30 May 2028
Said9 Aug 2026
Concall transcript
StatusPending
In management's words
“But I believe the growth trajectory momentum should remain similar.”
How this guidance changed
Stated once in the documents read so far.
FY28 margins versus FY26 sweet spot
Hint
Management indicated FY26 gross and EBITDA margins are the appropriate reference levels to look at for FY28.
Targetto hold or improve
DueFY28
result by 30 May 2028
Said9 Aug 2026
Concall transcript
StatusPending
In management's words
“Yes. So, like I said, yes, FY28, that's how we should look at it.”
Condition attached by management: Analyst framed FY26 margins as the sweet spot; management responded affirmatively.
How this guidance changed
Stated once in the documents read so far.
Additional amortisation from Uniclan brand
Direct
Additional amortisation from the Uniclan brand is expected to reduce profit by about INR 4.5 crore a year for the next few years.
Target~₹4.5 Cr
DueFY27–FY29
result by 30 May 2029
Said20 May 2025
Concall transcript
StatusPending
In management's words
“there will be an impact on the profitability to the tune of around INR 4.5 crores annually for the next few years.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
- 'few years' read as 2 to 4 years
How this guidance changed
Stated once in the documents read so far.
ESOP grants under ESOP 2023 plan
Indirect
The company expects to keep granting ESOPs from the ESOP 2023 plan for four more years.
Targetmilestone
Dueby FY29
result by 30 May 2029
Said30 Aug 2025
Annual report
StatusPending
In management's words
“We expect to continue to give grants from our approved ESOP 2023 plan for four more additional years”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Capacity investment over the next 3 to 4 years
Indirect
Management expects to keep investing in capacity for at least the next 3-4 years to drive growth.
Targetto hold or improve
DueFY28–FY29
result by 30 May 2029
Said11 Nov 2025
Concall transcript
StatusOn track
So far: over INR200 crore capex invested in H1 FY27
In management's words
“So we will keep investing in building our capacities at least for the next 3 to 4 years to drive growth in the business.”
How it was checked
Capex continues, with about INR100 crore in Q1FY27 and over INR200 crore in H1FY27, consistent with ongoing investment; the FY28-FY29 horizon has not passed. (judged from later company statements)
Evidence (3 Nov 2026): “During H1 FY27, we invested over INR200 crores in capital expenditure” — Concall transcript — Q2FY27 (6 Nov 2026)
Evidence (9 Aug 2026): “The company has already invested close to INR100 crores in Q1 of FY27, primarily towards capital investments.” — Concall transcript — Q1FY27 (9 Aug 2026)
Condition attached by management: Depends on utilisation reaching about 50-60% for each category.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Capex each year for the next few years · 45-acre facility
Indirect
Company expects to spend a similar level of capex each year over the next few years to fully use the 45-acre site and adjacent land.
Targetto hold or improve
DueFY29
result by 30 May 2029
Said19 May 2026
Concall transcript
StatusOn track
In management's words
“every year, we'll end up doing a similar level of capex for the next few years to completely utilize the 45 acres”
How it was checked
Capex of about INR100 crore in Q1 and over INR200 crore in H1 FY27 is consistent with a steady annual spend pattern, with the FY29 deadline still ahead. (judged from later company statements)
Evidence (3 Nov 2026): “During H1 FY27, we invested over INR200 crores in capital expenditure” — Concall transcript — Q2FY27 (6 Nov 2026)
Evidence (9 Aug 2026): “The company has already invested close to INR100 crores in Q1 of FY27, primarily towards capital investments.” — Concall transcript — Q1FY27 (9 Aug 2026)
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Total capex for the 45-acre project · 45-acre facility
Direct
Total investment in the 45-acre plant, including land and full plant development, is expected at INR850-1,000 crore.
Target₹850 Cr – ₹1,000 Cr
Dueby FY29
result by 30 May 2029
Said19 May 2026
Concall transcript
StatusOn track
In management's words
“the total capex would be close to INR850 crores to INR1,000 crores.”
What it implies in numbers
Reaching ₹850 Cr by FY29 from ₹293 Cr (FY26) needs about 42.6% growth a year.
How it was checked
Over INR200 crore has been invested in H1 FY27 and the greenfield project is on track, but the total against the INR850–1,000 crore range is not known. (judged from later company statements)
Evidence (3 Nov 2026): “During H1 FY27, we invested over INR200 crores in capital expenditure” — Concall transcript — Q2FY27 (6 Nov 2026)
Evidence (9 Aug 2026): “The company has already invested close to INR100 crores in Q1 of FY27, primarily towards capital investments.” — Concall transcript — Q1FY27 (9 Aug 2026)
Evidence (3 Aug 2026): “Development at our ∼50+ acre Greenfield Project on track” — Concall presentation — Q1FY27 (Aug 2026)
Condition attached by management: Funded partly from IPO proceeds and partly from internal accruals
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- timeline wording 'over the next roughly 3 years from land purchase in January ' parsed as by Jan 2023; using the extracted FY29
How this guidance changed
Stated once in the documents read so far.
Reynolds brand share of company revenue · Reynolds brand
Direct
Management expects the Reynolds brand to contribute close to 10% of company revenue, probably by FY29.
Target~10%
Dueby FY29
result by 30 May 2029
Said9 Aug 2026
Concall transcript
StatusPending
In management's words
“probably by FY29, Reynolds brand should be contributing close to 10% of the company's overall revenues.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Capacity additions (ongoing)
Hint
Management expects capacity additions to be an ongoing process for at least the next 5-7 years.
Targetto improve
DueFY30–FY32
result by 30 May 2032
Said20 May 2025
Concall transcript
StatusOn track
So far: Ongoing capacity additions: new wet wipes line, third diaper line, and development on track.
In management's words
“we believe capacity addition will be an ongoing project at least for the next 5 to 7 years.”
How it was checked
Capacity additions are continuing, with a new wet wipes line and a third diaper line commissioned and the greenfield project on track, consistent with a multi-year programme. (judged from later company statements)
Evidence (3 Aug 2026): “Development at our ∼50+ acre Greenfield Project on track” — Concall presentation — Q1FY27 (Aug 2026)
Evidence (12 Aug 2026): “We also commenced operations of a new wet wipes production line adding annual capacity of approximately 1.72 crore packs.” — Annual report FY26
Evidence (12 Aug 2026): “Uniclan commissioned its third diaper manufacturing line increasing annual production capacity to approximately 65 crore pieces.” — Annual report FY26
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
How this guidance changed
Stated once in the documents read so far.
Uniclan long-term EBITDA margin · Uniclan
Indirect
Uniclan EBITDA margin expected to stabilise around 10% over the long term.
Target~10%
DueFY31–FY33
result by 30 May 2033
Said19 May 2026
Concall transcript
StatusPending
In management's words
“we'll be happy to achieve a 10% sort of an EBITDA and stay at that level, maximizing revenue growth.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Near-term softness expected
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Long-term margin profile
Hint
Management believes the long-term margin profile is structurally unchanged despite near-term pressure.
Targetto hold or improve
DueFY31–FY33
result by 30 May 2033
Said19 May 2026
Concall transcript
StatusPending
In management's words
“But in the long term, we believe that structurally, the company would continue to do the same sort of a margin profile.”
Condition attached by management: Near-term margins may be impacted
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Total investment in the new greenfield project (incl. land)
Direct
The full greenfield project, including land, is expected to need about INR 900-1,000 crore of investment.
Target₹900 Cr – ₹1,000 Cr
DueNot specified
Said4 Feb 2025
Concall transcript
StatusPending
So far: ₹293 Cr (FY26)
In management's words
“this entire project would entail an investment of close to INR 900 crores to INR 1,000 crores.”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
Stated once in the documents read so far.
Sales potential at peak utilisation with current Uniclan capacity · Uniclan
Direct
Uniclan's sales potential with current capacity at peak utilisation is about INR 250-300 crore.
Target₹250 Cr – ₹300 Cr
DueNot specified
Said4 Feb 2025
Concall transcript
StatusPending
In management's words
“the sales potential is close to between around INR 250 crores to INR 300 odd crores.”
How it was checked
Capacity utilisation is not in the stored financial tables.
Condition attached by management: at peak utilisation reachable with current capacity and plan
How this guidance changed
Stated once in the documents read so far.
Pencil capacity ramp-up · pencils
Direct
Management expects to soon ramp pencil capacity by 2.5 million wooden pencils per day from about 5.5 million per day.
Target2,500,000 million wooden pencils per day
DueNot specified
Said4 Feb 2025
Concall transcript
StatusPending
In management's words
“we soon expect to ramp it up by 2.5 million wooden pencils per day.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Pencil capacity · scholastic pencils
Direct
Pencil capacity is planned to rise from 5.5 million to 8 million, in phases as construction completes.
Target5,500,000 million pencils
DueNot specified
Said20 May 2025
Concall transcript
StatusPending
In management's words
“our plan is to increase the capacities from 5.5 million to 8 million, but that will come up in phased manner.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Phased commissioning; construction delays from monsoon and unseasonal rain
How this guidance changed
Stated once in the documents read so far.
One of the largest single-location manufacturing facilities in the stationery industry in the Asia Pacific region
Indirect
The group is gearing up to set up one of the largest single-location stationery manufacturing facilities in Asia Pacific, which it expects to strengthen its market position. No timeline or amount is stated.
Targetmilestone
DueNot specified
Said6 Aug 2025
Credit-rating note (the rating agency's words)
StatusPending
In management's words
“The group is gearing up to set up one of the largest single-location manufacturing facilities in the stationery industry in the Asia Pacific region.”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- reported by CRISIL in its rating note, not stated by management directly
How this guidance changed
Stated once in the documents read so far.
Workforce for the 44-acre project · 44-acre project
Indirect
Once the 44-acre project is fully operational, workforce is expected to reach about 12,000-13,000 people, roughly doubling.
Target12,000–13,000 people
DueNot specified
Said11 Aug 2025
Concall transcript
StatusPending
In management's words
“we believe we will require about 12,000 to 13,000 people similar to the workforce that we have right now. So, it is going to actually double once the project is completely operational.”
How it was checked
Headcount is not in the stored financial tables.
Condition attached by management: Gradual, as new buildings come into production.
How this guidance changed
Stated once in the documents read so far.
Asset turns on new plant · 44-acre project
Indirect
Asset turns on the new plant are expected to start at about 2-2.25x and gradually move towards 3x.
Target2–2.25x (triple)
DueNot specified
Said11 Aug 2025
Concall transcript
StatusPending
In management's words
“we start with like a 2 - 2.25 and gradually move towards 3x.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
44-acre site production capabilities
Hint
Once the 44-acre Umbergaon site is operational, management expects it to significantly strengthen production capabilities and market share.
Targetmilestone
DueNot specified
Said30 Aug 2025
Annual report
StatusPending
In management's words
“Once operational, this facility will significantly strengthen our production capabilities and help us capture greater market share.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Completion of the 44-acre facility
How this guidance changed
Stated once in the documents read so far.
DOMS-branded products through F.I.L.A. · International
Hint
Pilot launches of DOMS-branded products through F.I.L.A. in international regions are underway, aimed at smoother export operations.
Targetmilestone
DueNot specified
Said30 Aug 2025
Annual report
StatusPending
In management's words
“Pilot initiatives are underway to launch DOMS-branded products through F.I.L.A. in international geographical regions.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Use of IPO / acquisition proceeds at Uniclan · Baby hygiene
Hint
Funds invested in Uniclan will be used for capacity expansion, debt reduction and working capital.
Targetmilestone
DueNot specified
Said30 Aug 2025
Annual report
StatusPending
In management's words
“These funds will be deployed towards capacity expansion, debt reduction, and meeting working capital requirements at Uniclan.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Revenue per INR1 of capacity investment
Direct
Walked back
Management targets revenue of INR3 for every INR1 invested in building capacity.
Target3x
DueNot specified
Said11 Nov 2025
Concall transcript · 3× since 4 Feb 2025
StatusPending
In management's words
“wherever we are investing INR1 in building capacities, we target to achieve revenues of INR3.”
How it was checked
Capacity is not in the stored financial tables.
How this guidance changed
- 4 Feb 2025 — 1,800,000 million sq ft built-up area for Not specified
First stated
Concall transcript · Pending (actual first building commissioned, adding about 170,000 sq ft of manufacturing space)
- 30 Aug 2025 — 1,800,000–2,000,000 million sq. ft. for Not specified
Raised
Annual report · Pending (actual first building commissioned, adding about 170,000 sq ft of manufacturing space)
- 11 Nov 2025 — 3x for Not specified
Lowered
Concall transcript · Pending
Production buildings in 44-acre project · 44-acre project
Direct
Management plans to construct about 9 production buildings in the 44-acre project.
Target~9 buildings
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“So right now, we have plans to construct about a total of 9 buildings.”
How it was checked
Production is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Market share in pencil segment · pencils
Direct
Pencil market share is expected to rise to close to 45% as new capacities come in.
Target~45%
DueNot specified
Said2 Feb 2026
Concall transcript
StatusPending
In management's words
“And with the new capacities coming in, we'll be close to about 45% of the market share.”
How it was checked
Market share is not in the stored financial tables.
Condition attached by management: with new capacities coming in
How this guidance changed
Stated once in the documents read so far.
Commercialise operations at ~44+ acres
Hint
Management plans to commercialise operations at the ~44+ acre site once first-phase construction is complete.
Targetmilestone
DueNot specified
Said18 May 2026
Concall presentation
StatusPending
In management's words
“Plan to commercialize operations at ~44+ acres – first phase construction nearing completion”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: First-phase construction completion.
How this guidance changed
Stated once in the documents read so far.
Wooden pencil capacity · wooden pencils
Indirect
Wooden pencil capacity to rise from about 5.8 million to about 8 million pieces a day once the new plant is fully ready.
Target~8,000,000 million pieces a day
DueNot specified
Said19 May 2026
Concall transcript
StatusPending
In management's words
“the capacity right now is around 5.8 million pieces a day, which eventually once the new plant is entirely ready, to increase to about 8 million.”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Once new plant is entirely ready
How this guidance changed
Stated once in the documents read so far.
Inorganic growth via acquisitions and partnerships
Hint
Management intends to pursue acquisition and partnership opportunities domestically and internationally to fill manufacturing and distribution gaps.
Targetmilestone
DueNot specified
Said3 Aug 2026
Concall presentation
StatusPending
In management's words
“Pursue acquisition and partnership opportunities domestically as well as internationally with an aim to fill gaps across manufacturing and distribution”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Zero Liquid Discharge mechanism across key plants
Hint
The company is implementing a zero liquid discharge mechanism across its key manufacturing plants, with the aim of progressively converting them into fully compliant ZLD units.
Targetmilestone
DueNot specified
Said12 Aug 2026
Annual report
StatusPending
In management's words
“with the objective of progressively converting these facilities into fully compliant ZLD units”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Completion of construction and installation activities for the new manufacturing facility
Hint
Walked back
Completion of the new manufacturing facility, originally due March 31, 2026, has slipped; management is expediting the remaining work but has not given a new date.
Targetmilestone
DueNot specified
Said12 Aug 2026
Annual report
StatusPending
In management's words
“There has been a slight delay in the completion of construction and installation activities for the new manufacturing facility, originally targeted for March 31, 2026, due to unseasonal rains during Q2 and Q3 of FY 2025–26. Consequently, the project timeline has been extended.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Weather-related delay; company is taking measures to expedite completion.
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
Track record · promised vs delivered
Guidance whose deadline has passed, most recent first: how management performed after giving it.
EBITDA margin beyond FY26
Indirect
Management is comfortable guiding EBITDA margin of 16.5-17.5% for the coming year and later, subject to review.
Promised16.5–17.5%for by FY27
Delivered17.33%FY26
ResultAchieved · early
Said20 May 2025Concall transcript
In management's words
“margins of 16.5% to 17.5% is something we'll be comfortable guiding for the coming year and later also.”
How it was checked
Reached in FY26, before the FY27 deadline.
Condition attached by management: Fixed costs ahead of new capacity and ESOP expense; will review next year
How this guidance changed
Stated once in the documents read so far.
New scholastic pencil capacity contribution · scholastic stationery
Hint
Management expects incremental growth in scholastic stationery over the next couple of quarters and major growth from Q2 FY27 as new pencil capacity comes on stream.
Promisedto improvefor Q2FY27
Delivered—
ResultMissed
Said11 Nov 2025Concall transcript
In management's words
“So going forward, I think incrementally, you will see some growth coming in the next couple of quarters and then major growth coming from Q2 FY '27.”
How it was checked
Major growth was expected from Q2FY27 as new pencil capacity came on stream, but the November 2026 update shows the new plant not yet commercialised and construction delayed. (judged from later company statements)
Evidence (2 Nov 2026): “Plan to commercialize operations at ~50+ acres – first phase construction nearing completion” — Investor presentation — Q2FY27 (2 Nov 2026)
Evidence (12 Aug 2026): “There has been a slight delay in the completion of construction and installation activities for the new manufacturing facility, originally targeted for March 31, 2026, due to unseasonal rains during Q2 and Q3 of FY 2025–26.” — Annual report FY26
Condition attached by management: Depends on possession of the first 44-acre building and pencil capacity addition.
How this guidance changed
Stated once in the documents read so far.
First building commercial production at ~45 acre land parcel
Indirect
First building at the ~45 acre land parcel is expected to begin commercial production by the end of Q2 FY27.
Promisedmilestonefor Q2FY27
DeliveredFirst building commercial production not evidenced by end Q2 FY27; first phase still nearing completion as of 2 Nov 2026.
ResultMissed
Said18 May 2026Concall presentation
In management's words
“first building commercial production expected by the end of Q2 FY27”
How it was checked
The 30 Sep 2026 deadline has passed. E19 (2 Nov 2026) shows first-phase construction still nearing completion, and E8 reports the building commissioned only in November. (judged from later company statements)
Evidence (3 Nov 2026): “approximately 170,000 square feet of manufacturing space into operation.” — Concall transcript — Q2FY27 (6 Nov 2026)
Evidence (3 Aug 2026): “Development at our ∼50+ acre Greenfield Project on track” — Concall presentation — Q1FY27 (Aug 2026)
Condition attached by management: First phase construction is nearing completion.
How this guidance changed
- 2 Feb 2026 — milestone for Q2FY27
First stated
Concall transcript · Missed (actual Commercial production from first building not evidenced by end Q2 FY27; first phase still nearing completion as of 2 Nov 2026, first building commissioned by 6 )
- 18 May 2026 — milestone for Q2FY27
Repeated
Concall presentation · Missed (actual First building commercial production not evidenced by end Q2 FY27; first phase still nearing completion as of 2 Nov 2026.)
Operational Area to be commissioned
Direct
Management expects to commission 300,000+ sq. ft. of operational area at the ~50+ acre greenfield project by the end of Q2FY27.
Promised≥ 300,000 sq. ft.for by Q2FY27
Delivered170,000 square feet
ResultMissed
Said3 Aug 2026Concall presentation
In management's words
“Expect to commission 300,000+ sq. ft. of Operational Area by the end of Q2’FY27”
How it was checked
The first building added about 170,000 sq ft of manufacturing space, well short of the 300,000+ sq ft guided by end Q2FY27, which has passed. (judged from later company statements)
Evidence (3 Nov 2026): “approximately 170,000 square feet of manufacturing space into operation.” — Concall transcript — Q2FY27 (6 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Operational area commissioned
Direct
Management expects close to 300,000 sq ft of operational area from the 50-plus acre greenfield project to be commissioned by end of Q2 FY27.
Promised~300,000 square feetfor Q2FY27
Deliveredapproximately 170,000 square feet
ResultMissed
Said9 Aug 2026Concall transcript
In management's words
“we expect to commission close to 300,000 square feet of operational area by the end of Q2 FY27.”
How it was checked
The deadline of end Q2 FY27 has passed. Only about 170,000 sq ft of the close to 300,000 sq ft guided was commissioned. (judged from later company statements)
Evidence (3 Nov 2026): “approximately 170,000 square feet of manufacturing space into operation.” — Concall transcript — Q2FY27 (6 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Reynolds manufacturing start · Reynolds brand
Indirect
Reynolds-branded manufacturing is expected to start with the first phase of the new greenfield plant, targeted for end of Q2 FY27.
Promisedmilestonefor Q2FY27
Delivered—
ResultMissed
Said9 Aug 2026Concall transcript
In management's words
“aligned with the commencement of the operations in the first phase of our new 50-plus acre greenfield project targeted for end of Q2 FY27.”
How it was checked
The end Q2FY27 deadline has passed, and as of 2 Nov 2026 first-phase construction was still nearing completion with commercialisation planned afterwards. (judged from later company statements)
Evidence (2 Nov 2026): “Plan to commercialize operations at ~50+ acres – first phase construction nearing completion” — Investor presentation — Q2FY27 (2 Nov 2026)
Condition attached by management: Dependent on first-phase commissioning of the greenfield project.
How this guidance changed
Stated once in the documents read so far.
Commercial production from first building of greenfield complex
Hint
Commercial production from the first building of the 50+ acre greenfield facility is expected to start toward the end of Q2 FY27.
Promisedmilestonefor Q2FY27
Delivered—
ResultMissed
Said12 Aug 2026Annual report
In management's words
“Commercial production is expected to commence towards the end of second quarter of financial year 2026-27.”
How it was checked
The Q2 FY27 deadline has passed. A November 2026 investor presentation says first-phase construction is still nearing completion, with commercialisation planned after it. (judged from later company statements)
Evidence (2 Nov 2026): “Plan to commercialize operations at ~50+ acres – first phase construction nearing completion” — Investor presentation — Q2FY27 (2 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Commercial production from the 44-acre plant
Hint
Management expects possession of the first 44-acre plant building in Q4 FY26 and commercial production to start from Q1 FY27.
Promisedmilestonefor Q1FY27
Delivered—
ResultMissed
Said11 Nov 2025Concall transcript
In management's words
“we are confident of getting the possession of the first building in Q4 FY '26 and start commercial production from Q1 FY '27.”
How it was checked
Possession of the first building slipped from Q4FY26 to Q1FY27, and the November 2026 update still shows commercialisation as planned, not started, after the June 2026 deadline. (judged from later company statements)
Evidence (3 Aug 2026): “milestone event marking possession of the first building in the 50+ acre project” — Concall presentation — Q1FY27 (Aug 2026)
Evidence (2 Nov 2026): “Plan to commercialize operations at ~50+ acres – first phase construction nearing completion” — Investor presentation — Q2FY27 (2 Nov 2026)
Evidence (12 Aug 2026): “There has been a slight delay in the completion of construction and installation activities for the new manufacturing facility, originally targeted for March 31, 2026, due to unseasonal rains during Q2 and Q3 of FY 2025–26.” — Annual report FY26
Condition attached by management: Construction delays from monsoon conditions noted; depends on building possession.
How this guidance changed
Stated once in the documents read so far.
EBITDA margin in Q1
Hint
Q1 FY27 margins expected to be slightly lower than the same quarter last year because of raw material inflation.
Promisedto come downfor Q1FY27
Delivereddown 5.2%Q1FY27
ResultAchieved
Said19 May 2026Concall transcript
In management's words
“we do expect margins in Q1 to remain slightly under pressure versus the corresponding period last year.”
How it was checked
EBITDA / operating margin fell by 5.2 pp in Q1FY27 from Q1FY26 — in line with what management indicated (quarterly result).
Condition attached by management: Depends on crude-linked raw material volatility and pricing actions
How this guidance changed
Stated once in the documents read so far.
EBITDA margin
Direct
Management guides EBITDA margin within a 16.5-17.5% range and says it is comfortable operating in that band.
Promised16.5–17.5%for FY26
Delivered17.33%FY26
ResultAchieved
Said11 Nov 2025Concall transcript
In management's words
“16.5% to 17.5% is a decent range that we’ll be comfortable operating in.”
How it was checked
FY26 actual 17.33% — met the guided 16.5–17.5% (annual result).
Condition attached by management: Includes ramp-up of new capacity and higher employee costs; management said ramp-up should not significantly impact margins.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
- 4 Feb 2025 — 16–17% for FY26
First stated
Concall transcript · Achieved (actual 17.33%)
- 20 May 2025 — 16.5–17.5% for FY26
Raised
Concall transcript · Achieved (actual 17.33%)
- 11 Aug 2025 — 16.5–17.5% for FY26
Repeated
Concall transcript · Achieved (actual 17.33%)
- 11 Nov 2025 — 16.5–17.5% for FY26
Repeated
Concall transcript · Achieved (actual 17.33%)
EBITDA margin for the full year basis · Uniclan
Direct
Management expects Uniclan's full-year EBITDA margin at about 8%-9% while sales and distribution are ramped up.
Promised8–9%for FY26
Deliveredabout 8.6%
ResultAchieved
Said11 Aug 2025Concall transcript
In management's words
“I will be comfortable with the Company doing about 8-9% EBITDA margin for the full year basis.”
How it was checked
The Q4FY26 concall reports Uniclan's FY26 EBITDA margin reached about 8.6%, within the guided 8%-9% range. (judged from later company statements)
Evidence (19 May 2026): “We've reached about 8.6%. And we believe with the new -- with the increasing revenues” — Concall transcript — Q4FY26 (May 2026)
Condition attached by management: Focus is on ramping up sales and distribution network.
How this guidance changed
- 4 Feb 2025 — 7–8% for FY26
First stated
Concall transcript · Achieved (actual about 8.6%)
- 11 Aug 2025 — 8–9% for FY26
Raised
Concall transcript · Achieved (actual about 8.6%)
Capex spend for the fiscal
Direct
FY26 consolidated capex is expected to cross INR250 crore.
Promised≥ ₹250 Crfor FY26
Delivered≈ ₹293 CrFY26
ResultAchieved
Said2 Feb 2026Concall transcript
In management's words
“we believe our capex spend for the fiscal would now cross INR250 crores.”
What it implies in numbers
Reaching ₹250 Cr by FY26 from ₹296 Cr (FY25) needs about 15.5% decline a year.
How it was checked
FY26 actual ₹293 Cr (estimate) — met the guided ≥ ₹250 Cr (change in fixed assets and CWIP plus depreciation).
How this guidance changed
- 4 Feb 2025 — ₹202 Cr – ₹225 Cr for FY26
First stated
Concall transcript · Missed (actual ≈ ₹293 Cr)
- 20 May 2025 — ₹225 Cr – ₹250 Cr for FY26
Raised
Concall transcript · Missed (actual ≈ ₹293 Cr)
- 11 Aug 2025 — ₹210 Cr – ₹225 Cr for FY26
Lowered
Concall transcript · Missed (actual ≈ ₹293 Cr)
- 11 Nov 2025 — ₹210 Cr – ₹225 Cr for FY26
Repeated
Concall transcript · Missed (actual ≈ ₹293 Cr)
- 2 Feb 2026 — ≥ ₹250 Cr for FY26
Raised
Concall transcript · Achieved (actual ≈ ₹293 Cr)
Consolidated sales growth
Direct
FY26 consolidated sales growth is expected at the upper end of the 18% to 20% guided range.
Promised18–20% growthfor FY26
Delivered21.59% growthFY26
ResultAchieved · beat
Said2 Feb 2026Concall transcript
In management's words
“Our 9-month consolidated growth of 22.7% positions us to close the fiscal year at the upper end of a guided range of 18% to 20%.”
What it implies in numbers
18–20% growth on ₹1,913 Cr (FY25) implies about ₹2,257 Cr to ₹2,296 Cr for FY26.
How it was checked
FY26 actual 21.59% — ahead of the guided 18–20% (annual result).
How this guidance changed
- 20 May 2025 — 18–20% growth for FY26
First stated
Concall transcript · Achieved (actual 21.59% growth)
- 11 Aug 2025 — 18–20% growth for FY26
Repeated
Concall transcript · Achieved (actual 21.59% growth)
- 2 Feb 2026 — 18–20% growth for FY26
Repeated
Concall transcript · Achieved (actual 21.59% growth)
PAT margin
Direct
Management expects FY26 PAT margin of 10%-10.5%.
Promised10–10.5%for FY26
Delivered10.32%FY26
ResultAchieved
Said11 Aug 2025Concall transcript
In management's words
“we are confident of achieving our FY26 sales growth range of 18%-20% with EBITDA margins of 16.5% to 17.5% and PAT margin of 10% to 10.5%.”
How it was checked
FY26 actual 10.32% — met the guided 10–10.5% (annual result).
How this guidance changed
- 20 May 2025 — ~10% for FY26
First stated
Concall transcript · Achieved (actual 10.32%)
- 11 Aug 2025 — 10–10.5% for FY26
Raised
Concall transcript · Achieved (actual 10.32%)
Other income
Hint
Other income is expected to keep falling as fixed deposits are used to fund expansion.
Promisedto come downfor FY26
Delivereddown 13.6%FY26
ResultAchieved
Said20 May 2025Concall transcript
In management's words
“So as we move forward, this cash would further come down. And hence, would our other income.”
How it was checked
Other income fell by 13.6% in FY26 from FY25 — in line with what management indicated (annual result).
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
First billing for the new plant · 44-acre project
Hint
Management targets first billing from the new plant in Q4 FY26.
Promisedmilestonefor Q4FY26
Delivered—
ResultMissed
Said11 Aug 2025Concall transcript
In management's words
“we target to have the first billing for the new plant happening in the fourth quarter.”
How it was checked
Q4FY26 was the first-billing target, but the November 2026 update says the plant's first-phase construction is still nearing completion, with commercialisation planned after it. (judged from later company statements)
Evidence (2 Nov 2026): “Plan to commercialize operations at ~50+ acres – first phase construction nearing completion” — Investor presentation — Q2FY27 (2 Nov 2026)
Evidence (3 Aug 2026): “milestone event marking possession of the first building in the 50+ acre project” — Concall presentation — Q1FY27 (Aug 2026)
How this guidance changed
Stated once in the documents read so far.
Pencil capacity expansion · wooden pencils
Indirect
Pencil capacity is expected to rise from 5.5 to 8 million per day, with finishing completing in Q4 FY26 through mid-Q2 FY27.
Promised5,500,000 million per dayfor by FY26
Delivered—
ResultMissed
Said11 Aug 2025Concall transcript
In management's words
“The finishing from where we will be able to make the finished product is something which will happen in Q4 of FY26 and Q1 to mid of Q2 FY27.”
How it was checked
Finishing was guided for Q4 FY26. Capacity was still 5.53 million in Feb 2026, and first-phase construction was only nearing completion in May 2026, after the FY26 deadline. (judged from later company statements)
Evidence (2 Feb 2026): “5.53 million that we have currently” — Concall transcript — Q3FY26 (Feb 2026)
Evidence (18 May 2026): “Capacity Expansion on Track : Foundation for Future Growth progressing - first phase construction nearing completion at ∼45 acre land parcel” — Concall presentation — Q4FY26 (May 2026)
How this guidance changed
Stated once in the documents read so far.
Manufacturing capacity
Hint
The company expects to further increase manufacturing capacity in FY 2025-26.
Promisedto improvefor FY26
Deliveredthird diaper line raising capacity to about 65 crore pieces; new wet wipes line adding about 1.72 crore packs
ResultAchieved
Said30 Aug 2025Annual report
In management's words
“In the previous financial year, we expanded our manufacturing footprint by an additional 0.5 million square feet and are set to further increase capacity in FY 2025-26.”
How it was checked
FY26 annual reports show Uniclan commissioned a third diaper line and a new wet wipes line, so manufacturing capacity was further increased in FY26. (judged from later company statements)
Evidence (12 Aug 2026): “Uniclan commissioned its third diaper manufacturing line increasing annual production capacity to approximately 65 crore pieces.” — Annual report FY26
Evidence (12 Aug 2026): “We also commenced operations of a new wet wipes production line adding annual capacity of approximately 1.72 crore packs.” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Machinery installation at 44-plus acre site
Indirect
The first building at the 44-plus acre Umbergaon site is scheduled for machinery installation in the last quarter of FY26.
Promisedmilestonefor Q4FY26
Delivered—
ResultMissed
Said30 Aug 2025Annual report
In management's words
“Construction at the 44+ acres greenfield development in Umbergaon, Gujarat going on in full swing, with the first building scheduled for machinery installation in installment in last quarter of the current financial year.”
How it was checked
Machinery installation was targeted for Q4FY26, but the FY26 annual report says construction slipped past March 31, 2026, and possession came only in Q1FY27. (judged from later company statements)
Evidence (12 Aug 2026): “There has been a slight delay in the completion of construction and installation activities for the new manufacturing facility, originally targeted for March 31, 2026, due to unseasonal rains during Q2 and Q3 of FY 2025–26.” — Annual report FY26
Evidence (3 Aug 2026): “milestone event marking possession of the first building in the 50+ acre project” — Concall presentation — Q1FY27 (Aug 2026)
How this guidance changed
Stated once in the documents read so far.
Growth in line with our 18% to 20% targeted range
Direct
Management expects H2 FY26 revenue growth to be in line with the 18-20% targeted range, as H1 growth was boosted by Uniclan consolidation.
Promised18–20% growthfor H2FY26
Delivered18.42% growthH2FY26
ResultAchieved
Said11 Nov 2025Concall transcript
In management's words
“we'll see the growth in line with our 18% to 20% targeted range.”
What it implies in numbers
18–20% growth on ₹1,010 Cr (H2FY25) implies about ₹1,192 Cr to ₹1,212 Cr for H2FY26.
How it was checked
H2FY26 actual 18.42% — met the guided 18–20% (sum of 2 quarters).
How this guidance changed
Stated once in the documents read so far.
Optimism about the second half
Hint
Management says it remains optimistic about H2 FY26, backed by product launches, expansion and market penetration.
Promisedto improvefor H2FY26
Deliveredup 18.4%H2FY26
ResultAchieved
Said11 Nov 2025Concall transcript
In management's words
“Looking ahead, we continue to remain optimistic about the second half of the year, backed by continuous product introduction, strategic expansion initiatives and increasing market penetration”
How it was checked
Revenue rose by 18.4% in H2FY26 from H2FY25 — in line with what management indicated (sum of 2 quarters).
Condition attached by management: Supported by GST and income tax cuts.
How this guidance changed
Stated once in the documents read so far.
EBITDA margin impact of input costs
Hint
Rising input prices are expected to have a neutral impact on FY26 full-year results.
Promisedto hold or improvefor FY26
Delivereddown 0.9%FY26
ResultPartly achieved
Said2 Feb 2026Concall transcript
In management's words
“However, with prices now trending upwards, we expect a neutral impact on our full year results.”
How it was checked
EBITDA / operating margin fell by 0.9 pp in FY26 from FY25 — roughly in line with what management indicated (annual result).
Condition attached by management: prices trending upwards
How this guidance changed
- 11 Nov 2025 — to hold or improve for FY26
First stated
Concall transcript · Partly achieved (actual down 0.9%)
- 2 Feb 2026 — to hold or improve for FY26
Repeated
Concall transcript · Partly achieved (actual down 0.9%)
Acquisition of remaining stake in Pioneer Stationery Private Limited
Hint
Walked back
The company expects to complete the acquisition of the remaining stake in Pioneer Stationery on or before March 31, 2026, after extending the earlier December 31, 2025 date.
Promisedmilestonefor by Mar 2026
Delivered—
ResultMissed
Said29 Dec 2025Exchange announcement
In management's words
“the acquisition of the remaining stake in Pioneer shall be completed on or before March 31, 2026.”
How it was checked
The FY26 annual report says construction for the new facility was delayed past the March 31, 2026 completion target due to unseasonal rains. The evidence does not mention the Pioneer stake acquisition itself. (judged from later company statements)
Evidence (12 Aug 2026): “There has been a slight delay in the completion of construction and installation activities for the new manufacturing facility, originally targeted for March 31, 2026, due to unseasonal rains during Q2 and Q3 of FY 2025–26.” — Annual report FY26
Condition attached by management: Extension mutually agreed between Gala Group shareholders and the Company
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
Establishment of new manufacturing facility
Indirect
Walked back
Completion of the new manufacturing facility, originally targeted for March 31, 2026, has been pushed out. No new completion date is given, and work is being expedited.
Promisedmilestonefor by Mar 2026
Delivered—
ResultMissed
Said12 Aug 2026Annual report
In management's words
“There has been a slight delay in the completion of construction and installation activities for the new manufacturing facility, originally targeted for March 31, 2026, due to unseasonal rains during Q2 and Q3 of FY 2025–26.”
How it was checked
The new facility was due March 31, 2026 and was delayed past that date by unseasonal rains. Completion was still only nearing as of November 2026. (judged from later company statements)
Evidence (12 Aug 2026): “There has been a slight delay in the completion of construction and installation activities for the new manufacturing facility, originally targeted for March 31, 2026, due to unseasonal rains during Q2 and Q3 of FY 2025–26.” — Annual report FY26
Evidence (2 Nov 2026): “Plan to commercialize operations at ~50+ acres – first phase construction nearing completion” — Investor presentation — Q2FY27 (2 Nov 2026)
Condition attached by management: Work is being expedited; timeline extended due to unseasonal rains during Q2 and Q3 of FY 2025–26.
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
Possession of first building at 44-acre project
Hint
Management expects possession of the first building at the 44-acre project in Q3FY26, with commercial production within 90 days.
Promisedmilestonefor Q3FY26
DeliveredFirst building possession came in Q1FY27 as a milestone, after the Q3FY26 deadline; annual report cites a marginal monsoon-related delay.
ResultMissed
Said4 Feb 2025Concall transcript
In management's words
“we should get the possession during the third quarter of FY '26 and believe to begin commercial production from that building within 90 days from getting the possession.”
How it was checked
Possession was due in Q3FY26 (by 31 Dec 2025), but the milestone was reported in Q1FY27 with a construction delay. (judged from later company statements)
Evidence (3 Aug 2026): “milestone event marking possession of the first building in the 50+ acre project” — Concall presentation — Q1FY27 (Aug 2026)
Evidence (12 Aug 2026): “Prolonged and unseasonal monsoon conditions resulted in a marginal construction delay.” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Possession of first building at 44-acre plant
Hint
Possession of the first building at the 44-acre plant is anticipated in Q3 FY26.
Promisedmilestonefor Q3FY26
DeliveredFirst building possession was reported as a Q1FY27 milestone; commercialisation still planned after first-phase construction nearing completion in Q2FY27.
ResultMissed
Said20 May 2025Concall transcript
In management's words
“anticipated possession of first building by Q3 FY'26 and beginning of commercial production slated in Q4 FY'26.”
How it was checked
Possession was guided for Q3FY26 (by 31 Dec 2025) but came later, and commercial production had not started by Q2FY27. (judged from later company statements)
Evidence (3 Aug 2026): “milestone event marking possession of the first building in the 50+ acre project” — Concall presentation — Q1FY27 (Aug 2026)
Evidence (2 Nov 2026): “Plan to commercialize operations at ~50+ acres – first phase construction nearing completion” — Investor presentation — Q2FY27 (2 Nov 2026)
Evidence (12 Aug 2026): “Prolonged and unseasonal monsoon conditions resulted in a marginal construction delay.” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
First building handover for plant and machinery installation · 44-acre project
Hint
First buildings of the 44-acre project are expected to be delivered by end of Q3 FY26 for plant and machinery installation.
Promisedmilestonefor Q3FY26
DeliveredFirst building possession reported as Q1FY27 milestone; annual report cites a marginal monsoon-related construction delay.
ResultMissed
Said11 Aug 2025Concall transcript
In management's words
“the delivery of the first buildings by end of Q3 for installation of plant and machinery.”
How it was checked
First building delivery was due by end of Q3 FY26 (31 Dec 2025), but possession was reported later, in Q1FY27. (judged from later company statements)
Evidence (3 Aug 2026): “milestone event marking possession of the first building in the 50+ acre project” — Concall presentation — Q1FY27 (Aug 2026)
Evidence (12 Aug 2026): “Prolonged and unseasonal monsoon conditions resulted in a marginal construction delay.” — Annual report FY26
Condition attached by management: Subject to construction milestones.
How this guidance changed
Stated once in the documents read so far.
Combined capacity for pens · pens and office supplies
Direct
Management expects combined pen capacity, including ballpoint and exam pens, to reach close to 5 million pens a day by the end of calendar 2025.
Promised~5,000,000 million pens per dayfor by Q3FY26
Deliveredabout 3 to 3.25 million pens a day
ResultMissed
Said11 Nov 2025Concall transcript
In management's words
“by the end of this year, our combined capacity for pens, you know, which includes the regular ballpoint pens and one-time use examination pens, all put together to be close to 5 million pens a day.”
How it was checked
The target was close to 5 million pens a day by end-2025, but the November 2025 update reports only about 3 to 3.25 million pens a day. (judged from later company statements)
Evidence (11 Nov 2025): “So today, we should be close to about 3 million to 3.25 million pens a day in terms of our pen manufacturing capacity.” — Concall transcript — Q2FY26 (Nov 2025)
How this guidance changed
Stated once in the documents read so far.
General trade contribution to sales
Direct
Management expects general trade to stay close to 75% of overall sales going forward.
Promised~75%for Not specified
Delivered₹2,326 CrFY26
ResultAchieved · beat
Said11 Nov 2025Concall transcript
In management's words
“But going forward, GT will continue to be close to about 75% of our overall sales.”
How it was checked
No deadline was given; reached in FY26.
How this guidance changed
Stated once in the documents read so far.
Working capital cycle
Direct
Management expects the consolidated working capital cycle to come down to around 55 days.
Promised~55 daysfor Not specified
Delivered44 daysFY26
ResultAchieved · beat
Said20 May 2025Concall transcript
In management's words
“we will be able to maintain our working capital cycle at around 55 days.”
How it was checked
No deadline was given; reached in FY26.
Condition attached by management: Growing operations and full-year integration of Uniclan
How this guidance changed
Stated once in the documents read so far.
Full-year revenue growth target on a consolidated basis, including Uniclan
Direct
Management maintains a FY25 consolidated revenue growth target of about 23% to 25%, including Uniclan.
Promised23–25% growthfor FY25
Delivered24.46% growthFY25
ResultAchieved
Said4 Feb 2025Concall transcript
In management's words
“we continue to maintain a full revenue growth target of full-year revenue growth target of about 23% to 25% on a consolidated basis, including Uniclan for FY 2025.”
What it implies in numbers
23–25% growth on ₹1,537 Cr (FY24) implies about ₹1,891 Cr to ₹1,921 Cr for FY25.
How it was checked
FY25 actual 24.46% — met the guided 23–25% (annual result).
How this guidance changed
Stated once in the documents read so far.
Total capital expenditure this financial year
Direct
Management plans to close FY25 with total capex of about INR 160-175 crore.
Promised₹160 Cr – ₹175 Crfor FY25
Delivered≈ ₹296 CrFY25
ResultMissed
Said4 Feb 2025Concall transcript
In management's words
“we are planning to close this financial year with a total capex of around INR 160 crores to INR 175 crores.”
What it implies in numbers
Reaching ₹160 Cr by FY25 from ₹247 Cr (FY24) needs about 35.2% decline a year.
How it was checked
FY25 actual ₹296 Cr (estimate) — short of the guided ₹160 Cr – ₹175 Cr (change in fixed assets and CWIP plus depreciation).
How this guidance changed
Stated once in the documents read so far.
New pencil production from new capacity · pencils
Hint
Pencil production from the new capacity is expected to start in Q4FY25, with expansion continuing in the next quarter.
Promisedmilestonefor Q4FY25
Delivered—
ResultMissed
Said4 Feb 2025Concall transcript
In management's words
“pencils production from the new capacity should start rolling in from the current quarter and there would be continuous expansion in the next quarter as well.”
How it was checked
Guidance was for new-capacity production to start by Q4FY25 (31 Mar 2025). Later evidence shows the new capacity was still under construction, nearing completion, in May and Nov 2026. (judged from later company statements)
Evidence (18 May 2026): “Capacity Expansion on Track : Foundation for Future Growth progressing - first phase construction nearing completion at ∼45 acre land parcel” — Concall presentation — Q4FY26 (May 2026)
How this guidance changed
Stated once in the documents read so far.
ROE, ROCE at a consolidated level
Direct
Management expects consolidated ROE and ROCE of around 23-25%, rising as more money is put into capex.
Promised23–25%for Not specified
Delivered26%FY25
ResultAchieved · beat
Said4 Feb 2025Concall transcript
In management's words
“So our ROE, ROCE at a consolidated level should be around 23% to 25%.”
How it was checked
No deadline was given; reached in FY25.
Condition attached by management: with EBITDA margin of 16-17% and about 3x asset turn on capex
How this guidance changed
Stated once in the documents read so far.
Key points from each document
The main takeaways, newest document first.
Concall transcript — Q2FY27 (6 Nov 2026) · 3 Nov 2026
- Management reiterated consolidated sales growth guidance of 18% to 20% for FY27 and said volume drove more than 80% of growth.
- EBITDA margin was 12.4% in both Q2 and H1 as roughly 15% raw material inflation and higher manpower costs offset calibrated price increases.
- The 16-17% EBITDA margin target is maintained, but management will wait a couple of quarters before deciding on bigger pricing action and gave no timing commitment.
- Q2 operating revenue grew 17.6% and H1 grew 18.4%, with management estimating a 300-350 bps hit to Q2 sales growth from Gujarat flooding.
- Reynolds pen production has started at the new 50-acre facility, with Reynolds revenue expected from Q3 FY27 and gaining momentum in Q4.
- H1 capex was over INR200 crore and management expects INR100-125 crore more in H2 FY27 for the 50-acre greenfield project.
- Borrowings have risen and management expects about INR100-120 crore more debt in the midterm to fund capex, with free cash flow temporarily weaker on lower margins.
- Baby hygiene (Uniclan) EBITDA margin fell to 6.4% from 8.1%, and management's longer-term goal for that segment is 8-10%.
- A one-time exceptional loss of INR10.4 crore from flood damage was booked, and insurance claims are expected to substantially offset it.
- Working capital cycle was kept within the guided 55-60 day range despite volume-led growth.
- The Seven SpA joint venture is not yet formalised; the JV agreement and apostille are pending and the business plan will follow once participation is confirmed.
Press release — Q2FY27 (2 Nov 2026) · 2 Nov 2026
- Management reiterated its FY27 consolidated sales growth guidance of 18-20%.
- EBITDA fell 16.8% to Rs 82.8 crore in Q2FY27, and EBITDA margin contracted to 12.4% from 17.5% a year earlier.
- Consolidated revenue grew 17.6% year-on-year to Rs 667.8 crore in Q2FY27, with volume growth in domestic and export markets.
- Heavy rainfall and flooding in Gujarat damaged inventory and cut sales growth by an estimated 300-350 bps in Q2FY27.
- A Rs 10.4 crore exceptional loss from flood damage drove PAT down 37.0% to Rs 38.3 crore; insurance recovery is expected to offset it.
- The first building at the new 50-acre Reynolds pen facility has been commissioned and is expected to contribute to revenue from Q3FY27.
- Consumption margins improved sequentially, but a sharp rise in input costs in the latter half of the quarter partly offset the gain.
- Management sees a positive demand environment across key categories and markets, with Hobby & Craft and Back-to-School performing well.
- DOMS acquired Uniclan Healthcare to enter the baby hygiene segment, extending its push into adjacent categories.
Investor presentation — Q2FY27 (2 Nov 2026) · 2 Nov 2026
- Consolidated EBITDA fell 16.8% year on year in Q2FY27, with margin at 12.4% against 17.5% a year earlier, as raw material costs and new-plant overheads weighed.
- Consolidated revenue rose 17.6% year on year in Q2FY27 to Rs 667.8 crore, which management attributes to higher volumes in domestic and export markets.
- Flood damage to inventory cut sales growth by an estimated 300–350 bps in Q2FY27 and led to a one-time exceptional loss of Rs 10.4 crore.
- The ~50+ acre greenfield plant is in its first construction phase, which is nearing completion, with commercial operations planned after that.
- Management expects insurance recovery to substantially offset the Rs 10.4 crore flood-related P&L impact, but gave no timing beyond 'in due course'.
- Management plans to keep expanding capacity and product lines, and to pursue domestic and international acquisitions and partnerships to fill manufacturing and distribution gaps.
- The company aims to grow Baby Hygiene by using its capacity more fully, and to widen its general-trade distribution.
- Recent launches include mechanical pencils, adhesives, back-to-school products and fine art products, which management cites as supporting growth.
Annual report FY26 · 12 Aug 2026
- Management targets consolidated revenue growth of 18% to 20% in FY27, despite prevailing uncertainties.
- Consolidated revenue from operations rose to Rs 232,636.52 lakh in FY26 from Rs 191,262.81 lakh in FY25.
- FY26 consolidated revenue rose 21.6% to ₹2,32,636.52 lakhs, driven by category expansion, new launches and domestic demand.
- EBITDA margin fell to 17.3% in FY26, which management attributes mainly to the higher contribution of Uniclan to consolidated operations.
- Management has prioritised volume-led growth and market share over near-term margins amid sharp commodity inflation, with input costs rising and pricing being raised.
- The 50+ acre greenfield complex has its first two buildings in possession, with commercial production from the first building now expected toward end of Q2 FY27 after a marginal monsoon-related delay.
- The Reynolds brand asset purchase, for US$3.7 million excluding inventories, was completed on July 1, 2026 to build a writing instruments franchise.
- Input costs linked to crude derivatives have risen since the start of the year, and management is responding with calibrated pricing and channel margin actions.
- Revenue from operations rose to Rs 2,04,964.07 lakh in FY26 from Rs 1,70,910.96 lakh in FY25, with domestic and export sales both higher.
- Net profit attributable to equity holders rose to Rs 21,950.71 lakh in FY26 from Rs 18,986.40 lakh, giving basic EPS of Rs 36.17.
- Cash spending on property, plant and equipment rose to Rs 26,538.61 lakh in FY26, and capital work in progress closed at Rs 15,759.55 lakh.
- Gross borrowings fell to Rs 5,016.29 lakh at March 31, 2026 from Rs 11,591.29 lakh, and net debt including leases fell to Rs 4,232.68 lakh.
- The new manufacturing facility is behind its original March 31, 2026 completion date because of unseasonal rains, and the timeline has been extended.
- Standalone net debt fell sharply in FY26 as borrowings were repaid, with the variance attributed to higher profits and loan repayment.
Concall transcript — Q1FY27 (9 Aug 2026) · 9 Aug 2026
- Management reiterated FY27 consolidated revenue growth guidance of 18% to 20%, saying it already includes the new capacity from the 50-plus acre plant.
- Q1 FY27 EBITDA margin fell to 12.3% from 17.6%, mainly from a roughly 400 bps gross margin drop due to raw material inflation.
- Management is not guiding on margins near term because raw material prices are volatile; it targets a return to a 16-17% operating margin once prices stabilise.
- Company is prioritising volume-led growth and market share over near-term margins, taking only calibrated price increases of about 4-5%.
- The 50-plus acre greenfield plant is expected to add about 300,000 sq ft of operational area by end of Q2 FY27, with H2 growth expected to draw heavily on it.
- Reynolds acquisition adds brand and assets but no new manufacturing capacity; it is expected to add little volume in FY27 and about 10% of revenue by FY29, mainly via price and mix.
- Management suggested FY26 gross and EBITDA margins are a sensible base for FY28, and said the current margin level is likely the bottom.
- Exports were flat in Q1 due to EU demand softness and West Asia logistics disruption; management expects full-year exports at 13-15% of sales.
Use-of-proceeds report — Q1FY27 (7 Aug 2026) · 7 Aug 2026
- Completion of the part-financed new manufacturing facility at Umbergaon, Gujarat is now shown for Fiscal 2027, against Fiscal 2026 in the offer document.
- The Rs 2,800 million facility part-financing allocation is unchanged in revised cost, but its completion timing has moved from Fiscal 2026 to Fiscal 2027.
- IPO net proceeds of Rs 3,327.24 million are fully utilised as at June 30, 2026, and this is the final monitoring agency report for the IPO.
- The monitoring agency reports no deviation from the objects of the IPO.
- Net proceeds were revised from Rs 3,315.75 million to Rs 3,327.24 million because actual issue expenses were Rs 11.49 million lower than estimated, and the difference went to general corporate purposes.
- General corporate purposes allocation of Rs 527.24 million is fully utilised and within the 25% cap on the fresh issue.
- IPO escrow and monitoring account balances are nil as at June 30, 2026, so no unutilised proceeds remain invested.
- Utilisation figures and delay disclosures rely on a management undertaking and a chartered accountant certificate dated July 25, 2026, not on independent verification by the monitoring agency.
Credit-rating note — CRISIL (6 Aug 2026) · 6 Aug 2026
- Operating revenue grew to Rs 2,327 crore in FY26 from Rs 1,913 crore in FY25, which the agency attributes to product diversification, brand positioning and new business divisions.
- Capex of Rs 200–250 crore is expected each year for the next two years, mainly for capacity and product portfolio enhancements and funded primarily from internal accruals.
- The agency says operating margin may fall in FY27 because the West Asia crisis is pushing up raw material prices across the value chain.
- DOMS plans to partly offset raw material price risk by offering different products and changing wholesaler discounts.
- Pen-division competition is expected to ease after the acquisition of intellectual property rights from Reynolds, which should help market share.
- Net cash accrual is expected above Rs 300 crore a year against yearly debt repayments of Rs 13–14 crore, and gearing is expected to stay near 0.1 times over the medium term.
- The rating of AA-/Stable was reaffirmed and the rated bank facilities were increased to Rs 252.1 crore from Rs 159 crore.
- No major dividend payout is expected, so net worth should keep rising from profit accretion.
- FILA's stake fell to 19.01% by June 30, 2026, but the agency expects DOMS to keep benefiting from FILA's experience and support over the medium term.
Concall presentation — Q1FY27 (Aug 2026) · 3 Aug 2026
- EBITDA margin fell to 12.3% from 17.6% a year earlier, which management attributes to raw material inflation and other transitory headwinds.
- The ~50+ acre greenfield project is on track, with 300,000+ sq. ft. of operational area expected by the end of Q2FY27.
- Q1FY27 consolidated revenue rose 19.2% year on year to Rs 670.5 crore, supported by domestic demand and back-to-school traction.
- Management described the EBITDA squeeze as transitory, citing raw material costs, ESOP grants, headcount for the new facility and event expenses.
- PAT fell 23.4% year on year to Rs 45.3 crore, with higher depreciation from new capacity adding to the pressure.
- DOMS acquired the Reynolds brand and writing-instrument assets, planning to run it as a parallel brand focused on the office segment.
- Full sales potential of the Reynolds brand is expected to be realised over time as functional integration progresses and Reynolds manufacturing starts.
- Balance sheet is conservative, with net debt to equity of 0.02x and cash balance of Rs 61.8 crore as of March 31, 2026.
- Management plans broad-based capacity expansion across stationery and art material categories, plus new product lines such as mechanical pencils, adhesives and fine art products.
- Management aims to accelerate Baby Hygiene growth by optimising capacity utilisation in line with market opportunities.
- DOMS intends to keep pursuing domestic and international acquisition and partnership opportunities to fill manufacturing and distribution gaps.
- A new ESOP tranche and headcount added for the upcoming facility raised employee costs, which will weigh on near-term margins.
Disclosure Of Events/ Information Under Regulation 30 Of SEBI LODR Regulations, 2015 · 1 Jul 2026
- DOMS has completed the acquisition of certain Reynolds-brand pen, marker, highlighter and school supplies assets from the listed Sellers.
- Aggregate cash consideration is US$ 3,700,000, excluding inventory value, under the Asset Purchase Agreement.
- Ancillary agreements, including IP assignment, a pen tip supply agreement with RPI and a licence agreement, were executed on completion.
- The company states there are no material changes to the transaction details disclosed in its June 10, 2026 intimation.
- None of the Sellers are related to the promoter or promoter group, so the transaction is not a related party transaction.
Concall transcript — Q4FY26 (May 2026) · 19 May 2026
- Management reiterated consolidated revenue growth guidance of 17% to 20% for FY27, citing planned capacity expansion and current demand trends.
- Management expects Q1 FY27 EBITDA margins to be slightly under pressure year-on-year due to raw material inflation, but views this as temporary rather than structural.
- Raw material costs rose about 15% to 20% while only 4% to 5% of price increases have been passed on so far, creating a near-term margin gap.
- FY27 capex plan was raised to INR250-275 crore from the earlier INR225-250 crore range, partly on higher costs and partly on additional land parcels.
- Total investment in the 45-acre plant is expected at INR850-1,000 crore, with the company in a high capex cycle for about three more years.
- First building at the 45-acre facility is on track for June 2027 completion, with commercial production expected towards the end of Q2 FY27.
- Management will prioritise market share over pricing, taking gradual and calibrated price increases so as not to lose shelf space to competitors.
- Uniclan is guided to grow close to 20% with long-term EBITDA margin around 10%, though near-term margins will soften due to crude-linked inputs.
- Management said there is considerable headroom to take on some additional debt if needed to fund capex, after FY26 free cash flow was not generated.
Concall presentation — Q4FY26 (May 2026) · 18 May 2026
- First building at the ~45 acre land parcel is expected to start commercial production by the end of Q2 FY27, the first phase of the capacity expansion.
- Consolidated revenue grew 21.6% to Rs 2,326.4 crore in FY26, and PAT grew 12.2% to Rs 239.6 crore.
- Management says domestic demand stayed buoyant, supported by the start of the back-to-school season.
- FY26 EBITDA margin was 17.3%, down from 18.2% in FY25, as employee and other expenses grew faster than revenue.
- Management says raw material cost volatility and supply chain disruption from the West Asia crisis were managed through prudent sourcing, with no disruption to operations.
- FY26 capex was Rs 292.8 crore, and the balance sheet remains lightly levered at 0.02x debt to equity.
- The Board recommended a final dividend of Rs 3.65 per share, about 10% of standalone PAT.
Concall transcript — Q3FY26 (Feb 2026) · 2 Feb 2026
- Management expects FY26 consolidated sales growth at the upper end of the 18% to 20% guided range, after 22.7% growth in the first nine months.
- FY27 sales growth of 18% to 20% is targeted, mainly from full utilisation of existing capacity and volume growth.
- FY26 capex is now expected to cross INR250 crore, with FY27 capex guided at INR225 crore to INR250 crore.
- The 44-acre project's first building is delayed by monsoon-related construction slippage; commercial production now starts in Q2 FY27.
- Input cost inflation is seen as a margin risk for the current quarter; management will decide on price or channel margin changes after watching whether increases persist.
- Wooden pencil capacity is planned to rise from about 5.53 million to about 8 million in the next couple of years, with scholastic growth expected to be significant in FY28.
- Uniclan's Q3 margin is seasonally high; management expects the diaper business to earn about 8% to 9% EBITDA margin on a full-year basis.
- A 50-50 JV with Seven SpA (FILA Group) will make premium backpacks for export and domestic niche sales; total investment is up to INR15 crore and formation is due by end Q1 FY27.
- US tariffs have cut wooden pencil exports to the FILA group; management expects lost US sales to return only if tariffs normalise.
- Q3 consolidated sales grew 18.2% and EBITDA margin was 17.5%, at the upper end of the guided 16.5% to 17.5% range.
Documents read
- Concall transcript — Q2FY27 (6 Nov 2026) · Concall transcript · 3 Nov 2026 · 10 statements
- Press release — Q2FY27 (2 Nov 2026) · Press release · 2 Nov 2026 · 3 statements
- Investor presentation — Q2FY27 (2 Nov 2026) · Investor presentation · 2 Nov 2026 · 4 statements
- Annual report FY26 · Annual report · 12 Aug 2026 · 7 statements
- Concall transcript — Q1FY27 (9 Aug 2026) · Concall transcript · 9 Aug 2026 · 14 statements
- Use-of-proceeds report — Q1FY27 (7 Aug 2026) · Use-of-proceeds report · 7 Aug 2026 · 1 statement
- Credit-rating note — CRISIL (6 Aug 2026) · Credit-rating note (the rating agency's words) · 6 Aug 2026 · 1 statement
- Concall presentation — Q1FY27 (Aug 2026) · Concall presentation · 3 Aug 2026 · 8 statements
- Disclosure Of Events/ Information Under Regulation 30 Of SEBI LODR Regulations, 2015 · Exchange announcement · 1 Jul 2026
- Concall transcript — Q4FY26 (May 2026) · Concall transcript · 19 May 2026 · 13 statements
- Concall presentation — Q4FY26 (May 2026) · Concall presentation · 18 May 2026 · 4 statements
- Concall transcript — Q3FY26 (Feb 2026) · Concall transcript · 2 Feb 2026 · 16 statements
- Announcement under Regulation 30 (LODR)-Updates on Acquisition · Exchange announcement · 29 Dec 2025 · 1 statement
- Concall transcript — Q2FY26 (Nov 2025) · Concall transcript · 11 Nov 2025 · 13 statements
- Annual report FY25 · Annual report · 30 Aug 2025 · 14 statements
- Concall transcript — Q1FY26 (Aug 2025) · Concall transcript · 11 Aug 2025 · 13 statements
- Credit-rating note — CRISIL (6 Aug 2025) · Credit-rating note (the rating agency's words) · 6 Aug 2025 · 1 statement
- Concall transcript — Q4FY25 (May 2025) · Concall transcript · 20 May 2025 · 19 statements
- Concall transcript — Q3FY25 (Feb 2025) · Concall transcript · 4 Feb 2025 · 17 statements
Guidance is extracted from company documents and interviews by an AI model and then checked against reported numbers by rule. It can contain errors or miss context, and the stored figures may differ from the basis management guided on. This page is information only and is not investment advice.