Borana Weaves Ltd: management guidance tracker
What management said it would deliver, when, where they said it — and what the reported numbers showed afterwards.
How to read this page — 30 seconds
- Latest guidance is what management said at its most recent results call, presentation or interview, next to what it had said before. Raised or Lowered tells you which way expectations moved.
- Other open guidance lists earlier promises that have not fallen due, soonest first, with the latest reported figure.
- Track record compares each promise that has fallen due with what the company actually delivered. That is the best guide to how much weight to give the new guidance.
Select any row for management's exact words, where they said it and how the target changed over time.
Latest guidance · 2 Nov 2026 – 4 Nov 2026
From Investor presentation — Q2FY27 (4 Nov 2026), Intimation Of Expansion Of Project At Unit 4 Of The Company. What management guided for most recently, against what it had said before.
Commercial production (192 looms + 3 texturising machines, earlier approved expansion)
Direct
Commercial production of the earlier-approved 192 water-jet looms and 3 texturising machines is targeted to commence in December 2026.
Earlier
First time stated
Nowmilestoneby Dec 2026
Change
New
StatusPending
In management's words
“192 looms + 3 Texturising machines (earlier approved expansion): Commercial production targeted to commence in December 2026.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Phase 1 looms added
Direct
Phase 1 of the Unit 4 expansion will add 192 Water Jet Looms by December 2026.
Earlier
First time stated
Now192 Water Jet Loomsby Dec 2026
Change
New
StatusOn track
In management's words
“Phase 1: 192 Water Jet Looms by December, 2026.”
How it was checked
The December 2026 deadline has not passed; the Nov 2026 expansion intimation confirms the Unit 4 project but not that Phase 1's 192 looms are installed. (judged from later company statements)
Evidence (4 Nov 2026): “1,212 Water Jet Looms” — Investor presentation — Q2FY27 (4 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Commercial production (additional 192 looms, newly approved)
Direct
Commercial production of the newly approved additional 192 water-jet looms is targeted to commence in March 2027.
Earlier
First time stated
Nowmilestoneby Mar 2027
Change
New
StatusPending
In management's words
“Additional 192 looms (newly approved): Commercial production targeted to commence in March 2027.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Total installed capacity (looms)
Direct
Total installed capacity across all units will reach 1,596 Water Jet Looms on completion of both phases.
Earlier
1,500 loomsby 2027 · 27 Jan 2026
Now1,596 Water Jet Loomsby Q4FY27
Change
Deadline brought forward
StatusOn track
So far: 1,212 looms currently operated
In management's words
“Upon completion of both phases, the total installed capacity across all units will be 1,596 Water Jet Looms, with an annual production capacity of 459.64 million metres (Approx.) of greige fabric.”
How it was checked
Deadline is FY27 and not yet passed; current looms are 1,212 against a 1,596 target, with Phase 1 expansion underway but not yet confirmed complete. (judged from later company statements)
Evidence (4 Nov 2026): “1,212 Water Jet Looms” — Investor presentation — Q2FY27 (4 Nov 2026)
How this guidance changed
- 27 Jan 2026 — 1,500 looms for by 2027
First stated
Concall transcript · On track (actual 1,212 looms currently operated)
- 2 Nov 2026 — 1,596 Water Jet Looms for by Q4FY27
Deadline brought forward
Exchange announcement · On track (actual 1,212 looms currently operated)
Investment required (total)
Direct
Total investment for the 384 looms and ancillary machinery is approximately Rs 49.92 crore.
Earlier
First time stated
Now~₹49.92 CrNot specified
Change
New
StatusPending
In management's words
“Total: Approximately Rs. 49.92 crore for 384 Water Jet Looms along with necessary ancillary machinery.”
How it was checked
No timeline was given; tracked against each new result.
How this guidance changed
Stated once in the documents read so far.
Renewable energy share of current power requirements
Direct
70–80% of current power requirements are expected to be met through renewable energy once the expansion is complete.
Earlier
70–80%Not specified · 4 Jun 2026
Now70–80%Not specified
Change
Repeated
StatusPending
In management's words
“70–80% of current power requirements are expected to be met through renewable energy sources upon completion of the expansion”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Upon completion of the expansion (23.34 MW renewable portfolio)
How this guidance changed
- 27 Jan 2026 — 70–80% for Not specified
First stated
Concall transcript · Pending
- 4 Jun 2026 — 70–80% for Not specified
Repeated
Investor presentation · Pending
- 4 Nov 2026 — 70–80% for Not specified
Repeated
Investor presentation · Pending
Capacity utilisation
Hint
Management expects the expansion to optimise capacity utilisation, with no figure given.
Earlier
to improveFY27 · 31 Aug 2026
Nowto improveFY27
Change
Repeated
StatusPending
In management's words
“The expansion is also expected to improve cost efficiency and optimize capacity utilization.”
How it was checked
Capacity utilisation is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 31 Aug 2026 — to improve for FY27
First stated
Annual report · On track (actual approximately 85% existing capacity utilisation)
- 2 Nov 2026 — to improve for FY27
Repeated
Exchange announcement · Pending
Cost efficiency
Hint
Management expects the expansion to improve cost efficiency, with no figure given.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“The expansion is also expected to improve cost efficiency and optimize capacity utilization.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
New order volumes
Hint
Management expects the added capacity to help it secure new order volumes and high-value buyers, with no figure given.
Earlier
First time stated
Nowto improveFY27
Change
New
StatusPending
In management's words
“strengthen its ability to attract high-value buyers and secure new order volumes”
How it was checked
Order inflow is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Operating margins (from renewable energy integration)
Hint
Completing the renewable expansion could potentially improve operating margins through lower power costs.
Earlier
to improveFY27 · 4 Jun 2026
Nowto improveFY27
Change
Repeated
StatusPending
In management's words
“potentially improving operating margins through reduced power costs.”
Condition attached by management: Upon completion of the expansion
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
- 24 Jan 2026 — to improve for FY27
First stated
Concall presentation · Pending
- 4 Jun 2026 — to improve for FY27
Repeated
Investor presentation · Pending
- 4 Nov 2026 — to improve for FY27
Repeated
Investor presentation · Pending
Operating margin (EBITDA margin)
Hint
Quarter-on-quarter pass-through of cost increases could ease margin pressure in the coming quarters.
Earlier
First time stated
Nowto improveby Q2FY28
Change
New
StatusPending
In management's words
“The company generally passes on cost increases to customers on a quarter-on-quarter basis, which could help ease margin pressure in the coming quarters.”
Condition attached by management: Cost increases passed on quarter-on-quarter; limited so far because orders were pre-booked at predetermined prices
Assumptions made in reading this
- 'near term' read as the next four quarters
How this guidance changed
Stated once in the documents read so far.
Other open guidance · soonest due first
Earlier promises that have not fallen due yet, with the latest figure where one has been reported.
New unit for waterproof and technical textile fabrics
Indirect
Company is set to launch a new unit with high-tech weaving looms for waterproof and technical textile fabrics in 2025.
Targetmilestone
Dueby 2025
result by 14 Feb 2026
Said14 Aug 2025
Annual report
StatusAwaiting data
In management's words
“In 2025, we are set to launch a new unit equipped with high-tech weaving looms designed for waterproof and technical textile fabrics.”
How it was checked
Milestone guidance is checked against later documents.
Assumptions made in reading this
- '2025' read as calendar year 2025
How this guidance changed
Stated once in the documents read so far.
Spinning capacity · spinning
Hint
Company plans to increase spinning capacity to meet rising yarn demand.
Targetto improve
DueFY26
result by 30 May 2026
Said14 Aug 2025
Annual report
StatusAwaiting data
In management's words
“Increasing spinning capacity to meet rising yarn demand.”
How it was checked
Capacity is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Export markets
Hint
Company is exploring export markets with a focus on quality and timely delivery.
Targetto improve
DueFY26
result by 30 May 2026
Said14 Aug 2025
Annual report
StatusAwaiting data
In management's words
“Exploring export markets with a focus on quality and timely delivery.”
How it was checked
Exports is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Remaining waterjet looms in Unit 4B · Unit 4B
Hint
The remaining looms in Unit 4B are expected to start operating in February 2026.
Targetmilestone
DueQ4FY26
result by 30 May 2026
Said27 Jan 2026
Concall transcript
StatusAwaiting data
In management's words
“It's 64. The rest of the balance will start in February.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Gross profit ratio in Q4
Hint
Gross margin in Q4FY26 may be better than in Q3FY26.
Targetto improve
DueQ4FY26
result by 30 May 2026
Said27 Jan 2026
Concall transcript
StatusAwaiting data
In management's words
“So, in quarter 4, it seems that gross margin profit may be better than this one also.”
How it was checked
Gross margin is not in the stored financial tables.
Condition attached by management: Attributed to lower raw material cost after duty removal on Chinese inputs.
How this guidance changed
Stated once in the documents read so far.
Interest subsidy booked in other income
Hint
Other income from interest subsidy is expected to stay flat or fall next quarter, not rise.
Targetto hold or improve
DueQ4FY26
result by 30 May 2026
Said27 Jan 2026
Concall transcript
StatusAwaiting data
In management's words
“So, it will remain the same for the next quarter or it will be less, it will not increase.”
How it was checked
Q4FY26 results were due by 2026-05-30 but are not in the stored data yet.
How this guidance changed
Stated once in the documents read so far.
Commissioning of the 9.9 MW Hybrid Power Project · 9.9 MW hybrid power project at Kalikanagar, Gujarat
Indirect
Walked back
The 9.9 MW hybrid project at Kalikanagar is now tentatively expected to be commissioned by the end of August 2026, later than the earlier May 31, 2026 date.
Targetmilestone
Dueby Aug 2026
result by 14 Nov 2026
Said18 Jun 2026
Exchange announcement
StatusPending
In management's words
“the commissioning of the project, which was earlier expected by May 31, 2026, has been delayed and is now tentatively expected to be completed by the end of August 2026”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Tentative; subject to wind conditions, fuel supply at site, and timely line shutdowns from private developer and GETCO/PGVCL. Developer cites factors outside its control.
How this guidance changed
Stated once in the documents read so far — management described it as “deadline pushed out” against earlier guidance.
Realisation per square metre
Hint
Realisation per square metre is expected to stay on the positive side in coming quarters.
Targetto improve
Dueby Q3FY27
result by 14 Feb 2027
Said27 Jan 2026
Concall transcript
StatusPending
In management's words
“No, we think it will be on the positive side in the coming quarters.”
How it was checked
ARPU / realisation is not in the stored financial tables.
Assumptions made in reading this
- 'near term' read as the next four quarters
How this guidance changed
Stated once in the documents read so far.
Unit 4 expansion (+192 looms, +3 texturisers) commercial production · Unit 4 expansion
Hint
Unit 4 expansion adding 192 looms and 3 texturisers is targeted to start commercial production in December 2026.
Targetmilestone
Dueby Dec 2026
result by 14 Feb 2027
Said31 Aug 2026
Annual report
StatusOn track
In management's words
“Targeted commercial production: December 2026”
How it was checked
The December 2026 deadline has not passed, and the November 2026 expansion intimation does not confirm commercial production has started. (judged from later company statements)
Evidence (2 Nov 2026): “Existing capacity (All Units) 1,212 Water Jet Looms with an annual production capacity of 349.05 million metres (Approx.) of greige fabric.” — Intimation Of Expansion Of Project At Unit 4 Of The Company
How this guidance changed
Stated once in the documents read so far.
Utilisation of plant 1 · Plant 1
Hint
Plant 1 utilisation is expected to rise to around 80% or more.
Targetto improve
DueFY27
result by 30 May 2027
Said27 Jan 2026
Concall transcript
StatusOn track
In management's words
“No, sir, it is increasing. We will easily reach around 80 plus.”
How it was checked
The FY27 deadline has not passed; company-wide utilisation is 80–85%, but no Plant 1-specific utilisation figure is reported. (judged from later company statements)
Evidence (4 Nov 2026): “With average utilization of 80 %” — Investor presentation — Q2FY27 (4 Nov 2026)
Evidence (2 Nov 2026): “Existing capacity utilization Approximately 85%.” — Intimation Of Expansion Of Project At Unit 4 Of The Company
Evidence (4 Jun 2026): “Average Capacity Utilization % (FY 26)” — Investor presentation — Q4FY26 (4 Jun 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Exports · high-value synthetic fabrics
Hint
Management plans to expand exports by focusing on high-value synthetic fabrics.
Targetto improve
DueFY27
result by 30 May 2027
Said4 Jun 2026
Investor presentation
StatusPending
In management's words
“Expand exports by focusing on high-value synthetic fabrics”
How it was checked
Exports is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Manufacturing efficiency, waste reduction and renewable energy use
Hint
Management is committed to improving manufacturing efficiency, reducing waste and strengthening renewable energy use, with no timeline given.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusOn track
So far: 3.55 MW rooftop solar commissioned
In management's words
“We remain committed to improving manufacturing efficiency, reducing waste and strengthening renewable energy use”
How it was checked
The commitment has no timeline, and a commissioned rooftop solar plant shows some progress on renewable energy use; other parts are unevidenced. (judged from later company statements)
Evidence (4 Nov 2026): “3.55 MW Rooftop Solar Plant commissioned to generate clean electricity for manufacturing operations.” — Investor presentation — Q2FY27 (4 Nov 2026)
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Cost efficiencies
Hint
Management intends to improve cost efficiencies across the business.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“enhance capacity utilisation, improve cost efficiencies and explore opportunities in value-added and man-made fibre-based textile products.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Participation in India's textile export opportunity
Hint
Management believes the company is well positioned to participate meaningfully in India's man-made fibre textile export opportunity.
Targetto improve
DueFY27
result by 30 May 2027
Said31 Aug 2026
Annual report
StatusPending
In management's words
“With our established polyester fabric platform, modern infrastructure and focus on technology, Borana Weaves is well positioned to participate meaningfully in this opportunity.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- no time frame was stated; checked on FY27, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Doubling our capacity in the next two years
Indirect
Management has started plans to double installed capacity within the next two years.
Target~2% growth
DueFY28
result by 30 May 2028
Said27 Jan 2026
Concall transcript
StatusOn track
In management's words
“We already have started strategies for doubling our capacity in the next two years.”
How it was checked
The FY28 deadline has not passed; expansion at Unit 4 has been intimated, but no doubled capacity has been reported yet. (judged from later company statements)
Evidence (2 Nov 2026): “Existing capacity (All Units) 1,212 Water Jet Looms with an annual production capacity of 349.05 million metres (Approx.) of greige fabric.” — Intimation Of Expansion Of Project At Unit 4 Of The Company
Evidence (2 Nov 2026): “Existing capacity (All Units) 1,212 Water Jet Looms with an annual production capacity of 349.05 million metres (Approx.) of greige fabric.” — Intimation Of Expansion Of Project At Unit 4 Of The Company
Evidence (31 Aug 2026): “398M Metres of annual fabric production capability.” — Annual report FY26
Evidence (4 Nov 2026): “With average utilization of 80 %” — Investor presentation — Q2FY27 (4 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Full looms doubling by March 2028
Direct
Management plans to increase looms from 1,000 to 2,000 by March 2028.
Target2,000 looms
Dueby Mar 2028
result by 30 May 2028
Said27 Jan 2026
Concall transcript
StatusOn track
So far: 1,212 water-jet looms operating
In management's words
“our planning is completely till March 28.”
How it was checked
The company operates 1,212 looms against a 2,000 target by March 2028, which is above the 1,000 base but well short, with the deadline not yet passed. (judged from later company statements)
Evidence (4 Nov 2026): “1,212 Water Jet Looms” — Investor presentation — Q2FY27 (4 Nov 2026)
Evidence (31 Aug 2026): “1,212 high-speed water-jet looms” — Annual report FY26
How this guidance changed
Stated once in the documents read so far.
Production capacity
Indirect
Management's medium-term vision is to double production capacity within the next 24 months.
Target~2x (double)
Dueby FY28
result by 30 May 2028
Said4 Jun 2026
Investor presentation · 2× since 24 Jan 2026
StatusBehind
So far: 349.05 million metres existing; 459.64 million metres planned on completion
In management's words
“Medium-term vision: To Double Production Capacity in next 24 months”
What it implies in numbers
Doubling over 2 years works out to roughly 41.4% growth a year.
How it was checked
Existing capacity is about 349 million metres, and the planned completion figure of about 460 million metres is well short of doubling. (judged from later company statements)
Evidence (2 Nov 2026): “Existing capacity (All Units) 1,212 Water Jet Looms with an annual production capacity of 349.05 million metres (Approx.) of greige fabric.” — Intimation Of Expansion Of Project At Unit 4 Of The Company
Evidence (31 Aug 2026): “1,212 high-speed water-jet looms” — Annual report FY26
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
How this guidance changed
- 24 Jan 2026 — 2x (double) for by FY28
First stated
Concall presentation · On track
- 4 Jun 2026 — ~2x (double) for by FY28
Repeated
Investor presentation · Behind (actual 349.05 million metres existing; 459.64 million metres planned on completion)
Long-term value
Hint
Chairman states confidence in delivering consistent long-term value to shareholders, without a number or date.
Targetto improve
DueFY30–FY32
result by 30 May 2032
Said14 Aug 2025
Annual report
StatusPending
In management's words
“we are confident of delivering consistent long-term value.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY25 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Sustainable long-term growth
Hint
Management aims to achieve sustainable long-term growth and strengthen its competitive position.
Targetto improve
DueFY31–FY33
result by 30 May 2033
Said31 Aug 2026
Annual report
StatusPending
In management's words
“the Company aims to strengthen its competitive position and achieve sustainable long-term growth.”
How it was checked
Other is not in the stored financial tables.
Assumptions made in reading this
- horizon counted from FY26 (last completed year at the statement date)
- 'long term' read as 5 to 7 years
How this guidance changed
Stated once in the documents read so far.
Production capacity for unbleached synthetic grey fabric · Unit 4, Surat (unbleached synthetic grey fabric)
Hint
Company plans a new Unit 4 facility in Surat to increase production capacity for unbleached synthetic grey fabric.
Targetmilestone
DueNot specified
Said14 Aug 2025
Annual report
StatusPending
In management's words
“Planned setup of a new facility to increase production capacity for unbleached synthetic grey fabric.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Funded from IPO proceeds
How this guidance changed
Stated once in the documents read so far.
Fund Allocation from IPO proceeds for new Unit 4 · Unit 4, Surat
Direct
Rs 71.35 crore from IPO proceeds is allocated to the new Unit 4 facility in Surat.
Target₹71.35 Cr
DueNot specified
Said14 Aug 2025
Annual report
StatusPending
In management's words
“Fund Allocation: Rs.71.35 crore from IPO proceeds.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
Condition attached by management: Funded from IPO proceeds
How this guidance changed
Stated once in the documents read so far.
Working capital allocation from IPO proceeds
Direct
Rs 26.50 crore from IPO proceeds is allocated to working capital needs.
Target₹26.5 Cr
DueNot specified
Said14 Aug 2025
Annual report
StatusPending
In management's words
“Allocation of Rs.26.50 crore to support increased working capital needs.”
How it was checked
Other is not in the stored financial tables.
Condition attached by management: Funded from IPO proceeds
How this guidance changed
Stated once in the documents read so far.
Renewable energy share of power requirements
Direct
Management plans to transition 70–80% of its power requirements to renewable energy, with solar and hybrid projects under execution.
Target70–80%
DueNot specified
Said24 Jan 2026
Concall presentation
StatusPending
So far: 3.55 MW rooftop solar commissioned as first phase
In management's words
“we outlined a clear roadmap to transition 70–80% of our power requirements to renewable energy”
How it was checked
Management said renewable initiatives are progressing as planned, and a 3.55 MW rooftop plant is operational as the first phase, but the 70–80% share is not yet reached. (judged from later company statements)
Evidence (27 Jan 2026): “Our renewable energy initiatives are progressing as planned” — Concall transcript — Q3FY26 (Feb 2026)
Evidence (4 Nov 2026): “3.55 MW Rooftop Solar Plant commissioned to generate clean electricity for manufacturing operations.” — Investor presentation — Q2FY27 (4 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
High-speed Water Jet looms planned · Unit 4B
Direct
160 high-speed water jet looms are planned, with 64 currently operational; the remaining looms will be commissioned in phases.
Target160 looms
DueNot specified
Said24 Jan 2026
Concall presentation
StatusPending
In management's words
“160 high-speed Water Jet looms planned”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: remaining looms are in transit and will be commissioned in a phased manner
How this guidance changed
Stated once in the documents read so far.
Remaining looms commissioning · Unit 4B
Hint
The remaining water jet looms at Unit 4 are in transit and will be commissioned in a phased manner.
Targetmilestone
DueNot specified
Said24 Jan 2026
Concall presentation
StatusPending
In management's words
“The remaining looms are in transit and will be commissioned in a phased manner”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Annual power savings from renewable projects
Direct
Renewable energy projects are expected to save about INR18-20 crore of power cost annually.
Target₹18 Cr – ₹20 Cr
DueNot specified
Said27 Jan 2026
Concall transcript
StatusPending
In management's words
“It will be around nearly INR18 crores to INR20 crores.”
How it was checked
Other is not in the stored financial tables.
How this guidance changed
Stated once in the documents read so far.
Equity dilution to fund expansion
Hint
No further equity dilution is planned to fund the expansion.
Targetmilestone
DueNot specified
Said27 Jan 2026
Concall transcript
StatusPending
In management's words
“No. Equity dilution is not at all coming.”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Incremental annual revenue from 160 looms · Unit 4B
Direct
The 160-loom addition is expected to add about INR60-75 crore of revenue per year.
Target₹60 Cr – ₹75 Cr
DueNot specified
Said27 Jan 2026
Concall transcript
StatusPending
In management's words
“It will be around INR60 crores to INR75 crores.”
How it was checked
Segment-level guidance cannot be read from company-level numbers.
How this guidance changed
Stated once in the documents read so far.
Funding of expansion capex
Hint
Expansion capex will be funded with debt as required alongside internal accruals; no equity dilution is planned.
Targetmilestone
DueNot specified
Said27 Jan 2026
Concall transcript
StatusPending
In management's words
“Yes, I mean, as per the company's generation, we will take the debt that is required along with it.”
How it was checked
Milestone guidance is checked against later documents.
Condition attached by management: Majorly from internal accruals or debt.
How this guidance changed
Stated once in the documents read so far.
Total Outside Liabilities to Tangible Net Worth
Direct
Even after the proposed borrowing, Total Outside Liabilities to Tangible Net Worth is expected to remain at about 0.6x.
Target~0.6x
DueNot specified
Said4 Jun 2026
Investor presentation · 2× since 24 Jan 2026
StatusPending
In management's words
“even after the proposed borrowing, the Total Outside Liabilities to Tangible Net Worth remains comfortable at ~0.6x”
How it was checked
No timeline was given; tracked against each new result.
Condition attached by management: After the proposed borrowing for the hybrid project
How this guidance changed
- 24 Jan 2026 — ~0.6x for Not specified
First stated
Concall presentation · Achieved (actual ₹282 Cr)
- 4 Jun 2026 — ~0.6x for Not specified
Repeated
Investor presentation · Pending
Annual capacity from expansion
Direct
Walked back
The planned expansion is expected to generate about 5 crore meters of annual capacity.
Target~₹5 Cr
DueNot specified
Said4 Jun 2026
Investor presentation · 2× since 27 Jan 2026
StatusPending
In management's words
“Expansion will generate ~5 crore meters of annual capacity”
How it was checked
Capacity is not in the stored financial tables.
Condition attached by management: Completion of the planned expansion
How this guidance changed
- 27 Jan 2026 — ₹350 Cr – ₹400 Cr for Not specified
First stated
Concall transcript · Pending
- 4 Jun 2026 — ~₹5 Cr for Not specified
Lowered
Investor presentation · Pending
RPU-coated fabrics for jackets & technical wear
Hint
Management plans to introduce RPU-coated fabrics for jackets and technical wear.
Targetmilestone
DueNot specified
Said4 Jun 2026
Investor presentation
StatusPending
In management's words
“Introduce RPU-coated fabrics for jackets & technical wear”
How it was checked
Milestone guidance is checked against later documents.
How this guidance changed
Stated once in the documents read so far.
Track record · promised vs delivered
Guidance whose deadline has passed, most recent first: how management performed after giving it.
Solar wind hybrid project commencement
Direct
The 19.79 MW solar-wind hybrid project is expected to commence operation in May 2026.
Promisedmilestonefor Q1FY27
Delivered—
ResultMissed
Said27 Jan 2026Concall transcript
In management's words
“expected to commence operation in May 26.”
How it was checked
Operation was due by Q1FY27 (30 June 2026), but the update says commissioning is now expected between late July and late August 2026. (judged from later company statements)
Evidence (18 Jun 2026): “earlier expected by 31st May 2026, has been delayed and is now tentatively expected From End of July 2026 to End of Aug'26” — Update With Respect To The Commissioning Timelines Of The 9.9 MW Hybrid Power Project
How this guidance changed
Stated once in the documents read so far.
Solar-Wind Hybrid Power Project commissioning
Hint
The Solar-Wind Hybrid Power Project is scheduled for commissioning in June 2026.
Promisedmilestonefor by Jun 2026
DeliveredCommissioning delayed to end-July to end-August 2026
ResultMissed
Said4 Jun 2026Investor presentation
In management's words
“Commissioning: June 2026”
How it was checked
The June 2026 commissioning slipped past the 31 May expectation and was tentatively moved to end-July to end-August 2026, after the June deadline. (judged from later company statements)
Evidence (18 Jun 2026): “earlier expected by 31st May 2026, has been delayed and is now tentatively expected From End of July 2026 to End of Aug'26” — Update With Respect To The Commissioning Timelines Of The 9.9 MW Hybrid Power Project
Condition attached by management: Project is partly debt-funded
How this guidance changed
Stated once in the documents read so far.
Solar–Wind Hybrid Power Project commissioning
Direct
The solar-wind hybrid project of 19.79 MW combined capacity is scheduled for commissioning in May 2026.
Promisedmilestonefor by May 2026
Delivered—
ResultMissed
Said24 Jan 2026Concall presentation
In management's words
“Solar 9.89 MW & Wind 9.90 MW”
How it was checked
The 19.79 MW hybrid project was due by 31 May 2026, but the June 2026 update says commissioning slipped to late July–August 2026. (judged from later company statements)
Evidence (18 Jun 2026): “earlier expected by 31st May 2026, has been delayed and is now tentatively expected From End of July 2026 to End of Aug'26” — Update With Respect To The Commissioning Timelines Of The 9.9 MW Hybrid Power Project
Condition attached by management: partly debt-funded
How this guidance changed
Stated once in the documents read so far.
Profitability
Hint
Company expects improved profitability in FY 2025–26.
Promisedto improvefor FY26
Deliveredup 62.5%FY26
ResultAchieved
Said14 Aug 2025Annual report
In management's words
“The company expects moderate revenue growth and improved profitability in FY 2025–26, driven by an efficient cost structure, product innovation, and customer-centric strategy.”
How it was checked
Net profit (PAT) rose by 62.5% in FY26 from FY25 — in line with what management indicated (annual result).
Condition attached by management: Driven by an efficient cost structure, product innovation and customer-centric strategy
How this guidance changed
Stated once in the documents read so far.
Weaving capabilities with automated looms · weaving
Hint
Company plans to expand weaving capabilities with automated looms.
Promisedto improvefor FY26
Delivered64 new high-speed looms commissioned; annual fabric capability rose from 392M to 398M metres
ResultAchieved
Said14 Aug 2025Annual report
In management's words
“Expanding weaving capabilities with automated looms.”
How it was checked
64 new high-speed looms were commissioned by Q4FY26 and reported capability rose from 392M to 398M metres. Evidence does not explicitly confirm automation. (judged from later company statements)
Evidence (24 Jan 2026): “39,21,12,000 Meter Total Installed Capacity” — Concall presentation — Q3FY26 (Feb 2026)
Evidence (31 Aug 2026): “398M Metres of annual fabric production capability.” — Annual report FY26
Assumptions made in reading this
- no time frame was stated; checked on FY26, the year ahead at the time
How this guidance changed
Stated once in the documents read so far.
Rooftop solar power project commissioning
Direct
A 3.55 MW rooftop solar power project is scheduled for commissioning in February 2026.
Promisedmilestonefor by Feb 2026
Delivered3.55 MW
ResultAchieved
Said24 Jan 2026Concall presentation
In management's words
“Installation of high-efficiency solar modules on facility rooftops to generate clean power”
How it was checked
A 3.55 MW rooftop solar plant is reported commissioned and operational, but the evidence does not date commissioning against the February 2026 deadline. (judged from later company statements)
Evidence (4 Nov 2026): “3.55 MW Rooftop Solar Plant commissioned to generate clean electricity for manufacturing operations.” — Investor presentation — Q2FY27 (4 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Rooftop solar project commissioning
Direct
The 3.54 MW rooftop solar project is on track to be commissioned in February 2026.
Promisedmilestonefor by Feb 2026
Delivered3.55 MW
ResultAchieved
Said27 Jan 2026Concall transcript
In management's words
“a rooftop solar project of 3.54 MW awarded to Lakshmi Electricals on track of commissioning in Feb 2026”
How it was checked
A 3.55 MW rooftop solar plant is reported commissioned, meeting the 3.54 MW target, though the evidence does not date commissioning against February 2026. (judged from later company statements)
Evidence (4 Nov 2026): “3.55 MW Rooftop Solar Plant commissioned to generate clean electricity for manufacturing operations.” — Investor presentation — Q2FY27 (4 Nov 2026)
How this guidance changed
Stated once in the documents read so far.
Key points from each document
The main takeaways, newest document first.
Investor presentation — Q2FY27 (4 Nov 2026) · 4 Nov 2026
- Q2FY27 EBITDA margin fell to 18.36% and PAT margin to 11.69% as delayed POY imports forced domestic procurement at 30-40% higher costs.
- Management says cost increases are generally passed to customers quarter-on-quarter, which could ease margin pressure in coming quarters, though orders pre-booked at fixed prices limited pass-through so far.
- Q2FY27 revenue from operations rose 37.05% QoQ and 44.71% YoY to Rs 13,820.13 lakhs, and H1FY27 revenue grew 35.44% YoY.
- Capacity expansion adds 384 water-jet looms in two tranches, with 192 looms plus 3 texturising machines targeted for December 2026 and 192 more for March 2027.
- Renewable energy build-out of about 23.34 MW, including 19.79 MW of solar-wind hybrid, is intended to meet 70-80% of power needs and could lower operating costs.
- Management describes strong demand outlook for polyester-based fabrics across apparel, home textiles and technical textiles, citing a 98% repeat order rate.
- Current borrowings rose to Rs 2,286.28 lakhs from Rs 1,384.85 lakhs, with the expansion partly funded through debt alongside internal accruals.
Intimation Of Expansion Of Project At Unit 4 Of The Company · 2 Nov 2026
- Board approved a capacity expansion at Unit 4 adding 384 Water Jet Looms in two phases of 192 looms each, at an estimated investment of about Rs 49.92 crore.
- Phase 1 adds 192 looms by December 2026 and Phase 2 adds another 192 by March 2027, taking total installed looms to 1,596.
- Annual greige fabric capacity is expected to rise from about 349.05 million metres to about 459.64 million metres after both phases.
- Management expects the added capacity to help attract high-value buyers, secure new order volumes and build relationships with premium international brands.
- Management expects the expansion to improve cost efficiency and optimise capacity utilisation, with no quantified target given.
- The expansion will be funded through internal accruals and debt.
- Existing capacity is about 1,212 looms and utilisation is around 85%, so the expansion adds headroom on a largely loaded base.
Annual report FY26 · 31 Aug 2026
- Purchases of fixed assets rose sharply to Rs 17,897.65 lakh in FY26 from Rs 997.15 lakh in FY25, and capital work in progress increased to Rs 8,093.61 lakh.
- Revenue from operations rose to Rs 38,859.31 lakh in FY26, an increase of around 33.85% over the prior year.
- Standalone profit after tax reached Rs 6,461.20 lakh in FY26, up around 60.71%, outpacing revenue growth.
- Unit 4 expansion adds 192 looms and 3 texturisers, with commercial production targeted for December 2026.
- Total revenue rose to Rs. 38,859.31 lakhs in 2025-26 from Rs. 29,031.04 lakhs, an increase of around 33.85%.
- Net profit after tax reached Rs. 6,461.20 lakhs, up about 60.71% from the prior year, with net profit ratio at 16.63% versus 13.85%.
- Management intends to strengthen the core greige fabric business, raise capacity utilisation, improve cost efficiencies and explore value-added and man-made fibre products.
- Debt-equity ratio fell to 0.25 from 0.67, with the change attributed to higher shareholder equity from IPO proceeds, and interest coverage improved to 6.42x from 3.96x.
- The company raised equity through an IPO in FY26, adding Rs 670.80 lakh to share capital and Rs 12,244.86 lakh to securities premium net of IPO expenses.
- Profit for the year was Rs 6,461.20 lakh in FY26, up from Rs 4,020.23 lakh in FY25 as shown in the statement of changes in equity.
- The company raised capital through an IPO completed on 27 May 2025, and issued equity shares rose to 26,645,295 from 19,937,295.
- Net debt to equity fell to 0.24 at March 31, 2026 from 0.67 a year earlier, as equity rose sharply after the IPO.
- The financial impact of the new Labour Codes on wages, gratuity and related costs cannot yet be ascertained, pending management's review.
- Net profit for the year rose to 6,486.89 lakh from 4,016.16 lakh, with basic EPS of 24.35 against 20.14.
Update With Respect To The Commissioning Timelines Of The 9.9 MW Hybrid Power Project · 18 Jun 2026
- Commissioning of the 9.9 MW hybrid power project at Kalikanagar, Gujarat, earlier expected by May 31, 2026, is now delayed to around end-August 2026.
- The developer cites high wind speeds halting wind turbine erection and a shortage of fuel at site as causes of the delay.
- Timely line shutdowns for 33 KV and 11 KV lines from a private developer and GETCO/PGVCL have not been obtained, holding up the 33KV transmission line work.
- The revised commissioning window is described as tentative and depends on factors the developer says are outside its control.
- The company disclosed the delay under Regulation 30, forwarding the project developer's communication to the exchanges and stakeholders.
Investor presentation — Q4FY26 (4 Jun 2026) · 4 Jun 2026
- Medium-term vision is to double production capacity within the next 24 months, with expansion expected to add about 5 crore meters of annual capacity.
- A solar-wind hybrid power project of 9.89 MW solar and 9.90 MW wind is slated for commissioning in June 2026, partly debt-funded.
- Management expects capacity expansion and higher renewable energy usage to improve operating margins, with no figure given.
- Management reports FY26 revenue from operations of 388.59 and PAT of 78.40 (figures as presented), up from FY25 on the annual highlights page.
- Management plans to expand exports by focusing on high-value synthetic fabrics and to enter technical textiles with RPU-coated fabrics.
- Management says the proposed borrowing for the hybrid project keeps Total Outside Liabilities to Tangible Net Worth comfortable at about 0.6x.
- Average capacity utilisation for FY26 is reported at 80.93% across 39,21,12,000 meters of installed capacity.
Concall transcript — Q3FY26 (Feb 2026) · 27 Jan 2026
- Management plans to double installed capacity from about 1,000 to 2,000 looms, with total investment of INR350-400 crore, funded mainly by internal accruals and debt with no equity dilution.
- Q3FY26 revenue rose 42% year on year to INR111.36 crore, with EBITDA margin at 24.32% and PAT up 63%.
- Management expects gross margin in Q4FY26 to be better than Q3, citing lower raw material costs after the duty removal on Chinese inputs.
- Management targets 70-80% of power needs from renewables, with a 3.54 MW rooftop solar plant due in February 2026 and a 19.79 MW solar-wind hybrid due in May 2026.
- Renewable power projects are expected to save INR18-20 crore a year in power costs, a benefit management expects to recover the investment within about six years.
- Management expects realisation per square metre to improve in coming quarters, partly from a shift toward higher GSM and value-added fabrics.
- EBITDA margin is expected to rise gradually from quarter to quarter as lower depreciation and interest costs flow through with Unit 4.
- Government interest and power subsidies support margins, but the subsidies run off unit by unit through 2026-2028, and other income is expected to stay flat next quarter.
Concall presentation — Q3FY26 (Feb 2026) · 24 Jan 2026
- Management plans to double production capacity within about two years, with 160 high-speed water jet looms planned at Unit 4B, of which 64 are operational.
- Management expects capacity expansion and higher renewable power usage to improve operating margins.
- Q3FY26 EBITDA margin expanded to 24.3% on 42% revenue growth, which management attributes to operating leverage.
- A roadmap targets meeting 70–80% of power needs from renewable sources, using rooftop solar and a solar-wind hybrid project.
- The hybrid renewable project is partly debt-funded; management says leverage stays comfortable at about 0.6x total outside liabilities to tangible net worth even after the new borrowing.
- Unit 4B began operations on 20 January 2026 with 64 water jet looms, and capacity is ramping up in phases.
- Expansion is expected to add about 5 crore meters of annual capacity.
- Strategy includes moving into technical textiles, RPU-coated fabrics and higher-value exports, with a focus on automation and water-efficient practices.
- Management's own industry view flags rising imports of industrial yarn, cost pressures, and slow capacity growth relative to demand as challenges.
- Greige fabric grew to 91% of 9M FY26 revenue from 87% in FY25, while PTY yarn fell to 9% from 12%.
Credit-rating note — CARE Ratings (26 Dec 2025) · 26 Dec 2025
- CARE Ratings continues to rate Borana Weaves under the issuer non-cooperating category because the company has not provided monitoring information despite repeated requests.
- Long-term bank facilities of Rs 50.50 crore and Rs 7.00 crore short-term facilities are rated CARE BB+ with Stable outlook, flagged as issuer not cooperating.
- The agency states the information available is not sufficient to arrive at a fair rating, so users are asked to exercise caution.
- The rating was placed under the issuer non-cooperating category in October 2024 because the company failed to provide monitoring information it had agreed to provide.
- Users including investors and lenders are advised to exercise caution while relying on the rating, given the lack of company cooperation.
- Reported H1FY26 unaudited figures show total operating income of Rs 180.48 crore and PBILDT of Rs 43.80 crore, against full-year FY25 audited figures of Rs 290.31 crore and Rs 63.66 crore.
- Overall gearing fell to 0.18 times in H1FY26 from 0.69 times in FY25, and interest coverage rose to 23.30 times from 12.36 times, per the agency's brief financials.
- The company completed its greenfield capex at its Surat, Gujarat facility in July 2021 and manufactures texturized yarn and polyester grey fabric.
- Borana Weaves was listed on NSE and BSE in May 2025.
- The rating history shows an upgrade path from CARE BB- in July 2022 to CARE BB+ by September 2023, followed by the non-cooperation category from October 2024.
- The outlook on the rating is Stable, and the facilities have no covenant disclosures, as the covenant annexure is marked not applicable.
Annual report FY25 · 14 Aug 2025
- Chairman reports FY25 turnover of ₹29,031.04 lakhs, up over 45.84% on the previous year, with profit after tax of ₹4,020.25 lakhs.
- Company plans to launch a new unit with high-tech looms for waterproof and technical textile fabrics in 2025.
- Gross turnover rose to Rs 29,031.04 lakhs in FY25 from Rs 19,905.56 lakhs in FY24, which the company attributes to robust demand and product mix.
- Net profit for FY25 was Rs 4,016.18 lakhs against Rs 2,358.63 lakhs in FY24, a sharp improvement in profitability.
- Operational revenue grew 48% year-over-year and profit after tax rose 70% in FY25.
- Management expects moderate revenue growth and improved profitability in FY 2025–26.
- Rs 71.35 crore of IPO proceeds is earmarked for a new Unit 4 in Surat to add grey fabric capacity.
- Net profit after tax rose to Rs 4,020.25 lakh in FY25 from Rs 2,358.63 lakh in FY24, according to the cash flow statement.
- Trade receivables more than doubled to Rs 2,181.54 lakh from Rs 1,104.34 lakh, and receivable turnover fell to 17.67 from 21.57.
- Large related-party sales of yarn to entities linked to the directors, including Rs 14,422.27 lakh to Borana Industries LLP, raise governance and concentration concerns.
- The company has bank guarantees of Rs 9,823.55 lakh outstanding on behalf of Ricon Textile Private Limited, which is a contingent liability.
- Management's stated focus is scaling responsibly, investing in technology and expanding domestic and international footprint.
- Board seeks shareholder approval for related party transactions up to ₹100 crore per entity in FY26, with interested directors named.
- Shareholders are asked to approve loans, guarantees or security to entities in which directors are interested, up to ₹300 crore.
Documents read
- Investor presentation — Q2FY27 (4 Nov 2026) · Investor presentation · 4 Nov 2026 · 5 statements
- Intimation Of Expansion Of Project At Unit 4 Of The Company · Exchange announcement · 2 Nov 2026 · 9 statements
- Annual report FY26 · Annual report · 31 Aug 2026 · 6 statements
- Update With Respect To The Commissioning Timelines Of The 9.9 MW Hybrid Power Project · Exchange announcement · 18 Jun 2026 · 1 statement
- Investor presentation — Q4FY26 (4 Jun 2026) · Investor presentation · 4 Jun 2026 · 8 statements
- Concall transcript — Q3FY26 (Feb 2026) · Concall transcript · 27 Jan 2026 · 19 statements
- Concall presentation — Q3FY26 (Feb 2026) · Concall presentation · 24 Jan 2026 · 9 statements
- Credit-rating note — CARE Ratings (26 Dec 2025) · Credit-rating note (the rating agency's words) · 26 Dec 2025
- Annual report FY25 · Annual report · 14 Aug 2025 · 9 statements
Guidance is extracted from company documents and interviews by an AI model and then checked against reported numbers by rule. It can contain errors or miss context, and the stored figures may differ from the basis management guided on. This page is information only and is not investment advice.